# Civil Technology Grade 12 Eastern Cape Mock 2022 QP (Eng)

> Grade 12 Civil Technology question paper from the Eastern Cape Mock Exam 2022 (English), 16 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2022-construction-english/43401b2f-4acf-4e60-9f65-229e57c46f36
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Question paper
- Year: 2022
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 16

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Mock 2022 QP (Eng)](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2022-construction-english/43401b2f-4acf-4e60-9f65-229e57c46f36)

## About this document

Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2022 · English. Question paper, 16 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                           NATIONAL SENIOR
                             CERTIFICATE

                                    GRADE 12

                         SEPTEMBER 2022

         CIVIL TECHNOLOGY: CONSTRUCTION

MARKS:   200

TIME:    3 hours

               This paper consists of 16 pages, including 2 answer sheets.

### Page 2

Downloaded from hlayiso.com
2                        CIVIL TECHNOLOGY: CONSTRUCTION                     (EC/SEPTEMBER 2022)

 REQUIREMENTS:

 1.     ANSWER BOOK

 2.     Drawing instruments

 3.     A non-programmable pocket calculator

 INSTRUCTIONS AND INFORMATION

 1.     This question paper consists of SIX questions: TWO questions are generic and
        FOUR questions are subject specific.

 2.     Answer ALL the questions.

 3.     Answer each question as a whole. Do NOT separate subsections of questions.

 4.     Start the answer to EACH question on a NEW page.

 5.     Do NOT write in the margins of the ANSWER BOOK.

 6.     You may use sketches to illustrate your answers.

 7.     Write ALL calculations and answers in the ANSWER BOOK or on the attached
        ANSWER SHEETS.

 8.     Use the mark allocation as a guide to the length of your answers.

 9.     Make drawings and sketches in pencil, fully dimensioned and neatly finished off
        with descriptive titles and notes to conform to the SANS/SABS Code of Practice
        for Building Drawings.

 10.    For the purpose of this question paper, the size of a brick should be taken as
        220 mm x 110 mm x 75 mm.

 11.    Use your own discretion where dimensions and/or details have been omitted.

 12.    Answer QUESTIONS 2.1 and 5.2 on the attached ANSWER SHEETS using
        drawing instruments where necessary.

 13.    Write your NAME on every ANSWER SHEET and hand them in with your
        ANSWER BOOK, whether you have answered the question or not.

 14.    Owing to electronic transfer, drawings in the question paper are NOT to scale.

Copyright reserved                                                             Please turn over

### Page 3

Downloaded from hlayiso.com
(EC/SEPTEMBER 2022)                 CIVIL TECHNOLOGY: CONSTRUCTION                           3

 QUESTION 1: SAFETY AND MATERIALS (GENERIC)

 Start this question on a NEW page.

 1.1    Define the term accident.                                                         (2)

 1.2    Name the material that scaffolding is made from.                                  (1)

 1.3    Choose the correct answer between brackets that is related to scaffolding:

        1.3.1    The safety factor that is used for scaffolding frames is (one / two /
                 three).                                                                  (1)

        1.3.2    The minimum thickness of a wooden scaffold platform is (38 mm /
                 50 mm / 76 mm).                                                          (1)

        1.3.3    The minimum height of a suspended scaffold is (900 mm / 1 200 mm
                 / 1 500 mm).                                                             (1)

 1.4    Give TWO reasons why scaffolding must be inspected before it can be used.
                                                                           (2 x 1)        (2)

 1.5    What is the maximum distance that a suspended scaffold may hang over the
        edge of the structure?                                                            (1)

 1.6    What is the maximum height of a trestle scaffold?                                 (1)

 1.7    Answer the following questions with regard to ladders.

        1.7.1    Why should only one person at a time use a ladder?                       (1)

        1.7.2    What should the end of a ladder be marked with for visibility when it
                 is transported?                                                          (1)

        1.7.3    Name ONE material that ladders can be made from.                         (1)

        1.7.4    Why should ladders be kept clean and free from oil and grease?           (1)

 1.8    Name TWO advantages of a water-based paint.                            (2 x 1)    (2)

 1.9    Name TWO advantages of the curing of concrete.                         (2 x 1)    (2)

 1.10   Name TWO methods that can be used to prevent the corrosion of metals.
                                                                        (2 x 1)            (2)
                                                                                          [20]

Copyright reserved                                                             Please turn over

### Page 4

Downloaded from hlayiso.com
4                         CIVIL TECHNOLOGY: CONSTRUCTION                     (EC/SEPTEMBER 2022)

 QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT (GENERIC)

 Start this question on a NEW page.

 2.1 FIGURE 2.1 on ANSWER SHEET A shows the outer lines of a structure which
     must be built on a site. Draw the site plan on scale 1 : 200 on ANSWER
     SHEET A so that the structure is in the middle of the site.

       The site plan must comply with the following requirements.
       Use the points table on SHEET A as reference.

       2.1.1     Site size is 30 m wide from east to west and 40 m long from south
                 to north.                                                                 (2)

       2.1.2     Pavement of 2 m and the street of 6 m on the south side.                  (3)

       2.1.3     Building boundaries are 2 m on the east, north and west sides and
                 4 m on the south side.                                                    (4)

       2.1.4     3 m wide entrance to the site.                                            (2)

       2.1.5     Datum level in the north-west corner of the site.                         (2)

       Draw in the sewer lay-out for the structure and show the following:

       2.1.6     Water closet symbol at the abbreviation                                   (1)

       2.1.7     Sewer pipes connections                                                   (2)

       2.1.8     Rodding eye with the abbreviation                                         (2)

       2.1.9     Inspection eye with the abbreviation                                      (2)

       2.1.10    Manhole with the abbreviation                                             (2)

       Indicate the following measurements:

       2.1.11    Length and width of the site                                              (4)

       2.1.12    South and west building boundaries                                        (2)

 2.2 What is the advantage of the square shoulder bolt?                                    (1)

Copyright reserved                                                              Please turn over

### Page 5

Downloaded from hlayiso.com
(EC/SEPTEMBER 2022)                CIVIL TECHNOLOGY: CONSTRUCTION                             5

2.3   Name parts A to D of the bolt in FIGURE 2.3.

                A

               B                       C          D

                                          FIGURE 2.3
                                                                            (4 x 1)        (4)

2.4    What is the purpose of the nylon insert of a hexagonal nut?                         (1)

2.5    What is the advantage of a wing nut?                                                (1)

2.6    FIGURE 2.6 shows the dumpy level reading which is taken on the telescopic
       staff. Answer the following questions with regard to the reading.

                                    1.7

                                    1.6

                                          FIGURE 2.6

       2.6.1    What is the height reading on the staff?                                   (1)

       2.6.2    Determine the distance between the dumpy level and the staff.
                Show ALL calculations, formulae and units.                                 (4)
                                                                                          [40]

                                                              TOTAL SECTION A:             60

Copyright reserved                                                              Please turn over

### Page 6

Downloaded from hlayiso.com
6                            CIVIL TECHNOLOGY: CONSTRUCTION                  (EC/SEPTEMBER 2022)

 QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)

 Start this question on a NEW page.

 3.1    Name THREE advantages for the use of roof underlays.                      (3 x 1)    (3)

 3.2    Name TWO requirements that roof trusses should meet.                   (2 x 1)       (2)

 3.3   Answer the following question with regard to roof construction in
       FIGURE 3.3.

                                                                              C

                A
                                                                              D
                B

                                                                              E

                                           FIGURE 3.3

        3.3.1    Name parts A to E.                                               (5 x 1)    (5)

        3.3.2    What are the measurements (sizes) of parts B and E?              (2 x 1)    (2)

        3.3.3    What is the purpose (function) of part D?                                   (1)

 3.4    Choose the correct answer from the words given in brackets in the following
        statements:

        3.4.1    The pitch of flat roofs are less than (10° / 20° / 30°).                    (1)

        3.4.2    The maximum centre-to-centre spacing of battens are (245 mm /
                 345 mm / 445 mm).                                                           (1)

        3.4.3    The minimum pitch for corrugated iron sheets are (5° / 10° / 15°).          (1)

 3.5    Provide the MEASUREMENT at the following descriptions of stairs:

        3.5.1       The minimum depth of the tread.                                          (1)

        3.5.2       The maximum vertical increase of a staircase between landings.           (1)

        3.5.3       The maximum pitch of stairs for private use.                             (1)

        3.5.4       The maximum rise of a stair.                                             (1)

Copyright reserved                                                                Please turn over

### Page 7

Downloaded from hlayiso.com
(EC/SEPTEMBER 2022)                 CIVIL TECHNOLOGY: CONSTRUCTION                           7

 3.6    Provide ONE term for the following descriptions of staircases:

        3.6.1    The horizontal distance covered by the stairs.                           (1)

        3.6.2    The overhang at the front of the tread.                                  (1)

        3.6.3    The vertical member between two consecutive treads.                      (1)

 3.7    Name TWO types of materials that staircases can be made from.         (2 x 1)     (2)

 3.8    Identify the following statements as TRUE or FALSE:

        3.8.1    The wall plate fixes the roof truss to the wall.                         (1)

        3.8.2    Galvanized steel straps must be to a depth of 600 mm in the wall
                 for light roofs, if the wall is built from hollow concrete blocks.       (1)

        3.8.3    Wall ties must be able to resist compressive stresses.                   (1)

 3.9    Name TWO types of cast-in bolt anchors.                                (2 x 1)    (2)
                                                                                         [30]

Copyright reserved                                                             Please turn over

### Page 8

Downloaded from hlayiso.com
8                               CIVIL TECHNOLOGY: CONSTRUCTION                 (EC/SEPTEMBER 2022)

 QUESTION            MATERIAL, EQUIPMENT AND TOOLS, EXCAVATIONS AND
 4:                  FOUNDATIONS (SPECIFIC)

 Start this question on a NEW page.

 4.1     Choose a description from COLUMN B that fits best with the item in
         COLUMN A. Write only the letter (A–I) next to the question numbers
         (4.1.1 to 4.1.6) in the ANSWER BOOK, for example 4.1.7 K.

                            COLUMN A                        COLUMN B
         4.1.1       Aluminium                    A   heavy metal

         4.1.2       Silicone                     B   dipped in molten zinc

         4.1.3       Ductile cast iron            C   tested in a laboratory

         4.1.4       Perspex                      D   light metal

         4.1.5       Cube test                    E   basic sealant

         4.1.6       Polystyrene                  F   tested on the site

                                                  G   packaging material

                                                  H   alternative for glass

                                                  I   highly toxic

                                                                                 (6 x 1)     (6)
 4.2     Name TWO methods to pump concrete to higher levels in a building.
                                                                         (2 x 1)             (2)

 4.3     What is the compressive strength in MPa of high-strength concrete?                  (1)

 4.4     Name ONE disadvantage of ready-mix concrete.                                        (1)

 4.5     Name FOUR types of apparatus used for the slump test.                   (4 x 1)     (4)

 4.6     Discuss the purposes of the cube test.                                  (2 x 1)     (2)

 4.7     How many cube samples is required for the cube test in a laboratory?                (1)

 4.8     Draw a neat sketch of a normal failure of the cube test in the
         ANSWER BOOK.                                                                        (2)

 4.9     Name the TWO main groups into which metals can be classified.           (2 x 1)     (2)
 4.10    Name TWO types of material that can be used for the cladding of
         buildings.                                                              (2 x 1)     (2)

Copyright reserved                                                                Please turn over

### Page 9

Downloaded from hlayiso.com
(EC/SEPTEMBER 2022)                  CIVIL TECHNOLOGY: CONSTRUCTION                               9

 4.11    Answer the following questions with regard to the construction machine in
         FIGURE 4.11.

                                           FIGURE 4.11

         4.11.1       Is this machine used for light or heavy compaction of soil?              (1)

         4.11.2       Name TWO methods of maintaining the machine.                  (2 x 1)    (2)

 4.12    Identify the construction machines in FIGURES 4.12A and 4.12B.             (2 x 1)    (2)

                       FIGURE 4.12A                           FIGURE 4.12B

 4.13    Name TWO factors that can influence the design of a building and the
         excavation thereof.                                               (2 x 1)             (2)

 4.14    Name FOUR causes for the collapse of an excavation.                        (4 x 1)    (4)

 4.15    Identify the following statements as TRUE or FALSE:

         4.15.1 Red or orange warning lights are used excavations.                             (1)

         4.15.2 The fencing around the perimeter of the excavation site must be
                at least two meters high.                                                      (1)

         4.15.3 Ropes may be used to exit deep trenches.                                       (1)

 4.16    Name THREE types of foundations.                                           (3 x 1)    (3)
                                                                                              [40]

Copyright reserved                                                                  Please turn over

### Page 10

Downloaded from hlayiso.com
10                         CIVIL TECHNOLOGY: CONSTRUCTION               (EC/SEPTEMBER 2022)

 QUESTION 5:         BRICKWORK, GRAPHICS, PLASTER AND SCREED
                     (SPECIFIC)

 Start this question on a NEW page.

 5.1 Answer the following questions with regard to the wall in FIGURE 5.1.

                                          FIGURE 5.1

       5.1.1    What type of bond was used to built this wall?                          (1)

       5.1.2    Is this a half brick wall or a one brick wall?                          (1)

       5.1.3    What is the width of the wall?                                          (1)

 5.2 Draw in the damp-proof course (DPC) at wall and floor on ANSWER
     SHEET B.                                                        (5 x 1)            (5)

 5.3 Answer the following questions with regard to the cavity wall.

       5.3.1    What is the width of a standard cavity wall?                            (1)

       5.3.2    How thick should the skins (leaves) at least be?                        (1)

       5.3.3    What is the maximum height of a cavity wall?                            (1)

       5.3.4    What connects the two skins?                                            (1)

       5.3.5    What is the purpose of the weep hole?                                   (1)

 5.4 Name THREE advantages of cavity walls.                                  (3 x 1)    (3)

Copyright reserved                                                           Please turn over

### Page 11

Downloaded from hlayiso.com
(EC/SEPTEMBER 2022)                 CIVIL TECHNOLOGY: CONSTRUCTION                            11

 5.5   Identify the wall ties in FIGURES 5.5A and 5.5B.                       (2 x 1)       (2)

                      FIGURE 5.5A                           FIGURE 5.5B

 5.6    Choose a description from COLUMN B that fits best with the item in
        COLUMN A. Write only the letter (A–F) next to the question numbers
        (5.6.1 to 5.6.4) in the ANSWER BOOK, for example 5.6.5 G.

                COLUMN A                               COLUMN B
        5.6.1    Su-base            A    natural soil on which the paving will be laid

        5.6.2    Kerb                B   sand used as grouting between paving
                                         blocks

        5.6.3    Subgrade           C    best edge restraint for paving

        5.6.4    Bedding sand       D    final layer upon which paving is laid

                                    E    preparation of the su-base

                                    F    prepared layer beneath paving and bedding
                                         sand
                                                                            (4 x 1)         (4)

 5.7    Name TWO advantages of mortar-set paving.                                (2 x 1)    (2)

 5.8    Name TWO reasons for construction failure of paving.                     (2 x 1)    (2)

 5.9    Draw a neat sketch with EIGHT (8) bricks of the basket-weave paving pattern
        in the ANSWER BOOK. Use your own scale.                                             (4)

Copyright reserved                                                               Please turn over

### Page 12

Downloaded from hlayiso.com
12                          CIVIL TECHNOLOGY: CONSTRUCTION               (EC/SEPTEMBER 2022)

 5.10    Answer the following questions with regard to the arch in FIGURE 5.10.

                                                  A                       B

                                                  C

                                           FIGURE 5.10

         5.10.1      Identify this type of arch construction.                           (1)

         5.10.2      Name parts A to C.                                    (3 x 1)      (3)

 5.11    Name the ingredients of plaster (water and lime excluded).           (2 x 1)   (2)

 5.12    Name TWO types of plaster finishes.                               (2 x 1)      (2)

 5.13    Name TWO types of screed layers.                                     (2 x 1)    (2)
                                                                                        [40]

Copyright reserved                                                            Please turn over

### Page 13

Downloaded from hlayiso.com
(EC/SEPTEMBER 2022)               CIVIL TECHNOLOGY: CONSTRUCTION                        13

 QUESTION 6:          FORMWORK, REINFORCING, CONCRETE FLOORS AND
                      QUANTITIES (SPECIFIC)

 Begin this question on a NEW page.

 6.1    Define the term in-situ concrete.                                             (1)

 6.2    Name THREE properties of good formwork.                             (3 x 1)   (3)

 6.3    Answer the following questions with regard to the formwork in FIGURE 6.3.

                                                                 C
                          A
                                                                 D

                          B

                                                                 E

                                            FIGURE 6.3

        6.3.1    Name parts A to E.                                        (5 x 1)    (5)

        6.3.2    Is this formwork used for a column or a beam?                        (1)

 6.4    Answer the following questions with regard to the bar code in FIGURE 6.4.

                                   Bar code: 8Y12-01-200

                                            FIGURE 6.4
        6.4.1    What type of steel is used?                                          (1)

        6.4.2    What is the diameter of the bars?                                    (1)

        6.4.3    What is the spacing of the bars?                                     (1)

Copyright reserved                                                         Please turn over

### Page 14

Downloaded from hlayiso.com
14                           CIVIL TECHNOLOGY: CONSTRUCTION           (EC/SEPTEMBER 2022)

 6.5 Draw a neat side view of the rib-and-block construction in the
     ANSWER BOOK. Show with an arrow the parts (rib and block).                    (6)

 6.6 Name ONE purpose of the cover depth at the reinforcing of concrete work.      (1)

 6.7 Name ONE method of joining steel bars.                                        (1)

 6.8 FIGURE 6.8 shows the outside measurements of a store-room.
     The foundation is 700 mm wide and 250 mm thick.
     Answer the following questions in the ANSWER BOOK.
     Table format is NOT required (show all formulas and steps).

                                                 5 500

               3 250

                                           FIGURE 6.8

       6.8.1      Calculate the centre line of the foundation.                     (5)

       6.8.2      Calculate the volume of concrete required.                       (4)
                                                                                  [30]

                                                                       TOTAL:      200

Copyright reserved                                                       Please turn over

### Page 15

Downloaded from hlayiso.com
(EC/SEPTEMBER 2022)            CIVIL TECHNOLOGY: CONSTRUCTION                        15

                             CIVIL TECHNOLOGY
   ANSWER SHEET          A        GENERIC
                                                     NAME:

 2.1 FIGURE 2.1 on ANSWER SHEET A shows the outer lines of a structure which
     must be built on a site. Draw the site plan on scale 1 : 200 on ANSWER SHEET
     A so that the structure is in the middle of the site.                            (28)

                                                      Plot size              2
                                                      Pavement + street      3
                                                      Building boundaries    4
                                                      Entrance               2
                                                      Datum level            2
                                                      Water closet           1
                                                      Sewer connection       2
                                                      Inspection eye + abbr. 2
                                                      Rodding eye + abbr.    2
                                 WC                   Manhole + abbr.        2
                                                      Measurements           6
                                                                     TOTAL 28

Copyright reserved                                                      Please turn over

### Page 16

Downloaded from hlayiso.com
16                      CIVIL TECHNOLOGY: CONSTRUCTION    (EC/SEPTEMBER 2022)

                             CIVIL TECHNOLOGY
  ANSWER SHEET          B      CONSTRUCTION
                                                  NAME:

5.2    Draw in the damp-proof course (DPC).                            (5)

Copyright reserved                                           Please turn over

## Related documents

- [CIV TECH GR12 QP SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-woodworking-english/c3b4a7c0-761a-45aa-a578-9b98afc86830) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR12 QP SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-civil-services-english/90720b3f-011a-43dc-8be9-862cb2bbc268) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-woodworking-english/62d9cbb1-1077-4edb-86c4-7a21fd6749a9) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-english/896ddb1f-2144-4bfc-a35a-3a71507d7637) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 QP SEPT2021 English Construction](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2021-english-construction/551ab3e9-47c5-4ab0-a0cf-bc66dda5a956) — Civil Technology · QP · 2021 · Eng
- [CIVIL TECH QP GR12 SEPT 2019 Woodwork English](https://www.hlayiso.com/library/civil-tech-qp-gr12-sept-2019-woodwork-english/7eaa0222-4bca-4690-a584-eab0441f77d9) — Civil Technology · QP · 2019 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2023-construction-english/9ab6f3f0-4774-49bf-8311-57f09822adf6) — Memo · 2023 · Eng
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Memo · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.