# Civil Technology Grade 11 Eastern Cape November 2018 Memo

> Grade 11 Civil Technology memorandum from the Eastern Cape November 2018 (English), 16 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-tech-grd-11-memo-woodworking-eng-d/0c949e26-dd00-453a-b9ba-02dfb10bc39b
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 11
- Document type: Memorandum
- Year: 2018
- Exam period: Eastern Cape November
- Curriculum: CAPS
- Pages: 16

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 11](https://www.hlayiso.com/library/grade-11) › [Civil Technology](https://www.hlayiso.com/library/grade-11/civil-technology) › [Civil Technology Grade 11 Eastern Cape November 2018 Memo](https://www.hlayiso.com/library/civil-tech-grd-11-memo-woodworking-eng-d/0c949e26-dd00-453a-b9ba-02dfb10bc39b)

## About this document

Civil Technology · Grade 11 · Eastern Cape November · 2018. Memorandum, 16 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                               NATIONAL
                          SENIOR CERTIFICATE

                                  GRADE 11

                            NOVEMBER 2018

         CIVIL TECHNOLOGY: WOODWORKING
                 MARKING GUIDELINE

MARKS:    200

  This marking guideline consists of 16 pages, including 5 pages of answer sheets.

### Page 2

Downloaded from hlayiso.com
 2                             CIVIL TECHNOLOGY: WOODWORKING                (EC/NOVEMBER 2018)

 QUESTION 1: SAFETY AND MATERIAL (GENERIC)

 1.1      1.1.1      Hard hat / Safety hat                                                (1)
          1.1.2      All building sites / construction sites                              (1)

 1.2      1.2.1      Loose clothing – Button up / Remove                                  (1)
          1.2.2      Type of shoes in a workshop – Non-slip / Metal point                 (1)
          1.2.3      When sharp object are carried – Point downwards                      (1)
          1.2.4      Dangerous moving parts of power tools – Covered by guards            (1)
          1.2.5      Number of operators who operates a machine – Only one                (1)

 1.3      Contractor                                                                      (1)

 1.4      Any FOUR safety measures which are applicable to the storage of
          flammable liquids.
              x Room must be well ventilated
              x Door must have a threshold
              x No material that may cause a spark
              x Liquids that may interact chemically not to be stored in close
                proximity
              x Containers sealed properly                                   (4 x 1)      (4)

 1.5      1.5.1      Suspended concrete floors – Reinforced concrete                      (1)
          1.5.2      Lintels above door openings – Precast concrete                       (1)
          1.5.3      Foundations for single-storey buildings – Unreinforced concrete      (1)

 1.6      Any ONE use of screed.
             x A finish for floors and walls
             x Facing material
             x Surfacing of suspended floors
             x Insulated roof screed                                                      (1)

 1.7      Any TWO reasons why lime can be added to a mortar mix
             x Increases plasticity
             x Makes mortar more workable                                      (2 x 1)    (2)

 1.8      (1) Cheap (2) easy workable                                                     (2)

 1.9      1.9.1      True                                                                 (1)

          1.9.2      False                                                                (1)

          19.3       False                                                                (1)

          1.9.4      True                                                                 (1)

Copyright reserved                                                              Please turn over

### Page 3

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)        CIVIL TECHNOLOGY: WOODWORKING                                  3

 1.10     (1) High hygienic properties and (2) easy to clean                           (2)

 1.11     (1) Two or more metals (2) are combined to (3) form a new metal / with
          better properties / other properties                                         (3)

 1.12     Any ONE use of thermosetting plastic.
             x Sewerage pipes
             x Gutters
             x Cold- and hot water pipes                                   (1 x 1)     (1)
                                                                                       [30]

Copyright reserved                                                           Please turn over

### Page 4

Downloaded from hlayiso.com
 4                            CIVIL TECHNOLOGY: WOODWORKING                 (EC/NOVEMBER 2018)

 QUESTION 2: EQUIPMENT, TOOLS AND GRAPHICS (GENERIC)

 2.1      2.1.1      Comb hammer                                                           (1)

          2.1.2      Steel comb, finish bricks, blocks/roughen smooth surfaces             (2)

          2.1.3      (1) Hammering on hard bricks (2) decays the comb / make comb
                     blunt                                                                 (2)

 2.2      (1) Mitre try square
          Any THREE uses of it.(3)
              x Testing squareness
              x Marking out perpendicular lines
              x Can be used as a ruler
              x Marking square lines
              x Test if surfaces are straight
              x Drawing 45° lines                                                          (4)

 2.3      (1) Radial arm saw
          Any THREE caring measures for it.(3)
              x Maintain – lubricate and adjust according to instructions
              x Clean after use
              x Repair damaged electrical cords
              x Handle with care not to damage accuracy
              x Use only for intended purpose
              x Do not force the saw
              x Avoid blunt blades
              x Keep ventilation holes open
              x Service regularly                                                         (4)

 2.4      Any TWO caring measures for a concrete mixer.
             x Clean inside after use
             x Do not leave water in the drum
             x Oil inside of drum when storing for a long time               (2 x 1)      (2)

Copyright reserved                                                               Please turn over

### Page 5

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)          CIVIL TECHNOLOGY: WOODWORKING                                   5

 2.5    2.5.1    Site plan                                                                (1)

        2.5.2    124                                                                      (1)

        2.5.3    Building boundary                                                        (1)

        2.5.4    2.5.B – Manhole
                 2.5.C – Rodding eye                                                      (2)

 2.6    FIGURE 2.6 on ANSWER SHEET A shows an incomplete section view of
        a single brick wall. Complete the section view on scale 1 : 20 and show
        the following parts with symbols and labels:

        2.6.1    A strip foundation of 700 x 250 mm with the invert level of
                 400 mm                                                                   (3)

        2.6.2    A single brick wall with a height of 2 700 mm from the floor level
                 and 10 mm plaster work on the outside and inside                         (5)

        2.6.3    The hard core filling of 250 mm                                          (1)

        2.6.4    The damp proof course                                                    (2)

        2.6.5    The blinding layer of 50 mm                                              (1)

        2.6.6    The concrete floor slab of 90 mm                                         (1)

        2.6.7    A door opening with a height of 2 100 mm                                 (1)

        2.6.8    A concrete lintel with a thickness of 70 mm above the door
                 opening                                                                  (2)

        2.6.9    A wall plate of 114 x 38 mm                                              (2)

        2.10     Show any TWO labels.                                          (2 x 1)    (2)
                                                                                         [40]

Copyright reserved                                                              Please turn over

### Page 6

Downloaded from hlayiso.com
 6                         CIVIL TECHNOLOGY: WOODWORKING                  (EC/NOVEMBER 2018)

 QUESTION 3: QUANTITIES, JOINING AND GRAPHICS (GENERIC)

 3.1    FIGURE 3.1 shows the foundation wall of a building. The width of the wall
        is 220 mm and the height 450 mm.
        Use the quantity list on ANSWER SHEET B and calculate the following:

        3.1.1    Determine the centre line of the foundation wall.                     (6)

        3.1.2    Determine the quantity of bricks needed to build the foundation
                 wall and make provision of 5% brick breakage damage.                  (9)

 3.2    (1) Thorough description of the (2) item that was measured and (3) any
        preliminary calculations or sketches                                           (3)

 3.3    (1) Apply adhesive to both surfaces (2) allow to dry and (3) when almost
         dry, clamp parts together                                                     (3)

 3.4    Epoxy                                                                          (1)

 3.5    Any TWO properties of mastic sealant.                               (2 x 1)
           x Works well on metals
           x Prevents dust penetration in joints
           x Flexible, yet keeps surfaces together
           x Adhesion for 5 years
           x Smooth exterior
           x Can be used outdoors
           x Water tight
           x Withstand low and high temperatures
           x Not weakened by exposure to sun                                (2 x 1)    (2)

3.6    3.6.1    Gully

                                                                                         (2)

       3.6.2    Check valve

                                                                                         (2)

       3.6.3    Dressed wood
                                                                                         (2)
                                                                                        [30]

Copyright reserved                                                            Please turn over

### Page 7

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)             CIVIL TECHNOLOGY: WOODWORKING                               7

 QUESTION 4: MATERIAL, TOOLS, GRAPHICS AND WINDOWS (SPECIFIC)

 4.1    Softwood and hardwood                                                             (2)

 4.2    4.2.1        More expensive

        4.2.2        Any type of wood

        4.2.3        50 mm

        4.2.4        25%                                                                  (4)

 4.3    4.3.1        Table saw / circular saw                                             (1)

        4.3.2        4.3.A – blade cover
                     4.3.B – mitre gauge
                     4.3.C – hand wheel for blade-height adjustment
                     4.3.D – mitre gauge slot
                     4.3.E – rip fence                                                    (5)

 4.4    4.4.1        Cutting of curves and circles on large surfaces
                     Cutting a wide range of materials such as hardboard, laminated
                     boards, plastic and thin metal                           (Any 1)     (1)

        4.4.2        Sanding across as well as along the grain of wood
                     Sanding surfaces before polishing
                     Sanding between layers of varnish                        (Any 1)     (1)

        4.4.3        Shaping of surfaces and edging of wood
                     Cutting of profiles to a straight or curved edge
                     Cutting groves
                     Cutting dovetail joints                                  (Any 1)     (1)

 4.5    ANSWER SHEET C – ROOF TRUSS                                                      (12)

 4.6    4.6.1        Skirting                                                             (1)

        4.6.2        Cornice                                                              (1)

        4.6.3        Rebate                                                               (1)
                                                                                         [30]

Copyright reserved                                                             Please turn over

### Page 8

Downloaded from hlayiso.com
 8                            CIVIL TECHNOLOGY: WOODWORKING              (EC/NOVEMBER 2018)

 QUESTION 5: JOINING WINDOWS, DOORS AND WALL PANELLING
             (SPECIFIC)

 5.1    To be built into brickwork/Fix door frame to wall                                (1)

 5.2    Floating shelves
        Steel rail brackets
        Dowels
        Wall plug, supporting pins and screws                                (Any 3)     (3)

 5.3.   5.3.1        Double mortise and tenon joint                                      (1)

        5.3.2        Doorframes                                                          (1)

        5.3.3        Tenons                                                              (2)

        5.3.4        5.3.B – Face cheek                 5.3.C – Edge cheek               (2)

        5.3.5        Mortise chisel                                                      (1)

 5.4    ANSWER SHEET D                                                                   (7)

 5.5    For shrinkage and expansion                                                      (2)

 5.6    Z-framed, ledged and braced batten door

                                                                                         (6)

Copyright reserved                                                            Please turn over

### Page 9

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)      CIVIL TECHNOLOGY: WOODWORKING                               9

 5.7    It gives a pleasing, decorative and durable appearance
        It conceals cracks in walls
        Panelling does not require the entire wall to be plastered
        Does not expand and shrink in the same way as solid timber
        Provides good insulation
        Requires no framework                                        (4 x 1)       (4)
                                                                                  [30]

Copyright reserved                                                      Please turn over

### Page 10

Downloaded from hlayiso.com
 10                       CIVIL TECHNOLOGY: WOODWORKING                   (EC/NOVEMBER 2018)

 QUESTION 6: CENTRING, FORMWORK, SHORING AND SUSPENDED
             FLOORS (SPECIFIC)

 6.1    The top shape of the framework must be the same as the underside of the
        arch
        Centre must support the weight of the wet masonry/brickwork until the
        cement between the arc stones has set
        Centres must be rigid and strong in order to support the masonry of the
        arch
        Must easily be removed
        Must be secured with round wire nails
        Size of members is determined by the design and construction of the
        centre                                                              (4 x 1)      (4)

 6.2    Two solid timber strips 25 mm thick                                              (1)

 6.3    A. Laggings
        B. Rib
        C. Strut
        D. Bearer
        E. Folding wedges

                                                                                         (5)

 6.4    Any TWO.
           x The boards are economical
           x Used where a smooth or quality finish is not needed
           x Big sheets available                                            (2 x 1)     (2)

Copyright reserved                                                            Please turn over

### Page 11

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)           CIVIL TECHNOLOGY: WOODWORKING                                 11

 6.5    6.5.1        To prevent the concrete from sticking to surfaces of the timber        (2)

        6.5.2        To ensure that the surface of the column is even                       (2)

        6.5.3        To ease assembling and dismantling of formwork                         (2)

 6.6    ANSWER SHEET E                                                                     (10)

 6.7    Make provision for raising or lowering the formwork to the required height
        Ease the removal of the formwork after completion of lintel                         (2)

 6.8    Made of wood and metal and used to pull together the box of a square
        column by means of nuts and bolts                                                   (2)

 6.9    6.9.1        False                                                                  (1)

        6.9.2        False                                                                  (1)

        6.9.3        False                                                                  (1)

        6.9.4        True                                                                   (1)

 6.10 A         Rising butt
      B         Parliament
      C         Strap                                                                       (3)

 6.11 For ventilation of timber floor                                                       (1)
                                                                                           [40]

                                                                               TOTAL:      200

Copyright reserved                                                               Please turn over

### Page 12

Downloaded from hlayiso.com
 12                      CIVIL TECHNOLOGY: WOODWORKING                (EC/NOVEMBER 2018)

                            CIVIL TECHNOLOGY
  ANSWER SHEET          A        GENERIC
                                                   NAME:

2.6      FIGURE 2.6 on ANSWER SHEET A shows an incomplete section view of a
         single brick wall. Complete the section view to scale 1 : 20.

                                                2.6.1    Strip foundation        3
                                                2.6.2    Single brick wall       5
                                                2.6.3    Hard core filling       1
                                                2.6.4    Damp proof course       2
                                                2.6.5    Blinding layer          1
                                                2.6.6    Concrete floor slab     1
                                                2.6.7    Door opening            1
                                                2.6.8    Concrete lintel         2
                                                2.6.9    Wall plate              2
                                                2.6.10   2 Labels                2
                                                         TOTAL                  20

                                     2xLabels

                                                          NGL

Copyright reserved                                                        Please turn over

### Page 13

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)        CIVIL TECHNOLOGY: WOODWORKING                             13

                               CIVIL TECHNOLOGY
  ANSWER SHEET           B          GENERIC
                                                         NAME:

QUESTION 3.1

      A              B    C                                 D
                               3.1.1      CENTRE LINE:                            (6)

                               2 x 9 m = 18 m

                               2 x 6 m = 12 m

                                            = 30 m

                               Minus: 4 x 0.22 m = 0.88 m

                                       TOTAL CENTRE LINE = 29.12 m

                               3.1.2      QUANTITY OF BRICKS:                       (9)

                               AREA:
                               Total wall area
      1          29.12
                  0.45 13.104. Thus: Total wall area = 13.104 m²

                             TOTAL BRICKS
                13.104       100 bricks/ m2 for single brick wall
                 100 1 310.4 Thus: 1 311 bricks for total wall

                               5% BREAKAGE

                               5/
                                    100 x 1 311

                               = 66 bricks

                               TOTAL BRICKS :
                               1 311 + 66 = 1 377 total quantity bricks

Copyright reserved                                                        Please turn over

### Page 14

Downloaded from hlayiso.com
 14                       CIVIL TECHNOLOGY: WOODWORKING                   (EC/NOVEMBER 2018)

                              CIVIL TECHNOLOGY
  ANSWER SHEET          C      WOODWORKING
                                                        NAME:

 4.5    FIGURE 4.5 on ANSWER SHEET C shows the incomplete sectional view
        of the outside walls and one inner wall of a building. Complete to a scale
        1 : 50, the SA type roof truss construction with supports on the outside
        walls. The roof pitch is at 30˚ with a overhang of 300 mm.                        (12)

                                                        SA-type roof truss           1
                                                        Tie beam                     1
                                                        Principal rafter             2
                                                        King post                    1
                                                        Strut                        2
                                                        Position of supports         1
                                                        30° Pitch                    1
                                                        300 mm Overhang              1
                                                        Scale                        2

                                                        TOTAL                        12

Copyright reserved                                                             Please turn over

### Page 15

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)       CIVIL TECHNOLOGY: WOODWORKING                                  15

                               CIVIL TECHNOLOGY
   ANSWER SHEET         D       WOODWORKING
                                                        NAME:

 5.4    FIGURE 5.4 on ANSWER SHEET D shows the incomplete horizontal
        section through the mullion and adjacent stiles with glass and partially
        rebated. Complete in good proportion the section view through the adjacent
        left view.

                                                       Ovolo mould                   2
                                                       Putty                         1
                                                       Lip of stilel                 2
                                                       Drip groove                   2

                                                       TOTAL                         7

Copyright reserved                                                          Please turn over

### Page 16

Downloaded from hlayiso.com
 16                       CIVIL TECHNOLOGY: WOODWORKING                (EC/NOVEMBER 2018)

                               CIVIL TECHNOLOGY
   ANSWER SHEET         E       WOODWORKING
                                                       NAME:

 6.6     FIGURE 6.6 on ANSWER SHEET E shows the vertical view of a wall, sole
         plate and formwork board for a concrete floor slab. Complete by drawing
         the parts of formwork supports on a scale of 1 : 20.                    (10)

                                                        Wedges                   2
                                                        Prop                     2
                                                        Cross-bearer             2
                                                        Bearer                   2
                                                        Scale                    2
                                                        TOTAL                    10

Copyright reserved                                                         Please turn over

## Related documents

- [Gr11-CIVIL-TECH S18-MEMO-Eng CT CONSTRUCTION](https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-eng-ct-construction/3e8968f2-6360-4925-8808-baa7bf13f42f) — Civil Technology · Memo · 2018 · Eng
- [CIVIL TECH GRD 11 MEMO KONSTRUKSIE AFR D](https://www.hlayiso.com/library/civil-tech-grd-11-memo-konstruksie-afr-d/a833678f-ed1c-40c5-b07a-26ba77e4dc1d) — Civil Technology · Memo · 2018 · Afr
- [Gr11-CIVIL-TECH S18-MEMO-Eng CT CIVIL SERVICES](https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-eng-ct-civil-services/949512e7-12a5-4c5f-82d0-1196bc4a5b45) — Civil Technology · Memo · 2018 · Eng
- [Gr11-CIVIL-TECH S18-MEMO-AFRK CT SIVIELE DIENSTE](https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-afrk-ct-siviele-dienste/77da9da4-54ce-404b-ac53-32294ed35961) — Civil Technology · Memo · 2018
- [Gr11-CIVIL-TECH S18-MEMO-AFRK CT HOUTBEWERKING](https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-afrk-ct-houtbewerking/e2a52fe8-59d0-4050-a612-bf25f67c4663) — Civil Technology · Memo · 2018
- [CIVIL TECH GRD 11 QP CONSTRUCTIONS ENG D](https://www.hlayiso.com/library/civil-tech-grd-11-qp-constructions-eng-d/1196db5c-18c1-4a77-92bd-46233279a6b3) — Civil Technology · QP · 2018 · Eng

## More from Grade 11 Civil Technology

- [Gr 11 Cons ATP 2023-24](https://www.hlayiso.com/library/gr-11-cons-atp-2023-24/5adb6254-7b36-487a-a882-c42b36bf49b7) — ATP
- [Gr 11 Civil Ser ATP 2023-24](https://www.hlayiso.com/library/gr-11-civil-ser-atp-2023-24/91ce1dc1-91cc-4a38-926b-b3d45f5b5305) — ATP
- [CIV TECH GR11 QP NOV2022 Civil Services Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-civil-services-afrikaans/195d9d88-060d-4288-a6c8-5c59a0e1f4e5) — QP · 2022 · Afr
- [CIV TECH GR11 QP NOV2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-civil-services-english/ed0b5808-e643-408f-bef2-165736e1c4b6) — QP · 2022 · Eng
- [CIV TECH GR11 QP NOV2022 Construction English](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-construction-english/ef9cc9f6-54a4-49fb-a7b1-407a487eeec8) — QP · 2022 · Eng
- [CIV TECH GR11 QP NOV2022 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-construction-afrikaans/f47aab44-2dd9-4504-b76e-8fab9b0cb88a) — QP · 2022 · Afr

## Collection

- [Grade 11 past papers](https://www.hlayiso.com/grade-11/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
