# Civil Technology Grade 12 Eastern Cape Mock 2021 Memo (Eng)

> Grade 12 Civil Technology memorandum from the Eastern Cape Mock Exam 2021 (English), 12 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-woodworking/64b85413-5d1c-4f47-addb-f08b14e695ec
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Memorandum
- Year: 2021
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 12

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Mock 2021 Memo (Eng)](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-woodworking/64b85413-5d1c-4f47-addb-f08b14e695ec)

## About this document

Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2021 · English. Memorandum, 12 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                          NATIONAL
                     SENIOR CERTIFICATE

                            GRADE 12

                     SEPTEMBER 2021

         CIVIL TECHNOLOGY: WOODWORKING
                 MARKING GUIDELINE

MARKS:    200

                     This marking guideline consists of 12 pages.

### Page 2

Downloaded from hlayiso.com
 2                          CIVIL TECHNOLOGY: WOODWORKING                     (EC/SEPTEMBER 2021)

INSTRUCTIONS FOR THE MARKERS

1.    Markers should:

       • Familiarise themselves with the question and answer before evaluating the
         responses of candidates.
       • Always interpret the responses of the candidates within the context of the
         question.
       • Consider any relevant and acceptable answer during pre-marking but should
         strictly adhere to the answers after finalisation of the marking guideline.
       • There are two approaches to answering questions, these are (1) to describe
         and (2) to explain.
       • If a candidate is required to explain e.g., a process in 4 steps, only the first 4
         responses should be considered.
       • If, however a candidate is required to e.g., explain or describe how to transfer
         heights from one point to another using a transparent pipe level we need to
         consider that candidates may write a long description not necessarily well
         organised as an intellectual response may do. In this case the marker needs to
         evaluate the complete statement to judge if the candidate explained the
         required outcome satisfactorily and allocate marks on merit. The marker should
         apply his/her professional judgement with these types of questions.
       • Mark what the candidate wrote and do not award marks for answers that the
         marker thinks the candidate meant with what was written.
       • Indicate the tick or cross right at the position where the mark needs to be
         awarded or where the candidate made the error.
       • Accept the letter corresponding with the correct answer as well as the answer
         written in full in multiple-choice questions.
       • Accept incorrect spelling in one-word answers unless the spelling changes the
         meaning of the answer.

2.    For calculations:

       • A mark is only awarded if the correct unit is written next to the answer.
       • If TWO marks are awarded ONE mark is awarded for the answer and ONE
         mark for the correct unit.
       • Where the candidate made a principle error e.g. added instead of multiplying,
         no marks will be awarded for the steps. If the answer is correct according to
         what the candidate did, the mark for the answer can be awarded for the
         application of skills.
       • Where an incorrect answer could be carried over to the next step, the first
         answer will be deemed incorrect. However, should the incorrect answer be
         carried over correctly, the marker has to recalculate the values, using the
         incorrect answer from the first calculation. If correctly used, the candidate
         should receive the full marks for subsequent calculations.
       • Markers should consider when and where a candidate has rounded off in a
         calculation, as well as the subsequent effect it has on the final answer obtained.
         The calculation should therefore be awarded marks on merit.
       • Alternative methods of calculations must be considered, provided that the
         correct answer is obtained.

Copyright reserved                                                                 Please turn over

### Page 3

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2021)        CIVIL TECHNOLOGY: WOODWORKING                                      3

3.    When marking drawings:

       • The member for which the mark should be awarded should be drawn correctly
         in the correct position to receive a mark.
       • A member incorrectly drawn but wrongfully repeated in another position will be
         awarded the mark for the repeated incorrect member provided that the marking
         guideline provide for TWO or more marks for that member (positive marking).
       • Marks can only be awarded for a label if the label is correctly indicating the
         correct member.
       • Scale drawings should always be marked using an appropriate mask.

      When a candidate drew the wrong drawing e.g.:

       • A horizontal section instead of a vertical section, no marks will be allocated to
         the drawing as the candidate did not respond to the expected outcome.
       • An orthographic view instead of sectional view, no marks will be allocated to
         the drawing as the candidate did not respond to the expected outcome.
       • An orthographic view instead of an isometric view, no marks will be allocated
         to the drawing as the candidate did not respond to the expected outcome.
       • If the incorrect drawing was drawn, the candidate can be awarded for only what
         was asked but mark/s for the correctness of the drawing will not be awarded
         e.g., if a King Post roof truss was asked in the question, and candidate drew
         SA-Howe Truss.

Copyright reserved                                                                Please turn over

### Page 4

Downloaded from hlayiso.com
 4                            CIVIL TECHNOLOGY: WOODWORKING                 (EC/SEPTEMBER 2021)

  QUESTION 1: SAFETY AND MATERIALS (GENERIC)

  1.1     Answer the following question regarding scaffolding.

          1.1.1      A – Guardrail (1)
                     B – Planks / Working platform (1)
                     C – Kickboard / Toe-board (1)
                     D – Brace (1)                                                            (4)

          1.1.2      228 mm (1) x 38 mm (1)                                                   (2)

          1.1.3      Provides stability to the scaffolding.                                   (1)

          1.1.4      Minimum = 900 mm (1) and maximum = 1 000 mm (1).                         (2)

  1.2     1.2.1      Placing of building rubble:
                     • May not obstruct access or exits
                     • Safe place
                     • Regularly removed.                                 (Any 1 x 1)         (1)

          1.2.2      When materials are transported to higher surfaces:
                     • Workers must maintain a safe distance /
                     • Overhead protection.                                  (Any 1 x 1)      (1)

  1.3     Any THREE:
          • Non-skid devices on the bottoms
          • Hooks at the upper ends
          • Lashed, secure or fastened
          • Held by someone                                                (Any 3 x 1)        (3)

  1.4     Rungs                                                                               (1)

  1.5     The coating of a metal by electrolysis (1) with a thin layer of another metal.
          (1)                                                                                 (2)

  1.6     To improve the metal’s corrosion resistance.                                        (1)

  1.7     Any TWO:
          • Adds strength to the metal
          • Galvanised metals are thicker
          • Galvanised nails and screws prevents staining                  (Any 2 x 1)       (2)
                                                                                            [20]

Copyright reserved                                                               Please turn over

### Page 5

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2021)        CIVIL TECHNOLOGY: WOODWORKING                                     5

 QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT (GENERIC)

 2.1    FIGURE 2.1 on ANSWER SHEET A shows a floorplan of a storeroom on
        scale 1 : 50. Draw the south elevation on scale 1 : 50 on ANSWER
        SHEET A from the given ground level, by using the following information:

        •    The floor level height is 200 mm above the ground level
        •    Wall height is 2 600 mm from the floor level to the ceiling
        •    Window 1 is 1 200 x 900 mm
        •    Door 1 is 1 100 x 2 100 mm
        •    Doorknob
        •    Roof construction pitch is 30°
        •    Show construction lines to determine the roof height
        •    Gable end at the west elevation
        •    Hippen end at the east elevation

 Use the marks table on ANSWER SHEET A as reference.                                     (29)

 2.2    A – Nut with built-in washer like a flange (1)
        B – Wing nut (1)
        C – Domed top nut (1)                                                              (3)

 2.3    Any TWO:
        • Resist pull-out failure
        • Excellent carrying capacity
        • Tolerance to a variance in the hole size                         (Any 2 x 1)     (2)

 2.4    Must be set-up that the telescope (1) is placed on a comfortable
        sightline, (1) to prevent a person from bending or stretching over the
        telescope and tripod. (1)                                                          (3)

 2.5    Any THREE:
        • Wiring
        • Wood
        • Metal studs
        • Copper pipes
        • Plumbing work                                                    (Any 3 x 1)    (3)
                                                                                         [40]

                                                               TOTAL SECTION A:            60

Copyright reserved                                                               Please turn over

### Page 6

Downloaded from hlayiso.com
 6                            CIVIL TECHNOLOGY: WOODWORKING                 (EC/SEPTEMBER 2021)

 QUESTION 3:           CASEMENTS, CUPBOARDS, WALL-PANELLING AND
                       QUANTITIES (SPECIFIC)

 3.1    3.1.1    520 mm – 570 mm                                                          (1)

        3.1.2    Rebate                                                                   (1)

        3.1.3    Cornice                                                                  (1)

 3.2    3.2.1    A – Top rail
                 B – Drip groove/throat
                 C – Transom
                 D – Drip groove/throat
                 E – Bottom rail of fanlight
                 F – Putty
                 G – Ovolo moulding
                 H – Windowpane/glass                                         (8 x 1)     (8)

        3.2.2    Prevents rainwater being blown into the casement and penetrating
                 the room.                                                                (1)

 3.3     A – Top shelf/storage space
         B – Hanging space
         C – Shelving
         D – Drawer unit                                                       (4 x 1)    (4)

 3.4     •   Melamine is waterproof
         •   Easy to clean
         •   Durable
         •   Smooth finish
         •   Improves appearance                                          (Any 2 x 1)     (2)

 3.5    Built-in-cupboards fastened against a wall.                                       (1)
        Free standing it is moveable and can stand anywhere.                              (2)

 3.6    3.6.1    A – 110 mm thick wall
                 B – Horizontal rough grounds
                 C – Tongue-and-groove board
                 D – Moulded skirting
                 E – Quadrant
                 F – Floor covering                                            (6 x 1)    (6)

        3.6.2        • No wall plastering needed
                     • Serves to enhance the aesthetic appeal of a room                   (2)

        3.6.3    Using nails or wall anchors or screws                                    (1)
                                                                                         [30]

Copyright reserved                                                              Please turn over

### Page 7

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2021)         CIVIL TECHNOLOGY: WOODWORKING                                   7

 QUESTION 4:           ROOFS, CEILINGS, TOOLS AND EQUIPMENT, AND
                       MATERIALS (SPECIFIC)

 4.1    4.1.1    C                                                                        (1)

        4.1.2    A                                                                        (1)

        4.1.3    D                                                                        (1)

        4.1.4    E                                                                        (1)

        4.1.5    F                                                                        (1)

 4.2     •    Gypsym ceiling board
         •    Coverstrip
         •    Trapdoor panel
         •    Tie beam                                                 (Any 2 x 1)        (2)

 4.3    1. Sand the surface with different grade of sandpaper
        2. Sand until surface is free of scratches and smooth.
        3. Remove all the dust.                                                           (3)

 4.4    Truss hanger is a U-shaped fastener; the roof timber member rest in the
        ‘U’.                                                                              (1)

        Gang nails is a steel plate punched to form a nail pattern and is
        prefabricated to be used in roof trusses.                                         (1)

 4.5    •    Strength
        •    Density                                                                      (2)

 4.6    4.6.1    Hipped roofs are pitched roofs that slope downward on all sides.         (1)

        4.6.2    Hipped roof with valley; A valley is formed when two inclined roof
                 surfaces meet at an internal angle.                                      (1)

 4.7    Always wear safety goggles.
        • Wear a dusk mask when using the belt sander.
        • Inspect the power cord regularly for damage.
        • A void carrying the machine by the cord.                                        (2)

 4.8    4.8.1    Mechanical and visual grading are two methods. The head of
                 each timber board is marked in cinnamon red letters and
                 numbers.                                                                 (2)

        4.8.2    The strength                                                             (2)

        4.8.3    South African Bureau of Standards                                        (1)

Copyright reserved                                                              Please turn over

### Page 8

Downloaded from hlayiso.com
 8                          CIVIL TECHNOLOGY: WOODWORKING                 (EC/SEPTEMBER 2021)

 4.9    4.9.1    A – Rafter joist
                 B – Hip/corner rafter
                 C – Wall plate
                 D – Ceiling joist
                 E – Jack rafter                                                        (5)

        4.9.2    A roof with two slanting ends, sometimes across a short, flat
                 gable.                                                                 (2)

 4.10 •     Resist weather conditions such as wind and rain.
      •     Look durable and enhances the appearance of the building.
      •     Is fire resistant.
      •     Provides insulation against heat and cold.              (Any 2 x 1)         (2)

 4.11 Batten 38 mm x 38 mm, placed and attached at right angles to the rafters
      onto which concrete tiles or slates are fixed.                                    (1)

        Purlin 50 mm x 76 mm, placed and attached perpendicular to the roof
        sheeting materials.                                                             (1)

 4.12 • Provides a highly effective barrier against the ingress of wind-driven
        rain and dust.
      • Allows the rain that is blown in under the tiles to flow to the gutters.
      • Lowers the suction pressure under the tiles and reduces the risk of
        wind lifting the tiles.
      • Acts as a thermal barrier by improving insulation.                              (6)
                                                                                       [40]

Copyright reserved                                                            Please turn over

### Page 9

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2021)        CIVIL TECHNOLOGY: WOODWORKING                                   9

 QUESTION 5:           CENTRING, FORMWORK, SHORING AND GRAPHICS AS
                       MEANS OF COMMUNICATION (SPECIFIC)

 5.1     •   Block board
         •   Laminated board
         •   Shutter board and
         •   Plywood                                                     (Any 1 x 1)      (1)

 5.2    5.2.1    • For the placing of the reinforcing bars.
                 • To facilitate the casting of the concrete.
                 • To ensure that it is thoroughly rammed into the column and the
                   fourth side can consist of shorter lengths.                            (3)

        5.2.2    A – Sides
                 B – Wedges
                 C – Yokes
                 D – Cleats
                 E – Bolts                                                                (5)

        5.2.3    To secure the formwork.                                                  (1)

 5.3    5.3.1    Nails used to secure the joint between the prop and needle.              (1)

        5.3.2    Made of timber to spread the weight transferred by the props over a
                 wider area.                                                              (1)

 5.4    To provide temporary support to two parallel walls that are located between
        9 metres and 15 metres apart, where one or both walls show signs of failure.      (2)

 5.5    Temporary timber framework is used to support a stone, brick or concrete
        arch during construction.                                                         (3)

 5.6    A – Ribs
        B – Ties
        C – Bearer
        D – Laggings
        E – Folding wedges
        F – Horizontal brace                                                              (6)

 5.7    5.7.1 Rib and block / Block and beam construction.                                (2)

        5.7.2 A – In-situ concrete layer
              B – Pre-cast hollow-core concrete blocks
              C – Steel mat                                                               (3)

        5.7.3 It is very strong and can carry heavy loads or weight.                      (2)
                                                                                         [30]

Copyright reserved                                                             Please turn over

### Page 10

Downloaded from hlayiso.com
 10                         CIVIL TECHNOLOGY: WOODWORKING               (EC/SEPTEMBER 2021)

  QUESTION 6:         SUSPENDED FLOOR, STAIRCASES, IRON MONGERY
                      DOORS AND JOINING (SPECIFIC)

  6.1 A vertical member supporting one end of a handrail at the top or bottom of a
      flight of stairs, the strings and the handrails are fixed to it.                  (2)

  6.2 Flight of stairs Runs in one direction and are uninterrupted flights of
      with a landing:  stairs that directly connects two floors.
                       Regulations stipulate that if there are more than 16
                       walkways in a straight step arm, landings must be
                       installed.
                       The signs allow the user to rest during the ascent and
                       are required where there is a steep rise between floor
                       levels.                                                          (3)

        Stairwell with a Also known as U-shaped stairs.
        half-landing:    Landings serve as a resting place.
                         Has two parallel flights of stairs that are connected by a
                         landing that makes a 180° turn when one ascends or
                         descends.
                         Takes up less floor space than straight stairs.                (3)

  6.3 Overhang or edge of the tread and frequently projects over the riser below it.    (2)

  6.4 Night latch                                                                       (1)

  6.5 6.5.1      Mortised into the door stile                                           (1)

        6.5.2    Screwed onto the doorjamb                                              (1)

        6.5.3    Onto the doorjamb                                                      (1)

        6.5.4    Onto the doorjamb                                                      (1)

  6.6 Clearance to allow shrinkage and expansion of wood.                               (1)

  6.7 6.7.1      A – Brace
                 B – V-tongue-and-groove battens
                 C – Stile                                                              (3)

        6.7.2    To prevent the sagging of the door.                                    (1)

        6.7.3    Gives a neat appearance to the outside of the frame members.           (1)

Copyright reserved                                                           Please turn over

### Page 11

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2021)          CIVIL TECHNOLOGY: WOODWORKING                                  11

  6.8

                         ✓               ✓

               Doorframe ✓
                                ✓

                     ✓

                         ✓
                         ✓          ✓            OR

               Jamb lining

                                        ASSESSMENT CRITERIA                MARK
                                        Walls                               2
                                        Frame profile of door               1
                                        Jamb lining profile                 1
                                        Title                               1
                                        Architraves                         1
                                                                  TOTAL:    6

  6.9     6.9.1      Double stub tenon and mortise joint                                     (1)

          6.9.2      A – Bottom rail
                     B – Haunch
                     C – Double stub tenon
                     D – Stile
                     E – Groove
                     F – Roove                                                               (6)

          6.9.3      Thickness is 1/3 of thickness of wood.                                  (1)

          6.9.4      To join the bottom rail and stile of a panel door.                      (1)

  6.10 Fixed or hinged                                                                       (2)
                                                                                           [40]

                                                                           TOTAL:           200

Copyright reserved                                                                Please turn over

### Page 12

Downloaded from hlayiso.com
 12                         CIVIL TECHNOLOGY: WOODWORKING               (EC/SEPTEMBER 2021)

                               CIVIL TECHNOLOGY
   ANSWER SHEET         A           GENERICS
                                                     NAME:

  2.1 FIGURE 2.1 shows the floorplan of a storeroom on scale 1 : 50.
      Draw the south elevation on scale 1 : 50 on ANSWER SHEET A from
      the given ground level.                                                        (29)

                             4 200

                             3 640

                                                    2 740   3 300

       SCALE 1 : 50

                                                                    Floor level   2
                                                                    Wall          3
                                      Pitch
                                                                    Window        3
                                                                    Windowsill    1
                                                                    Door          4
                                                  Height
                                                                    Stairs        1
                                                                    Ramp          1
                                                                    Fascial board 2
                                                                    Gutter        1
                                                                    Down pipe     1
                                                                    Gable end     4
                                                                    Hipped end    3
                                                                    Roof height   3
                                                            NGL           TOTAL: 29

Copyright reserved                                                          Please turn over

## Related documents

- [CIV TECH GR12 MEMO SEPT2021 English Civil Services](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-civil-services/80eb9860-b118-41e2-98fd-5bea1b29a026) — Civil Technology · Memo · 2021 · Eng
- [CIV TECH GR12 QP SEPT2021 English Construction](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2021-english-construction/551ab3e9-47c5-4ab0-a0cf-bc66dda5a956) — Civil Technology · QP · 2021 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-woodworking-english/62d9cbb1-1077-4edb-86c4-7a21fd6749a9) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-english/896ddb1f-2144-4bfc-a35a-3a71507d7637) — Civil Technology · Memo · 2022 · Eng
- [CIVIL TECH GR12 MEMO GR12 SEPT2017 English](https://www.hlayiso.com/library/civil-tech-gr12-memo-gr12-sept2017-english/fcb77566-a1ac-4dff-af72-678e70ccfbc4) — Civil Technology · Memo · 2017 · Eng
- [CIV TECH GR12 QP SEPT 2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-english/4163a632-f091-41bf-8a36-993d566fb2cc) — Civil Technology · QP · 2023 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — QP · 2024 · Afr
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — QP · 2023 · Eng
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
