# Civil Technology Grade 12 NSC June 2019 Question Paper (Eng)

> Grade 12 Civil Technology question paper from the NSC June Exam 2019 (English), 24 pages. Read online or get the free PDF download, memo linked when available.

- Page: https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-eng/3f3d8211-a2ae-4ecd-89a4-623bb435b86a
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2019
- Exam period: NSC June Exam
- Curriculum: CAPS
- Pages: 24

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC June 2019 Question Paper (Eng)](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-eng/3f3d8211-a2ae-4ecd-89a4-623bb435b86a)

## About this document

Civil Technology · Grade 12 · NSC June Exam · 2019. Question paper, 24 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

             SENIOR CERTIFICATE EXAMINATIONS/
         NATIONAL SENIOR CERTIFICATE EXAMINATIONS

                       CIVIL TECHNOLOGY: CIVIL SERVICES

                                        2019

                                                                         MARKS: 200

                                                                       TIME: 3 hours

            This question paper consists of 17 pages and 5 answer sheets.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Civil Services              2                                    DBE/2019
                                           SC/NSC

REQUIREMENTS:

1.         Drawing instruments

2.         A non-programmable calculator

3.         ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.         This question paper consists of SIX questions.

2.         Answer ALL the questions.

3.         Answer each question as a whole. Do NOT separate subsections of
           questions.

4.         Start the answer to EACH question on a NEW page.

5.         Do NOT write in the margins of the ANSWER BOOK.

6.         You may use sketches to illustrate your answers.

7.         Write ALL calculations and answers in the ANSWER BOOK or on the
           attached ANSWER SHEETS.

8.         Use the mark allocation as a guide to the length of your answers.

9.         Make drawings and sketches in pencil, fully dimensioned and neatly finished
           off with descriptive titles and notes to conform to the SANS/SABS Code of
           Practice for Building Drawings.

10.        For the purpose of this question paper, the size of a brick should be taken as
           220 mm x 110 mm x 75 mm.

11.        Use your own discretion where dimensions and/or details have been omitted.

12.        Answer QUESTIONS 2, 3.2, 3.6, 5.4 and 6.4 on the attached ANSWER
           SHEETS using drawing instruments where necessary.

13.        Write your CENTRE NUMBER and EXAMINATION NUMBER on every
           ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
           have used them or not.

14.        Drawings in the question paper are NOT to scale due to electronic transfer.

15.        Google Images was used as the source for all photographs and pictures.

Copyright reserved                                                             Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Civil Services               3                                        DBE/2019
                                            SC/NSC

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
            (GENERIC)

Start this question on a NEW page.

1.1        Choose a description from COLUMN B that matches an item in COLUMN A.
           Write only the letter (A–G) next to the question numbers (1.1.1 to 1.1.5) in the
           ANSWER BOOK, e.g. 1.1.6 H.

                      COLUMN A                              COLUMN B
          1.1.1      Galvanising             A    keeps freshly cast concrete damp

          1.1.2      Electroplating          B    metal dipped in lead

          1.1.3      Curing                  C    protects wood and other material
                                                  against natural decay
          1.1.4      Paint
                                             D    a plastic finish on metal surfaces,
          1.1.5      Powder coating               applied with a compressed air spray
                                                  gun

                                             E    coating mild steel with a thin layer of
                                                  another material by electrolysis

                                             F    coating timber with a thin layer of
                                                  another material by electrolysis

                                             G    metal dipped in zinc
                                                                                     (5 x 1)       (5)

1.2        Explain ONE cause of injuries when handling materials.                                  (1)

1.3        Give the angle/ratio at which a ladder should be placed against a wall.                 (2)

1.4        Explain TWO safety precautions that must be followed when using a builder's
           hoist.                                                                                  (2)

Copyright reserved                                                              Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Civil Services                    4                               DBE/2019
                                                 SC/NSC

1.5        FIGURE 1.5 below shows tools that are used on a construction site.

                                       A                           B
                                                 FIGURE 1.5

           1.5.1        Identify both A and B.                                                    (2)

           1.5.2        Name ONE use of A and B respectively.                                     (2)

1.6        The pictures below illustrate the steps followed when fixing material to a floor
           with a fastener.

                      A                    B                   C                D
                                                 FIGURE 1.3

           1.6.1        Identify the fastener that is used in D.                                  (1)

           1.6.2        Describe the steps in A–D above in your ANSWER BOOK.                      (4)

           1.6.3        Justify the use of this fastener to secure the bracket of a heavy
                        gate to a wall.                                                           (1)
                                                                                                  [20]
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

Start this question on a NEW page.

FIGURE 2 on the next page shows an elevation and a ground floor plan that appear on
a building plan. Analyse the drawings and complete the table on ANSWER SHEET 2.
Copyright reserved                                                             Please turn over

### Page 5

Downloaded from hlayiso.com
   Civil Technology: Civil Services                            5                                                DBE/2019
                                                            SC/NSC

                                                                                     NOTE:
                                                                                     Contractors must verify all
                                                                                     dimensions and levels on site before
                                                                                 1   commencing work. Architects must
                                                                                     be notified of any discrepancies
                                                                                     immediately.

                                                                                     ARCHITECT'S SIGNATURE ………………….
                                                                                     CLIENT'S SIGNATURE ……………………….

                                                                                 2
                                                                                     The following must be placed at a
                                                                                     long passage or a staircase:
                                                                                 3

        8                                     W1

                                                                                 4

                                                                                     Symbol to be placed at the entrance
                         W2                                                      5
                                                                                     door of the house:
                                                                                 6

                                                                                 7

                              FIGURE A
                             SCALE 1 : 100
                                                                                     REVISION         DATE         DESCRIPTION
        220             3 000             110
                                                                                     PRINTED BY:                  DATE OF PRINT:
                                                                                     QUALITY PRINTERS             2019/06/16
                                         WH

                                                                                     DRAWING TITLE:
                                                                                     SITE PLAN STAND 1445
                   11                    10
                                                        9

                                                                     W1              PROJECT:
                                                                                     PROPOSED NEW DWELLING OF
                                                                                     MR H SMITH ON STAND 1445,
                         LOUNGE                                                      JUPITER STREET, GERMISTON

              W2
                                                                                     PROJECT NO.               DRAWING NO.

6 000
                                                                                     GR 447-104                337P7

                                                                                     DATE       DRAWN    CHECKED SCALE
                                12
                                                                                     25/04/2019 JP BOTHA P BLADE 1 : 100

                                                                     W2              REFERENCE CODE:
                                                                                     QP 2-2019

                                                                                     WINDOW 1                    WINDOW 2
                                                   14

                                                                                             1 200                  2 400
                        W1          13
220                           110              3 000                      220
                                                                                     1 800             1 800
                        FIGURE B                                            15

                                                    FIGURE 2                                                                 [40]
   Copyright reserved                                                                                Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Civil Services                6                                   DBE/2019
                                             SC/NSC

QUESTION 3:          CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA,
                     AND QUANTITIES (SPECIFIC)

Start this question on a NEW page.

3.1        FIGURE 3.1 below is an illustration of a manhole. Study the illustration and
           answer the questions that follow.

                                                      B
                                      A                           C

                                                                                D

                                                 FIGURE 3.1

           3.1.1        Describe the difference between A and D with regard to the flow of
                        sewage.                                                                  (2)

           3.1.2        Identify B.                                                              (1)

           3.1.3        The benching (C) must be installed at a slope. Give ONE reason
                        for this.                                                                (1)

           3.1.4        Recommend ONE type of brick that can be used to build the walls
                        of the manhole.                                                          (1)

3.2        FIGURE 3.2 on ANSWER SHEET 3.2 shows the top view of a T-junction and
           the incomplete sectional view of a one-brick wall in stretcher bond.

           Draw the sectional front view by projecting it from the given top view. Show
           FIVE brick courses.                                                                   (10)

Copyright reserved                                                            Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Civil Services                      7                                 DBE/2019
                                                   SC/NSC

3.3        FIGURE 3.3 below is a drawing of a type of shore used in trenches. Study the
           drawing and answer the questions that follow.

                                   A

                                   B
                                                   FIGURE 3.3
           3.3.1        Name the type of soil where this type of shore will be used.                  (1)
           3.3.2        Identify A and B.                                                             (2)
3.4        A mask will not provide sufficient protection when you are working inside a
           manhole. Name the safety equipment that will be appropriate.                               (1)
3.5        Describe THREE regulations that must be adhered to when workers work in
           high places.                                                                               (3)
3.6        FIGURE 3.6 below is a drawing of the incomplete sectional view through the
           bricks and concrete floor of a septic tank. Use ANSWER SHEET 3.6 and
           answer the questions that follow. Round off your answer to TWO decimal
           places.

                                       2 600                                1 200

                                               A                1 200

                                                                150
                                       2 800                               1 300

                                                   FIGURE 3.6
           Specifications:
              External walls are 220 mm wide.
              Partition wall is 110 mm wide.
              Use 50 bricks per square metre for a half-brick wall.
           Calculate the number of bricks needed for the partition wall, excluding
           breakage. Ignore the openings.                                                             (8)
                                                                                                      [30]
Copyright reserved                                                                 Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Civil Services                   8                            DBE/2019
                                                SC/NSC

QUESTION 4:          HOT- AND COLD-WATER SUPPLY, TOOLS, EQUIPMENT AND
                     MATERIALS (SPECIFIC)

Start this question on a NEW page.

4.1        FIGURE 4.1 below shows a picture of a water-heating system that is used in
           the hot-water system of a house.

                                          FIGURE 4.1

           4.1.1        Identify the water-heating system in FIGURE 4.1.                      (1)

           4.1.2        Name the source that is used to heat the water in the system
                        indicated in FIGURE 4.1.                                              (1)

           4.1.3        Describe TWO disadvantages of using a heat pump in a hot-water
                        system.                                                               (2)

4.2        There are many different faults that can occur in hot-water systems. Explain
           ONE method of preventing the following situations:

           4.2.1        Poor hot-water pressure                                               (1)

           4.2.2        Water that is not hot enough                                          (1)

           4.2.3        Dripping geyser overflow                                              (1)

4.3        Draw the SANS-approved symbols for the following parts found in a hot-water
           system:

           4.3.1        Pressure-control valve (adjustable)                                   (2)

           4.3.2        Pressure-relief valve                                                 (2)

           4.3.3        Shower (fixed)                                                        (2)

Copyright reserved                                                         Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Civil Services                 9                              DBE/2019
                                              SC/NSC

4.4        FIGURE 4.4 below shows a picture of a valve used in the cold-water supply of
           a house. Study the picture and answer the questions that follow.

                                                                A

                                                                B

                                              FIGURE 4.4

           4.4.1        Identify the valve in FIGURE 4.4.                                     (1)

           4.4.2        Identify parts A and B in FIGURE 4.4.                                 (2)

           4.4.3        Recommend ONE place where the valve in FIGURE 4.4 can be
                        used.                                                                 (1)

4.5        Name TWO water-saving devices that can help reduce water consumption in
           our homes.                                                                         (2)

4.6        Explain in FIVE steps how you would repair a damaged galvanised pipe that
           is installed above ground level by using a Johnson pipe coupling.                  (5)

Copyright reserved                                                         Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Civil Services              10                                         DBE/2019
                                            SC/NSC

4.7        Choose a description from COLUMN B that matches an item in COLUMN A.
           Write only the letter (A–F) next to the question numbers (4.7.1 to 4.7.5) in the
           ANSWER BOOK, e.g. 4.7.6 G.

                          COLUMN A                                COLUMN B
           4.7.1

                                                     A   alternative heating unit that
                                                         saves electricity

           4.7.2

                                                     B   high-pressure geyser

           4.7.3

                                                     C   bibcock (tap)

           4.7.4

                                                     D   inspection eye

           4.7.5

                                                     E   pillar tap

                                                     F   rodding eye

                                                                                         (5 x 1)    (5)
Copyright reserved                                                              Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Civil Services               11                                  DBE/2019
                                             SC/NSC

4.8        Explain TWO problems that can be caused by dezincification.                           (2)

4.9        Describe TWO methods used to prevent galvanic corrosion from occurring in
           metals.                                                                               (2)

4.10       FIGURE 4.10 below shows a picture of a machine. Study the picture and
           answer the questions that follow.

                                             FIGURE 4.10

           4.10.1       Identify the machine in FIGURE 4.10.                                     (1)

           4.10.2       State ONE use of the machine in FIGURE 4.10.                             (1)

           4.10.3       Explain TWO factors to consider when taking care of this machine.        (2)

4.11       Describe the use of a water-pressure testing pump.                                    (1)

4.12       Explain TWO factors to consider when taking care of a water-pressure testing
           pump.                                                                                 (2)
                                                                                                 [40]

Copyright reserved                                                            Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Civil Services                 12                                     DBE/2019
                                               SC/NSC

QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
            STORM WATER (SPECIFIC)

Start this question on a NEW page.

5.1        Give ONE word/term for each of the following descriptions by choosing a
           word/term from the list below. Write only the word/term next to the question
           numbers (5.1.1 to 5.1.5) in the ANSWER BOOK, e.g. 5.1.6 drainage system.

                      fascia board; rip saw; gutter seal; steel clip; flashing;
                       hacksaw; stop end; gutter; union clip; barge board

           5.1.1        The fitting used to prevent rain water from flowing off the gutter           (1)

           5.1.2        The material used to waterproof roofs                                        (1)

           5.1.3        The tool used to cut PVC guttering to size                                   (1)

           5.1.4        The object used to clip together PVC gutters                                 (1)

           5.1.5        A gutter can be mounted to this feature of the roof                          (1)

5.2        FIGURE 5.2 below is a drawing of a part of a roof. Study the drawing and
           answer the questions that follow.

                                   A

                                   B

                                   C

                                               FIGURE 5.2

           5.2.1        Identify A.                                                                  (1)

           5.2.2        Name B, which indicates an important part of the downpipe.                   (1)

           5.2.3        Describe the function of C.                                                  (1)

Copyright reserved                                                                Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Civil Services              13                                DBE/2019
                                            SC/NSC

5.3        FIGURE 5.3 below shows a metal object used to channel storm water to
           catchment areas.

                                        FIGURE 5.3

           5.3.1        Name the metal object shown in FIGURE 5.3.                            (1)

           5.3.2        Recommend TWO other methods that can be used to channel
                        storm water to catchment areas.                                       (2)

           5.3.3        Storm-water construction should be managed by qualified people
                        because if it is constructed or managed poorly, it may have
                        negative consequences. Explain ONE consequence if storm-water
                        systems are constructed and managed poorly.                           (1)

5.4        ANSWER SHEET 5.4 shows a drawing of a frustrum of a cone where the
           base of the cone is not parallel to the horizontal axis. Use the drawing and
           information on ANSWER SHEET 5.4 and draw the development of the cone.
           Show ALL construction lines. Do NOT redraw the drawing, but project the
           development from the given drawing.                                                (18)
                                                                                              [30]

Copyright reserved                                                         Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Civil Services                14                                   DBE/2019
                                              SC/NSC

QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)

Start this question on a NEW page.

6.1        Various options are given as possible answers to the following questions.
           Choose the answer and write only the letter (A–D) next to the question
           numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.

           6.1.1        Sewage is water that contains … contaminants.

                        A    green
                        B    organic
                        C    poisonous
                        D    soapy                                                                 (1)

           6.1.2        A soil vent pipe runs … from the underground sewerage and allows
                        odours and gases to escape.

                        A    vertically
                        B    horizontally
                        C    diagonally
                        D    All the above-mentioned                                               (1)

           6.1.3        Sewer pipes should be at least … in diameter.

                        A    50 mm
                        B    150 mm
                        C    100 mm
                        D    80 mm                                                                 (1)

           6.1.4        Water from sinks, baths and basins is discharged into ...

                        A    waste-water pipes.
                        B    soil pipes.
                        C    soil vent pipes.
                        D    All the above-mentioned                                               (1)

           6.1.5        A … can be used to join straight lengths of pipes.

                        A    soil pipe
                        B    stop end
                        C    straight coupling
                        D    None of the above-mentioned                                           (1)

Copyright reserved                                                              Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Civil Services                 15                                    DBE/2019
                                               SC/NSC

6.2        FIGURE 6.2 below shows drawings of TWO different water traps found in a
           sewerage system.

                                   TRAP A                         TRAP B
                                               FIGURE 6.2

           6.2.1         Differentiate between A and B by referring to the shape of the
                         traps.                                                                      (2)

           6.2.2         Explain the function of the water at the base of EACH of the fittings
                         in FIGURE 6.2.                                                              (1)

6.3        FIGURE 6.3 below is a drawing of the sectional view through a part of a
           building showing the installation of a water closet. Study the drawing and
           answer the questions that follow.

                                                                       A

                                                                       B

                     D

                                              FIGURE 6.3
           6.3.1         Identify part A.                                                            (1)

           6.3.2         Explain why cone B is made out of rubber.                                   (1)

           6.3.3         Identify D and explain ONE consequence of not having this fitting.          (2)

Copyright reserved                                                                Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Civil Services                16                                     DBE/2019
                                              SC/NSC

           6.3.4        Name ONE tool that you will use to clear a blocked waste pipe that
                        is connected to a basin.                                                     (1)

           6.3.5        A ball valve is found inside part A in FIGURE 6.3 and regulates the
                        water level. In you ANSWER BOOK, draw a neat line diagram of a
                        ball valve as seen from the direction of A in FIGURE 6.3. Show the
                        following in your drawing:

                            Ball
                            Lever arm
                            Casing with silencing tube
                            Label any TWO parts of the drawing.                                     (5)

6.4        FIGURE 6.4 on ANSWER SHEET 6.4 is a drawing of a part of a building with
           sanitary fitments and sewerage components. Use ANSWER SHEET 6.4 and
           develop and draw a one-pipe sewerage layout for this building up to the
           indicated manhole. ALL regulations and design principles of a good drainage
           (sewerage) system must be considered and appropriate symbols and
           abbreviations must be used.

           The drainage system should consist of:

               2 x rodding eyes
               5 x inspection eyes
               1 x ventilation pipe
               Main sewerage pipes
               Branch pipes                                                                         (10)

6.5        FIGURE 6.5 below shows a cross section of a part of a sewerage system.
           Study the drawing and answer the questions that follow.

                                              FIGURE 6.5
           6.5.1        Identify the part of the sewerage system in FIGURE 6.5.                      (1)

           6.5.2        Predict ONE consequence of channelling grey water into a septic
                        tank.                                                                        (1)
Copyright reserved                                                                Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Civil Services               17                                   DBE/2019
                                             SC/NSC

6.6        Name ONE situation where you would install a vacuum tank.                           (1)

6.7        Identify the fitting used in a sewerage system, illustrated in FIGURE 6.7
           below.

                                             FIGURE 6.7                                        (1)

6.8        Name TWO methods that can be used to join copper pipes.                             (2)

6.9        Draw a neat line diagram in your ANSWER BOOK to show how two pieces of
           sheet metal interlocks when you make a grooved seam lap joint.                      (2)

6.10       FIGURE 6.10 below is a drawing of a soldered joint and the forces that act
           upon it.

                                                           A

                                                                               B

                                            FIGURE 6.10

           6.10.1       Identify forces A and B in FIGURE 6.10.                                (2)

           6.10.2       Give TWO reasons why the contact of a soldering iron on the sheet
                        metal is important while soldering overlap joints.                     (2)
                                                                                               [40]

                                                                                   TOTAL:      200

Copyright reserved

### Page 18

Downloaded from hlayiso.com
Civil Technology: Civil Services                               DBE/2019
                                             SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 2

NO.                   QUESTION                        ANSWER        MARKS

1       Identify the elevation shown in
                                                                          1
        FIGURE A.

2       Name the scale of FIGURE B.                                       1

3       Identify number 1.                                                1

4       Identify number 2.                                                1

5       Recommend a suitable finish for
                                                                          1
        number 3.

6       What is indicated by number 4?                                    1

7       Identify the drawing symbol
                                                                          1
        indicated by number 5.

8       Identify the drawing symbol
                                                                          1
        indicated by number 6.

9       What is indicated by number 7?                                    1

10      Give the date on which the
                                                                          1
        building plan was printed.

11      Who checked the building plan?                                    1

12      Name the electrical drawing
        symbol in the column for the notes
                                                                          1
        in FIGURE 2 that must be placed
        at a staircase.

13      Name the electrical feature in the
        column for the notes in FIGURE 2
                                                                          1
        that must be placed at the
        entrance door of the house.

Copyright reserved

### Page 19

Downloaded from hlayiso.com
Civil Technology: Civil Services                       DBE/2019
                                              SC/NSC

14      Identify the type of roof that is
        used on the building in                               1
        FIGURE A.

15      Explain the purpose of number 1.                      1

16      Who is the owner of this house?                       1

17      In which street is the proposed
                                                              1
        dwelling situated?

18      Identify number 8.                                    1

19      What is the sanitary fitting
                                                              1
        indicated by number 9 used for?

20      Recommend an alternative
        sanitary fitting to replace
                                                              1
        number 10 that will serve a similar
        purpose.

21      Explain the purpose of number 11
                                                              1
        as indicated on the staircase.

22      What is indicated by number 13?                       1

23      What is indicated by number 15?                       1

24      Deduce the height of window 1
                                                              1
        from the window schedule.

25      Deduce the width of window 2
                                                              1
        from the window schedule.

26      Name the elevations of the
        building on which the staircase is                    2
        situated.

27      Differentiate between the
        electrical symbols indicated by                       2
        numbers 12 and 14.

Copyright reserved

### Page 20

Downloaded from hlayiso.com
Civil Technology: Civil Services                     DBE/2019
                                           SC/NSC

28      Recommend a suitable floor
                                                            1
        covering for the lounge.

29      Calculate the area of the lounge
                                                            3
        in m². Show ALL calculations.

30      Calculate the perimeter of the
        building. Show ALL calculations.

                                                            7

                                            TOTAL:         40

Copyright reserved

### Page 21

Civil Technology: Civil Services
                                   Downloaded from hlayiso.com                                                     DBE/2019
                                                         SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.2

                                                             ASSESSMENT CRITERIA                       MARK   CANDIDATE'S
                                                                                                                 MARK
                                                             Five brick courses in stretcher bond       5
                                                             Half brick on alternate plan courses on
                                                                                                        3
                                                             left side
                                                             Section correctly drawn                    1
                                                             Hatching lines                             1
                                        A                A
                                                             TOTAL:                                     10

                                            FIGURE 3.2

Copyright reserved

### Page 22

Downloaded from hlayiso.com
Civil Technology: Civil Services                                               DBE/2019
                                            SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.6

 A            B                    C                       D
                                       Total length of partition wall:
                                       1/ _________mm - 2 /_________
                                       = _________                               (2)

                                       Area of partition wall:
1/      _________
        _________        _________m2                                             (3)
                                       Number of bricks needed for partition
                                       wall excluding 5% for breakage
1/      _________
        _________          _________                 Bricks are needed           (3)

Copyright reserved

### Page 23

Downloaded from hlayiso.com
       Civil Technology: Civil Services                                                         DBE/2019
                                                 SC/NSC

       CENTRE NUMBER:

       EXAMINATION NUMBER:

       ANSWER SHEET 5.4

SEAM

                                          ASSESSMENT CRITERIA                                    M    CM
                                          Construction lines to top of cone                      2
                                          Construction lines of outer circle                     2
                                          Divide outer circle in 12 parts                        1
                                          Construction lines from top of cone to outer circle    3
                                          Cone measurement (marked/transferred) from front       6
                                          view to determine top part of development (ONE
                                          mark for every FOUR coordinates = 3)
                                          Outside lines of development                            2
                                          3 mm seam on both sides                                 2
                                          TOTAL:                                                 18

       Copyright reserved

### Page 24

Downloaded from hlayiso.com
Civil Technology: Civil Services                                           DBE/2019
                                           SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.4

                                            WB
                                   WC
                                                    B

                                                        S   G

                                    FIGURE 6.4

                                                                MH

                         ASSESSMENT CRITERIA                    MARK   CANDIDATE'S
                                                                          MARK
      2 x rodding eyes correctly positioned                      2
      5 x inspection eyes correctly positioned                   5
      1 x ventilation pipe correctly positioned                  1
      Sewerage pipes drawn correctly (main and branch pipes)     2
      TOTAL:                                                     10

Copyright reserved

## Related documents

- [Civil Technology May June 2019 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-construction-afr/87c657e9-94a5-422f-ade2-b3b897806384) — Civil Technology · QP · 2019 · Afr
- [Civil Technology May June 2019 (Wood Working) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-wood-working-afr/bdea7087-4612-4372-bd72-70147466f760) — Civil Technology · QP · 2019 · Afr
- [Civil Technology May June 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-afr/2a9b9e1b-37dc-48dc-9aa7-67dd5fa19a10) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology May June 2019 (Civil Services) Memo Eng](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-eng/8c1355fc-f6e2-40c6-85ff-1d03eb2991ea) — Civil Technology · Memo · 2019 · Eng
- [CIVIL TECH GR12 QP Eng SEPT2019 CIVIL SERVICES](https://www.hlayiso.com/library/civil-tech-gr12-qp-eng-sept2019-civil-services/24d2e0b8-d851-4c36-a274-0e7449793231) — Civil Technology · QP · 2019 · Eng
- [CIVIL TECH GR12 QP AFR SEPT2019 KONSTRUKSIE](https://www.hlayiso.com/library/civil-tech-gr12-qp-afr-sept2019-konstruksie/c3787049-358b-4ee5-a539-4188e9f548b5) — Civil Technology · QP · 2019 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
