# Civil Technology Grade 12 NSC June 2022 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC June Exam 2022 (English), 17 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-may-june-2022-construction-services-mg-eng/e8de3c2c-fe44-4498-9d84-f5ed197f39bb
- Updated: 2026-10-29
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2022
- Exam period: NSC June Exam
- Curriculum: CAPS
- Pages: 17

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC June 2022 Memo (English)](https://www.hlayiso.com/library/civil-technology-may-june-2022-construction-services-mg-eng/e8de3c2c-fe44-4498-9d84-f5ed197f39bb)

## About this document

Civil Technology · Grade 12 · NSC June Exam · 2022. Memorandum. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

             SENIOR CERTIFICATE EXAMINATIONS/
         NATIONAL SENIOR CERTIFICATE EXAMINATIONS

                      CIVIL TECHNOLOGY: CONSTRUCTION

                                          2022

                               MARKING GUIDELINES

                                                                        MARKS: 200

                      This marking guideline consists of 17 pages.

Copyright reserved                                                   Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Construction               2                                       DBE/2022
                                  SC/NSC – Marking guidelines

INSTRUCTIONS FOR THE MARKERS

1.        Markers should:

              Familiarise themselves with the question and answer before evaluating the
               responses of candidates.

              Always interpret the responses of the candidates within the context of the
               question.

              Consider any relevant and acceptable answer during pre-marking but
               should strictly adhere to the answers after finalisation of the marking
               guideline.

              There are TWO approaches to answering questions; these are (1) to
               describe and (2) to explain.
               o If a candidate is required to explain, e.g. a process in 4 steps, only the
                 first 4 responses should be considered.
               o However, if for example a candidate is required to explain or describe
                 how to transfer heights from one point to another using a transparent pipe
                 level we need to consider that candidates may write a long description,
                 not necessarily well organised, as an intellectual response may do. In this
                 case the marker needs to evaluate the complete statement to judge if the
                 candidate explained the required outcome satisfactorily and allocate
                 marks on merit. The marker should apply his/her professional judgement
                 with these types of questions.

              Mark what the candidate wrote and do not award marks for answers that the
               marker thinks the candidate meant with what was written.

              Indicate the tick or cross right at the position where the mark needs to be
               awarded or where the candidate made the error.

              Accept the letter corresponding with the correct answer as well as the
               answer written in full in multiple-choice questions.

              Accept incorrect spelling in one-word answers unless the spelling changes
               the meaning of the answer.
2.        For calculations:

              A mark is only awarded if the correct unit is written next to the answer.

              If TWO marks are awarded ONE mark is awarded for the answer and ONE
               mark for the correct unit.

              Where the candidate made a principal error, e.g. added instead of
               multiplying, no marks will be awarded for the steps. If the answer is correct
               according to what the candidate did, the mark for the answer can be
               awarded for the application of skills.

Copyright reserved                                                              Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Construction               3                                      DBE/2022
                                  SC/NSC – Marking guidelines

              Where an incorrect answer could be carried over to the next step, the first
               answer will be deemed incorrect. However, should the incorrect answer be
               carried over correctly, the marker has to recalculate the values, using the
               incorrect answer from the first calculation. If correctly used, the candidate
               should receive the full marks for subsequent calculations.

              Markers should consider when and where a candidate has rounded off in a
               calculation, as well as the subsequent effect it has on the final answer
               obtained. The calculation should therefore be awarded marks on merit.

              Alternative methods of calculations must be considered, provided that the
               correct answer is obtained.

3.        When marking drawings:

              The member for which the mark should be awarded should be drawn
               correctly in the correct position to receive a mark.

              A member incorrectly drawn but wrongfully repeated in another position will
               be awarded the mark for the repeated incorrect member provided that the
               marking guideline provide for TWO or more marks for that member (positive
               marking).

              Marks can only be awarded for a label if the label is correctly indicating the
               correct member.

              Scale drawings should always be marked using an appropriate mask.
          When a candidate drew the wrong drawing, e.g.:

              A horizontal section instead of a vertical section, no marks will be allocated
               to the drawing as the candidate did not respond to the expected outcome.

              An orthographic view instead of sectional view, no marks will be allocated to
               the drawing as the candidate did not respond to the expected outcome.

              An orthographic view instead of an isometric view, no marks will be
               allocated to the drawing as the candidate did not respond to the expected
               outcome.

              If the incorrect drawing was drawn, the candidate can be awarded for only
               what was asked but mark/s for the correctness of the drawing will not be
               awarded e.g., if a King Post roof truss was asked in the question, and
               candidate drew SA-Howe Truss

Copyright reserved                                                            Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Construction                4                                     DBE/2022
                                   SC/NSC – Marking guidelines

QUESTION 1:          OHSA, MATERIALS,         TOOLS,      EQUIPMENT      AND     JOINING
                     (GENERIC)

1.1       1.1.1        Thermo plastic/Thermo plastic powder coating                              (1)

          1.1.2        Electroplating                                                            (1)

          1.1.3        Curing                                                                    (1)

          1.1.4        Paint/Varnish                                                             (1)

          1.1.5        Galvanising                                                               (1)

1.2       1.2.1        Non-skid material should be fitted to:
                        Prevent ladders from moving when workers are using
                          them 
                        Ensure stability of the ladder when in use
                       ANY ONE OF THE ABOVE                                                       (1)

          1.2.2        Wooden ladders are better:
                        To prevent electrical shock 
                        Because it is a poor conductor of electricity
                       ANY ONE OF THE ABOVE                                                       (1)

          1.2.3        Aluminium ladder is:
                        Lighter 
                        More durable
                        Easier to handle
                        Easy to clean
                        Stronger
                        Suitable to extend to higher hights
                       ANY ONE OF THE ABOVE                                                       (1)

          1.2.4        Wooden ladders can be treated with:
                        Linseed Oil/Oil 
                        Clear varnish/Varnish 
                        Wood preservative/Preservative
                       ANY TWO OF THE ABOVE                                                       (2)

1.3        The scaffold platform:
            Must have guard rails 
            Must have toe boards 
            Should have sufficient room between the structure and the platform for
               the worker to sit and work
            Must be free of any obstruction/waste/projecting nails/equipment that can
               cause injury
            Must be non-slip
            Should not be filled with unnecessary equipment/Overloaded
           ANY TWO OF THE ABOVE                                                                   (2)

Copyright reserved                                                             Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology: Construction                 5                                  DBE/2022
                                    SC/NSC – Marking guidelines

1.4        A safety net can be erected:
            Above an entrance 
            At passageways 
            At areas where persons work while work is being performed above them
            To prevent falling objects from injuring workers
           ANY TWO OF THE ABOVE                                                                 (2)

1.5       1.5.1        Rawlbolt/Expansion bolt/Anchor bolt                                     (1)

          1.5.2            Drill hole 
                           Remove debris/Clean the hole 
                           Remove the bolt and washer/insert the shield                       (3)

1.6       Dumpy level determines:
           Levels and heights 
           Differences between levels and vertical heights
           Levels and slopes
           Distances
          ANY ONE OF THE ABOVE                                                                  (1)

          Protect the dumpy level by:
           Placing the telescope in its case directly after use 
           Not bumping the instrument against objects
           Not dropping the instrument
           Performing the collimation test regularly to ensure accuracy
           Keeping it dry
          ANY ONE OF THE ABOVE                                                                  (1)
                                                                                                [20]

Copyright reserved                                                           Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Construction                6                                       DBE/2022
                                   SC/NSC – Marking guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
ANSWER SHEET 2

NO.                     QUESTIONS                                ANSWERS                    MARKS

        Identify the scale that was used for the     1:500 
  1                                                                                                2
        site plan and the floor plan respectively.   1:100 

        Who is responsible for checking the
  2                                                  C. Lee                                       1
        building plan?

        What type of fencing does the architect
  3                                                  Precast concrete fencing                     1
        recommend for the new dwelling?

        Name the town where the new dwelling
  4                                                  Jeffreys Bay                                 1
        will be erected.

  5     What was done as revision 1?                 Window in room A                             1

  6     Identify number 1.                           Municipal sewer line/Sewer line              1

        Identify number 3 by giving the
  7                                                  MH                                           1
        abbreviation.

  8     Identify number 4.                           New dwelling                                 1

  9     Identify number 5.                           Earth                                        1

 10     Identify number 9.                           Distribution board/DB                        1

 11     Identify number 11.                          One-way switch-double pole                   1
                                                     Sink unit-single/Single bowl
 12     Identify number 12.                                                                        1
                                                     sink/Sink 
        Identify the number that indicates the
 13                                                  8                                            1
        boundary line.
                                                     For pedestrians/Area dedicated for
 14     Describe the purpose of number 2.                                                          1
                                                     walking 
        Deduce the plot number of the existing
 15                                                  Plot 73                                      1
        dwelling from FIGURE A.
        What is omitted in Maple Street with         Municipal connection/Municipal
 16                                                                                                1
        reference to number 6?                       manhole 

Copyright reserved                                                              Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Construction               7                                       DBE/2022
                                  SC/NSC – Marking guidelines

        What leisure feature is located on the
 17                                                Swimming pool                                1
        site plan?

                                                                  
        Draw the north symbol to show that the                    
 18                                                                                              3
        driveway side is facing east.
                                                                   OR
                                                   Direction 
        What is the purpose of the north symbol To indicate the direction/
 19                                                                                              1
        on a house plan?                        elevation 
 20     Which feature indicates that this is a     Staircase/Stairs                             1
        double storey building?
                                                   Dimension incorrectly indicated as
                                                   110 mm of outside wall 
 21     Deduce THREE faults from bedroom 2.        No electrical connection from light           3
                                                   switch to the light fitting/ 
                                                   No wiring 
                                                   Window symbol incorrect

 22     Draw the symbol for a wash tub.                                                        2
                                                                           

 23     Draw the symbol for a bath.                                             
                                                                                                 2

 24     Draw the symbol for a water meter.                                                       2
                                                                         
                                                       Omitted dimensions/
                                                        Measurements 
                                                       No levels/heights/invert
                                                        levels/corner heights
        Describe TWO reasons why the local              indicated 
 25     municipality would not approve                                                           2
                                                       Impossible to position new
        FIGURE A.                                       dwelling
                                                       No north symbol
                                                       Incomplete sewage layout
                                                       No contour lines indicated
                                                                             
        Calculate the length of the house.         4 000 + 5 000 + 4 000 + 4 000
        Give your answer in m.                                                                 6
 26
        Show all calculations.                     + 220 +220 + 110 + 110 +110
                                                   = 17 770 
                                                   = 17,77  m
                                                                              TOTAL:             40

Copyright reserved                                                            Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Construction                 8                                      DBE/2022
                                    SC/NSC – Marking guidelines

QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)

3.1       3.1.1        Bolted                                                                      (1)

          3.1.2        J-bolt                                                                      (1)

          3.1.3        7 metres                                                                    (1)

          3.1.4        50 mm x 76 mm                                                               (1)

          3.1.5        760 mm                                                                      (1)

3.2       The margin is the distance between the top of the string and the pitch line 
          that is measured at 90° to the pitch line.                                               (2)

3.3       A pitch board is a template, made from plywood or other board products,
          used to set out a staircase.                                                             (2)

3.4       A. Landing 
          B. Baluster 
          C. Tread/Going                                                                           (3)

3.5       3.5.1        No wall plate – Will not be able to tie/fasten the Rafter to the wall
                       plate/Rafter might fall from wall. 
                       Rafter does not have a slope - Water will not be able to flow down
                       from roof/Roof will collapse due to rainwater not flowing away.              (2)

          3.5.2

                                                     
                                    

                       NOTE: IF A LINE DIAGRAM WAS DRAWN ONE MARK WILL BE
                       ALLOCATED FOR THE SLOPE

                        ASSESSMENT CRITERIA                MARK
                        Wall plate                           1
                        Rafter with a slope                  2
                                            TOTAL            3                                      (3)

Copyright reserved                                                               Please turn over

### Page 9

Downloaded from hlayiso.com
    Civil Technology: Construction                      9                                    DBE/2022
                                             SC/NSC – Marking guidelines

    3.6                                                         RIDGE BEAM   
                                                         

                                                                             APPLICATION OF SCALE     
                     RAFTER 

                                         
                                     
             COLLAR–BEAM                         

                                                                              COLLAR–BEAM NOT HIGHER 
                                                                              THAN HALF THE RISE

WALL PLATE

                 
     WALL

                                             USE A MASK TO MARK THIS DRAWING
                            NOTE:
                            COLLER-BEAM CAN BE PLACED LOWER THAN HALF OF THE RISE OF
                            THE ROOF

               ASSESSMENT CRITERIA                                   MARK
               Correctness of drawing:
               Collar beam                                             2
               Rafters                                                 3
               Ridge beam                                              2
               Overhang                                                1
               Collar beam not higher than half the rise
                                                                       1
               of truss
               Any TWO labels                                          2
               Application of scale:
               ONE or TWO incorrect       = 2
               THREE or FOUR incorrect = 1
                                                                       2
               More than FIVE incorrect = 0
                                               TOTAL:                  13                                  (13)
                                                                                                           [30]

    Copyright reserved                                                                  Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Construction              10                               DBE/2022
                                 SC/NSC – Marking guidelines

QUESTION 4:          EXCAVATIONS, FORMWORK,             TOOLS,   EQUIPMENT    AND
                     MATERIALS (SPECIFIC)

4.1       4.1.1        I                                                                 (1)

          4.1.2        H                                                                 (1)

          4.1.3        G                                                                 (1)

          4.1.4        F                                                                 (1)

          4.1.5        D                                                                 (1)

          4.1.6        C                                                                 (1)

          4.1.7        A                                                                 (1)

          4.1.8        K                                                                 (1)

4.2       600 mm                                                                         (1)

4.3       Safety factors before excavations begin:
           A competent person should evaluate the stability of the ground 
           Draw up a safety plan and take sufficient steps to ensure safe working
              conditions 
           The planned trench excavation should be supported by a protective
              system 
           Safety signs must be displayed
           Warning lights must be displayed
           Eliminate any risks and hazards to prevent people from being buried
              under loose ground or falling objects
           Erect fencing around the perimeter of the excavation site
           Excavations should take place under the constant supervision of a
              qualified person with appointment confirmed in writing
           Determine the location of services through inspection
           Consider the weather conditions
          ANY THREE OF THE ABOVE                                                          (3)

4.4       Steel shuttering is:
           Sturdy enough to bear the mass of wet concrete without collapsing 
           Stronger than wood and timber board products 
           Easy to remove when concrete has set
           Not as adaptive as timber shuttering
           Only available in specific sizes and patterns
           More expensive than timber shuttering
           More durable than timber shuttering
           Reusable
           Tight along seams and joints so that concrete does not leak to form
              honeycombs or fins
          ANY TWO OF THE ABOVE                                                            (2)

Copyright reserved                                                     Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Construction                11                                  DBE/2022
                                   SC/NSC – Marking guidelines

4.5       Levelling a site:
           Filling a slope 
           Cutting away a slope 
           Cutting and filling 
           Excavated soil can be used
          ANY THREE OF THE ABOVE                                                                (3)

4.6       Components of shuttering:
           Folding wedges/Wedges 
           Walling boards 
           Poling boards 
           Struts
          ANY THREE OF THE ABOVE                                                                (3)

4.7       Block board is:
           Lightweight 
           Easy to work with, using ordinary woodwork tools
           Not prone to warping
           Suitable for indoor and outdoor use
           Excellent ability to hold nails and screws
          ANY ONE OF THE ABOVE                                                                  (1)

4.8       4.8.1        Tamping rammer                                                          (1)

          4.8.2        Safe handling regarding your hands and feet:
                        Do not place your hands/feet near the moving parts 
                        Use both hands to operate the machine 
                        Ensure a well-balanced stance
                        Wear appropriate PPE/Wear gloves/Wear boots
                       ANY TWO OF THE ABOVE                                                     (2)

          4.8.3           To prevent the machine from rusting/not working effectively 
                          So that the machine lasts longer
                       ANY ONE OF THE ABOVE                                                     (1)

Copyright reserved                                                           Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Construction                      12                                  DBE/2022
                                         SC/NSC – Marking guidelines

4.9

                                                             
                                                                        SHUTTER BOARD

                                                                     BEAM/JOIST

                                                            
                                                                        CLEAT

                                                                        BRACE/STRUT
                                 
                                                                         WEDGE
                                                                    FIXING PLATE

                                                                        SOFFIT- OR SHUTTER
                                                                        BOARD

           ASSESSMENT CRITERIA                           MARK
           Correctness of drawing:
           Shutter boards                                    2
           Shutter board sides                               2
           Soffit/Shutter board                              1
           Beams/Joists                                      2
           Cleats                                            2
           Braces/Struts                                     2
           Wedges                                            2
           Fixing plates                                     2
                                               TOTAL:        15                                     (15)
                                                                                                    [40]

Copyright reserved                                                               Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Construction                13                                     DBE/2022
                                   SC/NSC – Marking guidelines

QUESTION 5:          PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
                     MEANS OF COMMUNICATION (SPECIFIC)

5.1       Wet the wall                                                                            (1)

5.2       Water will make the mixture workable                                                    (1)

5.3       1:3  (cement; sand)                                                                     (1)

5.4       Splatter dash finish/Splatter finish                                                    (1)

5.5       Types of screeds:
           Dry screed 
           Monolithic screed 
           Bonded screed
          ANY TWO OF THE ABOVE                                                                     (2)

5.6       Water-reducing agent                                                                    (1)

5.7       5.7.1        The cavity will:
                        Ensure that no water will penetrate the inner wall 
                        Provide insulation against heat/sound/cold                               (2)

          5.7.2                                

                                           OR

                                    NYLON WALL TIE
                        ASSESSMENT CRITERIA       MARK
                        Correctness of drawing:     2                                              (2)
                                         

                            TWISTED PATTERN WALL TIE
                        ASSESSMENT CRITERIA     MARK
                        Correctness of drawing:   2                                                (2)

5.8       Plaster sand/River sand/Dune sand/Sand/Cement slurry                                    (1)

5.9       Construction failure:
           Poorly constructed edge restraint 
           Haunching not correctly done
          ANY ONE OF THE ABOVE                                                                     (1)

Copyright reserved                                                              Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Construction                14                                    DBE/2022
                                   SC/NSC – Marking guidelines

5.10

                                                                 PURLIN

                                                                 ROOF COVERING

                                                                  TIE BEAM
                                                                  WALL PLATE

                                                                  FOOT PURLIN
                                                                 HANGER 
                            
                                                                   GUTTER

                                                                   WALL
                                                                 BEARER 
                                                                QUARTER ROUND

                                                                    FIBRE CEMENT BOARD

                                                                    FASCIA BOARD

                                                                    DOWNPIPE

                ASSESSMENT CRITERIA                       MARK
                Correctness of drawing:
                Hanger                                        2
                Bearer                                        2
                Fibre cement board                            1
                Quarter rounds                                2
                Fascia board                                  1
                Foot purlin                                   1
                Purlins                                       1
                Roof covering                                 1
                Gutter and downpipe                           2
                Any TWO labels                                2
                TOTAL                                        15                                   (15)
                                                                                                  [30]

Copyright reserved                                                             Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Construction                15                                    DBE/2022
                                   SC/NSC – Marking guidelines

QUESTION 6:          REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
                     FLOORS AND QUANTITIES (SPECIFIC)

6.1       6.1.1        D                                                                         (1)

          6.1.2        A                                                                         (1)

          6.1.3        B                                                                         (1)

          6.1.4        B                                                                         (1)

          6.1.5        A                                                                         (1)

6.2       Installation of driven in-situ piles:
           Metal pipes that contain a dry concrete mix (gravel plug) are driven into a
              drilled hole in the ground 
           A drop hammer is used to drive the pre-filled dry concrete mix (gravel
              plug) out of the pipe to form an extended base (toe) at the bottom of the
              hole 
           Concrete is now poured into the pipe and compacted with a drop
              hammer 
           The steel pipe is slowly extracted as the concrete is poured into the
              pipe                                                                               (4)

6.3       6.3.1        A - Hollow-core concrete block/Concrete block/Block 
                       C - Reinforced ribs/Pre-stressed concrete ribs/Ribs                       (2)

          6.3.2        Purpose of B is:
                        Used for the placement of conduit pipes 
                        Serves as insulation
                        Reduce the weight
                        Lower the cost of materials
                       ANY ONE OF THE ABOVE                                                       (1)

          6.3.3        Disadvantages:
                        Mechanical handling is required on site 
                        Manual labour is required to place blocks                               (2)

          6.3.4        Components for rib- and- block floor:
                        Steel mat/Mesh/Steel/Reinforcement 
                        In-situ cast concrete/Concrete 
                        Spacers 
                        Bearer/Joist
                        Props/Posts/Poles
                        Soleplate
                        Wedges
                       ANY THREE OF THE ABOVE                                                     (3)

6.4       6.4.1        A - Anchor bar/Pressure bar/Compression bar 
                       B - Main bar                                                              (2)
Copyright reserved                                                             Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Construction                      16                           DBE/2022
                                         SC/NSC – Marking guidelines

6.4.2                STIRRUPS
                                         MINIMUM CONCRETE COVER DEPTH 

                                     
                         
                                        
                                 
                                               
                                     

                             MAIN BAR
              SHEAR BAR

                             ASSESSMENT CRITERIA            MARK
                             Correctness of drawing:
                             Shear bar                        3
                             Minimum concrete cover depth
                                                              2
                             indicated with a label
                             Stirrups-close spacing           1
                             Stirrups-bigger spacing          1
                                                     TOTAL:   7                                (7)
6.5       Minimum concrete cover depth in reinforced concrete is important to:
           Protect the steel against corrosion 
           Ensure adequate bonding between the steel and the concrete 
           Ensure adequate protection of steel in the event of a fire
          ANY TWO OF THE ABOVE                                                                 (2)

6.6       Elements to protect reinforcing from:
           Water that is moderately aggressive 
           Corrosive fumes 
           Salt/Moisture in the air/Air
           Fire and heat
          ANY TWO OF THE ABOVE                                                                 (2)

Copyright reserved                                                          Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Construction                     17                                   DBE/2022
                                        SC/NSC – Marking guidelines

6.7.1       A         B             C                               D
                                              Skirting: Internal dimensions of long walls
                                              = 8 500 mm - 440 mm  OR - 2(220)
                                              = 8 060 mm

                                              Skirting: Internal dimensions of short
                                              walls
                                              = 4 000 mm – 440 mm OR -2(220)
                                              = 3 560 mm

                                              Total Length = 2(8 060+3 560)  - 900 
                                                           = 2(11 602) - 900
                                                           = 23 240 - 900
                                                           = 22 340
                                                           = 22,34 m  skirting is needed          (6)
6.7.2
                                              Screed: Inside area of building
           1/     8,06 
                  3,56 
                  0,025         0,72 m3     = 0,72 m3 screed is needed                           (4)

                                                                                                   [40]

                                                                                       TOTAL:      200

Copyright reserved

## Related documents

- [Civil Technology May June 2022 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-may-june-2022-woodworking-eng/6bfe9199-25cf-4c12-8dc6-817a01e3c184) — Civil Technology · QP · 2022 · Eng
- [Civil Technology May June 2022 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2022-civil-services-afr/a141cdd2-0859-4ede-bb4e-499b3261db3d) — Civil Technology · QP · 2022 · Afr
- [Civil Technology May June 2022 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2022-woodworking-afr/b7830db2-93f0-405b-b704-e06c38ed8339) — Civil Technology · QP · 2022 · Afr
- [Civil Technology May June 2022 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-may-june-2022-civil-services-eng/97927c67-c7a8-40fb-af20-ad306ca6284c) — Civil Technology · QP · 2022 · Eng
- [Civil Technology May June 2022 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2022-construction-afr/c4a7cdae-7306-4e0c-a474-e8856468ab9d) — Civil Technology · QP · 2022 · Afr
- [CIV TECH GR12 MEMO SEPT2022 Civil Services Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-afrikaans/e517a483-4536-458b-945a-1e2a6820fc1b) — Civil Technology · Memo · 2022 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.