# Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

> Grade 12 Civil Technology memorandum from the Eastern Cape Prelim Exam 2024 (English), 17 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Memorandum
- Year: 2024
- Exam period: Eastern Cape Prelim Exam
- Curriculum: CAPS
- Pages: 17

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50)

## About this document

Civil Technology · Grade 12 · Eastern Cape Prelim Exam · 2024 · English. Memorandum, 17 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                        NATIONAL
                   SENIOR CERTIFICATE

                         GRADE 12

                    SEPTEMBER 2024

         CIVIL TECHNOLOGY: CONSTRUCTION
                 MARKING GUIDELINE

MARKS:   200

               This marking guideline consists of 17 pages.

                  Hosted by www.ecexams.co.za.

### Page 2

Downloaded from hlayiso.com
2                          CIVIL TECHNOLOGY: CONSTRUCTION                      (EC/SEPTEMBER 2024)

INSTRUCTIONS FOR MARKERS

1.     Markers should:
       •    Familiarise themselves with the question and answer before evaluating
            the responses of candidates.
       •    Always interpret the responses of the candidates within the context of
            the question.
       •    Consider any relevant and acceptable answer during pre-marking but
            should strictly adhere to the answers after finalisation of the marking
            guideline.
       •    There are TWO approaches to answering questions; these are (1) to
            describe and (2) to explain.
            o If a candidate is required to explain e.g., a process in 4 steps, only the
                 first 4 responses should be considered.
            o However, if for example candidate is required to explain or describe a
                 process, we need to consider that that candidates may write a long
                 description, not necessarily well organised. In this case the marker
                 needs to evaluate the complete statement to judge if the candidate
                 explained the required outcome satisfactorily and allocate marks on
                 merit.
       •    Mark what the candidate wrote and do not interpret or predict
            responses.
       •    Indicate the tick or cross right at the position where the mark needs to
            be awarded or where the candidate made the error.
       •    Accept the letter corresponding with the correct answer as well as the
            answer written in full in multiple-choice questions or similar questions.
       •    Accept incorrect spelling in one-word answers unless the spelling
            changes the meaning of the answer.
       •    If a learner writes two or more answers separated by a slash (/) mark
            only the first response, unless the additional answer/s are different
            names for the same item e.g., Yale lock/Night latch. In this case, the
            answer for the response should be awarded and the slash (/) should
            NOT be considered as an additional answer.

2.     For calculations:
       •    A mark is only awarded if the correct unit is written next to the answer.
            If the question states that the answer must be in a specific unit, a mark
            will ONLY be awarded if the answer has the correct unit as indicated in
            the question.
       •    Marks will only be allocated for the correct values if the candidates add
            instead of multiply. NO marks will be awarded for the calculations and
            the answer.
       •    Where an incorrect answer is correctly carried over, the marker must
            recalculate the values, using the incorrect answer from the first
            calculation. If correctly used, the candidate should receive the full
            marks for subsequent calculations.
       •    Alternative methods of calculations must be considered, provided that
            the correct answer is obtained.
       •    For the calculation of quantities marks will be awarded for the correct
            use of the dimension paper.

Copyright reserved                                                                Please turn over

                            Hosted by www.ecexams.co.za.

### Page 3

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: CONSTRUCTION                             3

3.     When marking drawings:

       •    The member for which the mark should be awarded should be drawn
            correctly in the correct position to receive a mark.
       •    A member incorrectly drawn but wrongfully repeated in another position
            will be awarded the mark for the repeated incorrect member provided
            that the marking guideline provide for TWO or more marks for that
            member (positive marking).
       •    Marks can only be awarded for a label if the label is correctly indicating
            the correct member.
       •    Scale drawings should always be marked using an appropriate mask.
       •    If the incorrect/wrong drawing was drawn, the candidate can be
            awarded for only what was provided for on the marking guideline.
       •    If a line diagram or an orthographic view instead of a pictorial drawing
            (isometric/oblique/perspective) is drawn, the first assessment criteria for
            each member will be marked wrong, but marks will be awarded for the
            subsequent members if TWO or more marks are awarded for the same
            member.
       •    If candidates draw/give more information than what is required, mark
            strictly according to the assessment criteria.

4.     Incorrect numbering of questions:

       •    If a candidate numbered an answer incorrectly, but the answer is in the
            correct position according to the sequence of the questions in the
            question paper, circle then the incorrect numbering and mark the
            response.
       •    If questions were answered randomly not following the same sequence
            as in the question paper and the learner numbered incorrectly, the
            response should NOT be marked.

5.     Duplication of responses and questions answered in the correct place:

       •    If a question has been answered twice, mark the first response.
       •    If a question should be answered on an answer sheet and the candidate
            answered it on both the answer sheet and in the answer book, mark the
            response on the answer sheet and cancel the response in the answer
            book.
       •    If the question has been answered in the answer book instead of on the
            answer sheet, mark the response in the answer book according to the
            assessment criteria on the marking guideline.

Copyright reserved                                                              Please turn over

                            Hosted by www.ecexams.co.za.

### Page 4

Downloaded from hlayiso.com
4                         CIVIL TECHNOLOGY: CONSTRUCTION                 (EC/SEPTEMBER 2024)

QUESTION 1: SAFETY AND MATERIAL (GENERIC)

1.1    1.1.1    2                                                                      (1)

       1.1.2    228 mm                                                                 (1)

       1.1.3    900 mm                                                                 (1)

       1.1.4    150 mm                                                                 (1)

       1.1.5    Non-slippery layer                                                     (1)

1.2    Similar answer:
       Prevent horizontal movement between the platform and structure.                 (1)

1.3    Identify THREE of the following requirements that are applicable to
       the supplier of hazardous chemical substances:

       1.3.1    First-aid measures must be shown.                                      (1)

       1.3.4    Fire-fighting measures must be shown.                                  (1)

       1.3.6    Storage instructions must be shown.                                    (1)

1.4    Minimum = 30° (1) and maximum = 50° (1)                                         (2)

1.5    Similar answer:
       Aluminium conducts electricity, (1) and workers who use the ladder could
       be shocked. (1)                                                                 (2)

1.6    Describe the difference between the surface finish of a water-based
       paint and an oil-based paint.
       • Water-based – provides an elastic, flexible finish. (1)
       • Oil-base – provides a hard, durable finish. (1)                               (2)

1.7    Any THREE advantages of curing concrete:
       • Increases strength
       • Decreases permeability
       • Improves durability
       • Reduces cracks
       • Makes concrete more watertight
       • Provides volume stability
       • Concrete can carry more weight                             (Any 3 x 1)        (3)

1.8    Briefly describe the powder-coating process.
       Plastic finish in powdered form, (1) is applied by means of a compressed
       air spray-gun. (1)                                                               (2)
                                                                                       [20]

Copyright reserved                                                          Please turn over

                           Hosted by www.ecexams.co.za.

### Page 5

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: CONSTRUCTION                               5

QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT

2.1      Use the information on ANSWER SHEET A and complete the site plan
         on a scale of 1 : 200 according to the following requirements:

         2.1.1   The site boundaries are measured from point A
                 The site boundaries in front and back are 23 m long
                 The site boundaries on the sides are 25 m long                                  (2)
         2.1.2 The front building line is 4 m from the site boundary
                 The back and side building lines are 2 m from the site boundaries               (2)
         2.1.3 Show the site entrance, 3 m from the western site boundary                        (1)
         2.1.4 Show the datum level in the north-eastern corner of the site                      (1)
         Complete the sewage lay-out and abbreviations of the sewage appliances
         according to the following requirements:
         2.1.5 The main sewage from the bathroom to the municipal connection                     (2)
         2.1.6 The branch sewage to the bathroom and kitchen                                     (2)
         2.1.7 Manhole on the site, before the municipal connection                              (2)
         2.1.8 Rodding eyes                                                                      (4)
         2.1.9 Inspection eye                                                                    (4)

2.2       •   Length of shank
          •   Diameter
          •   Type of thread
          •   Head size                                                            (4 x 1)       (4)

2.3      When square shoulder is driven in, (1) it will resist rotation. (1)                     (2)

2.4      A – Nut
         B – Thread
         C – Runout
         D – Shank                                                                (4 x 1)        (4)

2.5      Any TWO requirements to which a trestle scaffold must comply.
         • Soundly constructed with a solid material.
         • Prevent spreading of supporting legs.
         • Not higher than 3 m.
         • Consists of not more than two tiers.                   (Any 2 x 1)                    (2)

2.6      Name TWO precautionary measures when transporting a ladder.
         • Not protruding excessively.
         • End marked with a red or orange flag.                     (2 x 1)                    (2)

2.7      Similar answer.
         Paint will cover (1) weaknesses. (1)                                                    (2)

2.8      Briefly describe any ONE use of the dumpy level.
         • Determine (1) height differences. (1)
         • Determine (1) levels and slopes. (1)
         • Setting out (1) of buildings. (1)
         • Transferring of (1) levels and heights. (1)
         • Determine horizontal (1) distances. (1)                             (Any 1 x 2)       (2)

 Copyright reserved                                                                Please turn over

                             Hosted by www.ecexams.co.za.

### Page 6

Downloaded from hlayiso.com
6                       CIVIL TECHNOLOGY: CONSTRUCTION              (EC/SEPTEMBER 2024)

2.9     Any TWO materials which can be detected in walls by a multi-detector.
        • Ferrous metals
        • Non-ferrous metals
        • WS-wiring
        • Timber
        • Metal pegs
        • Steel rods
        • Copper pipes                                           (Any 2 x 1)        (2)
                                                                                   [40]

Copyright reserved                                                     Please turn over

                         Hosted by www.ecexams.co.za.

### Page 7

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)              CIVIL TECHNOLOGY: CONSTRUCTION                      7

QUESTION 3: ROOFS, STAIRCASES AND JOINING

3.1     Draw in good proportion, a neat sketch of a collar tie roof truss with a
        pitch of 45° resting on two supporting walls.

                                                       CANDIDATE’S
             ASSESSMENT CRITERIA            MARK
                                                          MARK
        Walls                                  2
        Wall plates                            2
        Rafters                                2
        Collar beam/Collar tie                 1
        Ridge beam correctly drawn             2
        Any ONE label                          1
                                TOTAL:        10                                   (10)

3.2     5º                                                                           (1)

3.3     1 400 mm                                                                     (1)

3.4     3.4.1    Riser                                                               (1)

        3.4.2    Baluster                                                            (1)

        3.4.3    Going / Tread                                                       (1)

        3.4.4    Landing                                                             (1)

        3.4.5    Run                                                                 (1)

3.5     Any ONE of the measurements:
        • 50 mm (1) x 76 mm (1) OR,
        • 76 mm (1) x 50 mm (1) OR,
        • 76 mm (1) x 76 mm (1)                                      (Any 1 x 2)     (2)

Copyright reserved                                                     Please turn over

                            Hosted by www.ecexams.co.za.

### Page 8

Downloaded from hlayiso.com
8                         CIVIL TECHNOLOGY: CONSTRUCTION                      (EC/SEPTEMBER 2024)

3.6    3.6.1    A – Landing                                                                   (1)
                B – Shutter board                                                             (1)
                C – Bearer / Joist                                                            (1)
                D – Prop                                                                      (1)
                E – Folding Wedges / Wedges                                                   (1)

       3.6.2    850 mm                                                                        (1)

3.7    Any ONE:

       3.7.1   Anchor / Galvanised steel straps / Hoop iron / Wires                           (1)

       3.7.2   Bolted / Nailed / Galvanised steel straps / Hoop iron / Wires built in         (1)

       3.7.3   Bolted / Welded / Glued                                                        (1)

       3.7.4   Cast-in anchors / Bolted                                                       (1)

       3.7.5   Screwed / Anchored to wall using sleeve anchors / Use support
               anchor                                                                        (1)
                                                                                             [30]

Copyright reserved                                                               Please turn over

                           Hosted by www.ecexams.co.za.

### Page 9

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                    CIVIL TECHNOLOGY: CONSTRUCTION                         9

QUESTION 4:           MATERIAL, EXCAVATIONS,          FOUNDATIONS        EQUIPMENT
                      AND TOOLS

4.1     4.1.1         H – alternative for glass                                              (1)

        4.1.2         C – tested in a laboratory                                             (1)

        4.1.3         D – non-ferrous metal                                                  (1)

        4.1.4         G – packaging material                                                 (1)

        4.1.5         F – tested on the site                                                 (1)

        4.1.6         A – ferrous metal                                                      (1)

4.2     4.2.1         Slump test                                                             (1)

        4.2.2         Any TWO reasons for the purpose of the slump test:
                      • To test the density of concrete (percentage water)
                      • To determine the workability and consistency of batches
                      • To determine the slump of the mixture              (Any 2 x 1)       (2)

        4.2.3         Any ONE tool used for slump test:
                      • Rule
                      • Level
                      • Cone
                      • Baseplate
                      • Tamping rod                                        (Any 1 x 1)       (1)

4.3     Any TWO methods of curing concrete:
        • Water by means of spraying
        • Cover with water-retaining substances such as damp sand, sacking,
          straw, hessian or canvas
        • Plastic membrane or plastic sheets
        • Commercial sealant
        • Pool forming
        • Similar answer                                            (Any 2 x 1)              (2)

4.4     Purpose of cladding on building
        • Application of prefabricated materials onto the external surfaces of
           buildings for aesthetic and functional purposes.
        • Helps to control and direct weather elements, like rainwater and wind.
                                                                             (2 x 1)         (2)

4.5     Any THREE types of cladding for buildings:
        • Tile cladding
        • Brick slip cladding
        • Stone cladding
        • Timber cladding
        • Metal sheet cladding                                             (Any 3 x 1)       (3)

Copyright reserved                                                              Please turn over

                               Hosted by www.ecexams.co.za.

### Page 10

Downloaded from hlayiso.com
10                            CIVIL TECHNOLOGY: CONSTRUCTION                   (EC/SEPTEMBER 2024)

4.6     4.6.1        Portable concrete vibrator                                                (1)

        4.6.2        Any ONE purpose of this machine:
                     • Compaction of ground
                     • Force the trapped air out of the mixture
                     • Refilling
                     • Paving stones                                         (Any 1 x 1)       (1)

        4.6.3        Any TWO ways of maintaining the machine:
                     • Maintain like all machinery – lubricate and adjust according to
                       the manufacturer’s instructions.
                     • Clean after use and store in a safe, dry place.
                     • Repair or replace damaged electric cords.
                     • Service regularly / ensure all parts are tightly secured
                     • Remove loose sand and dust after use.                 (Any 2 x 1)       (2)

4.7     4.7.1        True                                                                      (1)

        4.7.2        True                                                                      (1)

        4.7.3        True                                                                      (1)

        4.7.4        False                                                                     (1)

4.8     Any THREE causes for the collapse of an excavation:
        • Heavy rains
        • Poor soil strata, structure or composition
        • Sides not dug at the correct angle
        • Improper use of formwork or shoring to support walls
        • Vibration by machinery or heavy vehicles nearby
        • Water seeping into the excavated area
        • Contact with underground service
        • Access to and exit from the excavation
        • Soil slides due to cracks or loose soil                            (Any 3 x 1)       (3)

4.9     Any TWO ways of making excavations safe at night:
        • Warning signs
        • Warning lights (red or orange)
        • Covering
        • Fencing                                                            (Any 2 x 1)       (2)

4.10    4.10.1        1,5 m                                                                    (1)

        4.10.2        1,3 m                                                                    (1)

        4.10.3        600 mm                                                                   (1)

Copyright reserved                                                                Please turn over

                               Hosted by www.ecexams.co.za.

### Page 11

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                  CIVIL TECHNOLOGY: CONSTRUCTION                   11

4.11    4.11.1        Pile foundation                                                 (1)

        4.11.2        Stepped foundation                                              (1)

        4.11.3        Strip foundation                                                (1)

        4.11.4        Pile foundation                                                 (1)

4.12    Any THREE advantages of pile foundations:
        • It can be used in poor soil
        • It can be used anywhere, even in water
        • The larger base ensures stability
        • Quick and easy to install if the equipment is available
        • If prefabricated piles are used, much time is saved
        • It resists tensile stress well
        • Quick and less expensive to produce
        • Can be manufactured elsewhere and transported to the site
        • Installation can continue in poor weather conditions
        • Length of piles can be easily adjusted
        • Offers good resistance against moving soil                  (Any 3 x 1)    (3)
                                                                                    [40]

Copyright reserved                                                       Please turn over

                              Hosted by www.ecexams.co.za.

### Page 12

Downloaded from hlayiso.com
12                        CIVIL TECHNOLOGY: CONSTRUCTION                      (EC/SEPTEMBER 2024)

QUESTION 5: BRICKWORK, GRAPHICS, PLASTER AND SCREED

5.1     5.1.1    C – Wet the wall / Prepare the wall / Clean                     (2 x 1)      (2)
                 B – Apply the plaster                                           (2 x 1)      (2)
                 D – Level / Cut the plaster / Removing access
                     Plaster (Sawing movement)                                   (2 x 1)      (2)
                 A – Smoothen / Float / Finish the surface                       (2 x 1)      (2)

        5.1.2    Any ONE purpose of wetting the wall:
                 • If not done, the plaster will not stick properly to the wall.
                 • If not done, the plaster will dry out too quickly.
                 • If not done, the strength of the plaster will be affected.
                                                                             (Any 1 x 1)      (1)

        5.1.3    Building lime                                                                (1)

5.2     5.2.1    Any ONE jointing method:
                 • River sand / Plaster sand is used as grouting between paving
                   blocks / bricks
                 • Mixture of plaster sand and cement is used as grouting between
                   paving blocks / bricks.                              (Any 1 x 1)           (1)

        5.2.2    The final layer upon which the paving units are laid.                        (1)

        5.2.3    Paving is subjected to only pedestrian use.                                  (1)

5.3     5.3.1

                                 BASKET-WEAVE PAVING PATTERN

                        ASSESSMENT CRITERIA                    MARK
                 Vertical first and second full bricks           2
                 Horizontal first and second full bricks         2
                 Creating pattern                                1
                                                    TOTAL:       5                            (5)

Copyright reserved                                                               Please turn over

                            Hosted by www.ecexams.co.za.

### Page 13

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: CONSTRUCTION                          13

        5.3.2

                                  HERRINBONE PAVING PATTERN

                 ASSESSMENT CRITERIA                      MARK
                 Half brick                                 1
                 Full bricks to create pattern              3
                 Creating pattern                           1
                                                   TOTAL:   5                              (5)

5.4     5.4.1    To hold the two skins (walls) of the cavity wall together.                (1)

        5.4.2    Any ONE position where the weep holes must be positioned:
                 • Above the horizontal damp-proof course of the external wall.
                 • On the same level as the concrete floor.
                 • Above the lintel on top of the window / door opening.
                 • Minimum 150 mm above NGL                              (Any 1 x 1)       (1)

        5.4.3    Any ONE purpose of weep holes:
                 • Water that penetrates the outside wall can drain out through the
                   weep hole.
                 • For ventilation purposes.                             (Any 1 x 1)       (1)

5.5

                                                                                           (4)
        DOOR FRAME IN FACE BRICK WALL                                                     [30]

Copyright reserved                                                            Please turn over

                            Hosted by www.ecexams.co.za.

### Page 14

Downloaded from hlayiso.com
14                           CIVIL TECHNOLOGY: CONSTRUCTION            (EC/SEPTEMBER 2024)

QUESTION 6:          FORMWORK, REINFORCEMENT, FOUNDATIONS,
                     CONCRETE FLOORS AND QUANTITIES (SPECIFIC)

6.1     Any ONE material that can be used to line the formwork, to obtain a
        smoother finish:
        • Plastic
        • Metal sheeting
        • Hardboard
        • Fibreglass                                             (Any 1 x 1)           (1)

6.2     A – Bearer / head tree                                                         (1)

        B – Brace / strut                                                              (1)

        C – Prop / strut                                                               (1)

        D – Soleplate                                                                  (1)

6.3     6.3.1        Soft / mild steel                                                 (1)

        6.3.2        200 mm                                                            (1)

        6.3.3        10 mm                                                             (1)

6.4     6.4.1        Compressive forces (Anchor bars)                                  (1)

        6.4.2        Shear forces (Stirrups)                                           (1)

6.5     Any ONE method of joining steel bars with wire:
        • Crosswise method
        • Hair knot method
        • Crown method                                              (Any 1 x 1)        (1)

6.6     Any TWO purposes of the cover depth at the reinforcing of concrete
        work:
        • To protect steel against corrosion
        • To ensure adequate bonding between the steel and concrete
        • To ensure adequate protection of steel in event of a fire (Any 2 x 1)        (2)

6.7     Any TWO types of pile foundations:
        • Precast concrete piles / prefabricated piles
        • Steel tube caisson piles
        • In-situ (driven) foundation piles
        • Short-bored (auger) piles                                 (Any 2 x 1)        (2)

Copyright reserved                                                        Please turn over

                               Hosted by www.ecexams.co.za.

### Page 15

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                   CIVIL TECHNOLOGY: CONSTRUCTION                        15

6.8     Any THREE reasons for using pile foundations:
        • Ground conditions not stable / solid enough
        • Distribute the load to more stable ground (underground / water
          supports)
        • Provides stability when raft / floating foundation is used
        • When structures are subjected to horizontal forces, pile foundations
          resist bending stress while still lending vertical support
        • Soils prone to swelling and shrinking (clay soil)
        • Superstructure is exposed to uplifting forces (offshore platforms)
        • Where soil erosion is possible (bridges)                       (Any 3 x 1)        (3)

6.9     6.9.1         A – Hollow-core blocks / Concrete floor block                         (1)

                      B – Rib / Reinforced ribs / Pre-stressed ribs                         (1)

        6.9.2         Any ONE disadvantage of the rib-and-block floor
                      construction:
                      • Mechanical handling for the ribs requires on site
                      • Manual labour required to place blocks between ribs
                                                                          (Any 1 x 1)       (1)

6.10    6.10.1        Calculate the length of the wall plate (See ANSWER SHEET B)           (3)

        6.10.2        Calculate the number of roof trusses (See ANSWER SHEET B)             (6)

        6.10.3        Calculate the number of purlins (See ANSWER SHEET B)                  (4)

        6.10.4        Calculate the length of fascia board (See ANSWER SHEET B)            (6)
                                                                                          [40]

                                                                             TOTAL:        200

Copyright reserved                                                             Please turn over

                               Hosted by www.ecexams.co.za.

### Page 16

Downloaded from hlayiso.com
16                             CIVIL TECHNOLOGY: CONSTRUCTION              (EC/SEPTEMBER 2024)

                                                         NAME
                                 CIVIL TECHNOLOGY         AND
ANSWER SHEET               A          GENERIC          SURNAME:

2.1      Use the information on ANSWER SHEET A and complete the site plan on
         a scale of 1 : 200.

ERF 121                                     ERF 123                                ERF 125

                     RE
                                     IE                IE   RE

                                  KITCHEN             BATHROOM

                                                  A

                          MH

               A

                                    PARLEMENT STREET

                                                      Site boundaries           2
                                                      Building lines            2
                                                      Site entrance             1
                                                      Datum level               1
                                                      Main sewerage             2
                                                      Branch sewerage           2
                                                      Manhole                   2
                                                      Rodding eyes              4
                                                      Inspection eyes           4
                                                                        TOTAL: 20

Copyright reserved                                                            Please turn over

                                Hosted by www.ecexams.co.za.

### Page 17

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                       CIVIL TECHNOLOGY: CONSTRUCTION                                         17

                                                                    NAME
                                      CIVIL TECHNOLOGY
 ANSWER SHEET                 B            (GENERIC)
                                                                     AND
                                                                  SURNAME:

  A       B      C                       D                   A     B     C                         D
                          6.10.1                                                  6.10.3
    Wall plate needed between gable walls:                          Number of purlins needed:
                          Internal dimensions for                             √               Length of rafter
                                                                                  =
                          Long walls = 5 560 mm                               √       Dist. Btw. Centres of purlins

   √      √      √                                                                    2,44
                                                                              √=
  2/    5,56 11,12 m wall plate needed.                                               0,813
                                                                              √ = 3 purlins needed

                                                       (3)                                                        (4)
                          6.10.2                                                  6.10.4
        Number of roof trusses needed:                            Length of fascia board needed:
                      √       Internal Dimensions                                 Length of fascia board =
                          =                            +1
                      √       Dist. Btw. centres                                  Length of purlin
                              11,12                                               = 150 + 6 000 + 150
                      √=              + 1 roof truss
                               1,2                                                = 6 300 mm purlin √ √
                                                                                  Fascia board =
                      √ = 9,27 + 1 roof truss
                                                                                  6 300 mm √
                      √ = 10 + 1 roof truss                  √     √      √
                      √ = 11 roof trusses needed             2/   6,3   12,60 m Fascia board needed

                                                       (6)                                                        (6)
                          PAGE 1                                              PAGE 2

Copyright reserved                                                                              Please turn over

                                  Hosted by www.ecexams.co.za.

## Related documents

- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — Civil Technology · QP · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-english/896ddb1f-2144-4bfc-a35a-3a71507d7637) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2021 English Civil Services](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-civil-services/80eb9860-b118-41e2-98fd-5bea1b29a026) — Civil Technology · Memo · 2021 · Eng
- [CIVIL TECH GR12 MEMO GR12 SEPT2017 English](https://www.hlayiso.com/library/civil-tech-gr12-memo-gr12-sept2017-english/fcb77566-a1ac-4dff-af72-678e70ccfbc4) — Civil Technology · Memo · 2017 · Eng
- [CIV TECH GR12 QP SEPT 2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-english/4163a632-f091-41bf-8a36-993d566fb2cc) — Civil Technology · QP · 2023 · Eng
- [CIV TECH GR12 QP SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-woodworking-english/c3b4a7c0-761a-45aa-a578-9b98afc86830) — Civil Technology · QP · 2022 · Eng

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — QP · 2024 · Afr
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — QP · 2023 · Eng
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.