# Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo

> Grade 12 Civil Technology memorandum from the Eastern Cape Prelim Exam 2024 (English), 20 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Memorandum
- Year: 2024
- Exam period: Eastern Cape Prelim Exam
- Curriculum: CAPS
- Pages: 20

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Prelim 2024 Memo](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7)

## About this document

Civil Technology · Grade 12 · Eastern Cape Prelim Exam · 2024 · English. Memorandum, 20 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                         NATIONAL
                    SENIOR CERTIFICATE

                           GRADE 12

                     SEPTEMBER 2024

         CIVIL TECHNOLOGY: WOODWORKING
                 MARKING GUIDELINE

MARKS:   200

               This marking guideline consists of 20 pages.

                  Hosted by www.ecexams.co.za.

### Page 2

Downloaded from hlayiso.com
2                         CIVIL TECHNOLOGY: WOODWORKING                  (EC/SEPTEMBER 2024)

INSTRUCTIONS FOR MARKERS

1.      Markers should:
        •    Familiarise themselves with the question and answer before evaluating
             the responses of candidates.
        •    Always interpret the responses of the candidates within the context of
             the question.
        •    Consider any relevant and acceptable answer during pre-marking but
             should strictly adhere to the answers after finalisation of the marking
             guideline.
        •    There are TWO approaches to answering questions; these are (1) to
             describe and (2) to explain.
             o If a candidate is required to explain e.g., a process in 4 steps, only
                  the first 4 responses should be considered.
             o However, if for example candidate is required to explain or describe
                  a process, we need to consider that that candidates may write a long
                  description, not necessarily well organised. In this case the marker
                  needs to evaluate the complete statement to judge if the candidate
                  explained the required outcome satisfactorily and allocate marks on
                  merit.
        •    Mark what the candidate wrote and do not interpret or predict responses.
        •    Indicate the tick or cross right at the position where the mark needs to
             be awarded or where the candidate made the error.
        •    Accept the letter corresponding with the correct answer as well as the
             answer written in full in multiple-choice questions or similar questions.
        •    Accept incorrect spelling in one-word answers unless the spelling
             changes the meaning of the answer.
        •    If a learner writes two or more answers separated by a slash (/) mark
             only the first response, unless the additional answer/s are different
             names for the same item e.g., Yale lock/Night latch. In this case, the
             answer for the response should be awarded and the slash (/) should
             NOT be considered as an additional answer.

2.      For calculations:
        •    A mark is only awarded if the correct unit is written next to the answer.
             If the question states that the answer must be in a specific unit, a mark
             will ONLY be awarded if the answer has the correct unit as indicated in
             the question.
        •    Marks will only be allocated for the correct values if the candidates add
             instead of multiply. NO marks will be awarded for the calculations and
             the answer.
        •    Where an incorrect answer is correctly carried over, the marker must
             recalculate the values, using the incorrect answer from the first
             calculation. If correctly used, the candidate should receive the full marks
             for subsequent calculations.
        •    Alternative methods of calculations must be considered, provided that
             the correct answer is obtained.
        •    For the calculation of quantities marks will be awarded for the correct
             use of the dimension paper.

Copyright reserved                                                             Please turn over

                            Hosted by www.ecexams.co.za.

### Page 3

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: WOODWORKING                            3

3.      When marking drawings:

        •    The member for which the mark should be awarded should be drawn
             correctly in the correct position to receive a mark.
        •    A member incorrectly drawn but wrongfully repeated in another position
             will be awarded the mark for the repeated incorrect member provided that
             the marking guideline provide for TWO or more marks for that member
             (positive marking).
        •    Marks can only be awarded for a label if the label is correctly indicating
             the correct member.
        •    Scale drawings should always be marked using an appropriate mask.
        •    If the incorrect/wrong drawing was drawn, the candidate can be awarded
             for only what was provided for on the marking guideline.
        •    If a line diagram or an orthographic view instead of a pictorial drawing
             (isometric/oblique/perspective) is drawn, the first assessment criteria for
             each member will be marked wrong, but marks will be awarded for the
             subsequent members if TWO or more marks are awarded for the same
             member.
        •    If candidates draw/give more information than what is required, mark
             strictly according to the assessment criteria.

4.      Incorrect numbering of questions:

        •    If a candidate numbered an answer incorrectly, but the answer is in the
             correct position according to the sequence of the questions in the
             question paper, circle then the incorrect numbering and mark the
             response.
        •    If questions were answered randomly not following the same sequence
             as in the question paper and the learner numbered incorrectly, the
             response should NOT be marked.

5.      Duplication of responses and questions answered in the correct place:

        •    If a question has been answered twice, mark the first response.
        •    If a question should be answered on an answer sheet and the candidate
             answered it on both the answer sheet and in the answer book, mark the
             response on the answer sheet and cancel the response in the answer
             book.
        •    If the question has been answered in the answer book instead of on the
             answer sheet, mark the response in the answer book according to the
             assessment criteria on the marking guideline.

Copyright reserved                                                       Please turn over

                            Hosted by www.ecexams.co.za.

### Page 4

Downloaded from hlayiso.com
4                         CIVIL TECHNOLOGY: WOODWORKING               (EC/SEPTEMBER 2024)

QUESTION 1: SAFETY AND MATERIAL (GENERIC)

1.1     1.1.1    2                                                                        (1)

        1.1.2    228 mm                                                                   (1)

        1.1.3    900 mm                                                                   (1)

        1.1.4    150 mm                                                                   (1)

        1.1.5    Non-slippery layer                                                       (1)

1.2     Similar answer:
        Prevent horizontal movement between the platform and structure.                   (1)

1.3     Identify THREE of the following requirements that are applicable to the
        supplier of hazardous chemical substances:

        1.3.1    First-aid measures must be shown.                                        (1)

        1.3.4    Fire-fighting measures must be shown.                                    (1)

        1.3.6    Storage instructions must be shown.                                      (1)

1.4     Minimum = 30° (1) and maximum = 50° (1)                                           (2)

1.5     Similar answer:
        Aluminium conducts electricity, (1) and workers who use the ladder could be
        shocked. (1)                                                                      (2)

1.6     Describe the difference between the surface finish of a water-based
        paint and an oil-based paint.
        • Water-based – provides an elastic, flexible finish. (1)
        • Oil-base – provides a hard, durable finish. (1)                                 (2)

1.7     Any THREE advantages of curing concrete:
        • Increases strength
        • Decreases permeability
        • Improves durability
        • Reduces cracks
        • Makes concrete more watertight
        • Provides volume stability
        • Concrete can carry more weight                                (Any 3 x 1)       (3)

1.8     Briefly describe the powder-coating process.
        Plastic finish in powdered form, (1) is applied by means of a compressed air
        spray-gun. (1)                                                                     (2)
                                                                                          [20]

Copyright reserved                                                         Please turn over

                           Hosted by www.ecexams.co.za.

### Page 5

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: WOODWORKING                                 5

QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT

2.1      Use the information on ANSWER SHEET A and complete the site plan
         on a scale of 1 : 200 according to the following requirements:

         2.1.1   The site boundaries are measured from point A
                 The site boundaries in front and back are 23 m long
                 The site boundaries on the sides are 25 m long                                       (2)
         2.1.2 The front building line is 4 m from the site boundary
                 The back and side building lines are 2 m from the site boundaries                    (2)
         2.1.3 Show the site entrance, 3 m from the western site boundary                             (1)
         2.1.4 Show the datum level in the north-eastern corner of the site                           (1)
         Complete the sewage lay-out and abbreviations of the sewage appliances
         according to the following requirements:
         2.1.5 The main sewage from the bathroom to the municipal connection                          (2)
         2.1.6 The branch sewage to the bathroom and kitchen                                          (2)
         2.1.7 Manhole on the site, before the municipal connection                                   (2)
         2.1.8 Rodding eyes                                                                           (4)
         2.1.9 Inspection eye                                                                         (4)

2.2       •   Length of shank
          •   Diameter
          •   Type of thread
          •   Head size                                                               (4 x 1)         (4)

2.3      When square shoulder is driven in, (1) it will resist rotation. (1)                          (2)

2.4      A – Nut
         B – Thread
         C – Runout
         D – Shank                                                                   (4 x 1)          (4)

2.5      Any TWO requirements to which a trestle scaffold must comply.
         • Soundly constructed with a solid material.
         • Prevent spreading of supporting legs.
         • Not higher than 3 m.
         • Consists of not more than two tiers.                   (Any 2 x 1)                         (2)

2.6      Name TWO precautionary measures when transporting a ladder.
         • Not protruding excessively.
         • End marked with a red or orange flag.                     (2 x 1)                          (2)

2.7      Similar answer.
         Paint will cover (1) weaknesses. (1)                                                         (2)

2.8      Briefly describe any ONE use of the dumpy level.
         • Determine (1) height differences. (1)
         • Determine (1) levels and slopes. (1)
         • Setting out (1) of buildings. (1)
         • Transferring of (1) levels and heights. (1)
         • Determine horizontal (1) distances. (1)                               (Any 1 x 2)          (2)
 Copyright reserved                                                            Please turn over

                             Hosted by www.ecexams.co.za.

### Page 6

Downloaded from hlayiso.com
6                      CIVIL TECHNOLOGY: WOODWORKING            (EC/SEPTEMBER 2024)

2.9     Any TWO materials which can be detected in walls by a multi-detector.
        • Ferrous metals
        • Non-ferrous metals
        • WS-wiring
        • Timber
        • Metal pegs
        • Steel rods
        • Copper pipes                                           (Any 2 x 1)         (2)
                                                                                    [40]

Copyright reserved                                                   Please turn over

                         Hosted by www.ecexams.co.za.

### Page 7

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                 CIVIL TECHNOLOGY: WOODWORKING                              7

QUESTION 3:          CASEMENT, CUPBOARDS, WALL-PANELLING AND
                     QUANTITIES (SPECIFIC)

3.1    3.1.1     Bottom rail of fanlight                                                      (1)

       3.1.2     Transom                                                                      (1)

       3.1.3     Wood/Wooden (glazing) bead/Quadrant/Quarter round                            (1)

       3.1.4     To enhance the appearance of the casement/to provide a good
                 finish.                                                                      (1)

       3.1.5     Fanlight is a small window that is built above the opening of a door
                 or window.                                                                   (1)

       3.1.6     To prevent rainwater from being blown into the casement and
                 penetrating the room.                                                        (1)

3.2    See ANSWER SHEET B.                                                                    (9)

3.3    See ANSWER SHEET C.                                                                    (8)

3.4    Built-in cupboard – 550 mm – 600                                                       (1)

       Free-standing cupboard – 520 mm – 570 mm                                               (1)

3.5    3.5.1     A – Cornice                                                                  (1)

                 B – Horizontal rough grounds                                                 (1)

                 C – Quadrant mould                                                           (1)

       3.5.2     To cover the gap between the skirting and floor covering.                    (1)

       3.5.3     To lend an aesthetic appearance.                                             (1)
                                                                                             [30]

Copyright reserved                                                        Please turn over

                            Hosted by www.ecexams.co.za.

### Page 8

Downloaded from hlayiso.com
8                         CIVIL TECHNOLOGY: WOODWORKING               (EC/SEPTEMBER 2024)

QUESTION 4:          ROOFS, CEILINGS, TOOLS AND EQUIPMENT AND
                     MATERIALS (SPECIFIC)

4.1    4.1.1     B                                                                       (1)

       4.1.2     F                                                                       (1)

       4.1.3     D                                                                       (1)

       4.1.4     E                                                                       (1)

       4.1.5     C                                                                       (1)

4.2    4.2.1     Building A – Gable roof                                                 (1)

                 Building B – Hipped roof                                                (1)

       4.2.2                     Top view of a hipped roof

                                              √
                                      √                √
                                              √
                                              √

                                              √                                          (4)

       4.2.3     Any THREE characteristics of a good roof covering:
                 • Good roof covering should resist weather conditions such as
                   wind and rain.
                 • Looks durable and enhance the appearance of the building.
                 • Be fire resistant.
                 • Provide insulation against heat and cold.          (Any 3 x 1)        (3)

4.3    4.3.1     Any ONE purpose of underlay for concrete or clay roof tiles:
                 • Provide highly effective barrier against the ingress of wind-
                   driven rain and dust.
                 • Allow rain that is blown under the tiles to flow to the gutters.
                 • Lowers the suction pressure under the tiles and reduces the
                   risk of the wind lifting the tiles.
                 • Acts as a thermal barrier by improving insulation. (Any 1 x 1)        (1)

       4.3.2     Any one purpose of underlay for a thatched roof:
                 • To delay the spread of fire.                                          (1)

       4.3.3     Any ONE purpose of underlay for IBR and corrugated iron
                 sheeting:
                 • Reduces the amount of dust inside the roof space
                 • Makes the roof waterproof                        (Any 1 x 1)          (1)

Copyright reserved                                                         Please turn over

                           Hosted by www.ecexams.co.za.

### Page 9

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                   CIVIL TECHNOLOGY: WOODWORKING                        9

4.4    Any ONE use of a truss hanger:
       • To join members of roof trusses at 45 or 90 angles
       • To join beams, joists or trusses of hipped roofs, pergolas, carports
         and floor joists or trusses to wall
       • Suitable for T-junction where beams are affixed to a wall or where two
         beams are joined                                             (Any 1 x 1)         (1)

       Any ONE use of a gang nail:
       • To connect different members of roof trusses
       • Used on each side of the roof truss members that are joined
                                                                   (Any 1 x 1)            (1)

4.5    If the area of a thatched roof exceeds 20 m² the roof must be constructed
       at least 4,5 metres from any boundary or neighbouring structures.                  (1)

4.6    Eaves are the portions of a roof that projects beyond the outside walls of
       a building.                                                                        (1)

4.7    Any TWO advantages of mechanical grading:

       •   Machine stress-grading is highly effective and more accurate.
       •   It provides a reliable and consistent method of grading timber.
       •   It is mostly used in engineering connector plate roof trusses.
       •   It is a fast process.                                       (Any 2 x 1)        (2)

4.8    5
       3
       2
       7
       4
       6
       1                                                                   (7 x 1)        (7)

4.9    A – Tie-beam                                                                       (1)

       B – Brandering                                                                     (1)

       C – Trap door                                                                      (1)

       D – Cover strip                                                                    (1)

4.10   610 mm x 610 mm                                                                    (1)

4.11   4.11.1 Portable woodworking machines                                               (1)

       4.11.2 B – Router                                                                  (1)

                 C – Electric plane                                                       (1)

Copyright reserved                                                     Please turn over

                            Hosted by www.ecexams.co.za.

### Page 10

Downloaded from hlayiso.com
10                     CIVIL TECHNOLOGY: WOODWORKING               (EC/SEPTEMBER 2024)

       4.11.3 Any ONE:
              • Clean the jig saw blade after use.
              • Do not force the jig saw blade.
              • Avoid the use of blunt blades.
              • Keep the power cord away from the blade.
              • Use the correct blade for specific work.
              • Always plan your cuts carefully – make pre-cuts if necessary
                to prevent the blade from breaking.
              • Unplug the device when replacing the saw blade.
              • Make sure that the blade has stopped moving before you
                leave the jig saw unattended.                      (Any 1 x 1)       (1)

       4.11.4 Any ONE:
              • Safe dry place.
              • Wooden or plastic box away from moisture.          (Any 1 x 1)      (1)
                                                                                   [40]

Copyright reserved                                                      Please turn over

                         Hosted by www.ecexams.co.za.

### Page 11

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                 CIVIL TECHNOLOGY: WOODWORKING                          11

QUESTION 5:          CENTERING, FORMWORK, SHORING, AND GRAPHICS AS
                     MEANS OF COMMUNICATION (SPECIFIC)

5.1    5.1.1     A – Inclined                                                              (1)

       5.1.2     C – yokes                                                                 (1)

       5.1.3     B – landing                                                               (1)

       5.1.4     A – head of the props/struts to the bearer                                (1)

       5.1.5     D – All the above-mentioned                                               (1)

5.2    5.2.1     Any TWO:
                 • Plastic
                 • Metal sheeting
                 • Hardboard
                 • Fibreglass                                          (Any 2 x 1)         (2)

       5.2.2     The pressure of the liquid concrete is concentrated at the bottom
                 of the formwork.                                                          (1)

       5.2.3     Any ONE:
                 • It is stronger than a wooden prop.
                 • It can be adjusted much easier than a wooden prop.
                 • Provide much more accurate height adjustment during
                     installation.                                (Any 1 x 1)              (1)

5.3    5.3.1     Double flying shore                                                       (1)

       5.3.2     Cleat/needle                                                              (1)

Copyright reserved                                                      Please turn over

                             Hosted by www.ecexams.co.za.

### Page 12

Downloaded from hlayiso.com
12                         CIVIL TECHNOLOGY: WOODWORKING               (EC/SEPTEMBER 2024)

       5.3.3

                                       1     1             O
                                                           R

                                     NO. ASSESSMENT CRITERIA MARK
                                      1  Braces/Diagonal struts   2
                                                           TOTAL: 2                      (2)

5.4    5.4.1     To support the weight of the wall/floor or roof                         (1)

       5.4.2     Any ONE:
                 • To tighten the dead shores and props
                 • To allow height adjustment
                 • To ease the removal of the members of the shores
                                                                  (Any 1 x 1)            (1)
5.5

                                2            3                 2

                                                       4

                                                                   5
                      5

                          NO.   ASSESSMENT CRITERIA                 MARK
                           1    Correctness of king post roof truss  2
                           2    Rafters                              2
                           3    King post                            1
                           4    Tie beam                             1
                           5    Overhang                             2
                                                         TOTAL:      8                   (8)

Copyright reserved                                                          Please turn over

                            Hosted by www.ecexams.co.za.

### Page 13

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                   CIVIL TECHNOLOGY: WOODWORKING                        13

5.6    5.6.1         •   Inserted at the ends
                     •   Under the bearer
                     •   On top of the props                               (3 x 1)         (3)

       5.6.2     Any TWO:
                 • To support the centre.
                 • Raise or lower the centre to the required height.
                 • Facilitate the removal of the centre after completion of the
                     arch.                                            (Any 2 x 1)          (2)

       5.6.3     Rough arch – Open laggings                                                (1)

                 Gauged arch – Closed laggings                                             (1)
                                                                                          [30]

Copyright reserved                                                     Please turn over

                               Hosted by www.ecexams.co.za.

### Page 14

Downloaded from hlayiso.com
14                          CIVIL TECHNOLOGY: WOODWORKING                  (EC/SEPTEMBER 2024)

QUESTION 6:          SUSPENDED TIMBER FLOORS, STAIRCASES,
                     IRONMONGERY, DOORS AND JOINING (SPECIFIC)

6.1    6.1.1     Night latch/lock                                                            (1)

       6.1.2     Mortise lock                                                                (1)

       6.1.3     Rim lock                                                                    (1)

       6.1.4     Straight cupboard lock                                                      (1)

6.2     •    Cut cupboard lock has a neater appearance because it fits flush with
             the internal surface of the door.
        •    It is stronger than straight cupboard locks because it is fitted in a
             recess on the internal surface of the cupboard.                    (2 x 1)      (2)

6.3    6.3.1     Between legs and the rails                                                  (2)

       6.3.2     See attached ANSWER SHEET 6.3.2.                                            (8)

6.4    6.4.1     Horizontal sectional view through the Muntin and raised panel.              (1)

       6.4.2     A – Muntin                                                                  (1)

                 B – Raised panel                                                            (1)

                 C – Clearance                                                               (1)

       6.4.3     Muntin is a vertical member that is inserted between the stiles to
                 house extra panels.                                                         (1)

       6.4.4     To allow for the shrinkage and expansion of wood.                           (1)

6.5    See attached ANSWER SHEET 6.5.                                                      (12)

6.6    6.6.1     A – Handrail                                                                (1)

                 B – Newel post                                                              (1)

                 F – Stringer                                                                (1)

Copyright reserved                                                              Please turn over

                              Hosted by www.ecexams.co.za.

### Page 15

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: WOODWORKING                             15

       6.6.2     Straight flight of stairs:
                 Any ONE:
                 • Run in one direction
                 • Uninterrupted flight of stairs that directly connects two floors
                 • Suitable for long flights
                 • Require long straight area for construction                               (1)

                 Half landing staircases:
                 Any ONE:
                 • Known as U-shaped
                 • Has two parallel flights of stairs that are connected by a
                      landing that makes a 180° turn when one ascends or
                      descends
                 • Need less floor space as it occupies shorter but wider floor
                      area                                                                   (1)

       6.6.3     Any ONE:
                 • Ideal when staircases change the direction.
                 • Serves as resting place/allow the user to pause when
                     ascending and descending stairs.                                        (1)
                                                                                            [40]

                                                                           TOTAL:           200

Copyright reserved                                                       Please turn over

                            Hosted by www.ecexams.co.za.

### Page 16

Downloaded from hlayiso.com
16                             CIVIL TECHNOLOGY: WOODWORKING           (EC/SEPTEMBER 2024)

                                                             NAME
                                     CIVIL TECHNOLOGY         AND
 ANSWER SHEET                  A          GENERIC          SURNAME:

 2.1     Use the information on ANSWER SHEET A and complete the site plan on
         a scale of 1 : 200.

ERF 121                                        ERF 123                             ERF 125

                     RE
                                        IE                IE   RE

                                     KITCHEN             BATHROOM

                                                    A

                          MH

               A

                                       PARLEMENT STREET

                                                         Site boundaries        2
                                                         Building lines         2
                                                         Site entrance          1
                                                         Datum level            1
                                                         Main sewerage          2
                                                         Branch sewerage        2
                                                         Manhole                2
                                                         Rodding eyes           4
                                                         Inspection eyes        4
                                                                         TOTAL: 20

Copyright reserved                                                          Please turn over

                                   Hosted by www.ecexams.co.za.

### Page 17

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                  CIVIL TECHNOLOGY: WOODWORKING                        17

                                                 NAME
 ANSWER SHEET                 CIVIL TECHNOLOGY    AND
     (3.2)               B         (SPECIFIC)  SURNAME:

                                       Dimension paper
          A          B        C                                D
3.2.1                                 Total length of wall plate needed for the
                                      building

                                       Internal measurements:
                                      8 000 mm – 2/220 = 7 560 mm √

                                       Total length of wall plate needed:
         2/ √ 7,56 √     15,12 m √    Internal length between gable ends = 7 560 mm

                                        15,12 m wall plate is needed                           (4)

                                      Total length of timber required for the tie-beam.

        8/ √    5.28 √   42,24 m √    42,24 m tie-beam is needed                               (3)

3.2.2
                                      Correct use of dimension paper                           (1)

Copyright reserved                                                     Please turn over

                             Hosted by www.ecexams.co.za.

### Page 18

Downloaded from hlayiso.com
18                   CIVIL TECHNOLOGY: WOODWORKING             (EC/SEPTEMBER 2024)

                                                  NAME
 ANSWER SHEET             CIVIL TECHNOLOGY         AND
     (3.3)           C         (SPECIFIC)       SURNAME:

                                                ASSESSMENT CRITERIA           MARK
                                            Top shelf (full width)               1
                                            Intermediate side in the
                                            middle                               1
                                            Hanging space of left side           1
                                            Oval hanging rail                    1
                                            FOUR shelves                         1
                                            TWO drawer units below
                                            shelving                             2
                                            Correctness of drawing               1
                                                                 TOTAL:          8

                                Correctness ✓

Copyright reserved                                                  Please turn over

                         Hosted by www.ecexams.co.za.

### Page 19

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)            CIVIL TECHNOLOGY: WOODWORKING                          19

                                                    NAME
 ANSWER SHEET              CIVIL TECHNOLOGY          AND
     (6.3.2)          D         (SPECIFIC)        SURNAME:

                                                  ASSESSMENT CRITERIA MARK
                                          Correctness of drawing
                                          Rail                                        1
                                          Haunch                                      4
                                          Tenon                                       3
                                                                     TOTAL:           8

Copyright reserved                                                 Please turn over

                          Hosted by www.ecexams.co.za.

### Page 20

Downloaded from hlayiso.com
20                              CIVIL TECHNOLOGY: WOODWORKING         (EC/SEPTEMBER 2024)

                                                             NAME
 ANSWER SHEET                       CIVIL TECHNOLOGY          AND
     (6.5)                    E          (SPECIFIC)        SURNAME:

                         ASSESSMENT CRITERIA              MARK
                     Bearer                                     1
                     Joists                                     2
                     Wall plate                                 1
                     Tongue and groove floorboard               1
                     Skirting                                   1
                     Quadrant                                   1
                     Hatching                                   1
                     Labels for: Ant guard                      1
                                 Air brick                      1
                                 DPC                            1
                     Correctness of drawing                     1
                                                 TOTAL:     12

Copyright reserved                                                         Please turn over

                                  Hosted by www.ecexams.co.za.

## Related documents

- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — Civil Technology · QP · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-english/896ddb1f-2144-4bfc-a35a-3a71507d7637) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2021 English Civil Services](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-civil-services/80eb9860-b118-41e2-98fd-5bea1b29a026) — Civil Technology · Memo · 2021 · Eng
- [CIVIL TECH GR12 MEMO GR12 SEPT2017 English](https://www.hlayiso.com/library/civil-tech-gr12-memo-gr12-sept2017-english/fcb77566-a1ac-4dff-af72-678e70ccfbc4) — Civil Technology · Memo · 2017 · Eng
- [CIV TECH GR12 QP SEPT 2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-english/4163a632-f091-41bf-8a36-993d566fb2cc) — Civil Technology · QP · 2023 · Eng
- [CIV TECH GR12 QP SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-woodworking-english/c3b4a7c0-761a-45aa-a578-9b98afc86830) — Civil Technology · QP · 2022 · Eng

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — QP · 2024 · Afr
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — QP · 2023 · Eng
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.