# Civil Technology Grade 11 2022 Memo (Eng)

> Grade 11 Civil Technology memorandum from the CIVIL TECH GR11 NOV2022 Woodworking (English), 17 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-woodworking-english/a7e06718-cada-4092-84e6-dffe9c65d79c
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 11
- Language: English
- Document type: Memorandum
- Year: 2022
- Exam period: CIVIL TECH GR11 NOV2022 Woodworking
- Curriculum: CAPS
- Pages: 17

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 11](https://www.hlayiso.com/library/grade-11) › [Civil Technology](https://www.hlayiso.com/library/grade-11/civil-technology) › [Civil Technology Grade 11 2022 Memo (Eng)](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-woodworking-english/a7e06718-cada-4092-84e6-dffe9c65d79c)

## About this document

Civil Technology · Grade 11 · CIVIL TECH GR11 NOV2022 Woodworking · 2022 · English. Memorandum, 17 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                NATIONAL
                           SENIOR CERTIFICATE

                                   GRADE 11

                             NOVEMBER 2022

          CIVIL TECHNOLOGY: WOODWORKING
                  MARKING GUIDELINE
                     (EXEMPLAR)

MARKS:     200

         This marking guideline consist of 17 pages, including 2 answer sheets.

### Page 2

Downloaded from hlayiso.com
2                         CIVIL TECHNOLOGY: WOODWORKING                        (EC/NOVEMBER 2022)

INSTRUCTIONS FOR THE MARKERS

1.    Markers should:

       • Familiarise themselves with the question and answer before evaluating the
         responses of candidates.
       • Always interpret the responses of the candidates within the context of the
         question.
       • Consider any relevant and acceptable answer during pre-marking but
         should strictly adhere to the answers after finalisation of the marking
         guideline.
       • There are two approaches to answering questions, these are (1) to
         describe and (2) to explain.
       • If a candidate is required to explain e.g., a process in 4 steps, only the first
         4 responses should be considered.
       • If, however a candidate is required to e.g., explain or describe how to
         transfer heights from one point to another using a transparent pipe level
         we need to consider that candidates may write a long description not
         necessarily well organised as an intellectual response may do. In this case
         the marker needs to evaluate the complete statement to judge if the
         candidate explained the required outcome satisfactorily and allocate
         marks on merit. The marker should apply his/her professional judgement
         with these types of questions.
       • Mark what the candidate wrote and do not award marks for answers that
         the marker thinks the candidate meant with what was written.
       • Indicate the tick or cross right at the position where the mark needs to be
         awarded or where the candidate made the error.
       • Accept the letter corresponding with the correct answer as well as the
         answer written in full in multiple-choice questions.
       • Accept incorrect spelling in one-word answers unless the spelling changes
         the meaning of the answer.

2.    For calculations:

       • A mark is only awarded if the correct unit is written next to the answer.
       • If TWO marks are awarded ONE mark is awarded for the answer and
         ONE mark for the correct unit.
       • Where the candidate made a principle error e.g. added instead of
         multiplying, no marks will be awarded for the steps. If the answer is correct
         according to what the candidate did, the mark for the answer can be
         awarded for the application of skills.
       • Where an incorrect answer could be carried over to the next step, the first
         answer will be deemed incorrect. However, should the incorrect answer be
         carried over correctly, the marker has to recalculate the values, using the
         incorrect answer from the first calculation. If correctly used, the candidate
         should receive the full marks for subsequent calculations.
       • Markers should consider when and where a candidate has rounded off in
         a calculation, as well as the subsequent effect it has on the final answer
         obtained. The calculation should therefore be awarded marks on merit.
       • Alternative methods of calculations must be considered, provided that the
         correct answer is obtained.

Copyright reserved                                                               Please turn over

### Page 3

Downloaded from hlayiso.com
(EC/NOVEMBER 2022)                CIVIL TECHNOLOGY: WOODWORKING                                 3

3.    When marking drawings:

       • The member for which the mark should be awarded should be drawn
         correctly in the correct position to receive a mark.
       • A member incorrectly drawn but wrongfully repeated in another position
         will be awarded the mark for the repeated incorrect member provided that
         the marking guideline provide for TWO or more marks for that member
         (positive marking).
       • Marks can only be awarded for a label if the label is correctly indicating the
         correct member.
       • Scale drawings should always be marked using an appropriate mask.

      When a candidate drew the wrong drawing e.g.:

       • A horizontal section instead of a vertical section, no marks will be
         allocated to the drawing as the candidate did not respond to the expected
         outcome.
       • An orthographic view instead of sectional view, no marks will be allocated
         to the drawing as the candidate did not respond to the expected outcome.
       • An orthographic view instead of an isometric view, no marks will be
         allocated to the drawing as the candidate did not respond to the expected
         outcome.
       • If the incorrect drawing was drawn, the candidate can be awarded for only
         what was asked but mark/s for the correctness of the drawing will not be
         awarded e.g., if a King Post roof truss was asked in the question, and
         candidate drew SA-Howe Truss.

Copyright reserved                                                           Please turn over

### Page 4

Downloaded from hlayiso.com
4                        CIVIL TECHNOLOGY: WOODWORKING                       (EC/NOVEMBER 2022)

QUESTION 1: SAFETY AND MATERIALS (GENERIC)

1.1     Gum boots                                                                         (1)

1.2     Under what circumstances will the following personal protective equipment be
        used?

       1.2.1 Safety glasses
             When working with bench grinders, drills, electrical saws, etc. or any
             electrical equipment.                                                        (1)

       1.2.2 Earplugs
             When noise levels are high.                                                  (1)

1.3    Loose clothing can be pulled (1) into the machine by its moving parts (1).         (2)

1.4    Describe the safety precaution that is applicable with the following hand tools:

       1.4.1 Hammer heads
             Should fit snugly into the handle and be wedged in properly.                 (1)

       1.4.2 Sawing equipment
             Should be sharp and clean / Handles should be properly attached.             (1)

       1.4.3 When carrying chisels.
             Carry the blade facing downwards.                                            (1)

1.5     The petrol fumes can be harmful (1), when inhaled (1).
        (Similar answer.)                                                                 (2)

1.6    Any TWO requirements for the storing of cement:
       • Store on a pallet / planks / damp proof course or similar answer.
       • Store under cover / inside a building.
       • No contact with water.                                           (Any 2 x 1)     (2)

1.7    Any ONE similar answer:
       • Warning people against overhead work / dangers.
       • To show that the wearing of a hard hat is compulsory.                            (1)

1.8    Any FOUR requirements for storing hazardous material in the workplace:
       • The room must be well ventilated.
       • The door must have a threshold.
       • Material that may cause a spark must not be stored here.
       • Liquids that may interact chemically must be stored in close proximity.
       • Containers must always be sealed or properly closed.
       • Never store other flammable material with hazardous material. (Any 4 x 1)        (4)

Copyright reserved                                                             Please turn over

### Page 5

Downloaded from hlayiso.com
(EC/NOVEMBER 2022)                 CIVIL TECHNOLOGY: WOODWORKING                               5

1.9    THREE ingredients to mix screed:
       • Cement (1)
       • Sand (1)
       • Water (1)                                                             (3 x 1)    (3)

1.10 Any THREE uses for screed:
     • Finish for floors and walls.
     • Facing material
     • Levelling layer for suspended floors
     • Levelling layer for floor covering
     • Infill to accommodate various levels
     • Insulated roof screed                                              (Any 3 x 1)     (3)

1.11   •   Aggregate is too coarse.
       •   Aggregate too big for a mortar joint.
       •   Rough parts will give a weak finish.
       •   Similar answer.                                                (Any 1 x 1)     (1)

1.12 Identify the type of board products that will be used for the following work:

       1.12.1    Backs of cupboards
                 Hard board or plywood.                                                   (1)

       1.12.2    Formwork for concrete
                 Shutter board                                                            (1)

1.13 Stock bricks:
     No attractive appearance / Must be plastered / Not good quality (1)

       Face bricks:
       Attractive appearance / Require no plaster / Good quality (1)                      (2)

1.14 Any TWO uses of cast iron:
     • Manhole covers
     • Sewerage pipes and fittings
     • Baths
     • Wash basins
     • Tools
     • Hinges
     • Similar answer                                                     (Any 2 x 1)     (2)
                                                                                         [30]

Copyright reserved                                                          Please turn over

### Page 6

Downloaded from hlayiso.com
6                          CIVIL TECHNOLOGY: WOODWORKING                    (EC/NOVEMBER 2022)

QUESTION 2: EQUIPMENT, TOOLS AND GRAPHICS (GENERIC)

2.1 Round shovel cannot shape the corners / square edges / straight lines (similar
    answer).                                                                             (1)

2.2 Any THREE hand tools that can be used to dress / cut bricks:
    • Comb hammer
    • Cold chisel
    • Bolster
    • Club hammer
    • Brick hammer                                                             (3 x 1)   (3)

2.3 2.3.1 Hand hawk                                                                      (1)

      2.3.2 Straight edge                                                                (1)

      2.3.3 External corner trowel                                                       (1)

      2.3.4 Nose trowel                                                                  (1)

2.4 The rip saw is used for cutting with the grain of the wood. (1)
    The cross-cut saw is used for cutting across the grain of wood. (1)                  (2)

2.5 2.5.1 Sliding bevel (1)                                                              (1)

             Any ONE use:
             • Drawing inclined / oblique lines.
             • Drawing angles other than 90º.
             • Copying angles to transfer them to other surfaces.           (1 x 1)      (1)

      2.5.2 Bench grinder (1)                                                            (1)

             Any ONE use:
             • Sharpening tools.
             • Grinding
             • Wire brush attachments can be installed.                     (1 x 1)      (1)

      2.5.3 Electrical drill (1)                                                         (1)

             Any ONE use:
             • Drilling holes.
             • Can be used as a screwdriver.
             • Sanding / buffing / cutting accessories attached to drill.   (1 x 1)      (1)

2.6 2.6.1 Plate compactor                                                                (1)

      2.6.2 Any ONE use:
            • Compacting disturbed or loose soil up to 150 mm.
            • Tamping fillings for a hard-core layer under concrete floors.
            • Compacting soil before paving bricks are laid.
            • Similar answer.                                                            (1)

Copyright reserved                                                            Please turn over

### Page 7

Downloaded from hlayiso.com
(EC/NOVEMBER 2022)                   CIVIL TECHNOLOGY: WOODWORKING                                7

2.7    See ANSWER SHEET 1.                                                                  (13)

2.8    Part of the structure is enlarged (1) to include more information to the
       drawing. (1)                                                                         (2)

2.9    Any THREE particulars of a site plan:
       • Boundaries of property.
       • Building line.
       • Erf numbers of plot and adjacent plots.
       • Services and connections
       • Name of street
       • Driveway
       • Trees / boulders
       • Measurements
       • Existing buildings
       • Contours
       • North arrow
       • Scale                                                                    (3 x 1)   (3)

2.10 2.10.1          Water closet

                                                                                            (2)

       2.10.2        Hot-water cylinder

                      HW                                                                     (2)
                                                                                            [40]

Copyright reserved                                                           Please turn over

### Page 8

Downloaded from hlayiso.com
8                          CIVIL TECHNOLOGY: WOODWORKING       (EC/NOVEMBER 2022)

 QUESTION 3: QUANTITIES, JOINING AND GRAPHICS

 3.1 FIGURE 3.1 shows a foundation strip for a building.
     The foundation is 600 mm wide and 200 mm thick.
     A concrete mix of 1 : 4 : 4 is used.

                                              9 000

                 6 000

       3.1.1    Determine the centre line of the foundation:
                2 x 9 000 = 18 000
                2 x 6 000 = 12 000
                            20 000
                4 x 600     - 2 400
                            17 600 = 17,6m                                  (5)

       3.1.2    Determine the volume of concrete needed:

                17,6 x 0,6 x 0,2 = 2,112 m³

 3.2 A one brick wall of 1,2 m high and 12 m long.
     Determine the number of bricks needed:                                 (5)

       Area of wall:
          12
       x 1,2    =        14,4 m2

        14,4 m2
        x 2
        x 50    =        1 440 bricks

Copyright reserved                                               Please turn over

### Page 9

Downloaded from hlayiso.com
(EC/NOVEMBER 2022)                   CIVIL TECHNOLOGY: WOODWORKING                               9

3.3     Apply a thin layer of PVC glue (1) to the fitting and the pipe. (1)
        Push the parts into position (1), while twisting slightly. (1)                       (4)

3.4     3.4.1    True                                                                        (1)

        3.4.2    False                                                                       (1)

        3.4.3    False                                                                       (1)

        3.4.4    True                                                                        (1)

        3.4.5    True                                                                        (1)

3.5     Any TWO safety precautions when using epoxy:
        • Apply with care – cleaning excess/overruns is difficult once dry.
        • Be careful not to inhale – the fumes may be toxic.
        • Press parts tightly together
        • Join surfaces firmly together, before the compound dry          (Any 2 x 1)       (2)

3.6

                                                                                            (2)

3.7     Bottom (1) right-hand corner (1) of the drawing page.                               (2)

3.8     3.8.1    Fluorescent light                                                           (1)

        3.8.2    Wall light                                                                 (1)
                                                                                            [30]

                                                                   TOTAL SECTION A:          100

Copyright reserved                                                            Please turn over

### Page 10

Downloaded from hlayiso.com
10                        CIVIL TECHNOLOGY: WOODWORKING                      (EC/NOVEMBER 2022)

 QUESTION 4:         CASEMENTS, DOORS, WALL PANELLING AND JOINING
                     (SPECIFIC)

 4.1    4.1.1    A – Brace
                 B – V-tongue-and-groove battens
                 C – Stile                                                      (3 x 1)   (3)

        4.1.2    What is the purpose of the two braces on the door?
                 To prevent the sagging of the door.                                      (2)

        4.1.3    Give a reason why the stub mortise and tenon joints are preferred
                 on the frame members of the door.
                 They give a better/neat appearance at the outside edges of the
                 frame members.                                                           (1)

 4.2    Safety goggles or safety glasses                                                  (1)

 4.3    Stub mortise and ten joints or continuous mortise and tenon joints                (1)

 4.1    4.4.1    To prevent rainwater from being blown into the casement and
                 penetrating the room.                                                    (2)

        4.4.2    A – Mullion
                 B – Stile
                 C – Ovolo moulding
                 D – Windowpane/glass
                 E – Putty                                                      (5 x 1)   (5)

 4.5    • It gives a pleasing, decorative and durable appearance.
        • It conceals cracks in walls.
        • Does not require the entire wall to be plastered prior to installation.
        • Does not expand and shrink as solid timber do
        • Provides good isolation – keeping the room cool in the summer and warm
          in the winter
        • Requires no framework.                                            (Any 3 x 1)   (3)

 4.6    A – Skirtings
        B – Cornice
        C – Rebate                                                                        (3)

 4.7    • Brackets
        • Fischer plugs
        • Steel rails                                                      (Any 1 x 1)    (1)

 4.8    Doorframes are joined to bricks by means of lugs.                                 (2)

Copyright reserved                                                             Please turn over

### Page 11

Downloaded from hlayiso.com
(EC/NOVEMBER 2022)                  CIVIL TECHNOLOGY: WOODWORKING                                    11

4.9     • Braces are screwed onto the V-tongue-and-groove battens.
        • Braces increase the rigidity of the door and prevent it from coming out of
          square.
        • Braces must incline upwards from the hang stile.
        • If it is not located in this position, the door will sag at the lock stile and
          will close with difficulty because it is no longer square.
        • For a neat appearance, braces must have the same inclination.
        • Braces can be replaced with sheets or boards covering the complete
          sections between the ledges on the internal side. This will also prevent
          the door from sagging.                                                     (6 x 1)    (6)
                                                                                               [30]

Copyright reserved                                                                Please turn over

### Page 12

Downloaded from hlayiso.com
12                         CIVIL TECHNOLOGY: WOODWORKING                        (EC/NOVEMBER 2022)

 QUESTION 5: CENTERING, FORMWORK AND SHORING (SPECIFIC)

 5.1 5.1.1      A – Sides
                B – Sides
                C – Cleats/clamps
                D – Yokes                                                          (4 x 1)   (4)

       5.1.2    Wedges to tighten the formwork securely.                                     (1)

       5.1.3    Steel rod: both ends are threaded to hold nuts and to keep the
                formwork in place.                                                           (2)

 5.2 5.2.1      • To provide stability to a wall or to prevent it from total collapse
                  during construction
                • To ensure a safe work environment for workers
                • To protect workers and the public from injuries
                • To support unstable walls and columns
                • To transfer additional weight from the raking strut/raker to the
                  ground and away from the wall.                                             (5)

       5.2.2    • Raking shores are placed at an angle against walls to provide
                  temporary lateral support.                                                 (1)

 5.3 5.3.1      • These are located under the horizontal strut to keep it in position
                  and rigid.                                                                 (1)

       5.3.2    • Raking struts (inclined struts) are supported by needles and cleats
                  at the top of the wall plate and by folding wedges at the horizontal
                  strut.
                • The raking struts transfer the weight from one wall plate to other.        (1)

 5.4 5.4.1      A – Ribs
                B – Bearer
                C – Folding wedges
                D – Prop                                                          (4 x 1)    (4)

       5.4.2    The top part of the centre is formed to conform to the soffit of the
                arch.                                                                        (1)

 5.5 • Temporary framework, normally made of timber, is needed to support a
       stone, brick or concrete arch during construction until the arch is able to
       stand by itself.
     • The timber framework used to support an arch, is called centring. (2 x 2)             (4)

Copyright reserved                                                                Please turn over

### Page 13

Downloaded from hlayiso.com
(EC/NOVEMBER 2022)              CIVIL TECHNOLOGY: WOODWORKING                              13

 5.6 • The top shape of the framework must be the same as the underside of the
       arch.
     • Centres must support the weight of the wet masonry or brickwork until the
       cement between the voussoirs has set.
     • Centres must be rigid and strong enough to support the weight of the
       brickwork of the arch.
     • Centres must be easy to remove after the binding time of the arches.
     • They must be secured with round wire nails for strength.
     • The size of the members is determined by the design and construction of
       the centre.                                                         (6 x 1)     (6)
                                                                                      [30]

Copyright reserved                                                      Please turn over

### Page 14

Downloaded from hlayiso.com
14                        CIVIL TECHNOLOGY: WOODWORKING                      (EC/NOVEMBER 2022)

QUESTION 6:          CENTERING, FORMWORK, SHORING, CEILINGS,
                     IRONMONGERY AND SUSPENDED FLOORS (SPECIFIC)

6.1    • Formwork refers to a temporary framework, normally made of timber or
         steel, which is ideal for in-situ casting of concrete and provides support
         until the concrete has set.
       • Striking can be defined as the dismantling of formwork once the concrete
         has cured and sufficiently hard.                                    (2 x 1)       (2)

6.2    • The inside faces of timber should be treated with mould oil or releasing
         oil to prevent the concrete from sticking to the surface of the timber.
       • The thickness of the matching members of the formwork should be
         uniform to ensure that the surface of the column is even.
       • Bolts should be greased to ease assembling and dismantling of
         formwork.                                                             (3 x 2)     (6)

6.3    • Shutter board
       • Plywood
       • Blockboard                                                       (Any 2 x 1)      (2)

6.4    6.4.1 Ceiling boards are nailed to the branders                                     (1)

       6.4.2 To close the gap between two ceiling boards.                                  (1)

6.5    • The minimum height for all rooms, from the finished floor level to the
         underside of the ceiling, is 2,4 m.
       • The minimum height for entrance halls, passages and bathrooms is
         2,1 m.
       • Ceiling boards are always installed in the direction of the roof trusses or
         tie beams.
       • At least one trapdoor measuring 650 mm x 650 mm must provide access
         to the roof space to allow the installation of the geyser or other electrical
         work.                                                           (Any 3 x 1)       (3)

6.6     FIGURE 6.6 on ANSWER SHEET B shows the vertical view of a wall, sole
        plate and soffit shutter board for a floor slab.
        Complete the drawing and show all the different parts on a scale 1 : 20.          (10)

6.7    • To make provision for raising or lowering the formwork to the required
         height.
       • To ease the removal of the formwork after completion of the floor slab.
                                                                            (2 x 1)        (2)

6.8    Made of wood and metals and used to pull together the box of a square
       column by means of nuts and bolts.                                                  (2)

Copyright reserved                                                              Please turn over

### Page 15

Downloaded from hlayiso.com
(EC/NOVEMBER 2022)               CIVIL TECHNOLOGY: WOODWORKING                       15

6.9    6.9.1     False                                                          (1)

       6.9.2     False                                                          (1)

       6.9.3    True                                                            (1)

       6.9.4    False                                                           (1)

6.10    Tee hinge
        A – Butt leaf
        B – Knuckle
        C – Tapered strap leaf
        D – Height of hinge
        E – Length of hinge                                      (1 + 5 x 1)    (6)

6.11   To provide sufficient underground ventilation.                           (1)
                                                                               [40]

                                                                   TOTAL:      200

Copyright reserved                                                Please turn over

### Page 16

Downloaded from hlayiso.com
16                       CIVIL TECHNOLOGY: WOODWORKING              (EC/NOVEMBER 2022)

                              CIVIL TECHNOLOGY
 ANSWER SHEET        1          CIVIL SERVICES
                                                  NAME:

2.7    FIGURE 2.7 on ANSWER SHEET 1 shows the isometric view of a T-junction
       of a half brick wall in stretcher bond.
       Draw the front view of the brick wall on scale 1 : 10.                   (13)

       T-junction                     4
       Brick sizes / Scale            3
       Height and length              2
       Stretcher bond                 2
       Line work / Neatness           2
                              TOTAL: 13

Copyright reserved                                                    Please turn over

### Page 17

Downloaded from hlayiso.com
(EC/NOVEMBER 2022)               CIVIL TECHNOLOGY: WOODWORKING                              17

                             CIVIL TECHNOLOGY
 ANSWER SHEET         2       WOODWORKING
                                                      NAME:

6.6      FIGURE 6.6 on this ANSWER SHEET 2 shows the vertical view of a wall,
         sole plate and soffit shutter board for a floor slab.
         Complete the drawing by and drawing all the parts for formwork supports
         on a scale 1 : 20.                                                           (10)

                                                           Wedges                   2
                                                           Props                    2
                                                           Cross-bearers            2
                                                           Bearer                   2
                                                           Scale                    2
                                                                            TOTAL: 10

Copyright reserved                                                       Please turn over

## Related documents

- [CIV TECH GR11 QP NOV2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-civil-services-english/ed0b5808-e643-408f-bef2-165736e1c4b6) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR11 QP NOV2022 Construction English](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-construction-english/ef9cc9f6-54a4-49fb-a7b1-407a487eeec8) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR11 QP NOV2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-woodworking-english/a861fa2b-c73e-4904-b61c-4c353984f188) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR11 MEMO NOV2019 Wood English](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2019-wood-english/d9292b82-a65b-4b49-b85f-48201a66cec4) — Civil Technology · Memo · 2019 · Eng
- [Civil Technology PAT GR 11 2017 Eng](https://www.hlayiso.com/library/civil-technology-pat-gr-11-2017-eng/1f5dca71-f3a0-422d-a710-07cec778ad51) — Civil Technology · PAT · 2017 · Eng
- [CVLT GR11 MEMO (Revised) Afr Nov 2020 SIVIELE DIENSTE .docx](https://www.hlayiso.com/library/cvlt-gr11-memo-revised-afr-nov-2020-siviele-dienste-docx/a014afb0-d15f-4eaa-838f-0768b568dc8b) — Civil Technology · Memo · 2020 · Afr

## More from Grade 11 Civil Technology

- [Gr 11 Cons ATP 2023-24](https://www.hlayiso.com/library/gr-11-cons-atp-2023-24/5adb6254-7b36-487a-a882-c42b36bf49b7) — ATP
- [Gr 11 Civil Ser ATP 2023-24](https://www.hlayiso.com/library/gr-11-civil-ser-atp-2023-24/91ce1dc1-91cc-4a38-926b-b3d45f5b5305) — ATP
- [CVLT GR11 QP MEMO Nov2020 Civil Services ENG D](https://www.hlayiso.com/library/cvlt-gr11-qp-memo-nov2020-civil-services-eng-d/3f8bbf56-245d-44d0-924d-bd4e2a4b63e2) — Memo · 2020 · Eng
- [CVLT CONSTRUCTION GR11 QP MEMO NOV2020 AFR D](https://www.hlayiso.com/library/cvlt-construction-gr11-qp-memo-nov2020-afr-d/725f8d55-3826-49c5-8cfb-56f282e6e3a3) — Memo · 2020 · Afr
- [CVLT GR11 QP MEMO Nov2020 SIVIELE DIENSTE AFR D](https://www.hlayiso.com/library/cvlt-gr11-qp-memo-nov2020-siviele-dienste-afr-d/7c8b4398-3523-408c-bdf0-2998a85031f7) — Memo · 2020 · Afr
- [CVLT GR11 MEMO Nov2020 SIVIELE DIENSTE AFR D](https://www.hlayiso.com/library/cvlt-gr11-memo-nov2020-siviele-dienste-afr-d/da33973a-5831-474f-9ba4-c0dd58162697) — Memo · 2020 · Afr

## Collection

- [Grade 11 past papers](https://www.hlayiso.com/grade-11/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
