# Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Eng)

> Grade 12 Civil Technology question paper from the Eastern Cape Mock Exam 2023 (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2023-civil-english/de45fdc8-980e-4cc3-a2d1-87b399333ce4
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Question paper
- Year: 2023
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Mock 2023 QP (Eng)](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2023-civil-english/de45fdc8-980e-4cc3-a2d1-87b399333ce4)

## About this document

Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2023 · English. Question paper, 18 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

NATIONAL
                        SENIOR CERTIFICATE

                                 GRADE 12

                         SEPTEMBER 2023

         CIVIL TECHNOLOGY: CIVIL SERVICES

MARKS:   200

TIME:    3 hours

         This question paper consists of 18 pages, including 2 answer sheets.

### Page 2

2                         CIVIL TECHNOLOGY: CIVIL SERVICES                 (EC/SEPTEMBER 2023)

REQUIREMENTS:

1.     Drawing instruments

2.     A non-programmable pocket calculator

3.     ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.     This question paper consists of SIX questions: TWO questions are generic
       and FOUR questions are subject specific.

2.     Answer ALL the questions.

3.     Answer each question as a whole. Do NOT separate subsections of
       questions.

4.     Number the answers correctly according to the numbering system used in this
       question paper.

5.     Start the answer to EACH question on a NEW page.

6.     Do NOT write in the margins of the ANSWER BOOK.

7.     You may use sketches to illustrate your answers.

8.     Write ALL calculations and answers in the ANSWER BOOK or on the
       attached ANSWER SHEETS.

9.     Use the mark allocation as a guide to the length of your answers.

10.    Make drawings and sketches in pencil, fully dimensioned and neatly finished
       off with descriptive titles and notes to conform to the SANS/SABS Code of
       Practice for Building Drawings.

11.    For the purpose of this question paper, the size of a brick should be taken as
       220 mm x 110 mm x 75 mm.

12.    Use your own discretion where dimensions and/or details have been omitted.

13.    Answer QUESTIONS 2.2 and 6.1 on the attached ANSWER SHEETS using
       drawing instruments where necessary.

14.    Write your NAME on every ANSWER SHEET and hand them in with your
       ANSWER BOOK, whether you have answered the question or not.

15.    Owing to electronic transfer, drawings in the question paper are NOT to scale.

16.    Write neatly and legibly.

Copyright reserved                                                             Please turn over

### Page 3

(EC/SEPTEMBER 2023)                  CIVIL TECHNOLOGY: CIVIL SERVICES                        3

QUESTION 1: SAFETY AND MATERIALS (GENERIC)

Start this question on a NEW page.

1.1    What is the aim of the Occupational Health and Safety Act (Act 85 of 1993)
       (OHS Act)?                                                                           (1)

1.2    Name the TWO main causes of accidents.                                   (2 x 1)     (2)

1.3    Name ONE reason why scaffolding should be inspected, before it can be
       used.                                                                              (1(1)
                                                                                             x 1)

1.4    Answer the following questions with regard to the scaffolding in FIGURE 1.4.

               A

                   B

                                                                        C

                                            FIGURE 1.4

       1.4.1       Name the parts A to C.                                       (3 x 1)     (3)

       1.4.2       Is this a dependant or an undependant scaffolding?                       (1)

       1.4.3       What is the maximum height that part A must be from the platform?        (1)

1.5    Answer the following questions regarding the regulations on a construction
       site.

       1.5.1       Name ONE way to transport waste material from higher levels in a
                   building to the ground level.                            (1 x 1)         (1)

       1.5.2       If work is done above an entrance, what will prevent materials from
                   falling on workers below?                                                (1)

Copyright reserved                                                             Please turn over

### Page 4

4                          CIVIL TECHNOLOGY: CIVIL SERVICES                 (EC/SEPTEMBER 2023)

1.6    Indicate whether the following statements are TRUE or FALSE.

       1.6.1    Trestle scaffold is used on heights greater than 3 m.                      (1)

       1.6.2    No stack height should exceed three times the width of the material.       (1)

       1.6.3    Aluminium ladders can be used in the proximity of electrical wires.        (1)

       1.6.4    The horizontal part of a ladder is called a stile.

1.7    Name the TWO main groups into which paint can be divided.               (2 x 1)     (2)

1.8    What is the purpose of galvanising?                                                 (1)

1.9    Name TWO advantages of curing (concrete).                               (2 x 1)     (2)
                                                                                          [20]

Copyright reserved                                                              Please turn over

### Page 5

(EC/SEPTEMBER 2023)                CIVIL TECHNOLOGY: CIVIL SERVICES                          5

QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT (GENERIC)

Start this question on a NEW page.

2.1    Identify SIX of the descriptions below which are applicable to the checklist of
       a floor plan.

       •   Window numbers
       •   Building lines
       •   Plot number
       •   Door swings
       •   Names of rooms
       •   Ground contours
       •   Stair directions
       •   Sliding doors
       •   Street number
       •   Water connection point
       •   Position of proposed building
       •   Floor covering                                                      (6 x 1)      (6)

2.2    FIGURE 2.2 on ANSWER SHEET A shows the incomplete elevation of a
       building. Complete the elevation by drawing in the following parts on scale
       1 : 50.

       2.2.1    A window with a length of 1 800 mm and a height of 900 mm.
                The window is built in 700 mm from the right-hand side and one-
                third of the right side of the window can open.                             (7)

       2.2.2    A door according to standard measurements, 900 mm from the left
                side of the building. The door opens to the left. There is one step to
                the ground level.                                                           (5)

       2.2.3    The barge board against the gable end.                                      (2)

2.3    Identify the appliances which are illustrated by the following drawing
       symbols.

       2.3.1
                                                                                            (1)

       2.3.2
                                                                                            (1)

 Copyright reserved                                                             Please turn over

### Page 6

6                          CIVIL TECHNOLOGY: CIVIL SERVICES                     (EC/SEPTEMBER 2023)

2.4    Make neat sketches according to standard building drawing practice to
       illustrate the following symbols.

       2.4.1    Water meter                                                                   (2)

       2.4.2    Plaster                                                                       (2)

       2.4.3    Invert level                                                                  (2)

2.5    Briefly explain the advantages of the square shoulder screw.                           (2)

2.6    Explain the meaning of the following code on rawl bolts: R-RBL M06/18.                 (3)

2.7    What is the purpose of the foot screws of the dumpy level?                             (1)

2.8    Identify the cross hairs A to C in the telescope of the dumpy level in
       FIGURE 2.8.

                               A
                               B
                                                                C

                                       FIGURE 2.8
                                                                                 (3 x 1)      (3)

2.9    Name TWO uses of the dumpy level.                                        (2 x 1)       (2)

2.10   Motivate briefly why labels and metal plates should be removed from the
       multi-detector before using the instrument.                                            (1)
                                                                                             [40]

                                                               TOTAL SECTION A:               60

Copyright reserved                                                                 Please turn over

### Page 7

(EC/SEPTEMBER 2023)                CIVIL TECHNOLOGY: CIVIL SERVICES                         7

QUESTION 3: SAFETY, MATERIAL AND CONSTRUCTION (SPECIFIC)

Start the question on a NEW page.

3.1   What is the responsibility of the employer when workers have to enter confined
      spaces?                                                                              (1)

3.2   What is the purpose of a safety rope, when workers have to enter confined
      spaces?                                                                              (1)

3.3   Study the picture below.

                                                                        A

                                                                       B

                                                                       C

                                         FIGURE 3.3

      Identify parts A to C in the safety harness appliances in FIGURE 3.3.    (3 x 1)     (3)

3.4   Name TWO safety methods for manholes when the covers have to be
      removed.                                                                 (2 x 1)     (2)

3.5   Who is responsible to see to that the fall protection plan is implemented on a
      building site?                                                                       (1)

3.6   Indicate whether the following statements as TRUE or FALSE.

      3.6.1    Dezincification is used in the preparation of galvanised metals for
               soldering.                                                                  (1)

      3.6.2    Dezincification is a form of corrosion.                                     (1)

      3.6.3    Dezincification weakens brass objects.                                      (1)

      3.6.4    Water with a high oil level causes dezincification.                         (1)

      3.6.5    Copper-zink alloys with more than 5% zinc are susceptible to
               dezincification.                                                            (1)

Copyright reserved                                                            Please turn over

### Page 8

8                             CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/SEPTEMBER 2023)

3.7     Explain the electrolytic cleaning method of a metal surface.                          (5)

3.8     Answer the following questions with regard to the wall construction in
        FIGURE 3.8.

                                             FIGURE 3.8

        3.8.1        What is the thickness of the wall?                                       (1)

        3.8.2        In which brick bond is the wall built?                                   (1)

        3.8.3        What is this wall called?                                                (1)

3.9     Name TWO construction requirements which will determine the effectiveness
        of the benching in a manhole.                                       (2 x 1)           (2)

3.10    Explain the difference between hard ground and firm ground when
        excavations are done for drainage.                                        (2 x 2)     (4)

3.11    Choose the correct answer from those in brackets for the backfill of drainage
        trenches. Write only the answers next to the question numbers
        (3.11.1 to 3.11.3) in the ANSWER BOOK.

        3.11.1       Backfilling must be done in layers of not more than
                     (150 mm / 250 mm).                                                       (1)

        3.11.2       Compaction of the ground must be done in layers of
                     (250 mm / 300 mm).                                                       (1)

        3.11.3       Soil compacting is done by (rollers / spades).                          (1)
                                                                                            [30]

Copyright reserved                                                               Please turn over

### Page 9

(EC/SEPTEMBER 2023)                CIVIL TECHNOLOGY: CIVIL SERVICES                          9

QUESTION 4:           COLD WATER SUPPLY, WARM WATER SUPPLY AND TOOLS
                      (SPECIFIC)

Start this question on a NEW page.

4.1    What is the purpose of the packing gland inside the stopcock?                         (1)

4.2    Name THREE positions where stopcocks must be installed.              (3 x 1)          (3)

4.3    Identify the type of valve for each of the following descriptions.

       4.3.1    The water is shut off by means of a lever.                                   (1)

       4.3.2    It works with a jumper to which a washer is fixed.                           (1)

       4.3.3    The valve shaped like a gate that moves up and down.                         (1)

4.4    Answer the following questions with regard to the valve in FIGURE 4.4.

                           A                           C

                       B
                                                   D

                                             FIGURE 4.4

       4.4.1    What is this valve called?                                                   (1)

       4.4.2    Name the parts A to D.                                      (4 x 1)          (4)

       4.4.3    Where is this valve installed?                                               (1)

       4.4.4    Explain the purpose of part D.                                               (1)

4.5    Which type of valve is used in pipe connections where you do not want the
       water to flow back into the pipe?                                                     (1)

4.6    Briefly explain the operation of a demand pillar tap.                                 (2)

4.7    Name TWO types of water saving shower heads.                             (2 x 1)      (2)

 Copyright reserved                                                             Please turn over

### Page 10

10                        CIVIL TECHNOLOGY: CIVIL SERVICES                   (EC/SEPTEMBER 2023)

4.8    FIGURE 4.8 shows a solar water geyser with a pre-heating hot water storage
       tank. Answer the following questions with regard to the system.

                                                                 C
                      A

                                                                 D

                                                                  E
          B
                             PRE-HEATED
                             HOT-WATER
                             STORAGE TANK

                                              FIGURE 4.8

       4.8.1    Name the parts A to E of the system.                               (5 x 1)     (5)

       4.8.2    What is the minimum angle of part B?                                           (1)

       4.8.3    Motivate why part B must face north.                                           (1)

4.9    Indicate the following statements as TRUE or FALSE.

       4.9.1    A shut-off valve is installed to the hot water outlet of the high-pressure
                geyser.                                                                        (1)

       4.9.2    The hot water pipes leading out of the geyser must be suitable to
                withstand water temperatures of up to 70°.                                     (1)

       4.9.3    A 200-litre geyser should not be wall-mounted.                                 (1)

       4.9.4    An electric isolator switch should be installed at least 1 metre from the
                geyser.                                                                        (1)

       4.9.5    The heating element of any water heater must be positioned close to
                the top of the container.                                                      (1)

4.10   Explain the working of a heat pump to heat water.                                       (6)

 Copyright reserved                                                               Please turn over

### Page 11

(EC/SEPTEMBER 2023)              CIVIL TECHNOLOGY: CIVIL SERVICES                          11

4.11 Answer the following questions with regard to the tool in FIGURE 4.11.

                                      FIGURE 4.11

      4.11.1 What is the use of this tool?                                                 (1)

      4.11.2 Name TWO caring measures for this tool.                           (2 x 1)     (2)
                                                                                          [40]

Copyright reserved                                                            Please turn over

### Page 12

12                         CIVIL TECHNOLOGY: CIVIL SERVICES                    (EC/SEPTEMBER 2023)

QUESTION 5: DRAINAGE AND QUANTITIES (SPECIFIC)

Start this question on a NEW page.

5.1    Briefly explain the purpose of a ventilation system in a drainage system.                (2)

5.2    Answer the following questions with regard to the sink installation in
       FIGURE 5.2.

                 A

                                                                    E

                       B

                       C
                       D

                                             FIGURE 5.2

       5.2.1    Identify the parts A to E.                                          (5 x 1)     (5)

       5.2.2    What is the purpose of part A?                                                  (1)

       5.2.3    What is the sectional size of part B?                                           (1)

       5.2.4    What is the purpose of part E?                                                  (1)

5.3    Answer the following questions with regard to the drainage system in
       FIGURE 5.3.

                       A

                                             FIGURE 5.3

       5.3.1    What is this system called?                                                     (1)

       5.3.2    Explain the circumstances and purpose of this system.                           (3)

       5.3.3    Name TWO disadvantages of this system.                              (2 x 1)     (2)

 Copyright reserved                                                                Please turn over

### Page 13

(EC/SEPTEMBER 2023)                  CIVIL TECHNOLOGY: CIVIL SERVICES                          13

5.4 Explain the purpose of a manhole ramp.                                                     (3)

5.5 Answer the following questions with regard to the French drain in FIGURE 5.5.

                                                                        A

                                                                        B

                                                                        C

                                                                        D

                                         FIGURE 5.5

       5.5.1    Name the parts A to D of this system.                             (4 x 1)      (4)

       5.5.2    Briefly motivate why French drains must not be excavated close to
                boreholes.                                                                     (1)

       5.5.3    Explain why stormwater must not be channelled into French drains.              (2)

5.6   Give the colour code for the following drainage fittings.

      5.6.1    Soil pipes                                                                      (1)

      5.6.2    Stormwater drains                                                               (1)

      5.6.3    All existing drains                                                             (1)

5.7   Briefly explain why drainage pipes must be laid at a stipulated gradient.                (1)

Copyright reserved                                                                Please turn over

### Page 14

14                       CIVIL TECHNOLOGY: CIVIL SERVICES             (EC/SEPTEMBER 2023)

5.8    FIGURE 5.8 shows a line diagram of the cold- and hot-water supply for a
       building. The cold-water pipe to the geyser has a diameter of 22 mm. The
       hot-water pipe from the geyser has a diameter of 22 mm and the branch
       pipes for the hot-water have a diameter 15 mm. Use the information in the
       table below and determine the quantity material 5.8.1 to 5.8.10 which is
       needed for the hot-water installation.

                                      FIGURE 5.8

         SANITARY WARE /        MATERIAL           SIZE          QUANTITY
             FITTING
       Temperature and             5.8.1                            5.8.2
       pressure safety valve
       with overflow
       Vacuum-relief valve         5.8.3                            5.8.4
       Pressure-control valve      5.8.5                              1
       Drip tray                   5.8.6                              1
       Cold-water pipe             5.8.7          22 mm          17 300 mm
       Hot-water branch pipe      Copper           5.8.8
       Compression tees           Copper      22 mm x 22 mm         5.8.9
       Reducing tee               Copper          5.8.10              1
                                                                        (10 x 1)       (10)
                                                                                       [40]

 Copyright reserved                                                         Please turn over

### Page 15

(EC/SEPTEMBER 2023)               CIVIL TECHNOLOGY: CIVIL SERVICES                        15

QUESTION 6: GRAPHIC COMMUNICATION, ROOF WORK, STORMWATER
            AND JOINING (SPECIFIC)

Start this question on a NEW page.

6.1 FIGURE 6.1 on ANSWER SHEET B shows the top and front elevation of a
    cone. Draw the development of the cone according to the radial-line method
    on ANSWER SHEET B. Show ALL construction lines.                                       (7)

6.2 Name the parts A to C of the gutter system in FIGURE 6.2.

                                                                   A

                                                                    B

                                                                   C

                                        FIGURE 6.2
                                                                                (3 x 1)   (3)

6.3 Indicate the following statements as TRUE or FALSE.

      6.3.1    Galvanised gutters must have a pitch of 25 mm for every 5,8 m.             (1)

      6.3.2    Gutters are mounted with brackets to the roof covering.                    (1)

      6.3.3    The front edge of the gutter is secured with spring hooks.                 (1)

      6.3.4    The seams of galvanised gutters are soldered with a 50/50 solder.          (1)

6.4 Which tools are used to cut PVC gutters accurate to the required lengths?
                                                                            (2 x 1)       (2)

6.5 With what will gutter ends be sealed off?                                             (1)

6.6 Name TWO types of material which are used for flushings.                    (2 x 1)   (2)

6.7 Briefly explain the use and purpose of a concrete shoe in the channelling of
    rain water.                                                                           (2)

6.8 Name TWO types of material which are illegal to direct into stormwater
    systems.                                                               (2 x 1)        (2)

Copyright reserved                                                           Please turn over

### Page 16

16                          CIVIL TECHNOLOGY: CIVIL SERVICES               (EC/SEPTEMBER 2023)

6.9     Briefly motivate why soakaways must be constructed at least 5 m away from
        a building.                                                                        (2)

6.10    Choose a description with regard to the fasteners from COLUMN B that
        matches the item in COLUMN A. Write only the correct letter (A–G) next to
        the question numbers (6.10.1 to 6.10.5) in the ANSWER BOOK, for example
        6.10.6 H.

                      COLUMN A                            COLUMN B
        6.10.1       Square shoulder screw   A    Has a nylon insert

        6.10.2       Wing nut                B    Truss head

        6.10.3       Rawl bolt               C    Is manufactured from fibre-plastic

        6.10.4       Hex flange              D    Can be tightened with fingers.

        6.10.5       Nylon on / Lock nut     E    The sheath expands when it is
                                                  fastened

                                             F    Domed head

                                             G    Has a built-in washer
                                                                               (5 x 1)    (5)
                                                                                         [30]

                                                                             TOTAL:       200

Copyright reserved                                                            Please turn over

### Page 17

(EC/SEPTEMBER 2023)               CIVIL TECHNOLOGY: CIVIL SERVICES                         17

                             CIVIL TECHNOLOGY           NAME:
 ANSWER SHEET          A          GENERIC

2.2 FIGURE 2.2 on ANSWER SHEET A shows the incomplete elevation of a
    building. Complete the elevation by drawing in the following parts on scale
    1 : 50.

      2.2.1    A window with a length of 1 800 mm and a height of 900 mm.
               The window is built in 700 mm from the right-hand side and one-third of
               the right side of the window can open.                                     (7)

      2.2.2    A door according to standard measurements, 900 mm from the left-
               hand side of the building. The door opens to the left. There is one step
               to the ground level.                                                        (5)

      2.2.3    The barge board against the gable end.                                      (2)

                                                                Window                7
                                                                Door                  5
                                                                Barge board           2

                                                                          TOTAL 14

                      FIGURE 2.2

Copyright reserved                                                            Please turn over

### Page 18

18                           CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/SEPTEMBER 2023)

                                CIVIL TECHNOLOGY        NAME:
 ANSHER SHEET            B        CIVIL SERVICES

6.1    FIGURE 6.1 on ANSWER SHEET B shows the top and front elevation of a
       cone. Draw the development of the cone according to the radial-line method
       on ANSWER SHEET B. Show ALL construction lines.                                   (7)

                     FRONT ELEVATION

                                                Halve circle 1 to 5               2
                                                Pattern lines A–1 to A–5          5
                                                                            TOTAL 7
                      TOP ELEVATION
                       FIGURE 6.1

Copyright reserved                                                            Please turn over

## Related documents

- [CIV TECH GR12 MEMO SEPT2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2023-construction-english/9ab6f3f0-4774-49bf-8311-57f09822adf6) — Civil Technology · Memo · 2023 · Eng
- [CIV TECH GR12 QP SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-woodworking-english/c3b4a7c0-761a-45aa-a578-9b98afc86830) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR12 QP SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-civil-services-english/90720b3f-011a-43dc-8be9-862cb2bbc268) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR12 QP SEPT2021 English Construction](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2021-english-construction/551ab3e9-47c5-4ab0-a0cf-bc66dda5a956) — Civil Technology · QP · 2021 · Eng
- [CIVIL TECH QP GR12 SEPT 2019 Woodwork English](https://www.hlayiso.com/library/civil-tech-qp-gr12-sept-2019-woodwork-english/7eaa0222-4bca-4690-a584-eab0441f77d9) — Civil Technology · QP · 2019 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-woodworking-english/62d9cbb1-1077-4edb-86c4-7a21fd6749a9) — Civil Technology · Memo · 2022 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Memo · 2023 · Afr
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
