# Civil Technology Grade 12 Eastern Cape Mock 2023 Memo (Eng)

> Grade 12 Civil Technology memorandum from the Eastern Cape Mock Exam 2023 (English), 12 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2023-civil-english/c6bdf8a9-40f7-4807-8f98-08e37af4807b
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Memorandum
- Year: 2023
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 12

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Mock 2023 Memo (Eng)](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2023-civil-english/c6bdf8a9-40f7-4807-8f98-08e37af4807b)

## About this document

Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2023 · English. Memorandum, 12 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

NATIONAL
                           SENIOR CERTIFICATE

                                    GRADE 12

                            SEPTEMBER 2023

         CIVIL TECHNOLOGY: CIVIL SERVICES
                 MARKING GUIDELINE

MARKS:     200

         This marking guideline consists of 12 pages, including 2 answer sheets.

### Page 2

2                         CIVIL TECHNOLOGY: CIVIL SERVICES                (EC/SEPTEMBER 2023)

QUESTION 1: SAFETY AND MATERIALS (GENERIC)

1.1   The purpose of the OHS Act is to ensure the health of the workers or their
      right to a working environment free of hazards.                                     (1)

1.2   Unsafe acts (1) and unsafe conditions (1)                                           (2)

1.3   Any ONE reason for inspecting a scaffold:
      • To ensure it is stable in all directions
      • To ensure it is able to carry the mass of the load
      • To ensure it is free of any defects                                   (1 x 1)     (1)

1.4   1.4.1 A – Guardrail

              B – Kickboard OR toe-board

              C – Base                                                        (3 x 1)     (3)

      1.4.2 Independent scaffolding                                                       (1)

      1.4.3 1 m OR 1 000 mm                                                               (1)

1.5   1.5.1 Any ONE way to transport waste material from higher levels:
            • Chute
            • Conveyor belt
            • Lift OR hoist                                                   (1 x 1)     (1)

      1.5.2 Safety net OR a catch platform                                                (1)

1.6   1.6.1 False                                                                         (1)

      1.6.2 True                                                                          (1)

      1.6.3 False                                                                         (1)

      1.6.4 False                                                                         (1)

1.7   Water-based paint (1) and oil-based paint (1)                                       (2)

1.8   It protects the metal against rust / corrosion.                                     (1)

1.9   Any TWO advantages of curing (concrete):
      • Allow adhesive bonding
      • Prevent the concrete from drying out too quickly
      • Assures the effective hardening of the concrete                       (2 x 1)     (2)
                                                                                         [20]

Copyright reserved                                                           Please turn over

### Page 3

(EC/SEPTEMBER 2023)               CIVIL TECHNOLOGY: CIVIL SERVICES                         3

QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT (GENERIC)

2.1   • Window numbers

      • Door swings

      • Names of rooms

      • Stair directions

      • Sliding doors

      • Floor covering                                                        (6 x 1)     (6)

2.2   FIGURE 2.2 on ANSWER SHEET A shows the incomplete elevation of a
      building.
      Complete the elevation by drawing in the following parts on scale 1 : 50.

      2.2.1 A window with a length of 1 800 mm and a height of 900 mm.
            The window is built in 700 mm from the right-hand side and one-third of
            the right-hand side of the window can open.                                   (7)

      2.2.2 A door according to standard measurements, 900 mm from the left-
            hand side of the building. The door opens to the left. There is one step
            to the ground level.                                                          (5)

      2.2.3 The barge board against the gable end.                                        (2)

2.3   2.3.1 Unfinished wood                                                               (1)

      2.3.2 Two-way switch                                                                (1)

2.4   2.4.1 Water meter

                                                                                          (2)

      2.4.2 Plaster

                                                                                          (2)

      2.4.3 Invert level

                                                                                          (2)

2.5   When driven into place (1) it cannot be turned. (1)                                 (2)

2.6   R-RBL – Anchor name

      M06 – Thread diameter

      18 – Thickness                                                          (3 x 1)     (3)

Copyright reserved                                                           Please turn over

### Page 4

4                           CIVIL TECHNOLOGY: CIVIL SERVICES          (EC/SEPTEMBER 2023)

2.7   To set the telescope of the instrument level.                                   (1)

2.8   A – Vertical hair

      B – Horizontal hair

      C – Stage hairs                                                    (3 x 1)      (3)

2.9   Any TWO uses:
      • Determine differences between levels and vertical heights
      • Determine slopes
      • Setting out buildings
      • Transfer of levels and heights                                    (2 x 1)     (2)

2.8   It can affect the measuring function of the tool.                               (1)
                                                                                     [40]

                                                               TOTAL SECTION A:        60

Copyright reserved                                                       Please turn over

### Page 5

(EC/SEPTEMBER 2023)               CIVIL TECHNOLOGY: CIVIL SERVICES                           5

QUESTION 3: SAFETY, MATERIAL AND CONSTRUCTION (SPECIFIC)

3.1     Similar answer:
        Must take all reasonable steps to ensure the worker’s safety / supply safety
        equipment.                                                                          (1)

3.2     Similar answer:
        If the workers are overcome by gasses / injured, they can be pulled out.            (1)

3.3     A – Rope grab

        B – Locking snap hook

        C – D-clip                                                              (3 x 1)     (3)

3.4     Name TWO safety methods:
        • The area must be cordoned off.
        • Warning signs must be posted.                                         (2 x 1)     (2)

3.5     Contractor                                                                          (1)

3.6     3.6.1 True                                                                          (1)

        3.6.2 True                                                                          (1)

        3.6.3 True                                                                          (1)

        3.6.4 False                                                                         (1)

        3.6.5 False                                                                         (1)

3.7     Scale or corrosion products from a metal surface (1) is removed by (1)
        subjecting it as an electrode to (1) an electric current (1) in an electrolytic
        bath. (1)                                                                           (5)

3.8     3.8.1 220 (215) mm                                                                  (1)

        3.8.2 Stretcher bond                                                                (1)

        3.8.3 Single brick wall                                                             (1)

3.9     Any TWO:
        •   Grade
        •   Level
        •   Line                                                                            (2)

3.10    Hard ground: The sides of the excavation is sturdy enough (1) and do not
        need support. (1)
        Firm ground: The sides of the excavation may cave in (1) and must
        be supported by poling boards. (1)                                    (2 x 2)       (4)

Copyright reserved                                                             Please turn over

### Page 6

6                           CIVIL TECHNOLOGY: CIVIL SERVICES                    (EC/SEPTEMBER 2023)

3.11     3.11.1 150 mm                                                                           (1)

         3.11.2 300 mm                                                                           (1)

         3.11.3 Rollers                                                                          (1)
                                                                                                [30]

QUESTION 4:           COLD WATER SUPPLY, WARM WATER SUPPLY AND TOOLS
                      (SPECIFIC)

4.1    Prevents water from leaking from the spindle.                                             (1)

4.2    Any THREE:
       • Water service pipe at the meter box
       • Water supply to the water closet cistern
       • Water supply to the geyser
       • Regulating taps at showers                                                  (3 x 1)     (3)

4.3    4.3.1    Full-way valve                                                                   (1)

       4.3.2    Stopcock                                                                         (1)

       4.3.3    Full-way valve / Pillar tap / Bibcock                                            (1)

4.4    4.4.1    Ball valve                                                                       (1)

       4.4.2    A – Diaphragm

                B – Nozzle

                C – Plunger

                D – Silencing tube                                                   (4 x 1)     (4)

       4.4.3    Cisterns / Storage tanks                                                         (1)

       4.4.4    It releases the water at the bottom of the cistern (1) thus reducing the
                splashing noises. (1)                                                            (1)

4.5    Non-return valve                                                                          (1)

4.6    The water will flow for as long as (1) the top button is depressed. (1)                   (2)

4.7    TWO types water saving shower heads:
       • Low-flow shower head
       • Electronic shower head                                                      (2 x 1)     (2)

 Copyright reserved                                                                 Please turn over

### Page 7

(EC/SEPTEMBER 2023)                 CIVIL TECHNOLOGY: CIVIL SERVICES                     7

4.8    4.8.1    A – Service pipe

                B – Solar heat absorber

                C – Vent

                D – Hot-water feed

                E – Hot-water storage tank                                   (5 x 1)     (5)

       4.8.2    10°                                                                      (1)

       4.8.3    North receives the most sun.                                             (1)

4.9    4.9.1    False                                                                    (1)

       4.9.2    True                                                                     (1)

       4.9.3    True                                                                     (1)

       4.9.4    True                                                                     (1)

       4.9.5    False                                                                    (1)

4.10   It extracts heat from the surrounding air, (1) thus enabling it to heat the
       refrigerant. (1) The refrigerant (1) is then compressed, (1) which causes the
       temperature to rise even further (1). The hot liquid runs through a heat
       exchanger (1) in which the water is heated. (1)                                   (6)

4.11   4.11.1 To clean drain pipes.                                                      (1)

       4.11.2 Any TWO:
              • Do not force
              • Use it for the specific application
              • Do not use it if the on/off switch does not work
              • Disconnect the plug before any adjustments
              • Do maintenance
              • Keep parts in good operating conditions                      (2 x 1)     (2)
                                                                                        [40]

 Copyright reserved                                                         Please turn over

### Page 8

8                          CIVIL TECHNOLOGY: CIVIL SERVICES                 (EC/SEPTEMBER 2023)

QUESTION 5: DRAINAGE AND QUANTITIES (SPECIFIC)

5.1 It prevents gasses (1) fromentering the building. (1)                                    (2)

5.2 5.2.1 A – Inspection eye

             B – Soil-water pipe

             C – Pipe bend

             D – Gully

             E – Trap                                                           (5 x 1)      (5)

      5.2.2 Cleaning / Removing blockages.                                                   (1)

      5.2.3 40 / 50 mm                                                                       (1)

      5.2.4 Close off bad odours                                                             (1)

5.3   5.3.1 Rodding eye                                                                      (1)

      5.3.2 It is used where the ground slopes (1) to accomplish sufficient flow (1)
            and for cleaning purposes. (1)                                                   (3)

      5.3.3 TWO disadvantages:
            • It can be cleaned in only one direction.
            • Expensive                                                                      (2)

5.4 When the ground slopes steeply (1) to the connection point (1) and the
    maximum gradient cannot be applied. (1)                                                  (3)

5.5 5.5.1 A – Coarse sand

             B – Distribution pipe

             C – Gravel filling

             D – Inspection pipe                                                (4 x 1)      (4)

      5.5.2 It may pollute groundwater.                                                      (1)

      5.5.3 The system can be saturated (1) and resulting in pollution. (1)                  (2)

5.6   5.6.1 Brown                                                                            (1)

      5.6.2 No colour                                                                        (1)

      5.6.3 Black                                                                            (1)

5.7   To ensure that the water carries the solid matter away easily.                         (1)

Copyright reserved                                                             Please turn over

### Page 9

(EC/SEPTEMBER 2023)                  CIVIL TECHNOLOGY: CIVIL SERVICES                 9

5.8   5.8.1    Copper                                                                 (1)

      5.8.2    1                                                                      (1)

      5.8.3    Copper                                                                 (1)

      5.8.4    2                                                                      (1)

      5.8.5    Copper                                                                 (1)

      5.8.6    Aluminium / Plastic                                                    (1)

      5.8.7    Polycop                                                                (1)

      5.8.8    15 mm                                                                  (1)

      5.8.9    3                                                                      (1)

      5.8.10 22 mm x 15 mm                                                           (1)
                                                                                    [40]

QUESTION 6:           GRAPHIC COMMUNICATION, ROOF WORK, STORMWATER
                      AND JOINING (SPECIFIC)

6.1 FIGURE 6.1 on ANSWER SHEET B shows the top and front elevation of a
    cone. Draw the development of the cone according to the radial-line method
    on ANSWER SHEET B. Show ALL construction lines.                                   (7)

 6.2 A – Holderbat

       B – Downpipe

       C – Rain water shoe                                              (3 x 1)       (3)

 6.3 6.3.1      False                                                                 (1)

       6.3.2    False                                                                 (1)

       6.3.3    True                                                                  (1)

       6.3.4    True                                                                  (1)

6.4    • Fine-tooth saw
       • Mitre box                                                       (2 x 1)     (2)

6.5 Stop ends / End caps                                                             (1)

Copyright reserved                                                      Please turn over

### Page 10

10                       CIVIL TECHNOLOGY: CIVIL SERVICES                (EC/SEPTEMBER 2023)

6.6     Any TWO:
        • Copper
        • Galvanised sheet metal
        • Lead
        • Bitumastic patents
        • Rubber sealant                                                     (2 x 1)     (2)

6.7     It is placed underneath the downpipe (1) to channel the water away from the
        house. (1)                                                                       (2)

6.8     TWO types of material:
        • Chemicals
        • Solid waste                                                        (2 x 1)     (2)

6.9     Prevent unnecessary accumulation of dampness (1) under the building. (1)         (2)

6.10    6.10.1 B                                                                         (1)

        6.10.2 D                                                                         (1)

        6.10.3 E                                                                         (1)

        6.10.4 G                                                                         (1)

        6.10.5 A                                                                         (1)
                                                                                        [30]

                                                                            TOTAL:      200

Copyright reserved                                                          Please turn over

### Page 11

(EC/SEPTEMBER 2023)              CIVIL TECHNOLOGY: CIVIL SERVICES                          11

                           CIVIL TECHNOLOGY
 ANSWER SHEET         A         GENERIC
                                                     NAME:

2.2 FIGURE 2.2 on ANSWER SHEET A shows the incomplete elevation of a
    building. Complete the elevation by drawing in the following parts on scale
    1 : 50.

      2.2.1 A window with a length of 1 800 mm and a height of 900 mm.
            The window is built in 700 mm from the right-hand side and one-third of
            the right side of the window can open.                                        (7)

      2.2.2 A door according to standard measurements, 900 mm from the left-hand
            side of the building. The door opens to the left. There is one step to the
            ground level.                                                              (5)

      2.2.3 The barge board against the gable end.                                        (2)

                                                               Window                 7
                                                               Door                   5
                                                               Barge board            2

                                                                        TOTAL: 14

                        FIGURE 2.2

Copyright reserved                                                           Please turn over

### Page 12

12                       CIVIL TECHNOLOGY: CIVIL SERVICES             (EC/SEPTEMBER 2023)

                          CIVIL TECHNOLOGY
ANSWER SHEET         B      CIVIL SERVICES
                                                 NAME:

6.1 FIGURE 6.1 on ANSWER SHEET B shows the top and front elevation of a
    cone. Draw the development of the cone according to the radial-line method
    on ANSWER SHEET B. Show ALL construction lines.

                     FRONT ELEVATION

                                            Halve circle 1 to 5       2
                                            Pattern lines A–1 to A–5 5
                                                                TOTAL 7

                     TOP ELEVATION
                       FIGURE 6.1
                                                                                     (7)

Copyright reserved                                                        Please turn over

## Related documents

- [CIV TECH GR12 QP SEPT 2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-english/4163a632-f091-41bf-8a36-993d566fb2cc) — Civil Technology · QP · 2023 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-woodworking-english/62d9cbb1-1077-4edb-86c4-7a21fd6749a9) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-english/896ddb1f-2144-4bfc-a35a-3a71507d7637) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2021 English Civil Services](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-civil-services/80eb9860-b118-41e2-98fd-5bea1b29a026) — Civil Technology · Memo · 2021 · Eng
- [CIVIL TECH GR12 MEMO GR12 SEPT2017 English](https://www.hlayiso.com/library/civil-tech-gr12-memo-gr12-sept2017-english/fcb77566-a1ac-4dff-af72-678e70ccfbc4) — Civil Technology · Memo · 2017 · Eng
- [CIV TECH GR12 QP SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-woodworking-english/c3b4a7c0-761a-45aa-a578-9b98afc86830) — Civil Technology · QP · 2022 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — QP · 2024 · Afr
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — QP · 2023 · Eng
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
