# Civil Technology Grade 12 NSC June 2019 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC June Exam 2019 (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-eng/8c1355fc-f6e2-40c6-85ff-1d03eb2991ea
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2019
- Exam period: NSC June Exam
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC June 2019 Memo (English)](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-eng/8c1355fc-f6e2-40c6-85ff-1d03eb2991ea)

## About this document

Civil Technology · Grade 12 · NSC June Exam · 2019. Memorandum, 18 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

             SENIOR CERTIFICATE EXAMINATIONS/
         NATIONAL SENIOR CERTIFICATE EXAMINATIONS

                       CIVIL TECHNOLOGY: CIVIL SERVICES

                                          2019

                                MARKING GUIDELINES

                                                                       MARKS: 200

                      These marking guidelines consist of 18 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Civil Services                2                              DBE/2019
                                   SC/NSC – Marking Guidelines

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
            (GENERIC)

1.1        1.1.1        G                                                                (1)

           1.1.2        E                                                                (1)

           1.1.3        A                                                                (1)

           1.1.4        C                                                                (1)

           1.1.5        D                                                                (1)

1.2        • When heavy materials/loads are not lifted/lowered/handled correctly. 
           • Wrong posture when lifting materials.
           • Not using safety apparel.
           ANY ONE OF THE ABOVE                                                           (1)

1.3         
           1 : 4 OR 76°                                                                   (2)

1.4        •  A qualified person must operate the device. 
           •  The device must never be overloaded. 
           •  The gates and wire components of the lift of the hoisting device must be
              at least 1 980 mm high.
           • The gates must be shut when the device is being used.
           • Emergency brake mechanisms must be installed.
           • Safety measures must be displayed inside the cage.
           • Inspections and maintenance work should be carried out regularly
              (at least six-monthly) by qualified persons.
           • Overhead protection must be provided to protect workers from falling
              objects.
           • When material or equipment is being hoisted, it must be stacked firmly
              and correctly, and secured properly.
           • The hoist must be inspected weekly by a qualified person.
           ANY TWO OF THE ABOVE                                                           (2)

           1.5.1        A = Laser level 
                        B = Dumpy level                                                  (2)

Copyright reserved

### Page 3

Downloaded from hlayiso.com
Civil Technology: Civil Services                 3                                     DBE/2019
                                    SC/NSC – Marking Guidelines

          1.5.2                   Laser level (A)                      Dumpy level (B)
                     To determine levels when:                      The dumpy level is used
                     • installing ceilings and floor tiles.        when:
                     • installing chair rails for example in •      determining differences
                        a dining room.                              between       levels    and
                     • installing receptacles for power             vertical heights, especially
                        inside a building during                    over longer distances 
                        construction.                         •     determining levels and
                     • hanging pictures.                            slopes.
                     • excavating for new buildings.          •     setting out buildings
                     • aligning and levelling floors.         •     transferring levels and
                     • when installing doors and windows.           heights.
                     • aligning shelves and cabinets.         •     determining/measuring the
                     • levelling post and beams on decks,            distances between two
                        fences and porches.                          points.
                     • setting out buildings on a site.
                     • aligning fences, post and decks.
                     • determining gradient/slope for
                        drainage and irrigation.
                     • establishing contours for farming or
                        drainage.

                     • To determine levels and slopes
                       when installing sewer pipes.
                       ANY ONE IN EACH COLUMN ABOVE                                                  (2)

1.6        1.6.1        Rawl bolt                                                                   (1)

           1.6.2        A – Drill a hole of the required diameter and depth. 
                        B – Remove debris and thoroughly clean the hole with a brush or
                            by blowing into it. 
                        C – Remove the bolt and washer, insert the sleeve/shield into the
                            hole and align the fixture (for example base plate, etc…) with
                            the hole. 
                        D – Insert the bolt with washer through the fixture and tighten to the
                            recommended torque.                                                     (4)

           1.6.3        Rawl bolts:
                        • are stronger fasteners than a screw with a plastic plug. 
                        • are designed to resist pull-out failure.
                        • have excellent mechanical properties such as tensile and yield
                           stress.
                        • have excellent carrying capacity.
                        • have excellent tolerance to variance in the hole size.
                        ANY ONE OF THE ABOVE                                                         (1)
                                                                                                     [20]

Copyright reserved                                                                Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Civil Services                4                                      DBE/2019
                                   SC/NSC – Marking Guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

ANSWER SHEET 2

NO.                    QUESTIONS                                  ANSWERS                        MARKS

1       Identify the elevation shown in
                                                   Eastern/East elevation/East                      1
        FIGURE A.
                                                                                                     1
2       Name the scale of FIGURE B.                1 : 100 

                                                                                                     1
3       Identify number 1.                         Barge board 

                                                                                                     1
4       Identify number 2.                         Roof overhang/Eave/Open eave 

5       Recommend a suitable finish for            Plaster/Paint/Face brick/Tiles/
        number 3.                                                                                    1
                                                   Cladding 

6       What is indicated by number 4?             Door/Entrance door/Door opening                  1

7       Identify the drawing symbol indicated
                                                   Finished floor level/FFL 
        by number 5.                                                                                 1

8       Identify the drawing symbol indicated
                                                   Natural ground level/NGL                         1
        by number 6.

9       What is indicated by number 7?             Step                                             1

10      Give the date on which the building
                                                                                                     1
        plan was printed.                          2019/06/16 

                                                                                                     1
11      Who checked the building plan?             P Blade 

12      Name the electrical drawing symbol         Two-way switch 
        in the column for the notes in
                                                                                                     1
        FIGURE 2 that must be placed at a
        staircase.
                                                                   DO NOT MARK
                                                                   THESE QUESTIONS
13      Name the electrical feature in the
        column for the notes in FIGURE 2
                                                   Wall light                                       1
        that must be placed at the entrance
        door of the house.

Copyright reserved                                                                Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology: Civil Services                5                                     DBE/2019
                                   SC/NSC – Marking Guidelines

14      Identify the type of roof that is
        used on the building in                Gable roof                                          1
        FIGURE A.

15      Explain the purpose of number 1.       To cover ends of purlins/battens/fixed to
                                               the purlins/battens for a neat appearance.           1
                                               To finish of the gable end of the roof. 

16      Who is the owner of this house?        Mr H Smith                                          1

17      In which street is the proposed
                                               Jupiter street                                      1
        dwelling situated?

18      Identify number 8.                     Rainwater down pipe/Downpipe                        1

19                                             To wash your face/Body 
        What is the sanitary fitting           Brush your teeth                                     1
        indicated by number 9 used for?        Wash your hands
                                               Washing/Rinsing

20      Recommend an alternative
        sanitary fitting to replace
                                               Bath                                                1
        number 10 that will serve a similar
        purpose.

21      Explain the purpose of number 11       Landing to serve as resting place or
                                                                                                    1
        as indicated on the staircase.         change of direction of staircase. 

22                                             Emergency light/External light
        What is indicated by number 13?                                                             1
                                               Thickness of wall/110 mm 

23      What is indicated by number 15?        North- symbol/direction/point                       1

24      Deduce the height of window 1
                                               1,8 m or 1 800 mm                                   1
        from the window schedule.

25      Deduce the width of window 2
                                               2,4 m or 2 400 mm                                   1
        from the window schedule.

26      Name the elevations of the
        building on which the staircase is     Western/West elevation/West                         2
        situated.                              Southern/South elevation/South 

Copyright reserved                                                               Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Civil Services                6                                     DBE/2019
                                   SC/NSC – Marking Guidelines

27                                             12 – One way light switch single pole/
        Differentiate between the
        electrical symbols indicated by        lever                                               2
        numbers 12 and 14.                     14 – One way light switch double pole/
                                               lever 

28      Recommend a suitable floor             Tiles/Novilon/Carpets/Laminated
                                                                                                    1
        covering for the lounge.               flooring/Wooden flooring.

29      Calculate the area of the lounge       6 m  x 3 m  = 18 m² 
        in m². Show ALL calculations.
                                               OR                                                   3
                                               6 000 mm x 3 000 mm = 18 m²

30      Calculate the perimeter of the         (220 + 3 000 + 110 + 3 000 + 220)  x 2 
        building. Show ALL calculations.
                                               = 6 550 x 2
                                               =13 100 mm 
                                               (220 + 6 000 + 220)  x 2 
                                               = 6 440 x 2                                          7
                                               = 12 880 mm 
                                               13 100 + 12 880
                                               = 25 980 mm  OR
                                               = 25,98 m

                                               TOTAL:                                               40

Copyright reserved                                                               Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Civil Services                   7                                    DBE/2019
                                      SC/NSC – Marking Guidelines

QUESTION 3: CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA,
            SAFETY AND QUANTITIES (SPECIFIC)

3.1        3.1.1        • The sewage runs into the system at A  and exits the system
                          at D.

                           OR

                        • Sewage flows from A to D.                                                   (2)

           3.1.2        Branch/Open channel                                                          (1)

           3.1.3        Benching must be installed at a slope for the following reasons:

                        • To ensure that sewage spills slide back into the channel. 
                        • So that rats or other vermin cannot settle there.
                        ANY ONE OF THE ABOVE                                                          (1)

           3.1.4        Engineering brick/Face brick/Common brick/Plaster brick                      (1)

3.2                                                           
                                                                    
                                                     √
                                                     
                                                              
                                                     √              
                                                              

                                             A                 A

                                   Section correctly drawn 

                                            ASSESSMENT CRITERIA                       MARK

                                            Five brick courses in stretcher bond         5
                                            Half brick on alternate plan courses on
                                                                                         3
                                            left side
                                            Section correctly drawn                      1
                                            Hatching lines (Accept any type of           1
                                            hatching for brick work)
                                            TOTAL:                                      10        (10)

Copyright reserved                                                                 Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Civil Services                    8                                     DBE/2019
                                       SC/NSC – Marking Guidelines

3.3        3.3.1        Moderately firm ground                                                        (1)

           3.3.2        A - Poling boards/planks 
                        B - Strut                                                                     (2)

3.4        Respirator/Breathing apparatus                                                             (1)

3.5        Regulations when working in high places:
           • Appoint a competent person, responsible for the preparation of a fall
             plan.
           • Ensure that a fall protection plan is implemented, amended where and
             when necessary, and maintained as required. 
           • Ensure that steps are taken in order to continue adherence to the fall
             protection plan.                                                                         (3)

3.6                       A        B           C                         D
                                                        Total length of partition wall
                                                        1/ 1 200 mm - 2 /220 
                                                         = 760 mm                                     (2)

                                                        Area of partition wall
                         1/    0,76 
                               1,2        0,91 m2                                                    (3)

                                                        Number of bricks needed for
                                                        partition wall excluding 5% for
                                                        breakage
                         1/
                               0,91 
                               50           45,5      46 bricks are needed                           (3)

                                                                                                       [30]

Copyright reserved                                                                  Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Civil Services                  9                                  DBE/2019
                                     SC/NSC – Marking Guidelines

QUESTION 4: HOT- AND COLD-WATER SUPPLY, TOOLS, EQUIPMENT AND
            MATERIALS (SPECIFIC)

4.1        4.1.1        Solar geyser                                                              (1)

           4.1.2        Sunlight                                                                  (1)

           4.1.3        Disadvantages of using a heat pump are:
                        • It runs on electricity. 
                        • It is costly. 
                        • Does not work well in all climates.
                        • Supplementary heat is needed for lower temperatures.
                        ANY TWO OF THE ABOVE                                                       (2)

4.2        4.2.1        Preventing poor hot water pressure:
                        • Replace geyser if it is faulty with new/modern one with a
                            higher pressure rating. 
                        • Replace blocked pipes.
                        • Replace the valves if it is faulty.
                        • Clean pipes
                        ANY ONE OF THE ABOVE                                                       (1)

           4.2.2        Preventing ware not being hot enough:
                        • Adjust the thermostat to a higher temperature. 
                        • Replace the thermostat and element if it is faulty.
                        • Replace the geyser if it is faulty.
                        ANY ONE OF THE ABOVE                                                       (1)

           4.2.3        Prevent dripping geyser overflow:
                        • Replace the pressure control/relief valve. 
                        • Clean the filter of the relief valve.
                        • Replace the o-ring in the relief valve.
                        • Replace the spring in the relief valve.
                        ANY ONE OF THE ABOVE                                                       (1)

4.3        4.3.1
                                      P
                                                                                                 (2)

           4.3.2
                                      PV
                                                                                                 (2)

           4.3.3
                                                                                                 (2)

4.4        4.4.1        Full-way valve/Gate valve                                                 (1)

           4.4.2        A - Hand wheel 
                        B - Gland nut                                                             (2)

Copyright reserved                                                              Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Civil Services                10                                  DBE/2019
                                   SC/NSC – Marking Guidelines

           4.4.3        This valve can be used at:
                        • geysers. 
                        • water meters.
                        • a place in a system where water supply needs to be shut off.
                        • a water supply system in a building.
                        • Inside/outside a building.
                        ANY ONE OF THE ABOVE                                                      (1)

4.5        Devices that can reduce water consumption are:
           • water-saving aerator device on tap. 
           • sensor/electronic taps. 
           • metered taps.
           • demand pillar taps.
           • water saving shower heads.
           • flushing devices with two buttons, to save water.
           ANY TWO OF THE ABOVE                                                                   (2)

4.6        How to repair a galvanised pipe by using a Johnson pipe coupling:
           • Shut off the water supply. 
           • Use a pipe cutter/hacksaw and cut the damaged section from the supply
              line. 
           • Put the Johnson pipe coupling over the one side of the pipe, ensuring
              that the tapered rubber seal is in place and secure it to the centre-
              coupling piece. 
           • Add a new length of pipe. 
           • Put the Johnson pipe coupling over the other side of the pipe and fasten
              it on both sides. 
           • Test for leaks.
           ANY FIVE OF THE ABOVE                                                                  (5)

4.7        4.7.1        E                                                                        (1)

           4.7.2        B                                                                        (1)

           4.7.3        A                                                                        (1)

           4.7.4        F                                                                        (1)

           4.7.5        C                                                                        (1)

4.8        Problems that can be caused by dezincification are:
           • In the presence of oxygen and water, zinc gradually dissolves from the
               surface of an alloy; the material that will remain is a weak, spongy copper
               layer. 
           • It can progress through the part and cause leaks. 
           • It can cause blockages if it forms a deposit.
           ANY TWO OF THE ABOVE                                                                   (2)

Copyright reserved                                                             Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Civil Services                11                                   DBE/2019
                                   SC/NSC – Marking Guidelines

4.9        Methods to prevent galvanic corrosion in metals are:
           • electrically insulating the two metals. 
           • making sure that there is no contact with an electrolyte. 
           • applying an antioxidant paste to copper and aluminium surfaces.
           • choosing metals that have similar electrode potentials.
           • connecting a direct current (DC) supply to oppose the corrosive galvanic
              current.
           ANY TWO OF THE ABOVE                                                                    (2)

4.10       4.10.1       Pipe thread cutting machine                                               (1)

           4.10.2       • To thread pipes 
                        • To cut pipes
                        • To ream pipes
                        • To thread and cut bolts and nuts
                        ANY ONE OF THE ABOVE                                                       (1)

           4.10.3       Factors to be considered when taking care:
                        • Maintain tool with care. 
                        • Keep cutting tools sharp and clean. 
                        • Check for misalignment or binding of moving parts, breakage
                            of parts and any other conditions that may affect the operation
                            of the tool.
                        • Use only accessories that are recommended by the
                            manufacturer.
                        • Grease surface of pipe before cutting.
                        • Start the cutting of threads slowly at first and then move to a
                            steady pace.
                        • Secure the machine to a bench or stand.
                        • Keep the covers in place.
                        • Support long heavy pipes.
                        • Do not wear gloves or loose clothing's that can get caught in
                            moving parts.
                        • Do not use the machine if the foot switch is broken.
                        • Tighten the chuck wheel and engage the rear centring device
                            before turning on the machine.
                        • Lock the foot switch when the machine is not in use to prevent
                            accidental starting.
                        • Use the clamp or any other practical way to secure and
                            support the work piece.
                        ANY TWO OF THE ABOVE                                                       (2)

4.11       Water pressure testing pump is used to test the pressure of water
           systems.                                                                               (1)

Copyright reserved                                                              Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Civil Services                12                                 DBE/2019
                                   SC/NSC – Marking Guidelines

4.12       Factors to be considered when taking care of this water pressure testing
           pump:
           • Keep the tank and pump system clean. 
           • The suction pipe is provided with a filter to prevent dirt from entering the
               system. Remove and clean the filter with water when it
               becomes clogged. 
           • Grease the piston regularly with water repellent grease.
           • Be careful not to damage the piston.
           • After use, turn off the test pump, disconnect it from the system and store
               it safely.
           • Use only liquids specified for the test.
           • No acids or other corrosive liquids may be used.
           • Use only clean water; oil can be used as an alternative.
           • Check the pump for damaged or defective parts before use.
           • The pump should not be used if pressure hoses or any other parts are
               faulty or damaged.
           ANY TWO OF THE ABOVE                                                                  (2)
                                                                                                 [40]

Copyright reserved                                                            Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Civil Services                  13                                DBE/2019
                                     SC/NSC – Marking Guidelines

QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
            STORM WATER (SPECIFIC)

5.1        5.1.1        Stop end                                                                 (1)

           5.1.2        Flashing                                                                 (1)

           5.1.3        Hacksaw                                                                  (1)

           5.1.4        Union clip                                                               (1)

           5.1.5        Fascia board                                                             (1)

5.2        5.2.1        Square gutter/Gutter                                                     (1)

           5.2.2        Offset                                                                   (1)

           5.2.3        Holder bat – is used to keep the downpipe anchored to the wall.          (1)

5.3        5.3.1        Grid                                                                     (1)

           5.3.2        Other methods of channelling water to catchment areas are:
                        • Gutters on roofs collect rainwater and feed it to down pipes. 
                        • Manholes connected to storm-water drains will carry the water
                            away from inhabited areas to be safely discharged into rivers
                            or dams. 
                        • Furrows can channel water to catchment areas.
                        ANY TWO OF THE ABOVE                                                      (2)

           5.3.3        Poorly constructed or managed storm water systems can result in:
                        • discomfort of occupants or the public. 
                        • loss of life.
                        • damage to properties.
                        • pollution of the environment.
                        • negative environmental impact.
                        ANY ONE OF THE ABOVE                                                      (1)

Copyright reserved                                                             Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Civil Services                     14                                             DBE/2019
                                        SC/NSC – Marking Guidelines

5.4

                                        7
                               2            4
                                                  5
                                                             6

             1                    1                        5
                                             4

                                   4

            5                                  5
                                                 2
                      5
                              7

                         5                                             Candidates can use any one of the two
                                                                        methods:

                                                                            1. Calculate the circumference
                                                                               and divide by 12
                                                                                  OR
                                                                            2. Measure distance between any
                                                                               two parts on top view (circle)
                         3

 DRAWING NOT TO SCALE: USE A MASK
 TO MARK THIS QUESTION

                                             ASSESSMENT CRITERIA                                   Code    M
                                             Construction lines to top of cone                      1      2
                                             Construction lines of outer circle                     2      2
                                             Divide outer circle in 12 parts                        3      1
                                             Construction lines from top of cone to outer circle    4      3
                                             Cone measurement (marked/transferred) from front
                                             view to determine top part of development (ONE         5      6
                                             mark for every FOUR coordinates = 3)
                                             Outside lines of development                           6       2
                                             3 mm seam on both sides                                7       2
                                             TOTAL:                                                        18

                                                                                                                  (18)
                                                                                                                  [30]

Copyright reserved                                                                             Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Civil Services                15                                   DBE/2019
                                   SC/NSC – Marking Guidelines

QUESTION 6: DRAINAGE SYSTEMS AND SANITARY FITTINGS (SPECIFIC)

6.1        6.1.1        B                                                                         (1)

           6.1.2        A                                                                         (1)

           6.1.3        C                                                                         (1)

           6.1.4        A                                                                         (1)

           6.1.5        C                                                                         (1)

6.2        6.2.1        Trap A – has the shape of a S. 
                        Trap B – has the shape of a P.                                            (2)

           6.2.2        It forms a water seal to prevent gasses and bad smells from the
                        sewerage system to enter the atmosphere.                                  (1)

6.3        6.3.1        Cistern/Water container                                                   (1)

           6.3.2        Rubber cone is malleable/elastic. 
                        Can make a watertight seal between the pipe and the water closet.
                        ANY ONE OF THE ABOVE                                                       (1)

           6.3.3        Access junction  – if there is no access junction there will be no
                        access to the pipe to clean blockages. 
                        OR
                        Inspection eye – if there is no inspection eye there will be no
                        access to the pipe to clean blockages.
                        OR
                        Soiled water will flow out.
                        Gasses would escape.                                                       (2)

           6.3.4        Drain-cleaning rods/Plunger/Coil spring 
                        ANY ONE OF THE ABOVE                                                       (1)

Copyright reserved                                                              Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Civil Services                 16                                     DBE/2019
                                    SC/NSC – Marking Guidelines

           6.3.5                                                     CASING 
                                               

                                                                             SILENCING TUBE
                           BALL 
                                              LEVER ARM
                                                                  

                        Line diagrams will also be accepted

                                          ASSESSMENT CRITERIA                         MARK

                                          Shape of the ball                              1
                                          Lever arm                                      1
                                          Casing with silencing tube                     1
                                          Any TWO labels                                 2
                                          TOTAL:                                         5
                                                                                                      (5)

Copyright reserved                                                                 Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Civil Services                  17                                        DBE/2019
                                     SC/NSC – Marking Guidelines

6.4
                                                                            RE 
                                               IE           IE     IE
                                     
                                   RE
                                          
                                         VP                                          
                                                                                   IE

                                                       WB
                                         WC
                                                              B
                                                                                   

                                                                   S       G
                                                                               
                                                                                   IE 

                                                                               MH

                                          ASSESSMENT CRITERIA                            MARK
                                          2 x rodding eyes correctly positioned            2
                                          5 x inspection eyes correctly
                                                                                            5
                                          positioned
                                          1 x ventilation pipe correctly positioned         1
                                          Sewerage pipes drawn correctly (main
                                                                                            2
                                          and branch pipes)
                                          TOTAL                                            10
                                                                                                          (10)

6.5        6.5.1        French drain                                                                     (1)

           6.5.2        The grey water will kill the bacteria in the septic tank.                        (1)

6.6        • Vacuum tanks are installed anywhere where there is no municipal
              sewerage systems. 
           • Farms
           • Rural areas
           • New developments
           ANY ONE OF THE ABOVE                                                                           (1)

Copyright reserved                                                                     Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology: Civil Services                18                                   DBE/2019
                                   SC/NSC – Marking Guidelines

6.7        Inspection chamber                                                                  (1)

6.8        Copper pipes can be joined by means of:
           • capillary/soldered joints. 
           • brass compression joints.                                                         (2)

6.9                         

                                                                                               (2)

6.10       6.10.1       A – Tension force 
                        B – Shear force                                                        (2)

           6.10.2       The position of the soldering iron is important because:
                        • proper contact of the soldering iron to the metal will ensure that
                          the metal heats up to the melting point of the solder. 
                        • heat is transferred from the tip of the soldering iron to the
                          metal. 
                        • it melts the solder and keeps it in liquid form during the
                          soldering process.
                        ANY TWO OF THE ABOVE                                                    (2)
                                                                                                [40]

                                                                                   TOTAL:       200

Copyright reserved

## Related documents

- [Civil Technology May June 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-afr/2a9b9e1b-37dc-48dc-9aa7-67dd5fa19a10) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology May June 2019 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-eng/3f3d8211-a2ae-4ecd-89a4-623bb435b86a) — Civil Technology · QP · 2019 · Eng
- [Civil Technology May June 2019 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-construction-afr/87c657e9-94a5-422f-ade2-b3b897806384) — Civil Technology · QP · 2019 · Afr
- [Civil Technology May June 2019 (Wood Working) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-wood-working-afr/bdea7087-4612-4372-bd72-70147466f760) — Civil Technology · QP · 2019 · Afr
- [Civil Technology Nov 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-afr/13c03cd5-cfa4-42cf-9a7c-5d7b0e1069f0) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology Nov 2019 (Civil Services) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-eng/53bd979c-a0bb-411f-960b-1f8755cd4874) — Civil Technology · Memo · 2019 · Eng

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.