# Civil Technology Grade 12 NSC June 2018 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC June Exam 2018 (English), 17 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-may-june-2018-memo-eng/559fa58b-574d-4982-8261-326355e9f841
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2018
- Exam period: NSC June Exam
- Curriculum: CAPS
- Pages: 17

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC June 2018 Memo (English)](https://www.hlayiso.com/library/civil-technology-may-june-2018-memo-eng/559fa58b-574d-4982-8261-326355e9f841)

## About this document

Civil Technology · Grade 12 · NSC June Exam · 2018. Memorandum, 17 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                     SENIOR CERTIFICATE EXAMINATIONS

                                  CIVIL TECHNOLOGY

                                           2018

                                MARKING GUIDELINES

                                                                      MARKS: 200

                       This marking guideline consists of 17 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology                               2                                   DBE/2018
                                    SCE – Marking Guidelines

QUESTION 1: CONSTRUCTION, SAFETY AND MATERIAL

1.1       1.1.1       A hard hat will:
                      • protect the worker from any head injury. 
                      • protect the worker from falling objects from above.
                      ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE
                      ANSWER                                                                     (1)

          1.1.2       The worker can wear a dust mask/respiratory mask/gas mask/
                      protective overall.                                                       (1)

          1.1.3       If the worker does not use the safety equipment:
                      • His/Her eyes can be damaged by the dust 
                      • Debris can get into his/her eyes
                      • Any part of his/her body can be injured if he/she is not wearing
                           a protective overall.
                      • Hearing can be damaged if ear protection is not used
                      • Dust can be inhaled
                      ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE
                      ANSWER                                                                     (1)

1.2       1.2.1       Ear muffs                                                                 (1)

          1.2.2       In a working area where machine and equipment makes loud
                      noises/sounds. 
                      ANY OTHER ACCEPTABLE ANSWER                                                (1)

1.3       1.3.1       SA or Howe roof truss                                                     (1)

          1.3.2       A – King post 
                      B – Queen post 
                      C – Rafter                                                                (3)

          1.3.3       The slope/gradient of a roof truss used for a thatch roof must
                      be 45˚ and the roof truss in FIGURE 1.3 has a slope of 30°.
                      ANY ONE OF THE ABOVE                                                       (1)

          1.3.4       • Concrete tiles 
                      • Clay tiles
                      • Slate tiles
                      ANY ONE OR OTHER ACCEPTABLE ANSWER                                         (1)

1.4                   DPC is used between the concrete floor and the wall between
                      courses of brickwork. 
                      DPM is used under a concrete floor to cover the whole area of a
                      room or a building or as roof underlay.                                   (2)

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology                                3                               DBE/2018
                                     SCE – Marking Guidelines

1.5
                        110               55 
                                                 

              75                              

                     STANDARD      QUEEN
                     BRICK          CLOSER

           ASSESSMENT CRITERIA              MARK         CANDIDATE'S
                                                            MARK
           Correctness of elevations           2
           Labelling of views                  1
           Correct dimension lines and         1
           Width of queen closer               1
           TOTAL:                              5                                             (5)

1.6       Galvanising is more expensive than painting but lasts longer than painting
                                              OR
          Painting is cheaper than galvanising and gives a wide variety of colours and
          surface finishing's.
          ANY ONE OF THE ABOVE                                                               (1)
1.7       • Varnish 
          • Oil
          • Wax
          • Coal tar creosote
          • Paint
          • Poisonous chemical salts (water and soluble salts)
          • Organic compounds
          ANY ONE OF THE ABOVE                                                               (1)

1.8                                  

                                                      

                       ASSESSMENT CRITERIA                 MARK   CANDIDATE'S
                                                                     MARK
                       Tongue(can be in the middle)         1
                       Groove(can be in the middle)         1
                       Board                                1
                       TOTAL:                               3                                (3)

1.9       Cement binds the ingredients of concrete together.                                (1)

1.10      •    Mass concrete – is a volume of concrete that do not have any
               reinforcing
          •    Reinforced concrete – is concrete that is reinforced with steel rods to
               strengthen the structure                                                     (2)

Copyright reserved                                                        Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology                              4                                   DBE/2018
                                   SCE – Marking Guidelines

1.11      • Compacting by hand (rodding and spading) 
          • Compacting through vibration (Mechanical vibrator)
          ANY ONE OF THE ABOVE                                                                 (1)

1.12      •   A slump test is used to test workability/consistency of concrete. 
          •   A cube test is used to test compressive/crushing strength of concrete.          (2)

1.13        • Cover strip/H-strip/Decorative grid strips 
            • Jointing /ceiling tape/Gauze
            • Jointing compound (rhinolyte)
          ANY ONE OF THE ABOVE

Copyright reserved                                                          Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology                               5                                     DBE/2018
                                    SCE – Marking Guidelines

QUESTION 2: ADVANCED CONSTRUCTION AND EQUIPMENT

2.1       2.1.1       •   A – Steel capping 
                      •   C – Steel tip                                                           (2)

          2.1.2       Undisturbed earth                                                           (1)

          2.1.3       A drop hammer                                                               (1)

          2.1.4       Pre-cast concrete piles can be used when:
                      • The soil is not stable/soft 
                      • Water content of soil is high 
                      • There's a highwater table
                      • Subsoil is subject to movement
                      • Filling materials are not sufficiently compacted
                      ANY TWO OF THE ABOVE OR ANY OTHER ACCEPTABLE
                      ANSWER                                                                       (2)

2.2       •   Bring the water level in the one side of the transparent pipe in line with the
              first level. 
          •   Take the other end of the pipe to the other position where the level must
              be transferred, maintaining the first level and make a mark next to the
              water level at this point.                                                          (2)

2.3       • Tape measure 
          • Chalk line 
          • Builders line 
          • Builders square
          • Straight edge
          • Spirit level
          ANY THREE OF THE ABOVE OR ANY OTHER ACCEPTABLE ANSWER                                    (3)

2.4       2.4.1       Angle grinder                                                               (1)

          2.4.2       Grinding/cutting disc                                                       (1)

          2.4.3       • The safety guard protects the worker against sparks or debris
                        from discs and materials. 
                      • The safety guard protects the body parts of the worker against
                        the rotating blade.
                      ANY ONE OF THE ABOVE                                                         (1)

2.5       2.5.1       •   Centre/Turning piece/Profile                                            (1)

          2.5.2       •   Key brick                                                               (1)

Copyright reserved                                                              Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology                              6                                  DBE/2018
                                   SCE – Marking Guidelines

2.6       A – Compression force 
          B – Tensile force                                                                   (2)

2.7
                                           

                                                 

                                           
                                         √
                                    
                                    √   

               NGL                                                   NGL

                       

                                                  

           ASSESSMENT CRITERIA                                MARK    CANDIDATE'S
                                                                         MARK
           6 Courses of bricks above the two existing          2
           courses
           Mortar between brickwork                            1
           Symbol for concrete in the cavity between
           the walls                                           1
           The symbol for concrete in the foundation           1
           The symbol for back filling on one side only        1
           The damp proof between the walls and the            2
           cavity
           The weep hole                                       1
           One wall tie                                        1
           TOTAL:                                              10                              (10)

2.8       Dry wall                                                                            (1)

2.9       Disadvantages of drywalls:
          • They are less soundproof than brickwork. 
          • They are less fireproof that brickwork.
          • Drywalls must be joined together or attached to existing walls, to   ensure
             sturdiness.
          • Drywalls cannot carry heavy loads.
          ANY ONE OF THE ABOVE                                                                 (1)

Copyright reserved                                                          Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology                                7                          DBE/2018
                                     SCE – Marking Guidelines

2.10      2.10.1      A - Anchor bar 
                      B - Shear bar                                                     (2)

          2.10.2      Structural failure will occur 
                                                                                         (1)

          2.10.3      • To keep the main or anchor bars together. 
                      • Helps to resist shear stress
                      ANY ONE OF THE ABOVE                                               (1)

2.11      A - Threaded rods and nuts
          B – Laggings 
          C – Lining
          D – Collar 
          E - Vertical clamps                                                           (5)

2.12      C, B, A                                                                        (1)
                                                                                         [40]

Copyright reserved                                                    Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology                               8                    DBE/2018
                                    SCE – Marking Guidelines

QUESTION 3: CIVIL SERVICES

3.1       3.1.1       E                                                          (1)

          3.1.2       G                                                          (1)

          3.1.3       D                                                          (1)

          3.1.4       F                                                          (1)

          3.1.5       C                                                          (1)

          3.1.6       B                                                          (1)

3.2       A water trap is installed:
          • under sinks 
          • baths
          • toilets
          • at a gully
          • at a shower
          ANY ONE OF THE ABOVE                                                    (1)

3.3       P trap or S trap or Bottle trap                                        (1)

3.4       3.4.1
                                       
                                                                                  (2)

          3.4.2

                                              
                                                                                  (2)

          3.4.3
                                     

                                                                                  (2)

Copyright reserved                                             Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology                              9                                      DBE/2018
                                   SCE – Marking Guidelines

3.5
                                                       

                                                                            OUTLET
                     INLET                                              
                                                                   

                                                                       
                                                                              OPENING

           ASSESSMENT CRITERIA                                 MARK     CANDIDATE'S
                                                                           MARK
           External walls with plaster and holes                    3
           Inner wall with hole and plaster                         2
           Inlet pipe with T-junction                               2
           Outlet pipe with T-junction                              2
           Liquid level                                             1
           Concrete cover with manholes                             1
                                                   TOTAL:          11
                                                                                                 (11)

3.6       • Boreholes 
          • Wells
          • Rain water
          • Snow
          • Rivers
          • Desalination
          ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE ANSWER                                    (1)

3.7       Storm water systems are used to carry storm water to rivers or low-lying
          dams. 
          OR ANY OTHER ACCEPTABLE ANSWER                                                         (1)

3.8       • Solar energy      
          • Nuclear power
          • Hydro electricity
          • Wind
          • Natural gas
          • Generator
          • Inverter
          ANY ONE OF THE ABOVE                                                                   (1)

Copyright reserved                                                            Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology                            10                                DBE/2018
                                  SCE – Marking Guidelines

3.9       • Solar geysers are environmentally friendly. 
          • Solar geysers can be used in areas where no electricity is available.
          • Hot water is available at a very low cost once the installation cost has
            been covered.
          ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE ANSWER                               (1)

3.10      • Using solar power as an alternative source of power. 
          • Using appliances only when necessary.
          • Using of low energy or LED light bulbs.
          • Switch of lights in rooms that are not in use.
          • Shower for shorter periods to prevent over use of geyser.
          • Boil only the required quantity of water for a purpose.
          • Use a geyser timer
          • Use of gas
          ANY ONE OF THE ABOVE OR ANY OTHER ACCEPTABLE ANSWER                               (1)
                                                                                            [30]

Copyright reserved                                                       Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology                             11                    DBE/2018
                                   SCE – Marking Guidelines

QUESTION 4: QUANTITIES, MATERIALS AND JOINING

4.1       4.1.1       B                                                         (1)

          4.1.2       C                                                         (1)

          4.1.3       D                                                         (1)

          4.1.4       A                                                         (1)

          4.1.5       C                                                         (1)

4.2       4.2.1       2 030/2 030 mm                                            (1)

          4.2.2       1                                                         (1)

          4.2.3       44/44 mm                                                  (1)

          4.2.4       813/813 mm                                                (1)

          4.2.5       200/200 mm                                                (1)

          4.2.6       32/32 mm                                                  (1)

          4.2.7       220/220 mm                                                (1)

Copyright reserved                                            Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology                          12                                      DBE/2018
                                SCE – Marking Guidelines

      A                B         C                                 D
                                          Centre line: Superstructure
                                          2/ 7 000 mm                =   14 000 mm 
                                          2/ 4 200 mm                =    8 400 mm 
                                                          TOTAL: =       22 400 mm
                                          Minus 4/ 220               =      880 mm 
                                                                     =   21 520 mm             (4)

1/                 21,52                 Area of walls for superstructure
                    2,6     55,95 m²                                                           (3)

1/                 2.1                   Area of side door
                   0,9      1,89 m²                                                           (3)

1/                 2,4                   Area of garage door
                   2,1      5,04 m²                                                           (3)

1/                 1,5                   Area of window
                   0,45     0,68 m²                                                           (3)

                                          Total area of wall after deductions
                                          = 55,95 m²- 1,89 m² - 5,04 m² – 0,68 m² 
                                          = 48,34 m²                                           (2)

                                                                                                (18)

                                                                                                [30]

Copyright reserved                                                           Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology                         13                             DBE/2018
                               SCE – Marking Guidelines

QUESTION 5: APPLIED MECHANICS
5.1

(A1 x d) + (A2 x d)
    Total area
                                  
= (3 600 mm² x 30 mm) + (900 mm² x 70 mm)
                 4 500 mm² 

= 108 000 mm³ + 63 000 mm³
         4 500 mm²

= 171 000 mm³ 
   4 500 mm² 

= 38  mm          

OR

 Part             Area                X                     AX
 1    60 mm x 60 mm = 3 600 mm²  30 mm             108 000 mm³

 2      15 x 60 = 900 mm²            70 mm         63 000 mm³

 ∑      4 500 mm²                                   171 000 mm³

X=
      ∑ Ax
      ∑A
= 171 000 mm³ 
    4 500 mm² 

= 38  mm                                                                            (9)

Copyright reserved                                                 Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology                               14                                             DBE/2018
                                     SCE – Marking Guidelines

5.2                                      80 N
                                 A

                                 E
                                                                B
                                                                                  40 N
                                                D
                                 60°                                    30°

                                                10 m    C
                                 DIAGRAM A: SPACE DIAGRAM                                                  (1)
                      a

                                                    

                      

                                                                                     e

                     b

                                                                             

                      

                                     
                      c                                                                                     (6)
                                                                    d

                                  NOT ACCORDING TO SCALE

          USE A MASK TO MARK THIS QUESTION
           MEMBER NATURE
           AE      Tie 
           BD      Tie 
           CD      Strut
           DE      Strut 

          Tolerance of 1 N to either side.                                                                  (3)

Copyright reserved                                                                       Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology                              15                                   DBE/2018
                                    SCE – Marking Guidelines

5.3       5.3.1       16 N                                                                      (1)

          5.3.2       4m                                                                        (1)

          5.3.3       6m                                                                        (1)

          5.3.4
                                        8N        4 N/m        4N

                                         B           C         D          E
                               A   2m               4m              2m
                         RL =15 N                                    RR = 13 N
                                             SPACE DIAGRAM

                                    
                        15 N

                                             7N 

                                                                               
                          0N                                              0N

                                                                -9N
                                                                - 13 N                   (8)
                                                                    
Correct shape 

                              SHEAR FORCE DIAGRAM
                      USE A MASK TO MARK THIS QUESTION
        ASSESSMENT CRITERIA              MARKS CANDIDATE'S MARK
Correct shape of shear force diagram        1
Value of shear forces correctly measured
                                            5
and indicated
Horizontal lines indicated                  2
TOTAL                                       8

If the drawing is not drawn to the correct scale, penalise the candidate with 1 mark.

                                                                                                 [30]

Copyright reserved                                                            Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology                              16                                     DBE/2018
                                    SCE – Marking Guidelines

QUESTION 6: GRAPHICS AND COMMUNICATION

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.1

NO.                   QUESTIONS                                  ANSWERS             MARKS
1       Identify the type of eave construction
                                                  Open eave                              1
        used in the drawing.
        State the minimum pitch (slope) of
2
        number 1, if galvanised roof sheeting     5° - 10°                               1
        is used.
3                                                 Tie-beam
        Identify number 2.                                                               1

4       State the standard dimension of           38 mm x 38 mm
                                                                                         1
        number 3.
                                                  To cover the opening between
5       State the purpose of number 4.            the wall and the ceiling.              1

6       Name the timber that is shown on top
                                                  Wall plate                             1
        of the external wall marked number 5.
7
        Draw the drawing symbol for
                                                                                         2
        number 6 in the next column.
                                                  To prevent dust, insects,
8
        Explain the purpose of number 7.          rodents, wind and birds to enter       1
                                                  the building
                                                  PVC, aluminium, galvanised
9       Name ONE material that can be used
                                                  sheet metal.                           1
        for number 8.
                                                  Fascia board
10      Identify number 9.                                                               1

                                                  Down pipe
11
        Identify number 10.                                                              1

12      Draw a neat freehand line diagram of
        a Fink or W roof truss in the next                                 
                                                                                        3
        column.                                              

                                                                           TOTAL:        15

Copyright reserved                                                             Please turn over

### Page 17

Civil Technology
                       Downloaded from hlayiso.com    17                                                                            DBE/2018
                                           SCE – Marking Guideliness

CENTRE NUMBER:
                                                                                                       ASSESSMENT                      CANDIDATES
                                                                                                                              MARKS
EXAMINATION NUMBER:                                                                                    CRITERIA                          MARK
                                                                                                       External walls           2
ANSWER SHEET 6.2                                                                                       NGL (correctly
                                                                                                                                1
                                                                                                      drawn)
                                                                                                       FFL (correctly
                                                                                                                                1
                                                                                                       drawn)
                                                                                                       Window                   1
                                                                                                       Window sill              1
                                                                                                    Door opening             1
                                                                                                      Step                     1
                                                                                                       Fascia board             1
                                                                                                      Rain-water down
                                                                                                                                1
                                                                                                       pipe
                          30°                                                                          Roof (correctly
                                                                                                      drawn)
                                                                                                                                2
                                                              
                                                                                                       Gutter                   1
                                                                                                       Ridge capping            1
                                                                                                       Determining roof
                                                                                                                                4
                                                                                                       height
                                                                                                      Any FOUR labels          4
                                                                                                     Application of scale
                                                                                                     One or two incorrect
                                                                                                       =3
                                                                                                      Three or four
                                                                                                      incorrect = 2
                                                                                                       More than five
                                                                                                       incorrect = 1
                                                                                                      No measurement
                                                                                                      correct = 0             3
                                                                           
                                                                                                       TOTAL                   25
                                                   6 550

                                                                           Application of scale         
    NOT TO SCALE: USE A MASK TO MARK THIS QUESTION
                                                                               Any four labels                

Copyright reserved

## Related documents

- [Civil Technology May June 2018 Memo Afr](https://www.hlayiso.com/library/civil-technology-may-june-2018-memo-afr/5658b3b9-7dc1-4539-afe1-ac2cbb68dce8) — Civil Technology · Memo · 2018 · Afr
- [Civil Technology May June 2018 Eng](https://www.hlayiso.com/library/civil-technology-may-june-2018-eng/0387d44e-4420-441b-98de-c3b1cb463e5c) — Civil Technology · QP · 2018 · Eng
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction-1/b6d609b6-89a5-4b39-a9b7-0d878af45cd4) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste-d/f328c182-752d-488c-88b6-f2a5cadcbcf2) — Civil Technology · Memo · 2018 · Afr
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction/2e799de8-da85-41b4-ad09-68d5cdf064b6) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste/4e2739ce-136f-4b93-9ff9-009fc471f0b4) — Civil Technology · Memo · 2018 · Afr

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
