# Civil Technology Grade 12 NSC June 2019 Question Paper (Eng)

> Grade 12 Civil Technology question paper from the NSC June Exam 2019 (English), 27 pages. Read online or get the free PDF download, memo linked when available.

- Page: https://www.hlayiso.com/library/civil-technology-may-june-2019-wood-working-eng/18075a77-0d13-412d-82e4-923d865150f9
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2019
- Exam period: NSC June Exam
- Curriculum: CAPS
- Pages: 27

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC June 2019 Question Paper (Eng)](https://www.hlayiso.com/library/civil-technology-may-june-2019-wood-working-eng/18075a77-0d13-412d-82e4-923d865150f9)

## About this document

Civil Technology · Grade 12 · NSC June Exam · 2019. Question paper, 27 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

             SENIOR CERTIFICATE EXAMINATIONS/
         NATIONAL SENIOR CERTIFICATE EXAMINATIONS

                      CIVIL TECHNOLOGY: WOODWORKING

                                        2019

                                                                        MARKS: 200

                                                                      TIME: 3 hours

            This question paper consists of 16 pages and 9 answer sheets.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Woodworking                2                                     DBE/2019
                                         SC/NSC

REQUIREMENTS:

1.        Drawing instruments

2.        A non-programmable calculator

3.        ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.        This question paper consists of SIX questions.

2.        Answer ALL the questions.

3.        Answer each question as a whole. Do NOT separate subsections of
          questions.

4.        Start the answer to EACH question on a NEW page.

5.        Do NOT write in the margins of the ANSWER BOOK.

6.        You may use sketches to illustrate your answers.

7.        Write ALL calculations and answers in the ANSWER BOOK or on the
          attached ANSWER SHEETS.

8.        Use the mark allocation as a guide to the length of your answers.

9.        Make drawings and sketches in pencil, fully dimensioned and neatly finished
          off with descriptive titles and notes to conform to the SANS/SABS Code of
          Practice for Building Drawings.

10.       For the purpose of this question paper, the size of a brick should be taken as
          220 mm x 110 mm x 75 mm.

11.       Use your own discretion where dimensions and/or details have been omitted.

12.       Answer QUESTIONS 2, 3.3, 3.4, 3.5, 4.2, 5.6, 6.2, 6.5 and 6.6 on the
          attached ANSWER SHEETS using drawing instruments where necessary.

13.       Write your CENTRE NUMBER and EXAMINATION NUMBER on every
          ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
          have used them or not.

14.       Drawings in the question paper are NOT to scale due to electronic transfer.

15.       Google Images was used as the source for all photographs and pictures.

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Woodworking                 3                                          DBE/2019
                                          SC/NSC

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
            (GENERIC)

Start this question on a NEW page.

1.1       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–G) next to the question numbers (1.1.1 to 1.1.5) in the
          ANSWER BOOK, e.g. 1.1.6 H.

                      COLUMN A                               COLUMN B
          1.1.1      Galvanising            A      keeps freshly cast concrete damp

          1.1.2      Electroplating         B      metal dipped in lead

          1.1.3      Curing                 C      protects wood and other material
                                                   against natural decay
          1.1.4      Paint
                                            D      a plastic finish on metal surfaces,
          1.1.5      Powder coating                applied with a compressed air spray
                                                   gun

                                            E      coating mild steel with a thin layer of
                                                   another material by electrolysis

                                            F      coating timber with a thin layer of
                                                   another material by electrolysis

                                            G      metal dipped in zinc
                                                                                      (5 x 1)       (5)

1.2       Explain ONE cause of injuries when handling materials.                                    (1)

1.3       Give the angle/ratio at which a ladder should be placed against a wall.                   (2)

1.4       Explain TWO safety precautions that must be followed when using a builder's
          hoist.                                                                                    (2)

Copyright reserved                                                               Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Woodworking                    4                                 DBE/2019
                                             SC/NSC

1.5       FIGURE 1.5 below shows tools that are used on a construction site.

                                     A                           B
                                               FIGURE 1.5

          1.5.1       Identify both A and B.                                                     (2)

          1.5.2       Name ONE use of A and B respectively.                                      (2)

1.6       The pictures below illustrate the steps followed when fixing material to a floor
          with a fastener.

                     A                   B                   C                 D
                                               FIGURE 1.3

          1.6.1       Identify the fastener that is used in D.                                   (1)

          1.6.2       Describe the steps in A–D above in your ANSWER BOOK.                       (4)

          1.6.3       Justify the use of this fastener to secure the bracket of a heavy
                      gate to a wall.                                                            (1)
                                                                                                 [20]
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

Start this question on a NEW page.

FIGURE 2 on the next page shows an elevation and a ground floor plan that appear on
a building plan. Analyse the drawings and complete the table on ANSWER SHEET 2.
Copyright reserved                                                            Please turn over

### Page 5

Downloaded from hlayiso.com
   Civil Technology: Woodworking                             5                                               DBE/2019
                                                         SC/NSC

                                                                                  NOTE:
                                                                                  Contractors must verify all
                                                                                  dimensions and levels on site before
                                                                              1   commencing work. Architects must
                                                                                  be notified of any discrepancies
                                                                                  immediately.

                                                                                  ARCHITECT'S SIGNATURE ………………….
                                                                                  CLIENT'S SIGNATURE ……………………….

                                                                              2
                                                                                  The following must be placed at a
                                                                                  long passage or a staircase:
                                                                              3

        8                                      W1

                                                                              4

                                                                                  Symbol to be placed at the entrance
                          W2                                                  5
                                                                                  door of the house:
                                                                              6

                                                                              7

                               FIGURE A
                              SCALE 1 : 100
                                                                                  REVISION         DATE         DESCRIPTION

        220              3 000             110
                                                                                  PRINTED BY:                  DATE OF PRINT:
                                                                                  QUALITY PRINTERS             2019/06/16
                                          WH

                                                                                  DRAWING TITLE:
                                                                                  SITE PLAN STAND 1445
                   11                     10
                                                         9

                                                                  W1              PROJECT:
                                                                                  PROPOSED NEW DWELLING OF
                                                                                  MR H SMITH ON STAND 1445,
                                                                                  JUPITER STREET, GERMISTON
                         LOUNGE

              W2
                                                                                  PROJECT NO.               DRAWING NO.

6 000
                                                                                  GR 447-104                337P7

                                                                                  DATE       DRAWN    CHECKED SCALE
                                 12                                               25/04/2019 JP BOTHA P BLADE 1 : 100

                                                                  W2              REFERENCE CODE:
                                                                                  QP 2-2019

                                                                                  WINDOW 1                    WINDOW 2
                                                    14

                                                                                          1 200                  2 400
                         W1          13
220                            110              3 000                  220
                                                                                  1 800             1 800
                        FIGURE B                                         15

                                                     FIGURE 2                                                             [40]
   Copyright reserved                                                                             Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Woodworking              6                                  DBE/2019
                                       SC/NSC

QUESTION 3:          CASEMENTS,     CUPBOARDS,        WALL-PANELLING            AND
                     QUANTITIES (SPECIFIC)

Start this question on a NEW page.

3.1       Name the part of a casement that separates two window panes so that they
          do not touch each other.                                                          (1)

3.2       FIGURE 3.2 below shows an external elevation of a double casement with
          fanlights. Name parts A–E.

                                                                    A

                                                                   B

                                                                   C

                                        FIGUUR 3.2

                                                                   D

                                                                    ED

                                        FIGURE 3.2                                          (5)

Copyright reserved                                                       Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Woodworking                   7                                  DBE/2019
                                            SC/NSC

3.3       FIGURE 3.3 below shows the front view of a built-in cupboard without the
          doors. Use ANSWER SHEET 3.3 and draw a vertical sectional view of the
          cupboard to scale 1 : 10.

                                        A

                                                              400

                                                                      2 000

                                                             1 400

                                        A                     100

                                              FIGURE 3.3

          Use the following specifications:

              All shelves and sides are 16 mm thick.
              The back is 3 mm thick.
              The depth of the cupboard is 570 mm.
              Show hanging rail in sectional view.                                              (11)

3.4       Use ANSWER SHEET 3.4 and draw, to scale 1 : 5, a vertical sectional view
          through the bottom part of a tongue and groove wall panel. The wall and floor
          level are given.

          Show the following parts clearly:

              Horizontal rough grounds: 25 mm x 50 mm
              Tongue and groove board: 15 mm thick
              Skirting: 22 mm thick
              Quadrant moulding: 22 mm thick                                                    (6)

Copyright reserved                                                            Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Woodworking                 8                                   DBE/2019
                                          SC/NSC

3.5       FIGURE 3.5 below shows the floor plan of a building with a gable roof.
          The centre-to-centre distance between the roof trusses is 1 300 mm. Study
          the figure and use ANSWER SHEET 3.5 to answer the questions that follow.

                        150                                          220

                                              9 000

                                            FIGURE 3.5

          3.5.1       Calculate the length, in metres, of fascia board needed for the
                      whole roof.                                                               (2)

          3.5.2       Calculate the number of trusses needed for the roof.                      (5)
                                                                                                [30]

Copyright reserved                                                           Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Woodworking              9                                    DBE/2019
                                       SC/NSC

QUESTION 4:          ROOFS, CEILINGS, TOOLS AND EQUIPMENT, AND MATERIALS
                     (SPECIFIC)

Start this question on a NEW page.

4.1       Choose a term from COLUMN B that matches a roof in COLUMN A. Write
          only the letter (A–G) next to the question numbers (4.1.1 to 4.1.5) in the
          ANSWER BOOK, e.g. 4.1.6 H.

                        COLUMN A                             COLUMN B
          4.1.1

                                                A   lean-to roof

          4.1.2

                                                B   couple roof

          4.1.3

                                                C   king post roof

          4.1.4

                                                D   collar-tie roof

          4.1.5

                                                E   South African (Howe) roof

                                                F   close-coupled roof

                                                G   thatch roof

                                                                                (5 x 1)     (5)

Copyright reserved                                                       Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Woodworking                 10                                DBE/2019
                                          SC/NSC

4.2       Use ANSWER SHEET 4.2 and complete the vertical section through the foot
          of a roof truss by drawing the closed eaves to scale 1 : 10.

          Show the following on your drawing:

              Fascia board: 230 mm x 38 mm
              Hanger: 38 mm x 38 mm
              Bearer: 38 mm x 38 mm
              6 mm fibre-cement board
              Two quarter-round mouldings below the fibre-cement board                       (7)

4.3       Differentiate between a hipped roof and a gable roof in terms of the quantity
          of material and the type of construction used. Tabulate your answer.                (4)

4.4       Name THREE different methods of joining roof truss members to each other.           (3)

4.5       Name TWO components that can be used to keep a trap door of a ceiling in
          position.                                                                           (2)

4.6       Give the minimum measurements for the opening of a trap door.                       (1)

4.7       FIGURE 4.7 below shows a portable electrical machine. Study the picture and
          answer the questions that follow.

                                              FIGURE 4.7

          4.7.1       Identify the machine.                                                   (1)

          4.7.2       Name TWO personal safety equipment that you must be wearing
                      when operating this machine.                                            (2)

          4.7.3       Explain how you will store the machine.                                 (2)

          4.7.4       Explain TWO precautions that should be applied to a piece of
                      timber to prevent damages to the machine shown in FIGURE 4.7.           (2)

Copyright reserved                                                         Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Woodworking                 11                                 DBE/2019
                                          SC/NSC

4.8       FIGURE 4.8 shows a radial arm saw. Study the picture and answer the
          questions that follow.

                                           FIGURE 4.8

          4.8.1       Describe THREE precautions that should be taken to ensure the
                      safe handling of the machine.                                            (3)

          4.8.2       Explain how the blade of the machine must be cared for to prevent
                      it from being damaged.                                                   (2)

4.9       Explain in FIVE steps how you will apply two layers of sanding sealer to a
          door that has been sanded smooth.                                                    (5)

4.10      Explain how you will recognise a graded timber plank/board.                          (1)
                                                                                               [40]

Copyright reserved                                                          Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Woodworking                   12                                 DBE/2019
                                            SC/NSC

QUESTION 5:          CENTRING, FORMWORK, SHORING AND GRAPHICS AS MEANS
                     OF COMMUNICATION (SPECIFIC)

Start this question on a NEW page.

5.1       Draw a neat two-dimensional sketch to show the open laggings, rib and
          a bearer to support a segmental arch.

          Show the following on your drawing:

              Bearer
              Rib
              Laggings
              Space between laggings
              Only half of the centre
              Any THREE labels                                                                  (8)

5.2       Give ONE word/term for each of the following descriptions by choosing a
          word/term from the list below. Write only the word/term next to the question
          numbers (5.2.1 to 5.2.5) in the ANSWER BOOK, e.g. 5.2.6 Riser.

                       fish plate;   ties; soleplate; folding wedges;   props;
                                          clamps; braces/struts

          5.2.1       Fixed diagonally to the struts/props and head tree to strengthen the
                      formwork                                                                   (1)

          5.2.2       To fix the props and bearers together                                      (1)

          5.2.3       Fixed to the beam sides to make them stronger                              (1)

          5.2.4       Placed under the props to allow the raising and lowering of the
                      formwork to the required height                                            (1)

          5.2.5       Transfers the load of the concrete beam evenly to the ground               (1)

5.3       Name TWO types of material that can be used for the lining on the inside of
          formwork.                                                                              (2)

Copyright reserved                                                            Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Woodworking               13                                   DBE/2019
                                        SC/NSC

5.4       FIGURE 5.4 below shows the formwork for a square concrete column. Study
          the picture and label parts A, B and C.

                                                                        A

                                                                        B

                                                                        C

                                         FIGURE 5.4                                            (3)

5.5       Draw a neat two-dimensional sketch, in good proportion, of the detail at the
          base of a dead shore.

          Show the following on your drawing:

              Dead shore
              Folding wedges
              Soleplate
              Steel dog
              Any TWO labels                                                                  (7)

5.6       Use ANSWER SHEET 5.6 and draw a neat two-dimensional sketch, in good
          proportion, of a lean-to roof.

          Show the following on your drawing:

              Parapet wall
              Supporting wall
              Wall plate
              Rafter                                                                          (5)
                                                                                               [30]

Copyright reserved                                                          Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Woodworking                  14                                     DBE/2019
                                           SC/NSC

QUESTION 6:          SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
                     AND JOINING (SPECIFIC)

Start this question on a NEW page.

6.1       Various options are given as possible answers to the following questions.
          Choose the answer and write only the letter (A–D) next to the question
          numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.

          6.1.1       Floorboards are attached to floor joists that are supported by ...

                      A   struts that are resting on tie beams.
                      B   props every 3 metres.
                      C   bearers and brick piers on concrete bases.
                      D   DPC.                                                                     (1)

          6.1.2       Ant guards are made from galvanised steel and placed ...

                      A   underneath the wall plate.
                      B   inside the air bricks.
                      C   outside the house.
                      D   on floor boards                                                          (1)

          6.1.3       The width of a floor board should be at least 50 mm and not
                      exceed ...

                      A   100 mm.
                      B   400 mm.
                      C   140 mm.
                      D   299 mm.                                                                  (1)

          6.1.4       Floor boards should have a ... joint.

                      A   tongue and groove
                      B   mortice and tenon
                      C   haunched mortice and tenon
                      D   rebate                                                                   (1)

          6.1.5       Staggered struts between the floor joist can be secured with …

                      A   nails.
                      B   screws.
                      C   a truss hanger.
                      D   All of the above-mentioned                                               (1)

Copyright reserved                                                              Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Woodworking                 15                                 DBE/2019
                                          SC/NSC

6.2       Use ANSWER SHEET 6.2 and draw, in good proportion, a sectional view of
          the external wall that supports a suspended timber floor. The foundation is
          given.
          Show the following parts on your drawing:
              Foundation wall: 330 mm wide
              Wall of superstructure: 220 mm wide
              DPC
              Ant guard
              Air brick
              Wall plate
              Joist
              Any ONE label                                                                   (9)

6.3       Explain a half-landing as used in a timber staircase.                                (3)

6.4       Explain the difference between a mortice lock and a night latch with regard to
          their placement and function.                                                        (4)

6.5      FIGURE 6.5 on ANSWER SHEET 6.5 shows an external view of an external
         door.
         Use ANSWER SHEET 6.5 and complete the following:
             Print any FOUR labels on the drawing.
             Indicate the dimension of the height of the door.
             Indicate the dimension of the width of the door.
             Print the title of the drawing.                                                  (7)

6.6      FIGURE 6.6 on ANSWER SHEET 6.6 shows the incomplete front view of a
         double tenon. Use ANSWER SHEET 6.6 and complete the drawing of the
         double tenon.
         Show the following on your drawing:
             Grooves for the panels on both sides
             Double tenon
             Any TWO labels                                                                   (7)

6.7       FIGURE 6.7 below shows a fastener used to join materials. Identify the
          fastener.

                                             FIGURE 6.7                                        (1)
Copyright reserved                                                          Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Woodworking                     16              DBE/2019
                                              SC/NSC

6.8       Name ONE fastener to join the following:

          6.8.1       Ceiling boards to brandering                           (1)

          6.8.2       Roof tiles to battens                                  (1)

          6.8.3       Roof sheeting to purlins                               (1)

6.9       State ONE method of fixing a window pane to a frame.               (1)
                                                                             [40]

                                                                 TOTAL:      200

Copyright reserved

### Page 17

Downloaded from hlayiso.com
Civil Technology: Woodworking                                 DBE/2019
                                            SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 2

NO.                  QUESTION                        ANSWER        MARKS

1      Identify the elevation shown in
                                                                         1
       FIGURE A.

2      Name the scale of FIGURE B.                                       1

3      Identify number 1.                                                1

4      Identify number 2.                                                1

5      Recommend a suitable finish for
                                                                         1
       number 3.

6      What is indicated by number 4?                                    1

7      Identify the drawing symbol
                                                                         1
       indicated by number 5.

8      Identify the drawing symbol
                                                                         1
       indicated by number 6.

9      What is indicated by number 7?                                    1

10     Give the date on which the
                                                                         1
       building plan was printed.

11     Who checked the building plan?                                    1

12     Name the electrical drawing
       symbol in the column for the notes
                                                                         1
       in FIGURE 2 that must be placed
       at a staircase.

13     Name the electrical feature in the
       column for the notes in FIGURE 2
                                                                         1
       that must be placed at the
       entrance door of the house.

Copyright reserved

### Page 18

Downloaded from hlayiso.com
Civil Technology: Woodworking                        DBE/2019
                                            SC/NSC

14     Identify the type of roof that is
       used on the building in                                  1
       FIGURE A.

15     Explain the purpose of number 1.                         1

16     Who is the owner of this house?                          1

17     In which street is the proposed
                                                                1
       dwelling situated?

18     Identify number 8.                                       1

19     What is the sanitary fitting
                                                                1
       indicated by number 9 used for?

20     Recommend an alternative
       sanitary fitting to replace
                                                                1
       number 10 that will serve a similar
       purpose.

21     Explain the purpose of number 11
                                                                1
       as indicated on the staircase.

22     What is indicated by number 13?                          1

23     What is indicated by number 15?                          1

24     Deduce the height of window 1
                                                                1
       from the window schedule.

25     Deduce the width of window 2
                                                                1
       from the window schedule.

26     Name the elevations of the
       building on which the staircase is                       2
       situated.

27     Differentiate between the
       electrical symbols indicated by                          2
       numbers 12 and 14.

Copyright reserved

### Page 19

Downloaded from hlayiso.com
Civil Technology: Woodworking                        DBE/2019
                                          SC/NSC

28     Recommend a suitable floor
                                                                1
       covering for the lounge.

29     Calculate the area of the lounge
                                                                3
       in m². Show ALL calculations.

30     Calculate the perimeter of the
       building. Show ALL calculations.

                                                                7

                                            TOTAL:              40

Copyright reserved

### Page 20

Downloaded from hlayiso.com
Civil Technology: Woodworking                                             DBE/2019
                                      SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.3

                                ASSESSMENT CRITERIA             MARK   CANDIDATE'S
                                                                          MARK
                                Front rail                       1
                                Top shelf                        1
                                Middle shelf                     1
                                Bottom shelf                     1
                                Hanging rail                     1
                                Kick plate                       1
                                Back of base                     1
                                Back of cupboard                 1
                                Application of scale:
                                Correct height                   1
                                Correct depth                    1
                                Correct thickness of material    1
                                TOTAL:                           11

Copyright reserved

### Page 21

Downloaded from hlayiso.com
Civil Technology: Woodworking                               DBE/2019
                                SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.4

                                ASSESSMENT CRITERIA MARKS CANDIDATE'S
                                                             MARK
                                Horizontal rough grounds 2
                                Tongue and groove board  1
                                Skirting                 1
                                Quadrant mould           1
                                Application of scale     1
                                TOTAL:                   6

Copyright reserved

### Page 22

Downloaded from hlayiso.com
Civil Technology: Woodworking                                           DBE/2019
                                    SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.5

                 A       B      C                        D
       3.5.1                         Length of fascia board

                                     =

                                     = _______mm

                                     = _______m

       3.5.2                         Number of roof trusses needed

                                         Internal dimension
                                      Distance between centres     +1

                                     = ________________          + 1

                                     =
                                         ____________
                                     =
                                         ____________

                                     =   ____________

Copyright reserved

### Page 23

Downloaded from hlayiso.com
Civil Technology: Woodworking                                 DBE/2019
                                     SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 4.2

 ASSESSMENT CRITERIA                       MARK CANDIDATE'S
                                                   MARK
 Fascia board: 230 mm x 38 mm                1
 Hanger: 38 mm x 38 mm                       1
 Bearer: 38 mm x 38 mm                       1
 6 mm fibre-cement board on closed eaves     1
 Quarter round mouldings below
                                              2
 fibre-cement board
 Application of scale                         1
 TOTAL:                                       7

Copyright reserved

### Page 24

Downloaded from hlayiso.com
Civil Technology: Woodworking                                    DBE/2019
                                        SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.6

                                ASSESSMENT CRITERIA   MARK   CANDIDATE'S
                                                                MARK
                                Parapet wall           1
                                Wall                   1
                                Wall plate             1
                                Rafter                 1
                                Proportion             1
                                TOTAL:                 5
Copyright reserved

### Page 25

Downloaded from hlayiso.com
Civil Technology: Woodworking                                      DBE/2019
                                     SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.2

                                ASSESSMENT CRITERIA       MARK   CANDIDATE'S
                                                                    MARK
                                Foundation wall: 330 mm    1
                                Wall of superstructure     1
                                DPC                        1
                                Ant guard                  1
                                Air brick                  1
                                Wall plate                 1
                                Floor joist                1
                                Proportion                 1
                                Any ONE label              1
                                TOTAL:                     9

Copyright reserved

### Page 26

Downloaded from hlayiso.com
Civil Technology: Woodworking                         DBE/2019
                                             SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.5

                                FIGURE 6.5

Copyright reserved

### Page 27

Downloaded from hlayiso.com
Civil Technology: Woodworking                                         DBE/2019
                                        SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.6

         FIGURE 6.6

                                ASSESSMENT CRITERIA        MARK   CANDIDATE'S
                                                                     MARK
                                Hidden detail of grooves    2
                                Double tenon                2
                                TWO labels                  2
                                Proportion of tenons        1
                                TOTAL:                      7

Copyright reserved

## Related documents

- [Civil Technology May June 2019 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-eng/3f3d8211-a2ae-4ecd-89a4-623bb435b86a) — Civil Technology · QP · 2019 · Eng
- [Civil Technology May June 2019 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-construction-afr/87c657e9-94a5-422f-ade2-b3b897806384) — Civil Technology · QP · 2019 · Afr
- [Civil Technology May June 2019 (Wood Working) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-wood-working-afr/bdea7087-4612-4372-bd72-70147466f760) — Civil Technology · QP · 2019 · Afr
- [Civil Technology May June 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-afr/2a9b9e1b-37dc-48dc-9aa7-67dd5fa19a10) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology May June 2019 (Civil Services) Memo Eng](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-eng/8c1355fc-f6e2-40c6-85ff-1d03eb2991ea) — Civil Technology · Memo · 2019 · Eng
- [CIVIL TECH GR12 QP Eng SEPT2019 CIVIL SERVICES](https://www.hlayiso.com/library/civil-tech-gr12-qp-eng-sept2019-civil-services/24d2e0b8-d851-4c36-a274-0e7449793231) — Civil Technology · QP · 2019 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
