# Civil Technology Grade 12 Eastern Cape Mock 2017 Memo (Eng)

> Grade 12 Civil Technology memorandum from the Eastern Cape Mock Exam 2017 (English), 14 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-tech-gr12-memo-gr12-sept2017-english/fcb77566-a1ac-4dff-af72-678e70ccfbc4
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Memorandum
- Year: 2017
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 14

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Mock 2017 Memo (Eng)](https://www.hlayiso.com/library/civil-tech-gr12-memo-gr12-sept2017-english/fcb77566-a1ac-4dff-af72-678e70ccfbc4)

## About this document

Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2017 · English. Memorandum, 14 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

NATIONAL
                   SENIOR CERTIFICATE

                          GRADE 12

                   SEPTEMBER 2017

                CIVIL TECHNOLOGY
                MARKING GUIDELINE

MARKS:   200

               This marking guideline consists of 14 pages.

### Page 2

2                                     CIVIL TECHNOLOGY                      (EC/SEPTEMBER 2017)

 QUESTION 1: CONSTRUCTION PROCESSES

 1.1 FIGURE 1.1 shows the substructure of a structure.

       1.1.1    150 mm / 200 mm                                                             (1)

       1.1.2    150 mm                                                                      (1)

       1.1.3    220 mm                                                                      (1)

       1.1.4    Concrete                                                                    (1)

       1.1.5    Hard core filling                                                           (1)

       1.1.6    Any TWO purposes of part 1.1.D.
                     Solid base for concrete floor
                     Give level surface.                                        (2 x 1)     (2)

 1.2 Any similar answer:
     (1) Water weakens (2) sub-soil / foundations can sink.
     (1) Water can dam up against foundations (2) and spread to walls.                      (2)

 1.3 (1) Makes burning process easy because (2) it burns right through to the
         centre of the brick.                                                               (2)

 1.4 Any THREE properties of face bricks.
        Hard
        Strong
        Does not absorb water
        Inner and outer walls                                                  (3 x 1)      (3)

 1.5 Describe in point form the manufacturing process of clay bricks.
     (1) Clay / scale / brick soil are dug out, (2) ground and (3) mixed with water.
     (4) Cast in moulds. (5) Dried. (6) Baked in kilns.                                     (6)

 1.6 FIGURE 1.6 shows a wood door frame.

       1.6.1    (1) Anchors / Frame ties (2) are built into brick joints.                   (2)

       1.6.2    1.1.A – Head
                1.1.B – Strut
                1.1.C – Frame stile                                                         (3)

       1.6.3    813                                                                         (1)

       1.6.4    Anchor frame to floor.                                                      (1)

 1.7 Name the tools in FIGURES 1.7.1 to 1.7.3.

       1.7.1    Plaster trowel                                                              (1)

       1.7.2    Belt sander                                                                 (1)

       1.7.3    Line and pins                                                              (1)
                                                                                          [30]

Copyright reserved                                                             Please turn over

### Page 3

(EC/SEPTEMBER 2017)                 CIVIL TECHNOLOGY                                         3

QUESTION 2: ADVANCED CONSTRUCTION PROCESSES

2.1 2.1.1      Main bar                                                                      (1)

      2.1.2    Withstand tensile stress / Shear stress over shear line                       (1)

      2.1.3    High tensile steel                                                            (1)

      2.1.4    16 mm                                                                         (1)

      2.1.5    Sturrups                                                                      (1)

      2.1.6    Any TWO purposes of the bars at 2.1.B.
                 Withstand shear stress
                 Bind main bars                                                 (2 x 1)      (2)

2.2 Any TWO requirements of the steel for steel reinforcement
    (1) Capable of resisting tensile stress (2) without significant strain
    (1) Easily bent (2) into required shape
    (1) Surface must bond adequately (2) with concrete                       (Any 2 x 2)     (4)

2.3 Similar answer:
    (1) Prevent damp from (2) penetrating to reinforcement / causing rust.                   (2)

2.4 Rough arch – Standard bricks
    Gauged arch – Wedge shape bricks                                                         (2)

2.5 Similar answer:
    (1) Allow for / glass not break (2) expansion and shrinking of glass.                    (2)

2.6 Any THREE safety rules when working on floors and stairs with open
    sides.
        Sufficiently lighting
        Free from material, waste and obstacles
        Sufficiently covered
        Sufficient trap platforms or nets
        Safety equipment must be used                                (3 x 1)                 (3)

2.7 2.7.1 – clamp

      2.7.2 – bearer

      2.7.3 – strut

      2.7.4 – prop

      2.7.5 – soleplate                                                          (5 x 1)     (5)

Copyright reserved                                                             Please turn over

### Page 4

4                                CIVIL TECHNOLOGY               (EC/SEPTEMBER 2017)

2.8 Open eave construction:
    Outer wall
    Rafter
    Tie beam
    Facia board (gutter board)
    2 purlins
    Tile roof covering
    Beam filling

                                                                                  (8)

2.9 (1) Wall or soil (2) which must be supported.                                 (2)

2.10 Indicate whether the following statements are TRUE or FALSE.

      2.10.1 False                                                                (1)

      2.10.2 False                                                                (1)

      2.10.3 True                                                                 (1)

      2.10.4 True                                                                 (1)

      2.10.5 False                                                               (1)
                                                                                [40]

Copyright reserved                                                  Please turn over

### Page 5

(EC/SEPTEMBER 2017)                CIVIL TECHNOLOGY                                         5

QUESTION 3: CIVIL SERVICES

3.1    3.1.1    Septic tank                                                                (1)

       3.1.2    (1) Digests and liquefy by (2) anaerobic bacteria and other biological
                life such as maggots / worms / micro-organisms.                            (2)

       3.1.3    Gas escape                                                                 (1)

       3.1.4    (1) Not disturbing (2) surface water layer.                                (2)

       3.1.5    French drain                                                               (1)

3.2    (1) Sucking / pressure as result of outlet of drain (2) can push or suck water
       lock out.                                                                           (2)

3.3    S-trap

                                                                                           (3)

3.4    3.4.1    STRAIGHT                                                                   (1)

       3.4.2    SLIGHTLY SMALLER                                                           (1)

       3.4.3    6 mm                                                                       (1)

3.5    Any THREE methods to generate electricity.
          Hydro
          Wind
          Sun
          Steam – Coal / Nuclear                                          (Any 3 x 1)      (3)

3.6    Protect electrical cables                                                           (1)

3.7    (1) Lead water to water tank (2) in roof to raise pressure. (3) Water then
       lead to draw-off points.                                                            (3)

3.8    User pipe                                                                           (1)

3.9    3.9.1    False                                                                      (1)
       3.9.2    True                                                                       (1)
       3.9.3    False                                                                      (1)
       3.9.4    False                                                                      (1)
       3.9.5    False                                                                      (1)

3.10 3.10.1 Stop cock                                                                      (1)

       3.10.2 Any ONE example where this type of tap must be installed.
                 Before geysers
                 Cistern
                 Storage tanks
                 Water service point                             (Any 1 x 1)              (1)
                                                                                         [30]
Copyright reserved                                                            Please turn over

### Page 6

6                                  CIVIL TECHNOLOGY                      (EC/SEPTEMBER 2017)

 QUESTION 4: MATERIALS AND QUANTITIES

 4.1    (1) Chemical (2) Physical / bind / harden                              (2 x 1)      (2)

 4.2    (1) Damp in air (2) react with cement particles                                     (2)

 4.3    Any ONE purpose of lime in a mortar mix.
          Better workability
          Better plasticity property for mortar
          When sand has insufficient round particles
          When not sufficient fine sand particles
          Better water retaining capacity                               (Any 1 x 1)         (1)

 4.4    Stone                                                                               (1)

 4.5    Any THREE methods of curing of concrete.
          Retaining formwork
          Covers
          Ponding
          Spraying
          Curing compounds                                              (Any 3 x 1)         (3)

 4.6    Similar answer:
        (1) To test compressive stress to (2) ensure that concrete comply to
        requirements.                                                                       (2)

 4.7    Name TWO uses of each of the following materials:

        4.7.1    Copper:
                   Electrical wires
                   Electrical equipment
                   Water pipes
                   Heads of soldering irons                             (Any 2 x 1)         (2)

        4.7.2    Zink:
                    Alloy material
                    Covering of iron and roof sheets                           (2 x 1)      (2)

 4.8    Channel iron.
                                                                                            (2)

 4.9    Any THREE properties of a good preservative for wood.
          Easily absorbed
          Cheap
          Readily available
          Not poisonous / harmful to humans and animals
          Not easily macerate
          Not corrode metal
          Not reduce strength of wood
          Not unpleasant smell
          Not spoil natural beauty of wood
          Not resist paint, varnish, glue, etc.
          Not flammable                                                 (Any 3 x 1)         (3)

Copyright reserved                                                             Please turn over

### Page 7

(EC/SEPTEMBER 2017)               CIVIL TECHNOLOGY                                         7

 4.10   (1) Odd number layers (2) veneer glued upon the other.                            (2)

 4.11   Use the quantity list on ANSWER SHEET A and determine the volume
        concrete which will be needed for a floor with a length of 6 m, width of 3 m
        and thickness of 75 mm.                                                           (3)

 4.12   Use the quantity list on ANSWER SHEET A and determine the number of
        bricks which will be needed for a cavity wall with a length of 4 m and a
        height of 2,4 m.                                                                 (5)
                                                                                        [30]

Copyright reserved                                                           Please turn over

### Page 8

8                                  CIVIL TECHNOLOGY                       (EC/SEPTEMBER 2017)

 QUESTION 5: APPLIED MECHANICS

 5.1 FIGURE 5.1 on ANSWER SHEET B show the space diagram of a lean to
     roof. Determine graphically scale 1 mm = 1 N on ANSWER SHEET B the
     size and nature of the forces in the parts of the truss by drawing the force
     diagram and completing the table.

                                      A
                                             40 N

                                 D                          B
                                                                   60 N
                                                E            30°

                                                                      C
                                                                                        (14)
                                       FIGURE 5.1

 5.2 FIGURE 5.2 on ANSWER SHEET C show a beam with point loads.
     Calculate on ANSWER SHEET C the following:

        SCALE/SKAAL: 1 mm = 1 N

        10 N          40 N                20 N        30 N

               2m            4m                  2m

                     60 N                             40 N

         a              b                   c           d

                                       FIGURE 5.2

       5.2.1    The bending moment values                                                 (6)

       5.2.2    Complete the bending moment diagram on scale 1 mm = 1 N
                according to the bending moment values                                    (4)

Copyright reserved                                                           Please turn over

### Page 9

(EC/SEPTEMBER 2017)            CIVIL TECHNOLOGY                                      9

 5.3 Determine the sentroid of the body in FIGURE 5.3 from point P.
     (The table on ANSWER SHEET C can be used for the calculations.)

                          Y-axis

                                                  6

                                                  4

                           P                      X-axis

                                    6

                                   FIGURE 5.3                                      (6)
                                                                                  [30]

Copyright reserved                                                     Please turn over

### Page 10

10                                   CIVIL TECHNOLOGY                  (EC/SEPTEMBER 2017)

 QUESTION 6: GRAPHICS AND COMMUNICATION

 6.1 Any FOUR responsibilities of the architect in the design of a structure.
       Determine the needs of the owners
       Determine the arrangement of rooms
       Determine arrangement of windows and doors
       Show dimensions
       Show outside views
       Show roof appearance                                             (4 x 1)        (4)

 6.2 6.2.1       Water closet

                                                                                       (2)

       6.2.2     Sink

                                                                                       (2)

       6.2.3     Water meter

                                                                                       (2)

 6.3 Site plan                                                                         (1)

 6.4 FIGURE 6.4 on ANSWER SHEET D shows the floor plan of a store room on
     scale 1 : 50. Draw the south elevation on scale 1 : 50 on ANSWER SHEET
     D from the given ground level line by using the following information:

       -   The floor level above the ground level: 200 mm
       -   Wall height from the floor level to the ceiling: 2 600 mm
       -   Window 1 : 600 x 2 100 mm
       -   Door 1 : 1 400 x 2 100 mm
       -   Door knob
       -   Roof construction pitch: 30º
       -   Indicate construction line to determine the roof height
       -   Gabel end at west elevation
       -   Hipped roof at east elevation

       Use the mark table on ANSWER SHEET D as reference.                            (29)
                                                                                     [40]

                                                                         TOTAL:       200

Copyright reserved                                                        Please turn over

### Page 11

(EC/SEPTEMBER 2017)               CIVIL TECHNOLOGY                                       11

 ANTWOORDBLAD                SIVIELE TEGNOLOGIE         NAAM:

  ANSWER SHEET
                        A     CIVIL TECHNOLOGY          NAME:

 4.11 Use the quantity list on ANSWER SHEET A and determine the volume
      concrete which will be needed for a floor with a length of 6 m, width of 3 m
      and thickness of 75 mm.                                                            (3)

 4.12 Use the quantity list on ANSWER SHEET A and determine the number of
      bricks which will be needed for a cavity wall with a length of 4 m and a
      height of 2,4 m.                                                                   (5)

    A          B       C                                  D
                                                         4.11
    1/        6
              3
             0,75     13,5   Thus: 13,5 m2 concrete needed for the floor

                                                         4.11

    1/         4
              2,4     9,6    Wall area = 9,6 m2

              9,6
              100     960    Thus: 960 bricks needed for the wall

Copyright reserved                                                          Please turn over

### Page 12

12                               CIVIL TECHNOLOGY                    (EC/SEPTEMBER 2017)

 ANTWOORDBLAD               SIVIELE TEGNOLOGIE       NAAM:

  ANSWER SHEET
                       B    CIVIL TECHNOLOGY         NAME:

VRAAG/QUESTION 5.1                                                    (14)

RUIMTEDIAGRAM:
SPACE DIAGRAM:

                 A
                     40 N

             D               B
                                    60 N
                      E

                                         C
KRAGTEDIAGRAM / FORCE DIAGRAM

SKAAL/SCALE: 1 mm = 1 N                      DEEL/    Grootte/    Aard/Nature
                                             PART       Size
     a                                        AD       160 N
                                              BE       120 N
                                              CE       104 N
                                              DE        40 N

                                                       Akkuraatheid / Accuracy
         b

                                                                                  d

     c                                                           e

Copyright reserved                                                      Please turn over

### Page 13

(EC/SEPTEMBER 2017)                    CIVIL TECHNOLOGY                                      13

 ANTWOORDBLAD                       SIVIELE TEGNOLOGIE       NAAM:

    ANSWER SHEET
                           C        CIVIL TECHNOLOGY         NAME:

VRAAG/QUESTION. 5.2

 5.2.1    Die buigmomentwaardes/The bending moment values                                   (4)

               a    = 0 N.
               b    = (-10 N x 2) = -20 N
               c    = (-10 N x 6) + (-40 N x 4) + (60 N x 4) = 20 N
               d    = (-10 N x 8)+(-40 N x 6) + (60 N x 60) + (-20 x 2) = 0 N

 5.2.2       FIGUUR 5.2: Die buigmomentdiagram/The bending moment diagram                   (4)

SKAAL/SCALE: 1 mm = 1 N

10 N          40 N                      20 N        30 N

     2m                    4m                  2m
             60 N                                   40 N

FIGUUR 5.2
             20 N

                                                        SKAAL

a              b                         c          d

                                      -20 N

VRAAG/QUESTION 5.3                                                                    (6)

    Vorm /                      X                                 Y
    Shape

                     h  6                               h   6
                     3= 3=6–2=4                         3 = 3 = 6 + 4 = 10

Copyright reserved                                                              Please turn over

### Page 14

14                                CIVIL TECHNOLOGY                (EC/SEPTEMBER 2017)

 ANTWOORDBLAD              SIVIELE TEGNOLOGIE        NAAM:

  ANSWER SHEET
                      D     CIVIL TECHNOLOGY         NAME:

VRAAG/QUESTION 6.4                                                             (26)

                          4 200

                          3 640

                                                 2 7403 300

       SCALE 1 : 50

                                                              Floor level    2
                                                              Wall           3
                                     Pitch
                                                              Window         3
                                                              Window sill    1
                                                 Height       Door           4
                                                              Step           1
                                                              Ramp           1
                                                              Facia board    2
                                                              Gutter         1
                                                              Down pipe      1
                                                              Gable end      4
                                                              Hipped roof    3
                                                              Roof height    3
                                                                    TOTAL    29

Copyright reserved                                                   Please turn over

## Related documents

- [CIV TECH GR12 MEMO SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-woodworking-english/62d9cbb1-1077-4edb-86c4-7a21fd6749a9) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-english/896ddb1f-2144-4bfc-a35a-3a71507d7637) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2021 English Civil Services](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-civil-services/80eb9860-b118-41e2-98fd-5bea1b29a026) — Civil Technology · Memo · 2021 · Eng
- [CIV TECH GR12 QP SEPT 2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-english/4163a632-f091-41bf-8a36-993d566fb2cc) — Civil Technology · QP · 2023 · Eng
- [CIV TECH GR12 QP SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-woodworking-english/c3b4a7c0-761a-45aa-a578-9b98afc86830) — Civil Technology · QP · 2022 · Eng
- [CIV TECH GR12 QP SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2022-civil-services-english/90720b3f-011a-43dc-8be9-862cb2bbc268) — Civil Technology · QP · 2022 · Eng

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — QP · 2024 · Afr
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — QP · 2023 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.