# Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)

> Grade 12 Civil Technology question paper from the Eastern Cape Prelim Exam 2024 (English), 17 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Question paper
- Year: 2024
- Exam period: Eastern Cape Prelim Exam
- Curriculum: CAPS
- Pages: 17

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Prelim 2024 QP (Eng)](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7)

## About this document

Civil Technology · Grade 12 · Eastern Cape Prelim Exam · 2024 · English. Question paper, 17 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                            NATIONAL
                       SENIOR CERTIFICATE

                               GRADE 12

                       SEPTEMBER 2024

         CIVIL TECHNOLOGY: CONSTRUCTION

MARKS:    200

TIME:     3 hours

          This paper consists of 17 pages, including 2 answer sheets.

                     Hosted by www.ecexams.co.za.

### Page 2

Downloaded from hlayiso.com
 2                         CIVIL TECHNOLOGY: CONSTRUCTION                   (EC/SEPTEMBER 2024)

REQUIREMENTS:

1.      Drawing instruments

2.      A non-programmable pocket calculator

3.      ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.      This question paper consists of SIX questions: TWO questions are generic
        and FOUR questions are subject-specific.

2.      Answer ALL the questions.

3.      Answer each question as a whole. Do NOT separate subsections of
        questions.

4.      Start the answer to EACH question on a NEW page.

5.      Number the answers correctly according to the numbering system used in
        this question paper.

6.      Do NOT write in the margins of the ANSWER BOOK.

7.      You may use sketches to illustrate your answers.

8.      Write ALL calculations and answers in the ANSWER BOOK or on the
        attached ANSWER SHEETS.

9.      Use the mark allocation as a guide to the length of your answers.

10.     Make drawings and sketches in pencil, fully dimensioned and neatly finished
        off with descriptive titles and notes to conform to the SANS/SABS Code of
        Practice for Building Drawings.

11.     For the purpose of this question paper, the size of a brick should be taken as
        220 mm x 110 mm x 75 mm.

12.     Use your own discretion where dimensions and/or details have been omitted.

13.     Answer QUESTIONS 2.1 and 6.10 on the attached ANSWER SHEETS
        using drawing instruments where necessary.

14.     Write your NAME on every ANSWER SHEET and hand them in with your
        ANSWER BOOK, whether you have answered the question or not.

15.     Owing to electronic transfer, drawings in the question paper are NOT to
        scale.

16.     Google images was used as the source of all photographs and pictures.

17.     Write neatly and legibly.
 Copyright reserved                                                            Please turn over

                            Hosted by www.ecexams.co.za.

### Page 3

Downloaded from hlayiso.com
 (EC/SEPTEMBER 2024)                CIVIL TECHNOLOGY: CONSTRUCTION                          3

QUESTION 1: SAFETY AND MATERIALS (GENERIC)

Start this question on a NEW page.

1.1     Choose the correct requirements regarding scaffolding:

        1.1.1    It must have a safety factor of at least 2 / 4                           (1)

        1.1.2    The width of the wooden scaffold platform is at least 114 mm /
                 228 mm                                                                   (1)

        1.1.3    Guard rails must be at least 750 mm / 900 mm high                        (1)

        1.1.4    Toe-boards must be at least 150 mm / 1 500 mm high                       (1)

        1.1.5    Platforms must have a non-slip layer / rust-free layer                   (1)

1.2     Motivate why suspended scaffolding should be as near as possible to the
        structure where work is being done.                                               (1)

1.3     Identify THREE of the regulations below that apply to the supplier of
        hazardous chemical substances.

        1.3.1    First-aid measures must be indicated

        1.3.2    The supplier of the containers must be indicated

        1.3.3    Emergency contact numbers must be indicated

        1.3.4    Fire-fighting measures must be indicated

        1.3.5    Transport information must be indicated

        1.3.6    Storage instructions must be indicated                     (3 x 1)       (3)

1.4     What is the minimum and maximum slope of the stairs used during the
        construction process?                                                             (2)

1.5     Briefly motivate why aluminium ladders must not be used close to electrical
        wires.                                                                            (2)

1.6     Describe the difference between the type of surface finish of a water-based
        paint and an oil-based paint.                                                     (2)

1.7     Name THREE advantages of the curing process of concrete.            (3 x 1)       (3)

1.8     Briefly describe the process of powder coating.                                   (2)
                                                                                         [20]

 Copyright reserved                                                           Please turn over

                             Hosted by www.ecexams.co.za.

### Page 4

Downloaded from hlayiso.com
 4                         CIVIL TECHNOLOGY: CONSTRUCTION                     (EC/SEPTEMBER 2024)

QUESTION 2: GRAPHICS, JOINING AND EQUIPMENT (GENERIC)

Start this question on a NEW page.

2.1   Use the information on ANSWER SHEET A and complete the site plan on a
      scale of 1 : 200 according to the following requirements:

      2.1.1    The site boundaries are measured from point A
               The site boundaries in front and back are 23 m long
               The site boundaries on the sides are 25 m long                                 (2)

      2.1.2    The front building line is 4 m from the site boundary
               The back and side building lines are 2 m from the site boundaries              (2)

      2.1.3    Show the site entrance, 3 m from the western site boundary                     (1)

      2.1.4    Show the datum level in the north-eastern corner of the site                   (1)

      Complete the sewage lay-out and abbreviations of the sewage appliances
      according to the following requirements:

      2.1.5    The main sewage from the bathroom to the municipal connection                  (2)

      2.1.6    The branch sewage to the bathroom and kitchen                                  (2)

      2.1.7    Manhole on the site, before the municipal connection                           (2)

      2.1.8    Rodding eyes                                                                   (4)

      2.1.9    Inspection eyes                                                                (4)

2.2   Name the FOUR particulars of a bolt which must be provide when it is
      purchased.                                                                  (4 x 1)     (4)

2.3   Briefly describe the advantage of the square shoulder bolt.                             (2)

2.4   Name parts A to D of the bolt in FIGURE 2.4.

                                        FIGURE 2.4
                                                                                  (4 x 1)     (4)

2.5   Name TWO requirements to which a trestle scaffold must comply before
      employees use it.                                                    (2 x 1)            (2)

 Copyright reserved                                                              Please turn over

                            Hosted by www.ecexams.co.za.

### Page 5

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)             CIVIL TECHNOLOGY: CONSTRUCTION                           5

2.6   Name TWO precautionary measures which must be taken when transporting
      a ladder.                                                     (2 x 1)            (2)

2.7   Briefly motivate why wooden ladders must not be painted.                         (2)

2.8   Briefly describe ONE use of the dumpy level.                        (1 x 2)      (2)

2.9   Name TWO materials that can be detected in walls by a multi-detector.
                                                                          (2 x 1)      (2)
                                                                                      [40]

Copyright reserved                                                         Please turn over

                          Hosted by www.ecexams.co.za.

### Page 6

Downloaded from hlayiso.com
6                         CIVIL TECHNOLOGY: CONSTRUCTION                    (EC/SEPTEMBER 2024)

QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)

Start this question on a NEW page.

3.1    Draw in good proportion, a neat sketch of a collar tie roof truss with a pitch
       of 45° resting on two supporting walls.

       Show the following on your drawing:

       •    Walls
       •    Wall plates
       •    Rafters
       •    Collar beam/Collar tie
       •    Ridge beam                                                                   (10)

3.2    What is the minimum pitch of a roof when class A corrugated iron sheeting
       is used to cover a roof?                                                           (1)

3.3    State the maximum distance for the spacing between roof trusses for
       corrugated iron roof sheeting.                                                     (1)

3.4    Give ONE word/term for EACH of the following descriptions by choosing a
       word/term from the list below. Write only the word/term next to the question
       numbers (3.4.1 to 3.4.5) in your ANSWER BOOK, for example 3.4.6 Riser.

                     run; landing; nosing; going/tread; apron; riser;
                          pitch line; baluster; handrail; stairwell

       3.4.1   The vertical distance between two consecutive treads                       (1)

       3.4.2   Vertical posts that hold up the handrail                                   (1)

       3.4.3   The flat, horizontal surface of a step on which one walks when
               descending or ascending a staircase                                        (1)

       3.4.4   The top horizontal area on top of a staircase                              (1)

       3.4.5   The horizontal distance covered by the stairs                              (1)

3.5    What are the width and thickness measurements of a purlin for corrugated
       iron roof sheeting?                                                (2 x 1)         (2)

Copyright reserved                                                             Please turn over

                           Hosted by www.ecexams.co.za.

### Page 7

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                 CIVIL TECHNOLOGY: CONSTRUCTION                       7

3.6    FIGURE 3.6 below shows the formwork for a concrete staircase. Study the
       figure and answer the following questions.

                                         FIGURE 3.6

       3.6.1    Name the parts labelled A to E.                           (5 x 1)     (5)

       3.6.2    What is the minimum distance between the handrail and the tread?      (1)

3.7    Explain ONE method of joining the following materials:

       3.7.1    Roof trusses to a brick wall                                          (1)

       3.7.2    Wall plate to a brick wall                                            (1)

       3.7.3    Metal to another metal                                                (1)

       3.7.4    Metal to concrete                                                     (1)

       3.7.5    Handrails mounted onto a wall                                         (1)
                                                                                     [30]

Copyright reserved                                                         Please turn over

                            Hosted by www.ecexams.co.za.

### Page 8

Downloaded from hlayiso.com
8                            CIVIL TECHNOLOGY: CONSTRUCTION                        (EC/SEPTEMBER 2024)

QUESTION 4:          MATERIAL, EXCAVATIONS, FOUNDATIONS, EQUIPMENT AND
                     TOOLS (SPECIFIC)

Start this question on a NEW page.

4.1     Choose a description from COLUMN B that matches best with an item in
        COLUMN A. Write only the letter (A–I) next to the question numbers
        (4.1.1 to 4.1.6) in the ANSWER BOOK, for example 4.1.7 K.

                       COLUMN A                                    COLUMN B
        4.1.1        Perspex                      A       ferrous metal

        4.1.2        Cube test                    B       dipped in molten zinc

        4.1.3        Aluminium                    C       tested in a laboratory

        4.1.4        Polystyrene                  D       non-ferrous metal

        4.1.5        Slump test                   E       basic sealant

        4.1.6        Ductile cast iron            F       tested on the site

                                                  G       packaging material

                                                  H       alternative for glass

                                                  I       highly toxic
                                                                                       (6 x 1)    (6)

4.2     Answer the following questions regarding the test in FIGURE 4.2.

                                             FIGURE 4.2

        4.2.1        Identify this type of test method.                                            (1)

        4.2.2        Name TWO reasons why this test is done on concrete.               (2 x 1)     (2)

        4.2.3        Identify ONE type of tool used in FIGURE 4.2.                     (1 x 1)     (1)

Copyright reserved                                                                    Please turn over

                              Hosted by www.ecexams.co.za.

### Page 9

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                  CIVIL TECHNOLOGY: CONSTRUCTION                           9

4.3     Name any TWO methods for the curing of concrete.                       (2 x 1)       (2)

4.4     Explain the purpose of cladding for buildings.                                       (2)

4.5     Name THREE types of materials that can be used for the cladding of a
        building.                                                           (3 x 1)          (3)

4.6     Answer the following questions regarding the construction machine in
        FIGURE 4.6.

                                           FIGURE 4.6

        4.6.1    Identify the type of machine.                                               (1)

        4.6.2    Name ONE purpose of this machine.                                 (1 x 1)   (1)

        4.6.3    Name TWO ways of maintaining the machine.                         (2 x 1)   (2)

4.7     Identify the following statements as TRUE or FALSE.

        4.7.1    At excavations all workers must wear hard hats.                             (1)

        4.7.2    No person is allowed to work on their own at an excavation site.            (1)

        4.7.3    Ladders or scaffolding must be used for accessing deep trenches.            (1)

        4.7.4    Weekly inspections are necessary at excavations.                            (1)

4.8     Name THREE causes for the collapse of an excavation.                       (3 x 1)   (3)

4.9     Name TWO ways of making excavations safe at night.                     (2 x 1)       (2)

4.10    Provide the MEASUREMENT in the following statements of excavations.

        4.10.1        From what depth should bracing be used?                                (1)

        4.10.2        From what depth should testing be done for atmospheric gasses?         (1)

        4.10.3        How far should excavated soil be away from the excavation?             (1)

Copyright reserved                                                             Please turn over

                              Hosted by www.ecexams.co.za.

### Page 10

Downloaded from hlayiso.com
10                           CIVIL TECHNOLOGY: CONSTRUCTION                    (EC/SEPTEMBER 2024)

4.11    Choose the correct answer from the block below for the following
        foundation descriptions.

                     strip foundation; stepped foundation; block foundation;
                                  raft foundation; pile foundation

        4.11.1       The depth of the foundation is more than three times its width          (1)

        4.11.2       Used where sites are not level                                          (1)

        4.11.3       Continuous concrete strip that is casted in a trench                    (1)

        4.11.4       The strip foundations and the floor slab are combined                   (1)

4.12    Name any THREE advantages of using pile foundations.                   (3 x 1)       (3)
                                                                                            [40]

Copyright reserved                                                                Please turn over

                              Hosted by www.ecexams.co.za.

### Page 11

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)               CIVIL TECHNOLOGY: CONSTRUCTION                           11

QUESTION 5: BRICKWORK, GRAPHICS, PLASTER AND SCREED (SPECIFIC)

Start this question on a NEW page.

5.1     The pictures in FIGURE 5.1 below show steps of a building process. Study
        the pictures and answer the following questions.

                                         FIGURE 5.1

        5.1.1    Re-arrange the pictures for this building process in the CORRECT
                 order from start to finish, using the letters A to D and give a short
                 description of what is being done in EACH picture.            (4 x 2)     (8)

        5.1.2    Explain why the process in C is necessary.                                (1)

        5.1.3    Name the admixture that can be added to the material to enhance
                 the plasticity of the mixture.                                            (1)

5.2     Explain the following terms that apply to paving:

        5.2.1    Jointing                                                                  (1)

        5.2.2    Bedding sand                                                              (1)

        5.2.3    Walkways                                                                  (1)

5.3     Draw, in good proportion, neat freehand sketches of the following paving
        types in your ANSWER BOOK. The paving must be laid from a corner to
        create a pattern.

        5.3.1    Basket-weave paving pattern                                               (5)

        5.3.2    Herringbone paving pattern                                                (5)

Copyright reserved                                                            Please turn over

                            Hosted by www.ecexams.co.za.

### Page 12

Downloaded from hlayiso.com
12                          CIVIL TECHNOLOGY: CONSTRUCTION                      (EC/SEPTEMBER 2024)

5.4     FIGURE 5.4 shows the front view of a cavity wall.

                                           FIGURE 5.4

        5.4.1        Why is there a need for the darkened and circled part A?                   (1)

        5.4.2        Describe ONE position where the weep holes in a cavity wall
                     should be positioned.                                       (1 x 1)        (1)

        5.4.3        Explain ONE purpose of a weep hole.                            (1 x 1)     (1)

5.5     Draw in your ANSWER BOOK, a neat sketch of the horizontal section of a
        steel door frame built into a half-brick wall, with face bricks and plastered on
        one side.                                                                               (4)
                                                                                               [30]

Copyright reserved                                                                 Please turn over

                              Hosted by www.ecexams.co.za.

### Page 13

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)               CIVIL TECHNOLOGY: CONSTRUCTION                          13

QUESTION 6:           FORMWORK, REINFORCING, FOUNDATIONS, CONCRETE
                      FLOOR AND QUANTITIES (SPECIFIC)

Start this question on a NEW page.

6.1     Name ONE material that can be used to line the formwork, to obtain a
        smoother finish.                                                     (1 x 1)      (1)

6.2     Study the following pictures and answer the questions that follow.

                                         FIGURE 6.2

        Name the parts A to D of the formwork in FIGURE 6.2.                  (4 x 1)     (4)

6.3     Answer the following questions regarding the bar code for steel
        reinforcement: 16R10-02-200.

        6.3.1    What type of steel is used?                                              (1)

        6.3.2    What is the spacing of the bars?                                         (1)

        6.3.3    What is the diameter of the bars?                                        (1)

6.4     What forces are being counteracted by the following parts in concrete beam:

        6.4.1    Anchor bar                                                               (1)

        6.4.2    Stirrups                                                                 (1)

Copyright reserved                                                           Please turn over

                            Hosted by www.ecexams.co.za.

### Page 14

Downloaded from hlayiso.com
14                           CIVIL TECHNOLOGY: CONSTRUCTION                     (EC/SEPTEMBER 2024)

6.5     Name ONE method of joining steel bars with wire.                            (1 x 1)     (1)

6.6     Name TWO purposes of the cover depth at the reinforcing of concrete work.
                                                                            (2 x 1)             (2)

6.7     Name TWO types of pile foundations.                                         (2 x 1)     (2)

6.8     Name THREE reasons for the use of pile foundations.                         (3 x 1)     (3)

6.9     Answer the following questions with regard to the concrete floor in
        FIGURE 6.9.

                A
                                          B
                                              FIGURE 6.9

        6.9.1       Name parts A and B.                                             (2 x 1)     (2)

        6.9.2       Name ONE disadvantage of this type of floor construction.       (1 x 1)     (1)

Copyright reserved                                                                 Please turn over

                              Hosted by www.ecexams.co.za.

### Page 15

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)                    CIVIL TECHNOLOGY: CONSTRUCTION                   15

6.10    FIGURE 6.10 shows a floorplan of a garage with a gable roof, a north
        elevation and a king post roof truss.
        Use the specifications provided and answer the following questions on
        ANSWER SHEET B.

KING POST TRUSS                      FLOORPLAN                   NORTH ELEVATION

                                         FIGURE 6.10

        Use the following specifications:
        - Walls are all 220 mm thick
        - Type of roof – King post roof truss
        - Pitch of roof truss – 30°
        - Members of roof truss are joined by gang nails
        - Corrugated roof sheeting is used
        - Measurement between centres of roof trusses is 1 200 mm
        - Length of the corrugated iron roof sheet is 2 490 mm with a cover width
          of 610 mm
        - Dimensions of wood used for wood trusses is 114 mm x 38 mm
        - True dimensions of the parts of the roof truss:
           o Tie beam          = 2 788 mm
           o Rafter            = 2 440 mm
           o King post         = 800 mm
        - Centre-to-centre spacing between the 76 mm x 50 mm purlins is
          1 130 mm
        - Length of one ridge capping is 1 800 mm
        - Overhang of the roof at the gable ends is 150 mm
        - Overhang of the roof at the fascia board ends is 600 mm

        6.10.1        Calculate the length of the wall plate.                           (3)

        6.10.2        Calculate the number of roof trusses.                             (6)

        6.10.3        Calculate the number of purlins.                                  (4)

        6.10.4        Calculate the length of fascia board.                             (6)
                                                                                       [40]

                                                                           TOTAL:      200

Copyright reserved                                                         Please turn over

                               Hosted by www.ecexams.co.za.

### Page 16

Downloaded from hlayiso.com
16                       CIVIL TECHNOLOGY: CONSTRUCTION             (EC/SEPTEMBER 2024)

                                                    NAME
                           CIVIL TECHNOLOGY          AND
ANSWER SHEET         A          (GENERIC)         SURNAME:

 2.1    Use the information on ANSWER SHEET A and complete the site plan on a
        scale of 1 : 200.

ERF 121                               ERF 123                               ERF 125

                            KITCHEN             BATHROOM

                                            A

               A

                              PARLEMENT STREET

                                                Site boundaries        2
                                                Building lines         2
                                                Site entrance          1
                                                Datum level            1
                                                Main sewerage          2
                                                Branch sewerage        2
                                                Manhole                2
                                                Rodding eyes           4
                                                Inspection eyes        4
                                                                TOTAL: 20

Copyright reserved                                                     Please turn over

                          Hosted by www.ecexams.co.za.

### Page 17

Downloaded from hlayiso.com
(EC/SEPTEMBER 2024)               CIVIL TECHNOLOGY: CONSTRUCTION                         17

                               CIVIL TECHNOLOGY        NAME AND
ANSWER SHEET           B            (SPECIFIC)         SURNAME:

  A       B      C                D                A    B     C               D
                      6.10.1                                      6.10.3
    Wall plate needed between gable walls:               Number of purlins needed:

                                             (3)                                           (4)
                      6.10.2                                      6.10.4
        Number of roof trusses needed:                 Length of fascia board needed:

                                             (6)                                           (6)
                      PAGE 1                                      PAGE 2

Copyright reserved                                                          Please turn over

                           Hosted by www.ecexams.co.za.

## Related documents

- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Civil Technology · Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Civil Technology · Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Civil Technology · Memo · 2024 · Eng
- [CIV TECH GR12 QP SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-woodworking-english/c3b4a7c0-761a-45aa-a578-9b98afc86830) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR12 QP SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-civil-services-english/90720b3f-011a-43dc-8be9-862cb2bbc268) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR12 QP SEPT2021 English Construction](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2021-english-construction/551ab3e9-47c5-4ab0-a0cf-bc66dda5a956) — Civil Technology · QP · 2021 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2023-construction-english/9ab6f3f0-4774-49bf-8311-57f09822adf6) — Memo · 2023 · Eng
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Memo · 2023 · Afr
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — QP · 2023 · Afr
- [Civil Technology Nov 2023 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-woodworking-afr/f6f7ac38-fb55-4d61-bc66-5441e4cbcee0) — QP · 2023 · Afr
- [Civil Technology Nov 2023 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-woodworking-eng/fdfc3cf4-1a3a-4817-a3e9-a2c7f9fe5c2e) — QP · 2023 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.