# Civil Technology Grade 12 NSC November 2021 QP (Eng)

> Grade 12 Civil Technology question paper from the NSC November Exam 2021 (English), 21 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-may-june-2021-civil-services-eng/dcb7f976-b3d6-42a9-b2b1-44ae9b2d8e3f
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2021
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 21

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2021 QP (Eng)](https://www.hlayiso.com/library/civil-technology-may-june-2021-civil-services-eng/dcb7f976-b3d6-42a9-b2b1-44ae9b2d8e3f)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2021. Question paper, 21 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

             SENIOR CERTIFICATE EXAMINATIONS/
         NATIONAL SENIOR CERTIFICATE EXAMINATIONS

                       CIVIL TECHNOLOGY: CIVIL SERVICES

                                        2021

                                                                         MARKS: 200

                                                                       TIME: 3 hours

            This question paper consists of 16 pages and 4 answer sheets.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Civil Services                  2                                 DBE/2021
                                               SC/NSC

REQUIREMENTS:

1.         Drawing instruments

2.         A non-programmable calculator

3.         ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.         This question paper consists of SIX questions.

2.         Answer ALL the questions.

3.         Read all the questions carefully.

4.         Answer each question as a whole. Do NOT separate subsections of
           questions.

5.         Number the answers correctly according to the numbering system used in this
           question paper.

6.         Start the answer to EACH question on a NEW page.

7.         Do NOT write in the margins of the ANSWER BOOK.

8.         You may use sketches to illustrate your answers.

9.         Write ALL calculations and answers in the ANSWER BOOK or on the
           attached ANSWER SHEETS. The SI unit for answers must be indicated next
           to the answer.

10.        Use the mark allocation as a guide to the length of your answers.

11.        Make drawings and sketches in pencil, fully dimensioned and neatly finished
           off with descriptive titles and notes to conform to the SANS/SABS Code of
           Practice for Building Drawings.

12.        For the purpose of this question paper, the size of a brick should be taken as
           220 mm x 110 mm x 75 mm.

13.        Use your own discretion where dimensions and/or details have been omitted.

14.        Answer QUESTIONS 2, 3.10, 5.4 and 6.10 on the attached ANSWER
           SHEETS using drawing instruments, where necessary.

15.        Write your CENTRE NUMBER and EXAMINATION NUMBER on every
           ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
           have used them or not.

16.        Drawings in the question paper are NOT to scale due to electronic transfer.

17.        Google Images were used as the source of all photographs and pictures.

18.        Write neatly and legibly.
Copyright reserved                                                             Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Civil Services                  3                                   DBE/2021
                                               SC/NSC

QUESTION 1:          OHSA, SAFETY, MATERIALS,                TOOLS,       EQUIPMENT    AND
                     JOINING (GENERIC)

Start this question on a NEW page

1.1        Give ONE word/term for each of the following descriptions by choosing a
           word/term from the list below. Write only the word/term next to the question
           numbers (1.1.1. to 1.1.5) in the ANSWER BOOK, e.g. 1.1.6 casement

                        curing;    electroplating; galvanising; powder coating;
                                    paint; turpentine; sanding sealer

           1.1.1        Available in a water- or oil-based liquid                                  (1)

           1.1.2        Allows concrete to achieve its optimal strength                            (1)

           1.1.3        Coating a metal by the process of electrolysis                             (1)

           1.1.4        Can be melted again because no chemical process is involved                (1)

           1.1.5        Adds strength to the original uncoated metal                               (1)

1.2        FIGURE 1.2 below shows equipment that is used on a construction site.

                                             A                      B
                                                 FIGURE 1.2

           1.2.1        State TWO materials that the equipment can be manufactured of.             (2)

           1.2.2        Deduce from FIGURE 1.2 the safest option to use, A or B.
                        Motivate your answer.                                                      (2)

Copyright reserved                                                              Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Civil Services                    4                                     DBE/2021
                                                 SC/NSC

           1.2.3        Explain the purpose of the equipment in FIGURE 1.2.                            (1)

           1.2.4        How far from a wall should the base of a ladder be placed to
                        ensure that it is positioned safely?                                           (1)

1.3        A laser level is often used in construction.

           1.3.1        Explain what you will determine if you use the laser level in EACH
                        of the following cases:

                       (a)    When installing a sewerage system for a building                         (1)

                       (b)    When laying tiles against a wall                                         (1)

           1.3.2        Explain what will happen if the tripod is not wide enough when
                        setting up the laser level.                                                    (1)

1.4        Explain what will happen if a worker manually lifts excessively heavy loads.                (1)

1.5        The use of scaffolds is not permitted, unless inspected.

           1.5.1        When should scaffolding be inspected?                                          (1)

           1.5.2        Who is responsible for the inspection of the scaffolding?                      (1)

1.6        FIGURE 1.6 below shows a joining fixture that can be used on building sites.

                                                   FIGURE 1.6

           1.6.1        Identify the joining fixture.                                                  (1)

           1.6.2        Name the part that should be used with the joining fixture.                    (1)

           1.6.3        Explain why it is a better option to use this joining fixture to join two
                        steel sections.                                                                (1)
                                                                                                       [20]

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

Start this question on a NEW page.

FIGURE 2 on the next page shows a drawing that appears on a building plan. Analyse
the drawing and complete the table on ANSWER SHEET 2.

Copyright reserved                                                                  Please turn over

### Page 5

Downloaded from hlayiso.com
           Civil Technology: Civil Services                    5                                           DBE/2021
                                                            SC/NSC

                                                                                      NOTES:
                                                                                      Contractors must verify all
                                                                                      dimensions and levels on site before
                                               PLOT 53                                commencing work. Architects are to
                                                                                      be notified of any discrepancies
                                               25 000                                 immediately.

                                                                                      ARCHITECT'S SIGNATURE ………………….

                                             14 100                                   CLIENT'S SIGNATURE ……………………….

                                                                                  1
                                                                     10 000
                         3 000   4 000           10 000     3 000                     The following symbol must be
                                                                                      indicated on a floor plan:
                                                                                  2    One-way switch – double-pole
                3 000
                                                                                      The following item must be installed
                                                                                  3   in the bathroom:
                4 000
                                                                                  4

 PLOT 49                                                                                       10

35 000                                     NEW
                                         DWELLING
                12 000                                               20 000

                                                                                  5
                                                                                      Main sewer line to be installed at a
                                                                                      slope of 1 : 40.

                                                                                      Brick force to be installed every
                                                                                      third course up to window height and
                4 000
                          PLOT 51
                                                                                      on every course from the top of the
                                                                                      window up to wall plate level.

                3 000                                                                 Pavement of 1,5 m wide must be
                                                                     5 000            paved.
                                                                                  6

                PAVEMENT 1 500 WIDE                                                        1          30/05/2021   RECTIFY
                                                                                                                   DIMENSION
                                                                                  7
                                                                                       REVISION        DATE        DESCRIPTION

                                          PROTEA STREET                               PRINTED BY:              DATE OF PRINT:
                                                                                      HENSON PRINTERS          01/04/2021
                                                             8
                                                                                      DRAWING TITLE:
                                                                                      SITE PLAN PLOT 51
                                          PAVEMENT
                                                                                      PROJECT:
                                                                                      PROPOSED NEW DWELLING ON PLOT 51,
                                                                                      DEEP RIVER

                                                                                      PROJECT NO.             DRAWING NO.
                                                                                      GR 448-209              559P9

                                                                                        DATE     DRAWN        CHECKED SCALE
                                                                                      16/04/2021 JP NSIKI     P GUNTER 1 : 200

                                                                                                    REFERENCE CODE
                                    SCALE 1 : 200                             9                        QP 2–2021

                                                          FIGURE 2                                                    [40]
           Copyright reserved                                                                        Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Civil Services                     6                              DBE/2021
                                                  SC/NSC

QUESTION 3:          CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA
                     AND QUANTITIES (SPECIFIC)

Start this question on a NEW page.

3.1        FIGURE 3.1 below is a drawing of a temporary excavation exposing the
           existing foundations. Study the drawing and answer the questions that follow.

                                                              B

                         A

                                   ≥300 mm

                                             1
                                             ≥2

                                             FIGURE 3.1

           3.1.1        What does A indicate on this drawing?                                     (1)

           3.1.2        Identify B.                                                               (1)

           3.1.3        Excavations always cause some ground movement. Name any
                        TWO factors that can cause ground movement.                               (2)

           3.1.4        Deduce the slope of the excavation from the drawing.                      (2)

3.2        Name the TWO acceptable colours for the warning signals that should be
           visible around excavations.                                                            (2)

3.3        Name TWO items that should NOT be placed near the edge of an excavation.               (2)

3.4        Describe briefly the process of soil compaction.                                       (2)

3.5        Name ONE type of soil that will be suitable for the use of jetting as a
           compaction method.                                                                     (1)

Copyright reserved                                                             Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Civil Services                 7                                    DBE/2021
                                              SC/NSC

3.6        FIGURE 3.6 below is a picture of a construction that is used to protect
           workers when working in excavations. Study FIGURE 3.6 and answer the
           questions that follow.

                                              FIGURE 3.6

           3.6.1        Identify the construction in FIGURE 3.6.                                    (1)

           3.6.2        Explain the purpose of the sides of the construction.                       (1)

3.7        FIGURE 3.7 below is a drawing of a cylindrical water tank. Study the drawing
           and calculate the volume of the tank in m³ in your ANSWER BOOK. Show
           ALL formulae and calculations. Round off your answer to TWO decimal
           places.

                                             Ø 1 600

                                   3 100

                                              FIGURE 3.7                                            (6)

3.8        State the formula that you will use to calculate the volume of a cubical water
           tank.                                                                                    (1)

3.9        Give the amount of water in litres that you would need to fill a tank of 1 m³.           (1)

3.10       ANSWER SHEET 3.10 shows the first plan course of a half-brick wall with a
           double return angle and an incomplete second plan course built in stretcher
           bond. Use the information given in the first plan course and project and draw
           the second (alternate) plan course of the half brick wall.                               (7)
                                                                                                    [30]

Copyright reserved                                                               Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Civil Services                  8                                     DBE/2021
                                               SC/NSC

QUESTION 4:          HOT- AND COLD-WATER SUPPLY, TOOLS, EQUIPMENT AND
                     MATERIALS (SPECIFIC)

Start this question on a NEW page.

4.1        FIGURE 4.1 below is a drawing of a device used in cold-water systems.
           Study FIGURE 4.1 and answer the questions that follow.

                             A

                             B

                            C

                             D

                                               FIGURE 4.1

           4.1.1        Name the device in FIGURE 4.1.                                              (1)

           4.1.2        Identify parts A, B and C.                                                  (3)

           4.1.3        Explain the function of D in this device.                                   (1)

           4.1.4        What will happen to part D if part A is turned anticlockwise?               (1)

4.2        Differentiate between a pillar tap and a bibcock by referring to the way in
           which it is installed to/onto a sanitary fitment.                                        (2)

Copyright reserved                                                               Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Civil Services                  9                                     DBE/2021
                                               SC/NSC

4.3        Choose a description from COLUMN B that matches an item in COLUMN A.
           Write only the letter (A–L) next to the question numbers (4.3.1 to 4.3.8) in the
           ANSWER BOOK, e.g. 4.3.9 M.

                         COLUMN A                                  COLUMN B
          4.3.1       Drain-cleaning rods               A   uses high-pressure water

          4.3.2       Pipe-thread cutting machine       B   to test for leakages in drainage
                                                            systems
          4.3.3       Centrifugal pump
                                                        C   used to test the pressure of
          4.3.4       Drain-cleaning machine                liquids in plumbing systems
                      (Jetting machine)
                                                        D   plate glass cover
          4.3.5       Compressed-air test
                      apparatus                         E   to convert kinetic energy into
                                                            hydrodynamic energy
          4.3.6       Water-pressure testing
                      pump                              F   attached to a plunger or coil

          4.3.7       Reason why drain-cleaning         G   do not wear gloves while
                      rods are cleaned after use            operating

          4.3.8       A device with a manometer         H   to get rid of harmful bacteria

                                                        I   to control waterflow

                                                        J   control valve of water meter

                                                        K   to ensure that it is clean and
                                                            shiny before it is stored

                                                        L   cuts flat metal surfaces
                                                                                        (8 x 1)       (8)

4.4        Identify the tool to be used in the following scenarios:

           4.4.1      Determining differences between levels and vertical heights,
                      especially over longer distances                                                (1)

           4.4.2      Moving sludge or liquid containing suspended matter                             (1)

           4.4.3      Ensuring a proper free-flowing sewer operation                                  (1)

4.5        The water closet is one of the household fitments that uses a lot of water.
           Explain ONE method that can be used to limit the water usage of the water
           closet by using an ordinary object.                                                        (2)

4.6        Name the device that regulates the water level inside a cistern.                           (1)

Copyright reserved                                                                 Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Civil Services                10                                      DBE/2021
                                              SC/NSC

4.7        FIGURE 4.7 below shows a drawing of a high-pressure geyser installation.
           Study the drawing and answer the questions that follow.

                            A

                                                                               B       C

                                                                                        D

                                                                          E

                                              FIGURE 4.7

           4.7.1        Explain the function of A.                                                    (1)

           4.7.2        A very important device that regulates the incoming water pressure
                        was omitted at B. Name this device.                                           (1)

           4.7.3        Identify C.                                                                   (1)

           4.7.4        Is the water in pipe D HOT or COLD? Motivate your answer.                     (2)

           4.7.5        Identify E.                                                                   (1)

4.8        Draw the SANS approved symbols for the following hot-water systems:

           4.8.1        Balancing device                                                              (2)

           4.8.2        Pressure-control valve                                                        (2)

           4.8.3        Pressure switch                                                               (2)

4.9        Many faults can occur in hot-water systems.

           4.9.1        Predict what could be the cause if water splutters through the taps.          (1)

           4.9.2        Explain how this fault can be prevented.                                      (1)

4.10       State TWO precautionary methods to avoid an electrolytic reaction in a water
           system.                                                                                    (2)

Copyright reserved                                                                 Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Civil Services                11                                  DBE/2021
                                              SC/NSC

4.11       Galvanised sheeting is covered with a thin coating of oil to avoid white rust
           between the sheets while stored. These sheets must be cleaned before they
           can be soldered.

           4.11.1       Name ONE type of acid that can be used to remove the galvanised
                        layer on these sheets before soldering.                                   (1)

           4.11.2       Give the scientific name of the white rust/corrosion that can occur
                        when zinc is dissolved and removed from an alloy.                         (1)
                                                                                                  [40]

Copyright reserved                                                             Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Civil Services              12                                   DBE/2021
                                            SC/NSC

QUESTION 5:          GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
                     STORM WATER (SPECIFIC)

Start this question on a NEW page.

5.1        Draw a neat freehand drawing in your ANSWER BOOK to show the
           installation of a gutter, down-pipe installation with an offset pipe and rain-
           water shoe as seen from the side.                                                     (6)

5.2        FIGURE 5.2 below shows drawings of a concrete shoe and a surface
           channel. Explain the purpose of each.

                     CONCRETE SHOE                 SURFACE CHANNEL
                                            FIGURE 5.2                                           (2)

5.3        Flashing is used for waterproofing roofs. Name TWO materials that are used
           for flashing.                                                                         (2)

5.4        ANSWER SHEET 5.4 shows the front view and top view of a cylindrical pipe
           elbow.

           Use the drawing and the information on ANSWER SHEET 5.4 and draw ONE
           development of the vertical cylindrical pipe elbow. Start the development at A,
           showing the 3 mm seam on both sides.

           Show ALL construction lines. Do NOT redraw the given views. Project the
           development from the given views.                                                     (20)
                                                                                                 [30]

Copyright reserved                                                            Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Civil Services                 13                                     DBE/2021
                                               SC/NSC

QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)

Start this question on a new page.

6.1        Various options are given as possible answers to the following questions.
           Choose the answer and write only the letter (A–D) next to the question
           numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.

           6.1.1        … can be used to secure copper pipes to different surfaces.

                        A     Perforated straps
                        B     Plastic plumbing tape
                        C     PVC weld, 50 mm
                        D     None of the above-mentioned                                             (1)

           6.1.2        When using a pipe cutter to cut pipes, you must do the following:

                        A     Place the pipe in a pipe vice or hold it firmly in one hand.
                        B     Rotate the tool clockwise or anticlockwise to ensure that the
                              wheel cuts into the metal.
                        C     Tighten the pipe cutter a little and turn again until the pipe is
                              cut.
                        D     All the above-mentioned                                                 (1)

           6.1.3        The ratio of the metals used in lead-free solder will depend on the
                        … during the soldering process.

                        A     temperature
                        B     type of metal to be soldered
                        C     length of the joint
                        D     soldering iron used                                                     (1)

           6.1.4        The following is a type of flux that can be used when soldering.

                        A     Tin flux
                        B     Zinc acid
                        C     Zinc chloride
                        D     Hydro chloride                                                          (1)

           6.1.5        To make and complete a grooved seam joint, you will use a mallet
                        and …

                        A     a cold chisel.
                        B     a soldering iron.
                        C     grooving tool.
                        D     None of the above-mentioned                                             (1)

Copyright reserved                                                                 Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Civil Services                 14                               DBE/2021
                                               SC/NSC

6.2        FIGURE 6.2 below shows a method used to join two or more materials
           together. Study the drawing and answer the questions that follows.

                                    A

                                               FIGURE 6.2

           6.2.1        Identify the tool illustrated in FIGURE 6.2.                            (1)

           6.2.2        Name ONE material that is normally used to manufacture the nail
                        of A.                                                                   (1)

           6.2.3        Name ONE material that is used for the manufacturing of the head
                        of A.                                                                   (1)

Copyright reserved                                                           Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Civil Services                15                                   DBE/2021
                                              SC/NSC

6.3        FIGURE 6.3 below shows a sectional view of a sink with the required pipe
           work and a gully. Study the drawing and answer the questions that follow.

                              A
                                                                    D

                              B

                              C

                                              FIGURE 6.3

           6.3.1        Identify parts A–D.                                                        (4)

           6.3.2        Describe the purpose of part C.                                            (1)

           6.3.3        Name TWO types of gully traps.                                             (2)

           6.3.4        Describe the purpose of the water that stays behind inside the gully
                        trap.                                                                      (1)

           6.3.5        Explain ONE disadvantage of a gully.                                       (1)

6.4        Explain the function of an overflow outlet on sanitary fitments.                        (2)

Copyright reserved                                                              Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Civil Services             16                                  DBE/2021
                                           SC/NSC

6.5        Name TWO sanitary fitments that can be manufactured with waste overflows.        (2)

6.6        Compare a rodding eye and a stop end with regard to their uses.                  (2)

6.7        State ONE characteristic of EACH of the following materials used for sanitary
           fitments:

           6.7.1        Ceramics                                                            (1)

           6.7.2        Terrazzo                                                            (1)

6.8        Draw the symbol for a rainwater shoe.                                            (2)

6.9        FIGURE 6.9 below shows a sectional view of a septic tank. Study the drawing
           and explain the working process of a septic tank.

                                           FIGURE 6.9                                       (6)

6.10       ANSWER SHEET 6.10 shows part of an incomplete horizontal sectional view
           of a manhole with a junction. Use ANSWER SHEET 6.10 and draw the
           complete horizontal sectional view. Indicate the direction of flow of the
           sewage by means of an arrow.                                                     (7)
                                                                                            [40]

                                                                               TOTAL:       200

Copyright reserved

### Page 17

Downloaded from hlayiso.com
Civil Technology: Civil Services                               DBE/2021
                                             SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 2

NO.                     QUESTION                      ANSWER        MARKS
1.     Identify the type of plan in FIGURE 2.                             1

       Deduce from the notes the brick force
2.                                                                        1
       installation up to window height.

       Deduce the scale that is used for
3.                                                                        1
       FIGURE 2.
4.     Identify number 1.                                                 1

5.     Identify number 3.                                                 1

6.     Identify number 5.                                                 1

7.     Identify number 7.                                                 1

8.     Identify number 8.                                                 1

9.     Identify number 9.                                                 1
       Name the item in the column for the
10.    notes in FIGURE 2 that must be                                     1
       installed in the bathroom.

       Draw the electrical symbol as
11.    described in the column for the notes                              2
       in FIGURE 2

       Deduce from FIGURE 2 which
12.                                                                       1
       company printed the building plan.
13.    Give the abbreviation for number 2.                                1
       State the colour that you would use to
14.    indicate the new dwelling on the site                              1
       plan.
       Deduce from FIGURE 2 why the new
15.                                                                       1
       dwelling is to be built on a corner plot.

       Deduce the plot number of the new
16.                                                                       1
       dwelling illustrated in FIGURE 2.

       Which elevation is the closest to
17.                                                                       1
       Protea Street?

Copyright reserved

### Page 18

Downloaded from hlayiso.com
Civil Technology: Civil Services                           DBE/2021
                                               SC/NSC

       What is the plot number of the property
18.                                                                   1
       on the western side of the dwelling?
19.    Give the abbreviation for number 6.                            1
       State the slope at which the main                              1
20.
       sewer line should be installed.

21.    Describe what was done as revision 1.                          1

22.    Deduce the dimension fault on the total
                                                                      1
       width of the dwelling.
23.    State the project number for this plan.                        1

24.    What is the width of the pavement?                             1

25.    How many branch pipes are indicated
                                                                      1
       on the plan?

26.    Explain the purpose of number 4.                               1

       In what SI unit are the dimensions
27.    indicated on the plan?                                         1

       Draw a neat freehand drawing of the
       top view of the symbol of a single
28.    kitchen sink, as indicated in the                              3
       SANS/SABS Code of Practice for
       Building Drawings.
       Recommend TWO types of building
29.    materials that can be used to finish the                       2
       area at number 7.
       Calculate the total area of the plot.
30.    Give your answer in m².                                        3
       Show ALL calculations.

       Calculate the distance between
       Number 1 and Number 3 on the north
31.                                                                   4
       elevation.
       Show ALL calculations.

                                                        TOTAL:        40

Copyright reserved

### Page 19

Downloaded from hlayiso.com
Civil Technology: Civil Services                                              DBE/2021
                                             SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.10

                                          FIGURE 3.10

                                   ASSESSMENT CRITERIA             MARK   CANDIDATE'S
                                                                             MARK
                               Correctness of second plan course    7
                                                          TOTAL:    7

Copyright reserved

### Page 20

Downloaded from hlayiso.com
Civil Technology: Civil Services                              DBE/2021
                                            SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.4

                                                          A

NO.      ASSESSMENT CRITERIA         MARK   CANDIDATE'S
                                               MARK
 1    Correctness of development      20
                            TOTAL:    20

Copyright reserved

### Page 21

Downloaded from hlayiso.com
Civil Technology: Civil Services                                         DBE/2021
                                      SC/NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.10

                                    FIGURE 6.10

NO.                  ASSESSMENT CRITERIA            MARK   CANDIDATE'S
                                                              MARK
 1     Correctness of drawing                        6
 2     Direction of flow                             1
                                           TOTAL:    7

Copyright reserved

## Related documents

- [Civil Technology Nov 2021 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2021-construction-eng/f39d7571-db9f-4ded-b5e7-27008235ca8b) — Civil Technology · QP · 2021 · Eng
- [CIV TECH GR12 QP SEPT2021 Afrikaans Construction](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2021-afrikaans-construction/19e5865a-d8a9-4741-b562-b0158255fd68) — Civil Technology · QP · 2021 · Afr
- [CIV TECH GR12 QP SEPT2021 English Construction](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2021-english-construction/551ab3e9-47c5-4ab0-a0cf-bc66dda5a956) — Civil Technology · QP · 2021 · Eng
- [Civil Technology May June 2021 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-may-june-2021-woodworking-eng/8f870317-4f98-4448-b660-0d528b30c2a4) — Civil Technology · QP · 2021 · Eng
- [Civil Technology May June 2021 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2021-woodworking-afr/ff7a7835-2450-4747-baaf-85c46ef7d411) — Civil Technology · QP · 2021 · Afr
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — Civil Technology · QP · 2023 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.