# Civil Technology Grade 12 NSC June 2019 Question Paper (Eng)

> Grade 12 Civil Technology question paper from the NSC June Exam 2019 (English), 24 pages. Read online or get the free PDF download, memo linked when available.

- Page: https://www.hlayiso.com/library/civil-technology-may-june-2019-construction-eng/4ffd94d8-0a11-4cd5-9e4f-7076c0127ba8
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2019
- Exam period: NSC June Exam
- Curriculum: CAPS
- Pages: 24

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC June 2019 Question Paper (Eng)](https://www.hlayiso.com/library/civil-technology-may-june-2019-construction-eng/4ffd94d8-0a11-4cd5-9e4f-7076c0127ba8)

## About this document

Civil Technology · Grade 12 · NSC June Exam · 2019. Question paper, 24 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

             SENIOR CERTIFICATE EXAMINATIONS/
         NATIONAL SENIOR CERTIFICATE EXAMINATIONS

                      CIVIL TECHNOLOGY: CONSTRUCTION

                                        2019

                                                                        MARKS: 200

                                                                      TIME: 3 hours

            This question paper consists of 14 pages and 8 answer sheets.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Construction               2                                    DBE/2019
                                          SC/NSC

REQUIREMENTS:

1.        Drawing instruments

2.        A non-programmable calculator

3.        ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.        This question paper consists of SIX questions.

2.        Answer ALL the questions.

3.        Answer each question as a whole. Do NOT separate subsections of
          questions.

4.        Start the answer to EACH question on a NEW page.

5.        Do NOT write in the margins of the ANSWER BOOK.

6.        You may use sketches to illustrate your answers.

7.        Write ALL calculations and answers in the ANSWER BOOK or on the
          attached ANSWER SHEETS.

8.        Use the mark allocation as a guide to the length of your answers.

9.        Make drawings and sketches in pencil, fully dimensioned and neatly finished
          off with descriptive titles and notes to conform to the SANS/SABS Code of
          Practice for Building Drawings.

10.       For the purpose of this question paper, the size of a brick should be taken as
          220 mm x 110 mm x 75 mm.

11.       Use your own discretion where dimensions and/or details have been omitted.

12.       Answer QUESTIONS 2, 3.6, 4.4, 4.6, 5.5, 5.6, 6.4 and 6.6 on the attached
          ANSWER SHEETS using drawing instruments where necessary.

13.       Write your CENTRE NUMBER and EXAMINATION NUMBER on every
          ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
          have used them or not.

14.       Drawings in the question paper are NOT to scale due to electronic transfer.

15.       Google Images was used as the source for all photographs and pictures.

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Construction                3                                        DBE/2019
                                           SC/NSC

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
            (GENERIC)

Start this question on a NEW page.

1.1       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–G) next to the question numbers (1.1.1 to 1.1.5) in the
          ANSWER BOOK, e.g. 1.1.6 H.

                      COLUMN A                             COLUMN B
          1.1.1      Galvanising            A    keeps freshly cast concrete damp

          1.1.2      Electroplating         B    metal dipped in lead

          1.1.3      Curing                 C    protects wood and other material
                                                 against natural decay
          1.1.4      Paint
                                            D    a plastic finish on metal surfaces,
          1.1.5      Powder coating              applied with a compressed air spray
                                                 gun

                                            E    coating mild steel with a thin layer of
                                                 another material by electrolysis

                                            F    coating timber with a thin layer of
                                                 another material by electrolysis

                                            G    metal dipped in zinc
                                                                                    (5 x 1)       (5)

1.2       Explain ONE cause of injuries when handling materials.                                  (1)

1.3       Give the angle/ratio at which a ladder should be placed against a wall.                 (2)

1.4       Explain TWO safety precautions that must be followed when using a builder's
          hoist.                                                                                  (2)

Copyright reserved                                                             Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Construction                     4                               DBE/2019
                                                SC/NSC

1.5       FIGURE 1.5 below shows tools that are used on a construction site.

                                      A                           B
                                                FIGURE 1.5

          1.5.1        Identify both A and B.                                                    (2)

          1.5.2        Name ONE use of A and B respectively.                                     (2)

1.6       The pictures below illustrate the steps followed when fixing material to a floor
          with a fastener.

                     A                    B                   C                D
                                                FIGURE 1.3

          1.6.1        Identify the fastener that is used in D.                                  (1)

          1.6.2        Describe the steps in A–D above in your ANSWER BOOK.                      (4)

          1.6.3        Justify the use of this fastener to secure the bracket of a heavy
                       gate to a wall.                                                           (1)
                                                                                                 [20]
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

Start this question on a NEW page.

FIGURE 2 on the next page shows an elevation and a ground floor plan that appear on
a building plan. Analyse the drawings and complete the table on ANSWER SHEET 2.

Copyright reserved                                                            Please turn over

### Page 5

Downloaded from hlayiso.com
   Civil Technology: Construction                              5                                                DBE/2019
                                                            SC/NSC

                                                                                     NOTE:
                                                                                     Contractors must verify all
                                                                                     dimensions and levels on site before
                                                                                 1   commencing work. Architects must
                                                                                     be notified of any discrepancies
                                                                                     immediately.

                                                                                     ARCHITECT'S SIGNATURE ………………….
                                                                                     CLIENT'S SIGNATURE ……………………….

                                                                                 2
                                                                                     The following must be placed at a
                                                                                     long passage or a staircase:
                                                                                 3

        8                                     W1

                                                                                 4

                                                                                     Symbol to be placed at the entrance
                         W2                                                      5
                                                                                     door of the house:
                                                                                 6

                                                                                 7

                              FIGURE A
                             SCALE 1 : 100
                                                                                     REVISION         DATE         DESCRIPTION
        220             3 000             110
                                                                                     PRINTED BY:                  DATE OF PRINT:
                                                                                     QUALITY PRINTERS             2019/06/16
                                         WH

                                                                                     DRAWING TITLE:
                                                                                     SITE PLAN STAND 1445
                   11                    10
                                                        9

                                                                     W1              PROJECT:
                                                                                     PROPOSED NEW DWELLING OF
                                                                                     MR H SMITH ON STAND 1445,
                         LOUNGE                                                      JUPITER STREET, GERMISTON

              W2
                                                                                     PROJECT NO.               DRAWING NO.

6 000
                                                                                     GR 447-104                337P7

                                                                                     DATE       DRAWN    CHECKED SCALE
                                12
                                                                                     25/04/2019 JP BOTHA P BLADE 1 : 100

                                                                     W2              REFERENCE CODE:
                                                                                     QP 2-2019

                                                                                     WINDOW 1                    WINDOW 2
                                                   14

                                                                                             1 200                  2 400
                        W1          13
220                           110              3 000                      220
                                                                                     1 800             1 800
                        FIGURE B                                            15

                                                    FIGURE 2                                                                 [40]
   Copyright reserved                                                                                Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Construction                 6                                      DBE/2019
                                            SC/NSC

QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)

Start this question on a NEW page.

3.1       Give the minimum pitch of a roof when concrete tiles are used as roof
          covering.                                                                                 (1)

3.2       Give the dimensions of a purlin that is used for corrugated iron sheeting.                (2)

3.3       Give the maximum spacing between roof trusses if the roof is covered with
          concrete tiles.                                                                           (1)

3.4       Name the first batten on a roof that is covered with concrete tiles.                      (1)

3.5       FIGURE 3.5 below is a drawing of a line diagram of a South African (Howe)
          roof truss. Identify parts A–E.

                                                                                  A
                                                                                  B

                                                                                  c
                                                                                  D

                                                                                  E

                                            FIGURE 3.5                                              (5)

3.6       Use ANSWER SHEET 3.6 and draw, in good proportion, a neat sketch of
          a lean-to roof supported by two walls.

          Show the following on your drawing:

              Span
              Walls
              Wall plate
              Rafter
              Any TWO labels                                                                       (8)

3.7       Recommend a suitable depth that wire or galvanised steel straps should be
          embedded into the wall for a roof covered with concrete tiles.                            (1)

Copyright reserved                                                               Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Construction                     7                                  DBE/2019
                                                SC/NSC

3.8       Give ONE word/term for each of the following descriptions by choosing a
          word/term from the list below. Write only the word/term next to the question
          numbers (3.8.1 to 3.8.5) in the ANSWER BOOK, e.g. 3.8.6 Flight.

                          stair well;     apron; pitch board; rise; handrail;
                                        nosing; tread/going; margin

          3.8.1        Overhang at the front end of the tread                                       (1)

          3.8.2        A timber board used to cover the floor joist of the landing                  (1)

          3.8.3        Template used to set out a step of a staircase                               (1)

          3.8.4        Open space between flights of stairs                                         (1)

          3.8.5        A member that forms part of the balustrade                                   (1)

3.9       What is the maximum pitch for stairs used by the public?                                  (1)

3.10      Describe how to fix a steel column to a concrete base.                                    (5)
                                                                                                    [30]

Copyright reserved                                                               Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Construction                  8                                DBE/2019
                                             SC/NSC

QUESTION 4:          EXCAVATIONS, FORMWORK, TOOLS AND EQUIPMENT AND
                     MATERIALS (SPECIFIC)

Start this question on a NEW page.

4.1       State TWO properties of EACH of the following metals:

          4.1.1        Steel                                                                   (2)

          4.1.2        Lead                                                                    (2)

4.2       Explain TWO functions of a concrete cube test.                                       (2)

4.3       Excavation of soil on a building site is necessary to establish a firm
          foundation.

          4.3.1        Explain THREE safety factors that should be considered before
                       excavation commences.                                                   (3)

          4.3.2        Describe THREE factors that can cause an excavation to collapse.        (3)

4.4       FIGURE 4.4 on ANSWER SHEET 4.4 shows a trench that has been
          excavated. Use ANSWER SHEET 4.4 and draw a neat sectional drawing, in
          good proportion, of the shuttering for a shallow trench.

          Show the following on your drawing:

              Poling boards
              Walling boards/Wailing boards
              Folding wedge
              Struts
              Any ONE label                                                                   (8)

4.5       Describe ONE use of folding wedges in formwork.                                      (1)

4.6       FIGURE 4.6 on ANSWER SHEET 4.6 shows an incomplete drawing of the
          formwork for a concrete beam with an attached floor on the right-hand side.
          Use ANSWER SHEET 4.6 and complete the drawing.

          Show the following on your drawing:

              Bearer/Joist for the soffit
              Cleats
              Braces for beams/struts
              Fixing plates/Kickers
              Wedges
              Any ONE label                                                                   (11)

Copyright reserved                                                          Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Construction                  9                                 DBE/2019
                                             SC/NSC

4.7       FIGURE 4.7 below shows a plate compactor that is used on a building site.
          Study FIGURE 4.7 and answer the questions that follow.

                                             FIGURE 4.7

          4.7.1        Describe TWO safety precautions that must be observed when
                       using the plate compactor in FIGURE 4.7.                                 (2)

          4.7.2        Explain in your own words how you will take care of the plate
                       compactor.                                                               (1)

4.8       FIGURE 4.8 below shows a construction machine that is used on a building
          site.

                                             FIGURE 4.8

          4.8.1        Identify the construction machine.                                       (1)

          4.8.2        Describe TWO ways in which you will take care of this construction
                       machine.                                                                 (2)

4.9       Name TWO methods that can be used to pump concrete to higher levels in
          a building.                                                                           (2)
                                                                                                [40]

Copyright reserved                                                           Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Construction               10                                     DBE/2019
                                           SC/NSC

QUESTION 5:          PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
                     MEANS OF COMMUNICATION (SPECIFIC)

Start this question on a NEW page.

5.1       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–G) next to the question numbers (5.1.1 to 5.1.5) in the
          ANSWER BOOK, e.g. 5.1.6 H.

                         COLUMN A                                COLUMN B
          5.1.1

                                                 A   plastering chased pipes

          5.1.2

                                                 B   floating of screed

          5.1.3

                                                 C   skim coat

          5.1.4

                                                 D   power floating

          5.1.5

                                                 E   wet the wall

                                                 F   application of plaster

                                                 G drying of concrete

                                                                                      (5 x 1)     (5)
Copyright reserved                                                             Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Construction              11                                   DBE/2019
                                          SC/NSC

5.2       How many wheelbarrows of sand will you use to mix plaster for interior walls
          when using ONE bag of cement?                                                        (1)

5.3       Recommend THREE areas that can be covered with paving.                               (3)

5.4       Give ONE reason for using paving instead of concrete.                                (1)

5.5       ANSWER SHEET 5.5 shows the outlines and a part of the cavity of
          each alternative plan course of the dead end of a cavity wall. Use
          ANSWER SHEET 5.5 and draw, in good proportion, the two alternative plan
          courses of the dead end of a cavity wall.                                            (7)

5.6       Use ANSWER SHEET 5.6 and draw, to scale 1 : 10, a detailed vertical
          section through the foot of a roof truss showing the closed (concealed) eaves.

          Show the following on your drawing:

              Wall: 220 mm wide
              Tie beam: 114 x 38 mm
              Wall plate: 114 x 38 mm
              Eaves overhang: 400 mm
              Rafter: 114 x 38 mm
              Fascia board: 228 x 28 mm
              Bearer: 38 x 38 mm
              Hanger: 38 x 38 mm
              6 mm fibre-cement board on closed eaves
              Two quarter-round mouldings below fibre-cement board
              Any ONE label                                                                   (13)
                                                                                               [30]

Copyright reserved                                                          Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Construction                  12                                   DBE/2019
                                              SC/NSC

QUESTION 6:          REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
                     FLOORS AND QUANTITIES (SPECIFIC)

Start this question on a NEW page.

6.1       Various options are given as possible answers to the following questions.
          Choose the answer and write only the letter (A–D) next to the question
          numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.

          6.1.1        Reinforcement is indicated on construction drawings with a code.
                       What does 20 indicate in the following code: 4 R 20 03 250?

                       A   Number of bars in the group
                       B   Bar number
                       C   Diameter of the bar
                       D   Centre-to-centre spacing                                                (1)

          6.1.2        Pile foundations consist of …

                       A   precast piles.
                       B   steel-tube piles.
                       C   driven in-situ piles.
                       D   All the above-mentioned                                                 (1)

          6.1.3        What type of foundation will be used in unstable ground?

                       A   Strip foundation
                       B   Raft foundation
                       C   Pile foundation
                       D   Step foundation                                                         (1)

          6.1.4        A concrete floor is classified as a reinforced floor when it consists
                       of …

                       A   concrete and anchor bars.
                       B   concrete and main bars.
                       C   concrete and welded mesh.
                       D   All the above-mentioned                                                 (1)

          6.1.5        Precast concrete piles are driven into the ground by a … hammer.

                       A   drop
                       B   club
                       C   claw
                       D   sledge                                                                  (1)

Copyright reserved                                                              Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Construction                 13                                    DBE/2019
                                             SC/NSC

6.2       Draw, by means of a neat freehand sketch, the shape of the bottom part of
          a driven in-situ pile.

          Show the following on your drawing:

              Steel casing
              Shape of the bottom part
              Any ONE label                                                                       (4)

6.3       Explain the purpose of the steel capping on a precast concrete pile.                     (1)

6.4       FIGURE 6.4 on ANSWER SHEET 6.4 shows the outline of three sides of an
          L-shaped concrete column. Use ANSWER SHEET 6.4 and draw a neat
          sectional view of an L-shaped reinforced concrete column in good proportion.

          Show the following on your drawing:

              L-shaped column
              8 main bars
              Stirrups/Binders
              Minimum concrete cover
              Any TWO labels                                                                      (10)

6.5       FIGURE 6.5 below shows a part of a floor construction. Study FIGURE 6.5
          and answer the questions that follow.

                                                                                        A

                                                                                        B

                                                                                       C

                                             FIGURE 6.5

          6.5.1        Name parts A, B and C.                                                      (3)

          6.5.2        Explain the purpose of C.                                                   (1)

          6.5.3        State THREE factors that must be considered when planning this
                       type of construction in FIGURE 6.5.                                         (3)

          6.5.4        Before the installation of this type of floor construction, provision
                       should be made for civil and electrical services to be installed.
                       Name THREE services that must be considered.                                (3)
Copyright reserved                                                              Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Construction             14                                  DBE/2019
                                         SC/NSC

6.6       FIGURE 6.6 below shows the foundation of a single garage.

                                                                      3 000

                                        6 000

                                         FIGURE 6.6

          SPECIFICATIONS:

              Outside measurements of foundation of garage: 6 000 mm x 3 000 mm
              The foundation is 600 mm wide and 250 mm thick.

          Use ANSWER SHEET 6.6 and calculate the volume of concrete needed for
          the foundation. Round off your answers to TWO decimal places.                   (10)
                                                                                          [40]

                                                                              TOTAL:      200

Copyright reserved

### Page 15

Downloaded from hlayiso.com
Civil Technology: Construction                                DBE/2019
                                            SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 2

NO.                  QUESTION                        ANSWER        MARKS

1      Identify the elevation shown in
                                                                         1
       FIGURE A.

2      Name the scale of FIGURE B.                                       1

3      Identify number 1.                                                1

4      Identify number 2.                                                1

5      Recommend a suitable finish for
                                                                         1
       number 3.

6      What is indicated by number 4?                                    1

7      Identify the drawing symbol
                                                                         1
       indicated by number 5.

8      Identify the drawing symbol
                                                                         1
       indicated by number 6.

9      What is indicated by number 7?                                    1

10     Give the date on which the
                                                                         1
       building plan was printed.

11     Who checked the building plan?                                    1

12     Name the electrical drawing
       symbol in the column for the notes
                                                                         1
       in FIGURE 2 that must be placed
       at a staircase.

13     Name the electrical feature in the
       column for the notes in FIGURE 2
                                                                         1
       that must be placed at the
       entrance door of the house.

Copyright reserved

### Page 16

Downloaded from hlayiso.com
Civil Technology: Construction                         DBE/2019
                                              SC/NSC

14      Identify the type of roof that is
        used on the building in                                   1
        FIGURE A.

15      Explain the purpose of number 1.                          1

16      Who is the owner of this house?                           1

17      In which street is the proposed
                                                                  1
        dwelling situated?

18      Identify number 8.                                        1

19      What is the sanitary fitting
                                                                  1
        indicated by number 9 used for?

20      Recommend an alternative
        sanitary fitting to replace
                                                                  1
        number 10 that will serve a similar
        purpose.

21      Explain the purpose of number 11
                                                                  1
        as indicated on the staircase.

22      What is indicated by number 13?                           1

23      What is indicated by number 15?                           1

24      Deduce the height of window 1
                                                                  1
        from the window schedule.

25      Deduce the width of window 2
                                                                  1
        from the window schedule.

26      Name the elevations of the
        building on which the staircase is                        2
        situated.

27      Differentiate between the
        electrical symbols indicated by                           2
        numbers 12 and 14.

Copyright reserved

### Page 17

Downloaded from hlayiso.com
Civil Technology: Construction                       DBE/2019
                                           SC/NSC

28      Recommend a suitable floor
                                                                1
        covering for the lounge.

29      Calculate the area of the lounge
                                                                3
        in m². Show ALL calculations.

30      Calculate the perimeter of the
        building. Show ALL calculations.

                                                                7

                                            TOTAL:              40

Copyright reserved

### Page 18

Downloaded from hlayiso.com
Civil Technology: Construction                          DBE/2019
                                 SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.6

ASSESSMENT CRITERIA                MARK   CANDIDATE'S
                                             MARK
Span                                 1
Walls                                2
Wall plate                           1
Rafter                               1
Any TWO labels                       2
Proportion                           1
TOTAL:                               8

Copyright reserved

### Page 19

Downloaded from hlayiso.com
Civil Technology: Construction                             DBE/2019
                                    SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 4.4

                       FIGURE 4.4

ASSESSMENT CRITERIA                   MARK   CANDIDATE'S
                                                MARK
Folding wedges                          1
Walling boards/Wailing boards           1
Poling boards                           2
Struts                                  1
Shuttering correctly drawn              1
Any ONE label                           1
Proportion                              1
TOTAL:                                  8

Copyright reserved

### Page 20

Downloaded from hlayiso.com
Civil Technology: Construction                                        DBE/2019
                                   SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 4.6

                                                   Shuttering board

                                 FIGURE 4.6

ASSESSMENT CRITERIA                   MARK    CANDIDATE'S
                                                 MARK
Bearer/Joist for the soffit             1
Cleats                                  2
Braces for beams/struts                 2
Fixing plates/Kickers                   2
Wedges                                  2
Any ONE label                           1
Proportion                              1
TOTAL:                                  11

Copyright reserved

### Page 21

Downloaded from hlayiso.com
Civil Technology: Construction                                         DBE/2019
                                         SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.5

                                    FIRST COURSE

                                  SECOND COURSE

ASSESSMENT CRITERIA                               MARK   CANDIDATE'S
                                                            MARK
One full brick on outer skin of first course       1
One full brick on inner skin of first course       1
Brick on first course to close cavity              1
One full brick on outer skin on second course      1
One full brick on inner skin on second course      1
Brick on second course to close cavity             1
Proportion                                         1
TOTAL:                                             7

Copyright reserved

### Page 22

Downloaded from hlayiso.com
Civil Technology: Construction                                           DBE/2019
                                         SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.6

               ASSESSMENT CRITERIA                              MARK   CANDIDATE'S
                                                                          MARK
               Wall: 220 mm wide                                 1
               Tie beam: 114 x 38 mm                             1
               Wall plate: 114 x 38 mm                           1
               Eaves overhang: 400 mm                            1
               Rafter: 114 x 38 mm                               1
               Facia board: 228 x 28 mm                          1
               Bearer: 38 x 38 mm                                1
               Hanger: 38 x 38 mm                                1
               6 mm fibre-cement board on closed eaves           1
               Two quarter-round mouldings below fibre-cement    1
               board
               Any ONE label                                     1
               Application of scale                              2
               TOTAL:                                            13
Copyright reserved

### Page 23

Downloaded from hlayiso.com
Civil Technology: Construction                         DBE/2019
                                        SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.4

ASSESSMENT CRITERIA              MARK    CANDIDATE'S
                                            MARK
L-shaped column                    2
8 main bars                        2
Stirrups/Binders                   2
Minimum concrete cover             1
Any TWO labels                     2
Proportion                         1
TOTAL:                            10

Copyright reserved

### Page 24

Downloaded from hlayiso.com
Civil Technology: Construction                                    DBE/2019
                                            SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.6

 A          B              C                             D
                                 Concrete for foundations
                                 Centre line
                                 2/ ___________      =       mm
                                 2/                  =       mm
                                 Total               =       mm
                                 Minus 4/            =       mm
                                 Total centre line   =       m
1/      _______
        _______
        _______ __________

Copyright reserved

## Related documents

- [Civil Technology May June 2019 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-eng/3f3d8211-a2ae-4ecd-89a4-623bb435b86a) — Civil Technology · QP · 2019 · Eng
- [Civil Technology May June 2019 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-construction-afr/87c657e9-94a5-422f-ade2-b3b897806384) — Civil Technology · QP · 2019 · Afr
- [Civil Technology May June 2019 (Wood Working) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-wood-working-afr/bdea7087-4612-4372-bd72-70147466f760) — Civil Technology · QP · 2019 · Afr
- [Civil Technology May June 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-afr/2a9b9e1b-37dc-48dc-9aa7-67dd5fa19a10) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology May June 2019 (Civil Services) Memo Eng](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-eng/8c1355fc-f6e2-40c6-85ff-1d03eb2991ea) — Civil Technology · Memo · 2019 · Eng
- [CIVIL TECH GR12 QP Eng SEPT2019 CIVIL SERVICES](https://www.hlayiso.com/library/civil-tech-gr12-qp-eng-sept2019-civil-services/24d2e0b8-d851-4c36-a274-0e7449793231) — Civil Technology · QP · 2019 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
