# Civil Technology Grade 12 NSC June 2018 Question Paper (Eng)

> Grade 12 Civil Technology question paper from the NSC June Exam 2018 (English), 26 pages. Read online or get the free PDF download, memo linked when available.

- Page: https://www.hlayiso.com/library/civil-technology-may-june-2018-eng/0387d44e-4420-441b-98de-c3b1cb463e5c
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2018
- Exam period: NSC June Exam
- Curriculum: CAPS
- Pages: 26

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC June 2018 Question Paper (Eng)](https://www.hlayiso.com/library/civil-technology-may-june-2018-eng/0387d44e-4420-441b-98de-c3b1cb463e5c)

## About this document

Civil Technology · Grade 12 · NSC June Exam · 2018. Question paper, 26 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                     SENIOR CERTIFICATE EXAMINATIONS

                              CIVIL TECHNOLOGY

                                       2018

                                                                       MARKS: 200

                                                                     TIME: 3 hours

  This question paper consists of 18 pages, 7 answer sheets and a formula sheet.

Copyright reserved                                                  Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology                             2                                     DBE/2018
                                            SCE

REQUIREMENTS:

1.        Drawing instruments

2.        A non-programmable calculator

3.        ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.        This question paper consists of SIX questions.

2.        Answer ALL the questions.

3.        Answer each question as a whole. Do NOT separate subsections of
          questions.

4.        Start the answer to EACH question on a NEW page.

5.        Do NOT write in the margins of the ANSWER BOOK.

6.        You may use sketches to illustrate your answers.

7.        Write ALL calculations and answers in the ANSWER BOOK or on the
          attached ANSWER SHEETS.

8.        Use the mark allocation as a guide to the length of your answers.

9.        Make drawings and sketches in pencil, fully dimensioned and neatly finished
          off with descriptive titles and notes to conform to the SANS/SABS Code of
          Practice for Building Drawings.

10.       For the purpose of this question paper, the size of a brick should be taken as
          220 mm x 110 mm x 75 mm.

11.       Use your own discretion where dimensions and/or details have been omitted.

12.       Answer QUESTIONS 2.7, 3.5, 4.3, 5.2, 5.3, 6.1 and 6.2 on the attached
          ANSWER SHEETS using drawing instruments, where necessary.

13.       Write your CENTRE NUMBER and EXAMINATION NUMBER on every
          ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
          have used them or not.

14.       Drawings in the question paper are NOT to scale due to electronic transfer.

15.       Google Images was used as the source for all photographs and pictures.

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology                               3                                DBE/2018
                                              SCE

QUESTION 1: CONSTRUCTION, SAFETY AND MATERIALS

Start this question on a NEW page.

1.1       Study FIGURE 1.1 below that shows a worker drilling on a construction site
          and answer the questions that follow.

                                            FIGURE 1.1

          1.1.1       Describe the purpose of the hard hat.                                   (1)

          1.1.2       Explain how the worker can protect himself from the dust caused
                      by the drill.                                                           (1)

          1.1.3       Describe the consequences if safety equipment is not used by the
                      worker whilst drilling.                                                 (1)

1.2       FIGURE 1.2 below shows safety equipment used for personal protection.

                                            FIGURE 1.2

          1.2.1       Identify the safety equipment.                                          (1)

          1.2.2       Name ONE specific place/working area where this equipment will
                      be used.                                                                (1)

Copyright reserved                                                         Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology                                 4                               DBE/2018
                                                SCE

1.3       FIGURE 1.3 below shows the line diagram of a roof truss.

                                                                           A

                                                                           B
                                                                                      C

                     30°

                                           FIGURE 1.3
          1.3.1       Identify the type of roof truss.                                         (1)
          1.3.2       Identify parts A to C of the roof truss.                                 (3)
          1.3.3       Motivate why the roof truss in FIGURE 1.3 cannot be covered with
                      grass (thatch).                                                          (1)
          1.3.4       Name ONE roof covering that can be used for the roof in
                      FIGURE 1.3 if battens (38 mm x 38 mm) are used to keep the roof
                      covering in place.                                                       (1)
1.4       Explain the difference between DPC (damp proof course) and a DPM (damp
          proof membrane) in terms of where it is used.                                        (2)
1.5       Differentiate between a standard clay brick and a queen closer by means of
          TWO freehand two-dimensional drawings in good proportion. Draw the view
          of the headers only. Label EACH drawing and write down the width and
          height of each brick.                                                                (5)
1.6       Corrosion of steel sections can be prevented by either painting or galvanising
          them. Recommend ONE of the methods and explain why you recommend it.                 (1)
1.7       Name any TWO preservatives that can be used to preserve timber.                      (1)
1.8       Draw a neat sketch of a tongue and groove board used for flooring.                   (3)
1.9       Describe the purpose of cement in concrete.                                          (1)
1.10      Distinguish between mass concrete and reinforced concrete.                           (2)
1.11      During the casting of fresh concrete many air bubbles that cause voids are
          trapped in the concrete. Name TWO ways in which trapped air in concrete
          can be removed.                                                                      (1)
1.12      Explain the difference between a slump test and a cube test in terms of the
          purpose of each test.                                                                (2)
1.13      Name the component used to close the gap/opening between two adjacent
          gypsum ceiling boards.                                                               (1)
                                                                                               [30]
Copyright reserved                                                          Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology                               5                                    DBE/2018
                                              SCE

QUESTION 2: ADVANCED CONSTRUCTION AND EQUIPMENT
Start this question on a NEW page.
2.1       FIGURE 2.1 below is a sketch of a precast concrete pile driven into the
          ground.

                                                         A

                                                         B

                                                         C

                                          FIGURE 2.1
          2.1.1       Name parts A and C.                                                        (2)
          2.1.2       What does symbol B indicate?                                               (1)
          2.1.3       What equipment is used to drive this type of pile into the ground?         (1)
          2.1.4       Under what conditions will a pile foundation be used?                      (2)
2.2       Explain how you will use a transparent pipe level to transfer levels from one
          point to another. The pipe is already filled with water.                               (2)
2.3       You must lay tiles on a floor. Name any THREE tools that can be used to set
          out the floor for the tiles.                                                           (3)
2.4       FIGURE 2.4 below is a machine that is used in the building environment.

                              A           B

                                         FIGURE 2.4
          2.4.1       Identify the tool in FIGURE 2.4.                                           (1)
          2.4.2       Identify part A.                                                           (1)
          2.4.3       Describe the function of part B.                                           (1)
Copyright reserved                                                            Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology                               6                                        DBE/2018
                                              SCE

2.5       Arches are commonly used in the building industry.

          2.5.1       Name the timber construction that has to be constructed to support
                      the bricks of a semi-circular arch.                                          (1)

          2.5.2       Name the brick that is in the middle of the semi-circular arch.              (1)

2.6       FIGURE 2.6 below shows a concrete beam with defects caused by forces
          acting on them. Name the types of forces that are responsible for the defects
          at A en B.

                                                  A

                                                  B

                                        FIGURE 2.6                                                 (2)

2.7       FIGURE 2.7 on the ANSWER SHEET shows an incomplete sectional view of
          a cavity wall.

          Use ANSWER SHEET 2.7 to complete the cavity wall by drawing the
          following in good proportion:

          •    Six brick courses above the existing two courses                                    (2)
          •    Mortar between brickwork                                                            (1)
          •    Symbol for concrete in the cavity between the walls                                 (1)
          •    Symbol for concrete in the foundation                                               (1)
          •    The symbol for back filling on one side only                                        (1)
          •    The damp proof between the walls and the cavity                                     (2)
          •    The weep hole                                                                       (1)
          •    One wall tie                                                                        (1)

2.8       A garage needs to be converted to a bachelor's flat. Due to limited time and
          the cost of labour, brick walls are not considered. Name a type of light-weight
          wall that can be used to divide the garage into rooms.                                   (1)

2.9       Describe ONE disadvantage of the type of wall named in QUESTION 2.8.                     (1)

Copyright reserved                                                              Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology                               7                           DBE/2018
                                              SCE

2.10      FIGURE 2.10 below shows an incomplete sectional view of a reinforced
          beam.

                                   A

                                                                               B

                                              FIGURE 2.10

          2.10.1      Identify A and B.                                                  (2)

          2.10.2      Name ONE negative consequence if there is no reinforcement
                      in concrete.                                                       (1)

          2.10.3      State ONE function of stirrups.                                    (1)

Copyright reserved                                                    Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology                                 8                             DBE/2018
                                                SCE

2.11      FIGURE 2.11 below shows formwork for a round column.

                                                                                         A

                                                                                         B

                                                                                         C

                                                                                         D

                                                                                         E

                                              FIGURE 2.11

          Identify A to E.                                                                   (5)

2.12      Rearrange the stages below in the correct order to erect the rib and block
          floor. Write down only the letters (A–C) in the correct order in the ANSWER
          BOOK.

          A        Place reinforcing on top of hollow blocks.
          B        Pack all the hollow blocks between the ribs.
          C        Place ribs on supporting walls.                                           (1)
                                                                                             [40]

Copyright reserved                                                        Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology                              9                                         DBE/2018
                                             SCE

QUESTION 3: CIVIL SERVICES

Start this question on a NEW page.

3.1       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–H) next to the question numbers (3.1.1 to 3.1.6) in the
          ANSWER BOOK, e.g. 3.1.7 F.

                   COLUMN A                                   COLUMN B
          3.1.1 Pressure reducing valve      A     installed at a water closet at the
                                                   highest point of a site sewerage
          3.1.2 Vacuum breaker                     system

          3.1.3 Hot-water outlet             B     regulates the temperature of the
                                                   water in the geyser by switching the
          3.1.4 Cold-water inlet                   element on and off at a pre-set
                                                   temperature
          3.1.5 Safety valve
                                             C     prevents the geyser from bursting
          3.1.6 Thermostat
                                             D     pipes mounted on the top part of
                                                   a high-pressure geyser

                                             E     installed before the geyser to regulate
                                                   the incoming water pressure from the
                                                   municipal mains

                                             F     pipes mounted on the bottom part of
                                                   a high-pressure geyser

                                             G     mounted above the top level of the
                                                   geyser on the hot- and cold-water
                                                   pipes to prevent a syphoning action in
                                                   the system

                                             H     component that physically heats the
                                                   water in an electric geyser
                                                                                 (6 x 1)           (6)

3.2       Where would you install a water trap?                                                    (1)

3.3       Name ONE type of water trap that is used at a hand wash basin.                           (1)

Copyright reserved                                                             Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology                              10                                  DBE/2018
                                             SCE

3.4       Draw the following electrical symbols:

          3.4.1       Socket outlet                                                             (2)

          3.4.2       Two-way switch                                                            (2)

          3.4.3       Light wall mounted                                                        (2)

3.5       On ANSWER SHEET 3.5 complete the drawing of a sectional view of a septic
          tank and show the following on your drawing:

          •    External walls with plaster and holes
          •    Inner wall with hole and plaster
          •    Inlet pipe with T-junction
          •    Outlet pipe with T-junction
          •    Liquid level
          •    Concrete cover with manholes                                                     (11)

3.6       In the absence of piped water from the municipality, name ONE other source
          of fresh water that is suitable for human consumption.                                (1)

3.7       Describe the main function of a storm-water system.                                   (1)

3.8       Coal is the primary energy source used in South Africa to generate electricity.
          Name ONE other source from which electricity can be generated.                        (1)

3.9       Describe ONE advantage of a solar geyser.                                             (1)

3.10      Describe ONE possible way in which a consumer could reduce electricity
          consumption in a home.                                                                (1)
                                                                                                [30]

Copyright reserved                                                           Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology                               11                                DBE/2018
                                              SCE

QUESTION 4: QUANTITIES, MATERIALS AND JOINING

Start this question on a NEW page.

4.1       Various options are given as possible answers to the following questions.
          Choose the answer and write only the letter (A–D) next to the question
          numbers (4.1.1 to 4.1.5) in the ANSWER BOOK, e.g. 4.1.6 C.

          4.1.1       … are used to connect steel roof parts, steel columns and in situ
                      timber trusses.

                      A   Steel nails
                      B   Bolts and nuts
                      C   Dry-wall screws
                      D   Cavity anchor                                                        (1)

          4.1.2       A/An … is a type of nail used to attach ceiling boards to the
                      brandering.

                      A   wire nail
                      B   cut nail
                      C   clout nail
                      D   oval wire nail                                                       (1)

          4.1.3       … is used to join copper pipes.

                      A   Brazing rod
                      B   Welding rod
                      C   Grease
                      D   Solder                                                               (1)

          4.1.4       … are used to join the members of a timber roof truss to one
                      another.

                      A   Gang nails/A connector plate
                      B   Clout nails
                      C   Rawl bolts
                      D   Screws                                                               (1)

          4.1.5       … can be used to join a roof truss to brickwork.

                      A   Bolt and nut
                      B   Sleeve anchor
                      C   Hoop iron
                      D   All the above-mentioned                                              (1)

Copyright reserved                                                          Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology                                    12                               DBE/2018
                                                   SCE

4.2       FIGURE 4.2 below shows the front view of a two-panel door. Study the
          drawing and complete the incomplete cutting list below. Write only the answer
          next to the question numbers (4.2.1 to 4.2.7) in the ANSWER BOOK.

                                                                  114 x 44
                                                                  114 x 44

                                                                  32 mm thick

                                                                  200 x 44
                              2 030

                                                                  32 mm thick

                                                                  220 x 44

                                             813

                                            FIGURE 4.2

 MEMBER            QUANTITY       UNIT     LENGTH        WIDTH     THICKNESS    MATERIAL
Stile                  2          mm        4.2.1         114          44        Saligna
Top rail             4.2.2        mm         813          114         4.2.3      Saligna
Lock rail              1          mm        4.2.4         4.2.5        44        Saligna
Raised                                                                           Saligna
and
                      2               mm    768           612         4.2.6
fielded
panel
Bottom rail                                                                      Saligna
                      1               mm    813          4.2.7          44
                                                                                                   (7)

Copyright reserved                                                              Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology                            13                                  DBE/2018
                                           SCE

4.3       FIGURE 4.3 below shows the floor plan of a garage with a garage door, a
          side door and a window.

                                                 7 000

                                                                              4 200

                                          FIGURE 4.3

          SPECIFICATIONS:

          •    The superstructure is a one-brick wall, 220 mm wide and 2 600 mm high.
          •    The side door opening is 2 100 mm high x 900 mm wide.
          •    The garage door is 2 400 mm wide x 2 100 mm high.
          •    The window opening is 1 500 mm wide x 450 mm high.

          Use ANSWER SHEET 4.3 and calculate the total area of the walls for the
          superstructure that needs to be built after deducting all the openings.            (18)
                                                                                             [30]

Copyright reserved                                                        Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology                               14                                DBE/2018
                                              SCE

QUESTION 5: APPLIED MECHANICS

Start this question on a NEW page.

5.1       FIGURE 5.1 shows a shaped lamina. All dimensions are in millimetres.

          Study the lamina and calculate the centroid of the lamina form A-A.

          HINT: Use the formulae on the FORMULA SHEET.

                             A

                       10

                       20

                                              1
                                                                 2
                       30

                             A           40            20            30

                                          FIGURE 5.1                                           (9)

5.2       ANSWER SHEET 5.2 shows a diagram of a cantilever frame. Use ANSWER
          SHEET 5.2 to answer the following questions.

          5.2.1       Name DIAGRAM A.                                                          (1)

          5.2.2       On ANSWER SHEET 5.2, develop and draw a diagram to
                      determine graphically the nature of the forces in each member
                      (part) of the cantilever frame. Use scale 1 mm = 1 N.                    (6)

          5.2.3       Use the information in the diagrams and complete the table on
                      ANSWER SHEET 5.2.                                                        (3)

Copyright reserved                                                          Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology                               15                                   DBE/2018
                                              SCE

5.3       FIGURE 5.3 shows the space diagram of a beam with a span of 8 metres with
          two point loads and a uniformly distributed load. Study the diagram and
          answer the questions that follow.

                                        8N          4 N/m    4N

                                         B           C        D           E
                             A    2m                4m            2m
                         RL =15 N                                    RR = 13 N
                                             FIGURE 5.3

          5.3.1       Convert the uniformly distributed load to a point load and write
                      down the value of the converted point load.                                 (1)

          5.3.2       Determine the distance of the converted uniformly distributed load
                      that is now a point load, from RR.                                          (1)

          5.3.3       Determine the distance of the 4 N point load, from RL.                      (1)

          5.3.4       The value of the shear forces at A = 15 N, B = 7 N, D = -9 N,
                      D 1 = -13 N and E = 0 N. Use the available information and draw
                      the shear force diagram on ANSWER SHEET 5.3. Use a scale of
                      2 mm = 1 N.                                                                 (8)
                                                                                                  [30]

Copyright reserved                                                             Please turn over

### Page 16

Downloaded from hlayiso.com
     Civil Technology                            16                                 DBE/2018
                                                SCE

     QUESTION 6: GRAPHICS AND COMMUNICATION

     6.1       FIGURE 6.1 below illustrates a detailed sectional view of the foot of a king
               post roof truss. Study the drawing and complete the table on ANSWER
               SHEET 6.1.

                                                                                                  1

                                  7

                                                                                                  2

                                                                                                  3
                                                                                                  4
8

9
                                                                                                  5
10
                                                                                                  6

                                            FIGURE 6.1

     Copyright reserved                                                        Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology                                     17                                        DBE/2018
                                                    SCE

6.2           FIGURE 6.2 below shows the floor plan of a two-bedroom house.

                                     110                       110

                220          3 000         545   900     545           3 500           220

      220                                                                                    220

      3 000

      110

                                                                                             6 110

      3 000

      220                                                                                    220

                220       2 100      900         2 100         1 000   1 500   1 000   220

                                                         110

                220                                8 710                               220

                                           FIGURE 6.2

Copyright reserved                                                                      Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology                              18                                     DBE/2018
                                             SCE

          6.2.1       Study FIGURE 6.2 and develop and draw, on ANSWER
                      SHEET 6.2, to scale 1 : 50, the SOUTH ELEVATION of the
                      building. Use the specifications below.
                      (Use the assessment criteria on ANSWER SHEET 6.2 as a
                      guideline for your drawing).

                      SPECIFICATIONS:

                      •   The height between the natural ground level and the top level
                          of the floor slab is 300 mm.
                      •   The height between the floor slab and the underside of the wall
                          plate is 2 600 mm.
                      •   The roof is covered with galvanised roof sheeting with a
                          228 mm wide fascia board.
                      •   Ridge capping is 100 mm high.
                      •   Rainwater downpipes are 75 mm in diameter and 100 mm
                          square gutters are used.
                      •   One rainwater downpipe must be placed on each side the of
                          the roof.
                      •   The eaves overhang is 500 mm and the verge overhang is
                          300 mm.
                      •   The door opening is 2 100 mm high and 900 mm wide.
                      •   The door step is 150 mm high.
                      •   The building has a gable roof with a pitch of 30°.

                      The following must also be shown on the drawing:
                      • The method used to determine the roof height
                      • Windows sills

                                          WINDOW SCHEDULE
                                 Window 1(W1)         Window 2(W2)

                             Width          Height          Width          Height
                           1 500 mm       1 200 mm         900 mm         600 mm

                      THREE marks will be allocated for the application of scale.

                      Start your drawing from corner A as indicated on ANSWER
                      SHEET 6.2.                                                                (25)
                                                                                                [40]

                                                                                    TOTAL:      200

Copyright reserved

### Page 19

Downloaded from hlayiso.com
Civil Technology                                                   DBE/2018
                                           SCE

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 2.7

                       NGL

                                        FIGURE 2.7

        ASSESSMENT CRITERIA                 MARK     CANDIDATE'S
                                                        MARK
Six brick courses above the two existing      2
courses
Mortar between brickwork                      1
Symbol for concrete in the cavity
                                              1
between the walls
Symbol for concrete in the foundation         1
The symbol for back filling on one
side only                                     1
The damp-proof course between the
walls and the cavity                           2
The weep hole                                  1
One wall tie                                   1
TOTAL:                                        10

Copyright reserved

### Page 20

Downloaded from hlayiso.com
Civil Technology                                                       DBE/2018
                                            SCE

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.5

          ASSESSMENT CRITERIA                     MARK   CANDIDATE'S
                                                            MARK
External walls with plaster and holes               3
Inner wall with hole and plaster                    2
Inlet pipe with T-junction                          2
Outlet pipe with T-junction                         2
Liquid level                                        1
Concrete cover with manholes                        1
                                        TOTAL:     11

Copyright reserved

### Page 21

Downloaded from hlayiso.com
Civil Technology                                                             DBE/2018
                                          SCE

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 4.3
Complete your answers in the spaces indicated with ... and .... .

A                  B       C         D

                                     Centre line: Superstructure
                                     2/…                  =…
                                     2/…                  =…
                                     Total = …
                                     Minus 4 / …       =…
                                     =…

1/                 …                 Area of walls for superstructure:
                   …       …

1/                 …                 Area of side door:
                   …       …

1/                 …                 Area of garage door:
                   …       …

1/                 …                 Area of window:
                   …       …

                                     Total area of wall after deductions:
                                     =…            …           …         …
                                     =…

                                                                             (18)

Copyright reserved

### Page 22

Downloaded from hlayiso.com
Civil Technology                                                       DBE/2018
                                            SCE

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.2
                                     80 N
                                 A

                             E
                                                      B
                                                                40 N
                                            D
                             60°                          30°

                                        10 m      C
 a
                            DIAGRAM A: __________________                   (1)

                                                                            (6)
DIAGRAM A IS NOT ACCORDING TO SCALE
MEMBER NATURE
AE
BD
CD       STRUT
DE                                                                          (3)

Tolerance of 1 N on both sides

Copyright reserved

### Page 23

Downloaded from hlayiso.com
Civil Technology                                                              DBE/2018
                                           SCE

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.3
                                     8N          4 N/m      4N

                                      B           C         D          E
                          A     2m               4m              2m
                       RL = 15 N                                  RR = 13 N

                         0N

       ASSESSMENT CRITERIA                 MARKS         CANDIDATE'S MARK
Correct shape of shear force diagram         1
Value of shear forces correctly measured     5
Horizontal lines indicated                   2
TOTAL                                        8

Copyright reserved

### Page 24

Downloaded from hlayiso.com
Civil Technology                                                      DBE/2018
                                             SCE

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.1

NO.                   QUESTIONS                    ANSWERS            MARKS
1.      Identify the type of eave construction
        used in the drawing.                                             1

2.      State the minimum pitch (slope) of
        number 1, if galvanised roof sheeting
                                                                         1
        is used.

3.      Identify number 2.
                                                                         1
4.      State the standard dimension of
        number 3.                                                        1

5.      State the purpose of number 4.
                                                                         1
6.      Name the timber that is shown on top
        of the external wall marked number 5.                            1

7.      Draw the drawing symbol for
        number 6 in the next column.                                     2

8.      Explain the purpose of number 7.
                                                                         1
9.      Name ONE material that can be used
        for number 8.                                                    1

10.     Identify number 9.
                                                                         1
11.     Identify number 10.
                                                                         1
12.     Draw a neat freehand line diagram of
        a fink or a W roof truss in the next
                                                                         3
        column.

                                                             TOTAL:      15

Copyright reserved

### Page 25

Civil Technology
                      Downloaded from hlayiso.com                         DBE/2018
                                  SCE

                                                             ASSESSMENT           CANDIDATE'S
CENTRE NUMBER:
                                                                          MARKS
EXAMINATION NUMBER:
ANSWER SHEET 6.2                                             CRITERIA                MARK

                                                    External walls         2
                                                    NGL (correctly
                                                                           1
                                                    drawn)
                                                    FFL (correctly
                                                                           1
                                                    drawn)
                                                    Window                 1
                                                    Window sill            1
                                                    Door opening           1
                                                    Step                   1
                                                    Fascia board           1
                                                    Rainwater
                                                                           1
                                                    downpipe
                                                    Roof (correctly
                                                                           2
                                                    drawn)
                                                    Gutter                 1
                                                    Ridge capping          1
                                                    Determining roof
                                                                           4
                                                    height
                                                    Any FOUR labels        4
                                                    Application of
                                                    scale
                                                    One or two
                                                    incorrect      =3
                                                    Three or four
                                                    incorrect      =2
                                                    More than five
                                                    incorrect      =1
                                                    No measurement
                                                    correct        =0      3
                                                    TOTAL                  25

 A

Kopiereg voorbehou

### Page 26

Downloaded from hlayiso.com
Civil Technology                                                                DBE/2018
                                                SCE

                                        FORMULA SHEET

IMPORTANT ABBREVIATIONS

SYMBOL         DESCRIPTION        SYMBOL         DESCRIPTION        SYMBOL DESCRIPTION
   c             Centroid            b            Breadth/Width        r      Radius
   ℓ              Length             s                Side             A       Area

FORMULAE

   AREA OF                FORMULA                  FORMULA             FORMULA FOR THE
                          (in words)              (in symbols)       POSITION OF CENTROIDS
                                                                       X-axis       Y-axis
                                                                         s            s
Square                    side x side                  sxs
                                                                         2            2
                                                                          ℓ           b
Rectangle              length x breadth                ℓxb
                                                                         2            2
Right-angled                                                             b            h
                      ½ x base x height               ½b x h
triangle                                                                 3            3
Equilateral
triangle/                                                                b             h
                      ½ x base x height               ½b x h
Isosceles                                                                2             3
triangle

                                               (A1× d) ± (A2 × d)
                      Position of centroid =
                                                 Total area

                                               OR

                                           Y=
                                                ∑ Ay
                                                ∑A

                                               OR

                                           X=
                                                ∑ Ax
                                                ∑A

Copyright reserved

## Related documents

- [Civil Technology May June 2018 Memo Eng](https://www.hlayiso.com/library/civil-technology-may-june-2018-memo-eng/559fa58b-574d-4982-8261-326355e9f841) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology May June 2018 Memo Afr](https://www.hlayiso.com/library/civil-technology-may-june-2018-memo-afr/5658b3b9-7dc1-4539-afe1-ac2cbb68dce8) — Civil Technology · Memo · 2018 · Afr
- [CVLT GR12 QP AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-qp-afr-sept2018-siviele-dienste-d/831c422e-f613-4a8c-adf9-061114273b23) — Civil Technology · QP · 2018 · Afr
- [CVLT GR12 QP AFR SEPT2018 KONSTRUKSIE D](https://www.hlayiso.com/library/cvlt-gr12-qp-afr-sept2018-konstruksie-d/c7a77714-a0da-45da-ac8d-6473db3fe9d4) — Civil Technology · QP · 2018 · Afr
- [CVLT GR12 QP ENG SEPT2018 CIVIL SERVICES D](https://www.hlayiso.com/library/cvlt-gr12-qp-eng-sept2018-civil-services-d/47b99167-7c6c-48d3-ab92-70a0cc6c7ac7) — Civil Technology · QP · 2018 · Eng
- [Civil Technology Nov 2018 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-afr/be54c81a-cc52-4da7-a74c-ec3f0bddf626) — Civil Technology · QP · 2018 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.