# Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

> Grade 12 Civil Technology memorandum from the Eastern Cape Prelim Exam 2024 (English), 15 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Memorandum
- Year: 2024
- Exam period: Eastern Cape Prelim Exam
- Curriculum: CAPS
- Pages: 15

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c)

## About this document

Civil Technology · Grade 12 · Eastern Cape Prelim Exam · 2024 · English. Memorandum, 15 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                            NATIONAL
                       SENIOR CERTIFICATE

                               GRADE 12

                        SEPTEMBER 2024

         CIVIL TECHNOLOGY: CIVIL SERVICES
                 MARKING GUIDELINE

MARKS:   200

                  This marking guideline consists of 15 pages.

                     Hosted by www.ecexams.co.za.

### Page 2

Downloaded from hlayiso.com
2                          CIVIL TECHNOLOGY: CIVIL SERVICES                    (EC/SEPTEMBER 2024)

INSTRUCTIONS FOR MARKERS

1.     Markers should:
       •    Familiarise themselves with the question and answer before evaluating
            the responses of candidates.
       •    Always interpret the responses of the candidates within the context of
            the question.
       •    Consider any relevant and acceptable answer during pre-marking but
            should strictly adhere to the answers after finalisation of the marking
            guideline.
       •    There are TWO approaches to answering questions; these are (1) to
            describe and (2) to explain.
            o If a candidate is required to explain e.g., a process in 4 steps, only the
                 first 4 responses should be considered.
            o However, if for example candidate is required to explain or describe a
                 process, we need to consider that that candidates may write a long
                 description, not necessarily well organised. In this case the marker
                 needs to evaluate the complete statement to judge if the candidate
                 explained the required outcome satisfactorily and allocate marks on
                 merit.
       •    Mark what the candidate wrote and do not interpret or predict
            responses.
       •    Indicate the tick or cross right at the position where the mark needs to
            be awarded or where the candidate made the error.
       •    Accept the letter corresponding with the correct answer as well as the
            answer written in full in multiple-choice questions or similar questions.
       •    Accept incorrect spelling in one-word answers unless the spelling
            changes the meaning of the answer.
       •    If a learner writes two or more answers separated by a slash (/) mark
            only the first response, unless the additional answer/s are different
            names for the same item e.g., Yale lock/Night latch. In this case, the
            answer for the response should be awarded and the slash (/) should
            NOT be considered as an additional answer.

2.     For calculations:
       •    A mark is only awarded if the correct unit is written next to the answer.
            If the question states that the answer must be in a specific unit, a mark
            will ONLY be awarded if the answer has the correct unit as indicated in
            the question.
       •    Marks will only be allocated for the correct values if the candidates add
            instead of multiply. NO marks will be awarded for the calculations and
            the answer.
       •    Where an incorrect answer is correctly carried over, the marker must
            recalculate the values, using the incorrect answer from the first
            calculation. If correctly used, the candidate should receive the full
            marks for subsequent calculations.
       •    Alternative methods of calculations must be considered, provided that
            the correct answer is obtained.
       •    For the calculation of quantities marks will be awarded for the correct
            use of the dimension paper.

Copyright reserved                                                          Please turn over

                            Hosted by www.ecexams.co.za.

### Page 3

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: CIVIL SERVICES                          3

3.     When marking drawings:

       •    The member for which the mark should be awarded should be drawn
            correctly in the correct position to receive a mark.
       •    A member incorrectly drawn but wrongfully repeated in another position
            will be awarded the mark for the repeated incorrect member provided
            that the marking guideline provide for TWO or more marks for that
            member (positive marking).
       •    Marks can only be awarded for a label if the label is correctly indicating
            the correct member.
       •    Scale drawings should always be marked using an appropriate mask.
       •    If the incorrect/wrong drawing was drawn, the candidate can be
            awarded for only what was provided for on the marking guideline.
       •    If a line diagram or an orthographic view instead of a pictorial drawing
            (isometric/oblique/perspective) is drawn, the first assessment criteria for
            each member will be marked wrong, but marks will be awarded for the
            subsequent members if TWO or more marks are awarded for the same
            member.
       •    If candidates draw/give more information than what is required, mark
            strictly according to the assessment criteria.

4.     Incorrect numbering of questions:

       •    If a candidate numbered an answer incorrectly, but the answer is in the
            correct position according to the sequence of the questions in the
            question paper, circle then the incorrect numbering and mark the
            response.
       •    If questions were answered randomly not following the same sequence
            as in the question paper and the learner numbered incorrectly, the
            response should NOT be marked.

5.     Duplication of responses and questions answered in the correct place:

       •    If a question has been answered twice, mark the first response.
       •    If a question should be answered on an answer sheet and the candidate
            answered it on both the answer sheet and in the answer book, mark the
            response on the answer sheet and cancel the response in the answer
            book.
       •    If the question has been answered in the answer book instead of on the
            answer sheet, mark the response in the answer book according to the
            assessment criteria on the marking guideline.

Copyright reserved                                                        Please turn over

                            Hosted by www.ecexams.co.za.

### Page 4

Downloaded from hlayiso.com
4                         CIVIL TECHNOLOGY: CIVIL SERVICES               (EC/SEPTEMBER 2024)

QUESTION 1: SAFETY AND MATERIAL (GENERIC)

1.1    1.1.1    2                                                                       (1)

       1.1.2    228 mm                                                                  (1)

       1.1.3    900 mm                                                                  (1)

       1.1.4    150 mm                                                                  (1)

       1.1.5    Non-slippery layer                                                      (1)

1.2    Similar answer:
       Prevent horizontal movement between the platform and structure.                  (1)

1.3    Identify THREE of the following requirements that are applicable to
       the supplier of hazardous chemical substances:

       1.3.1    First-aid measures must be shown.                                       (1)

       1.3.4    Fire-fighting measures must be shown.                                   (1)

       1.3.6    Storage instructions must be shown.                                     (1)

1.4    Minimum = 30° (1) and maximum = 50° (1)                                          (2)

1.5    Similar answer:
       Aluminium conducts electricity, (1) and workers who use the ladder could
       be shocked. (1)                                                                  (2)

1.6    Describe the difference between the surface finish of a water-based
       paint and an oil-based paint.
       • Water-based – provides an elastic, flexible finish. (1)
       • Oil-base – provides a hard, durable finish. (1)                                (2)

1.7    Any THREE advantages of curing concrete:
       • Increases strength
       • Decreases permeability
       • Improves durability
       • Reduces cracks
       • Makes concrete more watertight
       • Provides volume stability
       • Concrete can carry more weight                             (Any 3 x 1)         (3)

1.8    Briefly describe the powder-coating process.
       Plastic finish in powdered form, (1) is applied by means of a compressed
       air spray-gun. (1)                                                                (2)
                                                                                        [20]

Copyright reserved                                                   Please turn over

                           Hosted by www.ecexams.co.za.

### Page 5

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: CIVIL SERVICES                               5

QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT

2.1      Use the information on ANSWER SHEET A and complete the site plan
         on a scale of 1 : 200 according to the following requirements:

         2.1.1   The site boundaries are measured from point A
                 The site boundaries in front and back are 23 m long
                 The site boundaries on the sides are 25 m long                                   (2)
         2.1.2 The front building line is 4 m from the site boundary
                 The back and side building lines are 2 m from the site boundaries                (2)
         2.1.3 Show the site entrance, 3 m from the western site boundary                         (1)
         2.1.4 Show the datum level in the north-eastern corner of the site                       (1)
         Complete the sewage lay-out and abbreviations of the sewage appliances
         according to the following requirements:
         2.1.5 The main sewage from the bathroom to the municipal connection                      (2)
         2.1.6 The branch sewage to the bathroom and kitchen                                      (2)
         2.1.7 Manhole on the site, before the municipal connection                               (2)
         2.1.8 Rodding eyes                                                                       (4)
         2.1.9 Inspection eye                                                                     (4)

2.2       •   Length of shank
          •   Diameter
          •   Type of thread
          •   Head size                                                              (4 x 1)      (4)

2.3      When square shoulder is driven in, (1) it will resist rotation. (1)                      (2)

2.4      A – Nut
         B – Thread
         C – Runout
         D – Shank                                                                  (4 x 1)       (4)

2.5      Any TWO requirements to which a trestle scaffold must comply.
         • Soundly constructed with a solid material.
         • Prevent spreading of supporting legs.
         • Not higher than 3 m.
         • Consists of not more than two tiers.                   (Any 2 x 1)                     (2)

2.6      Name TWO precautionary measures when transporting a ladder.
         • Not protruding excessively.
         • End marked with a red or orange flag.                     (2 x 1)                      (2)

2.7      Similar answer.
         Paint will cover (1) weaknesses. (1)                                                     (2)

2.8      Briefly describe any ONE use of the dumpy level.
         • Determine (1) height differences. (1)
         • Determine (1) levels and slopes. (1)
         • Setting out (1) of buildings. (1)
         • Transferring of (1) levels and heights. (1)
         • Determine horizontal (1) distances. (1)                              (Any 1 x 2)       (2)

 Copyright reserved                                                            Please turn over

                             Hosted by www.ecexams.co.za.

### Page 6

Downloaded from hlayiso.com
6                       CIVIL TECHNOLOGY: CIVIL SERVICES             (EC/SEPTEMBER 2024)

2.9     Any TWO materials which can be detected in walls by a multi-detector.
        • Ferrous metals
        • Non-ferrous metals
        • WS-wiring
        • Timber
        • Metal pegs
        • Steel rods
        • Copper pipes                                           (Any 2 x 1)          (2)
                                                                                     [40]

Copyright reserved                                                Please turn over

                         Hosted by www.ecexams.co.za.

### Page 7

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)              CIVIL TECHNOLOGY: CIVIL SERVICES                            7

QUESTION 3: SAFETY, MATERIAL AND CONSTRUCTION (SPECIFIC)

3.1   Any TWO:
      • Exposure to gases
      • Exposure to raw sewages
         (Any other realistic risk.)                                           (2 x 1)      (2)

3.2   3.2.1    True                                                                         (1)

      3.2.2    False                                                                        (1)

      3.2.3    False                                                                        (1)

3.3   Similar answer:
      • Prevent material from falling into the manhole.                                     (1)

3.4   When the cover is removed.                                                            (1)

3.5   Serves as protection against poisonous gasses.                                        (1)

3.6   Zinc has a weak atomic bond with other metals (1) and it causes
      dezincification. (1)                                                                  (2)

3.7   THREE disadvantages:
      • Causes a weak metal.
      • Can cause leaks.
      • Can cause blockages.                                                   (3 x 1)      (3)

3.8   It causes pit marks, (1) which are caused by the chemical reaction (1) between
      the metals.                                                                           (2)

3.9   Any THREE factors:
      •   The difference between the electrode potential of two metals.
      •   Contact resistance at the boundary between two metals.
      •   Electrical resistance of the electrolyte solution.
      •   Anode-to-cathode area ratio.
      •   Presence of a passive film.
      •   Properties of the electrolyte solution.                       (Any 3 x 1)         (3)

3.10 FIGUR 3.10 on ANSWER SHEET B shows layer 1 of a double return angle in
     a one-brick wall in stretcher bond. Draw the alternate layer of the one-brick
     wall on a scale of 1 : 10 on ANSWER SHEET B.                                          (10)

3.11 Any ONE purpose:
     •   Ensure that the sewage spill slide back into the channel pipe.
     •   Prevent that vermin settle there.                              (Any 1 x 1)         (1)

3.12 1 : 40                                                                                 (1)
                                                                                           [30]

Copyright reserved                                                      Please turn over

                          Hosted by www.ecexams.co.za.

### Page 8

Downloaded from hlayiso.com
 8                           CIVIL TECHNOLOGY: CIVIL SERVICES                (EC/SEPTEMBER 2024)

QUESTION 4:           COLD WATER SUPPLY, WARM WATER SUPPLY AND TOOLS
                      (SPECIFIC)

4.1    4.1.1    A – Stopcock
                B – Water meter
                C – Water main
                D – Cold water supply pipe                                      (4 x 1)      (4)

       4.1.2    Shut off water supply for maintenance / water leaks.                         (1)

       4.1.3     Municipality                                                                (1)

       4.1.4     Owner                                                                       (1)

       4.1.5     450 mm                                                                      (1)

4.2    4.2.1     Non-return valve                                                            (1)

       4.2.2     Locking valve                                                               (1)

       4.2.3     B                                                                           (1)

       4.2.4     To prevent backflow in a pipe system that pumps water to a higher-
                 lying area.                                                                 (1)

4.3    Only allow water to flow, (1) when the sensor is triggered. (1)                       (2)

4.4    Similar answer:
       Sandy water will damage the mechanisms (1) of pressure-reducing valves /
       flushing valves / taps. (1)                                                           (2)

4.5    In a limited space.                                                                   (1)

4.6    4.6.1    Mixer                                                                        (1)

       4.6.2    Non-return valve                                                             (1)

       4.6.3    Pressure-relief valve                                                        (1)

4.7    4.7.1             B
                                                                                             (2)

       4.7.2
                                                                                             (2)

4.8    When water is heated, (1) it rises to the top of the geyser. (1)                      (2)

4.9    4.9.1    To lead overflow water outside.                                              (1)

       4.9.2    To balance the water pressure to the hot and cold-water supply.              (1)

 Copyright reserved                                                       Please turn over

                                Hosted by www.ecexams.co.za.

### Page 9

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)               CIVIL TECHNOLOGY: CIVIL SERVICES                        9

4.10   4.10.1 Solar geyser system                                                        (1)

       4.10.2 A – Storage tank / Geyser
              B – Cold water pipes
              C – Hot water pipes
              D – Collectors                                               (4 x 1)       (4)

       4.10.3 Keep heat inside.                                                          (1)

4.11   Any TWO:
       • Sudden drop in secondary supply pipes.
       • Loose jumpers in taps.
       • Pipes in walls are not properly caulked.
       • Pipes are not secured in roof spaces.
       • Draw-off pipe is bigger than the supply pipe.                (Any 2 x 1)        (2)

4.12   4.12.1 Water pressure testing pump                                                (1)

       4.12.2 Prevent dirt from entering the pressure system.                            (1)

       4.12.3 Any TWO:
              •   Water meters
              •   Plumbing lines
              •   Pressure vessels
              •   Solar systems
              •   Sprinkler systems                                   (Any 2 x 1)        (2)
                                                                                        [40]

Copyright reserved                                                   Please turn over

                           Hosted by www.ecexams.co.za.

### Page 10

Downloaded from hlayiso.com
10                        CIVIL TECHNOLOGY: CIVIL SERVICES                 (EC/SEPTEMBER 2024)

QUESTION 5: DRAINAGE AND QUANTITIES (SPECIFIC)

5.1    5.1.1    A – Branch vent
                B – Wash basin
                C – Trap
                D – Main drainpipe
                E – Vent valve
                F – Vent pipe
                G – Wet vent
                H – Water closet                                              (8 x 1)      (8)

       5.1.2    B – WB / WHB
                H – WC                                                        (2 x 1)      (2)

       5.1.3   Prevent flooding / blockages / close off bad odours.      (Any 1 x 1)       (1)

       5.1.4    Similar answer:
                When waste water is released, it opens the valve. (1) This reduces
                the vacuum (1) and allows air into the system. (1)                         (3)

       5.1.5    Conveys gasses from the drainpipe.                                         (1)

5.2    B                                                                                   (1)

5.3    Provide access to the system (1) for cleaning / inspection purposes. (1)            (2)

5.4    It is an underground, (1) watertight (1) tank which receives sewerage. (1)          (3)

5.5   5.5.1    A, C, D                                                        (3 x 1)      (3)

      5.5.2    B, G                                                          (2 x 1)       (2)

      5.5.3    H                                                                           (1)

5.6   100 mm                                                                               (1)

5.7   5.7.1     Ensure that solid matter can be carried away easily.                       (1)

      5.7.2     To prevent blockages.                                                      (1)

      5.7.3     Prevents the pipe from damage.                                             (1)

5.8   5.8.1     2                                                                          (1)

      5.8.2     1,3 m + 1,3 m (1) = 2,6 m (2 600 mm) (1)                                   (2)

      5.8.3    12 m (12 000 mm)                                                            (1)

      5.8.4    2                                                                           (1)

Copyright reserved                                                      Please turn over

                           Hosted by www.ecexams.co.za.

### Page 11

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                   CIVIL TECHNOLOGY: CIVIL SERVICES                        11

                        22
5.9   5.9.1    𝜋r²h =        x 0,9 x 0,9 x 2,8 = 7,128 m³
                        7
                                                                                            (3)

      5.9.2    7,13 m³ x 1 000 = 7 128 l                                                     (1)
                                                                                            [40]

Copyright reserved                                                       Please turn over

                               Hosted by www.ecexams.co.za.

### Page 12

Downloaded from hlayiso.com
12                        CIVIL TECHNOLOGY: CIVIL SERVICES                  (EC/SEPTEMBER 2024)

QUESTION 6: GRAPHIC COMMUNICATION, ROOF WORK, STORMWATER
            AND JOINING (SPECIFIC)

6.1   25 mm for each 4,8 m / 1 : 600                                                         (1)

6.2   Keep the gutters in position.                                                          (1)

6.3   It serves as waterproofing (1) at junctions of walls that protrude above the
      roof. (1)                                                                              (2)

6.4   Any TWO:
      •   The pitch of the roof.
      •   The position of the battens and purlins.
      •   The material and tools needed.                                  (Any 2 x 1)        (2)

6.5   6.5.1    D

      6.5.2    E

      6.5.3    G

      6.5.4    F

      6.5.5    H                                                               (5 x 1)       (5)

6.6   Any TWO:
      •   Cleaning the solder material.
      •   Prevents oxidation.
      •   Promotes the flow of solder.                                    (Any 2 x 1)        (2)

6.7   Ensure a watertight joint.                                                             (1)

6.8   FIGUUR 6.8 on ANSWER SHEET C shows a square-based truncated
      pyramid.
      Draw on sheet ANSWER SHEET C the pattern development for the
      truncated pyramid.
      (Refer to ANSWER SHEET C.)                                                            (16)
                                                                                            [30]

                                                                             TOTAL:         200

Copyright reserved                                                       Please turn over

                           Hosted by www.ecexams.co.za.

### Page 13

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                 CIVIL TECHNOLOGY: CIVIL SERVICES                       13

                                                        NAME
                                CIVIL TECHNOLOGY         AND
ANSWER SHEET               A         (GENERIC)        SURNAME:

2.1      Use the information on ANSWER SHEET A and complete the site plan on
         a scale of 1 : 200.

ERF 121                                    ERF 123                                 ERF 125

                     RE
                                    IE                IE    RE

                                 KITCHEN             BATHROOM

                                                 A

                          MH

               A

                                   PARLEMENT STREET

                                                     Site boundaries           2
                                                     Building lines            2
                                                     Site entrance             1
                                                     Datum level               1
                                                     Main sewerage             2
                                                     Branch sewerage           2
                                                     Manhole                   2
                                                     Rodding eyes              4
                                                     Inspection eyes           4
                                                                       TOTAL: 20

Copyright reserved                                                      Please turn over

                               Hosted by www.ecexams.co.za.

### Page 14

Downloaded from hlayiso.com
14                        CIVIL TECHNOLOGY: CIVIL SERVICES                 (EC/SEPTEMBER 2024)

                                                       NAME
                           CIVIL TECHNOLOGY             AND
ANSWER SHEET          B         (SPECIFIC)           SURNAME:

3.10    FIGURE 3.10 on ANSWER SHEET B shows layer 1 of a double return
        angle in a one-brick wall in stretcher bond. Draw the alternate layer of the
        one-brick wall on a scale of 1 : 10 on ANSWER SHEET B.

                                                           Brickwork                8
                                                           Application of scale     2
            FIGURE 3.10                                                     TOTAL: 10

Copyright reserved                                                      Please turn over

                           Hosted by www.ecexams.co.za.

### Page 15

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                  CIVIL TECHNOLOGY: CIVIL SERVICES                         15

                                                             NAME
                                CIVIL TECHNOLOGY              AND
ANSWER SHEET           C             (SPECIFIC)            SURNAME:

6.8        FIGURE 6.8 on ANSWER SHEET C shows a square-based truncated
           pyramid.
           Draw on ANSWER SHEET C the pattern development for the truncated
           pyramid.

                           D4

                                                      D3

      D5
                        G4
                  G5                      G3

             G6                           C2

             F1                                      G2
                                                            D2
                                A3
                                                G1
D6
                                               F2
                                                           C1

                                                     D1
                        SIDE VIEW
                                                                 Accuracy + neatness
                                     A1

                                                     A2
                                                            Construction lines A1 – A3    3
                                                            Arc lines C1 + C2             2
                                                            Base points D1 – D6           6
                                                            Seam lines F1 + F2            1
                                                            Side lines G1 – G6            2
                                                            Accuracy + neatness           2

                                                                              TOTAL: 16

                       TOP VIEW

                       FIGURE 3.10

Copyright reserved                                                         Please turn over

                            Hosted by www.ecexams.co.za.

## Related documents

- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — Civil Technology · QP · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-english/896ddb1f-2144-4bfc-a35a-3a71507d7637) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2021 English Civil Services](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-civil-services/80eb9860-b118-41e2-98fd-5bea1b29a026) — Civil Technology · Memo · 2021 · Eng
- [CIVIL TECH GR12 MEMO GR12 SEPT2017 English](https://www.hlayiso.com/library/civil-tech-gr12-memo-gr12-sept2017-english/fcb77566-a1ac-4dff-af72-678e70ccfbc4) — Civil Technology · Memo · 2017 · Eng
- [CIV TECH GR12 QP SEPT 2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-english/4163a632-f091-41bf-8a36-993d566fb2cc) — Civil Technology · QP · 2023 · Eng
- [CIV TECH GR12 QP SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-woodworking-english/c3b4a7c0-761a-45aa-a578-9b98afc86830) — Civil Technology · QP · 2022 · Eng

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — QP · 2024 · Afr
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — QP · 2023 · Eng
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
