# Civil Technology Grade 12 NSC November 2017 QP (Eng)

> Grade 12 Civil Technology question paper from the NSC November Exam 2017 (English), 32 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2017-eng/3bf1e781-deea-4626-883d-f87f96194cca
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2017
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 32

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2017 QP (Eng)](https://www.hlayiso.com/library/civil-technology-nov-2017-eng/3bf1e781-deea-4626-883d-f87f96194cca)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2017. Question paper, 32 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                 GRAAD 12

                               NATIONAL
                          SENIOR CERTIFICATE

                                 GRADE 12

                            CIVIL TECHNOLOGY

                              NOVEMBER 2017

MARKS: 200

TIME: 3 hours

 This question paper consists of 21 pages, 10 answer sheets and a formula sheet.

Copyright reserved                                                  Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology                             2                          DBE/November 2017
                                            NSC

REQUIREMENTS:

1.        Drawing instruments

2.        A non-programmable pocket calculator

3.        ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.        This question paper consists of SIX questions.

2.        Answer ALL the questions.

3.        Answer each question as a whole. Do NOT separate subsections of
          questions.

4.        Start the answer to EACH question on a NEW page.

5.        Do NOT write in the margins of the ANSWER BOOK.

6.        You may use sketches to illustrate your answers.

7.        Write ALL calculations and answers in the ANSWER BOOK or on the
          attached ANSWER SHEETS.

8.        Use the mark allocation as a guide to the length of your answers.

9.        Make drawings and sketches in pencil, fully dimensioned and neatly finished
          off with descriptive titles and notes to conform to the SANS/SABS Code of
          Practice for Building Drawings.

10.       For the purpose of this question paper, the size of a brick should be taken as
          220 mm x 110 mm x 75 mm.

11.       Use your own discretion where dimensions and/or details have been omitted.

12.       Answer QUESTIONS 1.7, 2.7, 2.11, 3.6, 3.7, 4.6, 5.2, 5.3, 6.1 and 6.2 on the
          attached ANSWER SHEETS using drawing instruments, where necessary.

13.       Write your CENTRE NUMBER and EXAMINATION NUMBER on every
          ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
          have used them or not.

14.       Due to electronic transfer, drawings in the question paper are NOT to scale.

15.       Google Images was used as the source for all photographs and pictures.

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology                            3                         DBE/November 2017
                                           NSC

QUESTION 1: CONSTRUCTION, SAFETY AND MATERIALS

1.1       FIGURE 1.1 below is an illustration of a worker on a building site.
          Describe TWO safety precautions that the worker should follow to prevent
          what is happening in the illustration.

                                         FIGURE 1.1                                          (2)

1.2       Explain why electric cables and the wires of power tools must be checked
          regularly.                                                                         (1)

1.3       Give ONE reason why it is NOT safe to adjust a machine while the blade is in
          motion (turning).                                                                  (1)

1.4       Name THREE accessories (equipment) that you need to conduct a slump test.          (3)

1.5       Mixing concrete for small projects is usually done by hand. Recommend ONE
          method of mixing concrete for bigger projects.                                     (1)

Copyright reserved                                                        Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology                                 4                            DBE/November 2017
                                                NSC

1.6       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–M) next to the question number (1.6.1–1.6.10) in the
          ANSWER BOOK, for example 1.6.11 N.

                       COLUMN A                                     COLUMN B
          1.6.1      Plywood                      A       finishing applied to wood to make it
                                                          durable
          1.6.2      Hardboard
                                                  B       used to make formwork
          1.6.3      Corrugated iron sheeting
                                                  C       used to line formwork
          1.6.4      Mild steel
                                                  D       roof covering
          1.6.5      PVC (polyvinyl chloride)
                                                  E       metal dipped in molten tin
          1.6.6      Gypsum board
                                                  F       ferrous metal that corrodes easily
          1.6.7      Concrete
                                                  G       used for making electrical conduits
          1.6.8      DPC (damp-proof course)
                                                  H       applied with a spray gun as a
          1.6.9      Powder coating                       free-flowing dry powder

          1.6.10     Varnish                      I       prevents moisture from moving
                                                          upwards on walls

                                                  J       used for dry walls and ceilings

                                                  K       mixture of cement, crushed stone
                                                          and water

                                                  L       can be cast into any shape when
                                                          wet

                                                  M       malleable and ductile
                                                                                       (10 x 1)      (10)

1.7       FIGURE 1.7 on ANSWER SHEET 1.7 shows a drawing of a plan course of
          a corner (quoin) of a one-brick wall built in English bond.

          1.7.1      Draw from the given plan course the next plan course of the corner.             (4)

          1.7.2      Print the title below the drawing.                                              (1)

          1.7.3      Describe the purpose of a queen closer in an English bond wall.                 (1)

1.8       Draw a line diagram of a lean-to roof in your ANSWER BOOK. Show the
          supporting walls and the roof.                                                             (2)

Copyright reserved                                                                Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology                                5                      DBE/November 2017
                                               NSC

1.9       Ceilings should be finished off to preserve them.

          1.9.1      Describe ONE type of equipment that can be used to apply paint to
                     a ceiling.                                                               (1)

          1.9.2      Give ONE reason for your answer to QUESTION 1.9.1.                       (1)

1.10      Name the components (materials) used to close the gap/opening between the
          following:

          1.10.1     Floor covering and the wall                                              (1)

          1.10.2     Wall and the ceiling of a building                                       (1)
                                                                                              [30]

Copyright reserved                                                         Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology                              6                          DBE/November 2017
                                             NSC

QUESTION 2: ADVANCED CONSTRUCTION AND EQUIPMENT

Start this question on a NEW page.

2.1       Various options are given as possible answers to the following questions.
          Choose the answer and write only the letter (A–D) next to the question
          number (2.1.1–2.1.5) in the ANSWER BOOK, for example 2.1.6 C.

          2.1.1      … foundation is used when the soil cannot support ordinary
                     foundations.

                     A   Strip
                     B   Step
                     C   Floating
                     D   Pile                                                                      (1)

          2.1.2      During transportation of ready-mixed concrete, … can take place.

                     A   desalination
                     B   segregation
                     C   curing
                     D   shrinking                                                                 (1)

          2.1.3      … arches should be plastered.

                     A   Gauged
                     B   Rough
                     C   Voussoir
                     D   Intrados                                                                  (1)

          2.1.4      … is used to prevent concrete from clinging to formwork.

                     A   Water
                     B   Sanding sealer
                     C   Thinners
                     D   Oil                                                                       (1)

          2.1.5      … are used to keep the main bars of the reinforcement of a column
                     together.

                     A   Spacers
                     B   Shear bars
                     C   Stirrups
                     D   Wall ties                                                                 (1)

Copyright reserved                                                              Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology                                7                         DBE/November 2017
                                               NSC

2.2       FIGURE 2.2 below is a photograph of an instrument used for surveying.

                                              FIGURE 2.2

          2.2.1      Identify the instrument in FIGURE 2.2 above.                                (1)

          2.2.2      Describe ONE function of this instrument.                                   (1)

          2.2.3      Name the part on which this instrument must be mounted.                     (1)

          2.2.4      Name the accessory that is used with the instrument to get
                     a reading.                                                                  (1)

          2.2.5      Describe why the instrument should be stored in its original casing
                     after being used.                                                           (1)

2.3       FIGURE 2.3 below is an illustration of a precast floor slab. Study the
          illustration and answer the questions that follow.

                                                                         A
                                            FIGURE 2.3

                                                                          B

                             C
                                              FIGURE 2.3

          2.3.1      Name the type of floor construction that is illustrated in FIGURE 2.3
                     above.                                                                      (1)

          2.3.2      Identify A, B and C.                                                        (3)

          2.3.3      Give ONE reason why you would rather use the type of floor
                     construction in FIGURE 2.3, than an in situ cast suspended floor.           (1)

Copyright reserved                                                            Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology                                8                           DBE/November 2017
                                               NSC

2.4       FIGURE 2.4 below shows a sectional view of a cavity wall.

                                                A

                              B

                                             FIGURE 2.4

          2.4.1      Identify A and B.                                                            (2)

          2.4.2      Name ONE other place in a building where you would find
                     material B.                                                                  (1)

          2.4.3      State ONE advantage of a cavity wall.                                        (1)

2.5       Explain the terms intrados and extrados, as used in arches.                             (2)

2.6       FIGURE 2.6 below shows equipment used to test concrete.

                                             FIGURE 2.6

          2.6.1      Identify the equipment shown in FIGURE 2.6 above.                            (1)

          2.6.2      Name ONE other piece of equipment that must be used with this
                     equipment when conducting the concrete test.                                 (1)

          2.6.3      Name the type of test conducted with this equipment.                         (1)

          2.6.4      Explain the purpose of this test.                                            (1)
Copyright reserved                                                             Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology                                  9                        DBE/November 2017
                                                 NSC

2.7       FIGURE 2.7 on ANSWER SHEET 2.7 is a sketch of a simple supported beam
          with a main bar and an anchor bar attached to a column with reinforcement in
          position. Complete the sketch on ANSWER SHEET 2.7 by drawing the
          following steel reinforcement in place:

          •    Shear bar
          •    Stirrups/Binders in the rest of the beam                                          (2)

2.8       FIGURE 2.8 below shows two types of reinforcing bars that can be used for
          reinforcing concrete. Study the figure and name EACH of the reinforcing bars.
          Write down the answer next to the question number (2.8.1–2.8.2) in the
          ANSWER BOOK.

                                        2.8.1             2.8.2
                                                FIGURE 2.8                                       (2)

2.9       FIGURE 2.9 below shows the formwork of a square column. Study the figure
          and answer the questions that follow.

                                                                       A

                                                                       B

                                                                       C
                                                                       D
                                                                       E

                                                FIGURE 2.9

          2.9.1      Name ONE material that A can be made of.                                    (1)

          2.9.2      Identify B to E.                                                            (4)

          2.9.3      Predict what will happen if E is not installed.                             (1)

Copyright reserved                                                            Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology                              10             DBE/November 2017
                                             NSC

2.10      State ONE disadvantage of a dry wall.                                    (1)

2.11      FIGURE 2.11 on ANSWER SHEET 2.11 shows a part of a dry-wall
          construction with a timber frame. Complete the drawing on ANSWER
          SHEET 2.11 by adding the following in good proportion:

          •    Cladding
          •    The moulding at the ceiling and the wall
          •    The moulding at the floor and the wall                              (3)

2.12      Name ONE type of pile foundation.                                        (1)
                                                                                   [40]

Copyright reserved                                              Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology                                11                        DBE/November 2017
                                               NSC

QUESTION 3: CIVIL SERVICES

Start this question on a NEW page.

3.1       FIGURE 3.1 below shows a water trap that is used in civil services.

                                            FIGURE 3.1
          3.1.1      Identify the water trap above.                                              (1)

          3.1.2      Explain the purpose of a water trap.                                        (1)

3.2       State TWO factors that determine the temperature of the water in a solar
          heater.                                                                                (2)

3.3       You are a plumber and must answer the following questions from a client:

          3.3.1      Name the part in an electric geyser that is used to warm up water.          (1)

          3.3.2      Explain why the cold water inlet is mounted at the bottom of the
                     geyser and the hot water outlet is mounted at the top of the geyser.        (2)

          3.3.3      Name the component that is installed for safety purposes to prevent
                     the geyser from bursting when the water becomes too hot.                    (1)

3.4       FIGURE 3.4 below is a photograph of a storm-water grid on a road. Study the
          photograph and answer the questions that follow.

                                             FIGURE 3.4
          3.4.1      Explain the function of the grid.                                           (1)

          3.4.2      State ONE consequence if the grid is blocked.                               (1)

Copyright reserved                                                            Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology                                12                    DBE/November 2017
                                               NSC

3.5       Water supply is a basic necessity of life. Owing to a lack of municipal
          services, an increasing number of people are investing in borehole systems.

          Name TWO mechanical methods that may be used to obtain water from
          a borehole.                                                                        (2)

3.6       FIGURE 3.6 on ANSWER SHEET 3.6 shows an incomplete floor plan of
          a kitchen. Complete the drawing on ANSWER SHEET 3.6 by drawing the
          symbols for the following electrical fittings and wiring:

          3.6.1      Fluorescent light at A                                                  (2)

          3.6.2      Distribution board at B                                                 (2)

          3.6.3      Double-pole one-way light switch at C                                   (2)

          3.6.4      Electrical wiring from C to A                                           (2)

3.7       FIGURE 3.7 on ANSWER SHEET 3.7 shows the incomplete layout of
          a one-pipe sewerage system connected to a conservancy tank. Sanitary
          fixtures have been indicated with symbols. Study the drawing and draw the
          following on ANSWER SHEET 3.7 with the correct symbols. All regulations
          and design principles of a good sewerage system must be adhered to.

          •    1 x rodding eye
          •    1 x gully
          •    1 x ventilation pipe
          •    2 x branch pipes
          •    2 x inspection eyes
          •    Any THREE abbreviations for sewerage components                               (10)
                                                                                             [30]

Copyright reserved                                                        Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology                              13                        DBE/November 2017
                                             NSC

QUESTION 4: QUANTITIES, MATERIALS AND JOINING

Start this question on a NEW page.

4.1       Below are photographs of fasteners that are used on building sites.
          Write down the name and ONE use of EACH fastener next to the question
          number (4.1.1–4.1.3) in the ANSWER BOOK.

              4.1.1                  4.1.2                     4.1.3

                                                                                               (6)

4.2       Name ONE fastener that you will use when joining purlins to rafters.                 (1)

4.3       State TWO advantages of nails over screws.                                           (2)

4.4       Name ONE pipe that can be joined by means of a compression joint.                    (1)

4.5       FIGURE 4.5 on the next page shows the brandering layout of a ceiling
          construction and the four walls. Study the drawing and complete the
          incomplete cutting list. Write down the answer next to the question number
          (4.5.1–4.5.7) in the ANSWER BOOK.

          Use the following specifications to answer the question:

          •     Ceiling board: 6,4 mm x 900 mm x 3 600 mm
          •     Brandering: 38 mm x 38 mm
          •     Brandering is placed 75 mm away from each wall
          •     Cornices: 75 mm x 75 mm
          •     Wooden cover strips: 45 mm x 10 mm                                             (7)

Copyright reserved                                                          Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology                                 14                     DBE/November 2017
                                                NSC

                                                                                3 600

                                           4 800

                                         FIGURE 4.5

                                CUTTING LIST FOR CEILING
   MEMBER            QUANTITY   UNIT   LENGTH    WIDTH THICKNESS    TOTAL    MATERIAL
                                                                   LENGTH
 Long-wall
 brandering/            2       mm     4 800       38    4.5.1     9 600    SA pine
 Battens
 Intermediate
 brandering/          4.5.2     mm     4 574       38     38       13 722   SA pine
 Battens
 Short-wall
 brandering/            2       mm      4.5.3      38     38       6 748    SA pine
 Battens
 Ceiling                                                                    Gypsum
                        6       mm      4.5.4      900    6,4      21 600
 boards                                                                     board
 Cornices:                                                                  Gypsum
                        2       mm     4 800       75     75        4.5.5
 Long wall                                                                  board
 Cornices:                                                                  Gypsum
                        2       mm      4.5.6      75     75       7 200
 Short wall                                                                 board
 Wooden
                        5       mm     3 450       45     10        4.5.7   SA pine
 cover strips

Copyright reserved                                                          Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology                                  15                           DBE/November 2017
                                                 NSC

4.6       FIGURE 4.6 below shows the floor plan of a room. You must install ceiling
          boards and skirtings in this room.

          SPECIFICATIONS:

          •    Outside measurements of the room: 7 000 mm x 4 000 mm
          •    The external walls are one-brick walls (220 mm)
          •    Size of sliding door: 3 000 mm wide x 2 000 mm high
          •    Size of ceiling boards: 4 200 mm x 1 200 mm

                                                    7 000

                     4 000

                                                FIGURE 4.6

          Use ANSWER SHEET 4.6 and answer the following questions:

          4.6.1         Calculate the inside area of the room in square metres (m²).
                        Round off your answer to TWO decimal places.                                  (6)

          4.6.2         Calculate the area of ONE ceiling board in square metres (m²).                (3)

          4.6.3         Calculate the length of the skirting required in metres (m). Ignore the
                        reveals.                                                                      (4)
                                                                                                      [30]

Copyright reserved                                                                 Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology                              16                       DBE/November 2017
                                             NSC

QUESTION 5: APPLIED MECHANICS

Start this question on a NEW page.

5.1       FIGURE 5.1 below shows a shaped lamina. All dimensions are in millimetres.

          Study the lamina and calculate the centroid of the lamina from A-A. Round off
          your answer to TWO decimal places.

          HINT: Use the formula on the FORMULA SHEET.

                                        15             30      15
                                   A

                            45
                                                   2

                            60                          1

                                  A                    60

                                          FIGURE 5.1                                          (10)

Copyright reserved                                                         Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology                                     17                              DBE/November 2017
                                                    NSC

5.2       FIGURE 5.2 shows the space diagram of a truss with two point loads and
          a span of 10 metres.

                                                    40 N

                                                B
                                       60 N
                                                                   C

                                                F          G
                              A
                                       E
                              45°             45°                      45°
                                                           D
                                                    10 m
                     RL = 65 N                                               RR = 35 N

                                               FIGURE 5.2

          5.2.1      Use ANSWER SHEET 5.2 and develop and draw a vector diagram
                     to determine the nature and magnitude of the forces in the members
                     (parts) of the truss graphically.
                     Use scale 1 mm = 1 N.                                                                  (8)

          5.2.2      Use the information in the space diagram and vector diagram and
                     complete the table on ANSWER SHEET 5.2.                                                (4)

5.3       FIGURE 5.3 below shows the space diagram of a beam with a span of
          12 metres, with three point loads and a uniformly distributed load. Study the
          diagram and answer the questions that follow.

                                  5N       5 N/m           7N                 4N

                         2m                   4m                       3m           3m
                A                 B            C               D              E                F
              RL = 22 N                                                                  RR = 14 N

                                                FIGURE 5.3

          5.3.1      Convert the uniformly distributed load to a point load and write down
                     the value of the converted point load.                                                 (1)

          5.3.2      Determine the distance of the converted uniformly distributed load
                     that now is a point load from RR.                                                      (1)
Copyright reserved                                                                       Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology                              18                        DBE/November 2017
                                             NSC

          5.3.3      Determine the distance of the converted uniformly distributed load
                     that now is a point load from RL.                                         (1)

          5.3.4      The value of the bending moments at A = 0 Nm, B = 44 Nm,
                     C = 68 Nm, D = 72 Nm, E = 42 Nm and F = 0 Nm. Use all the
                     available information and draw the bending moment diagram on
                     ANSWER SHEET 5.3. Use scale 1 mm = 1 Nm.                                  (5)
                                                                                               [30]

Copyright reserved                                                          Please turn over

### Page 19

Downloaded from hlayiso.com
    Civil Technology                           19                        DBE/November 2017
                                              NSC

    QUESTION 6: GRAPHICS AND COMMUNICATION

    6.1       FIGURE 6.1 below shows the south elevation of a proposed dwelling.

              Study the drawing and complete the table on ANSWER SHEET 6.1.

                                                                                                   1

                                                                                                   2

                                                                                                   3

4

                           7                             6
                                   Scale 1 : 100
                                                                                                   5
                                   South elevation

                                        FIGURE 6.1                                              (15)

    Copyright reserved                                                       Please turn over

### Page 20

Downloaded from hlayiso.com
Civil Technology                                  20                   DBE/November 2017
                                                 NSC

6.2       FIGURE 6.2 below shows the floor plan of a one-bedroom house.

                   3 000           2 000                3 500

220                        110             110                            220   220

                                                                                      2 000

                                                                                110

                                                                                      2 000
                     B

                     B                                                          220

                                    FIGURE 6.2
          On ANSWER SHEET 6.2, draw to scale 1 : 20 a vertical sectional view on
          section line B–B to show the top part of the superstructure wall and a little
          more than half of the SA (Howe) roof truss with closed eaves and an
          overhang of 500 mm. Start your drawing from the point given on the answer
          sheet.
          SPECIFICATIONS:
          •    Wall: 220 mm, plastered on both sides
          •    Plaster: 20 mm thick
          •    Wall plate: 114 mm x 38 mm
          •    Span of roof: 4 110 mm
          •    SA (Howe) roof truss with closed eaves
          •    Slope of roof: 30°
          •    Tie beam: 114 mm x 38 mm
          •    Rafters: 114 mm x 38 mm
          •    King post: 114 mm x 38 mm
          •    Queen post: 114 mm x 38 mm
          •    Strut: 114 mm x 38 mm
          •    Fascia board: 228 mm x 32 mm

Copyright reserved                                                         Please turn over

### Page 21

Downloaded from hlayiso.com
Civil Technology                                21         DBE/November 2017
                                               NSC

          Closed eaves:

          •    Hangers: 38 mm x 38 mm
          •    Bearers: 38 mm x 38 mm
          •    Fibre-cement ceiling boards/Soffit boards

          Print the title below the drawing.

          Show any THREE labels on the drawing.                                (25)
                                                                               [40]

                                                                 TOTAL:        200

Copyright reserved

### Page 22

Downloaded from hlayiso.com
Civil Technology                               DBE/November 2017
                                   NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 1.7

                                  FIGURE 1.7

    ASSESSMENT           MARK   CANDIDATE'S
      CRITERIA                     MARK
Stretcher course          1
Corner brick              1
Queen closer              1
Header course             1
TOTAL                     4

Copyright reserved

### Page 23

Downloaded from hlayiso.com
Civil Technology                                  DBE/November 2017
                                      NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 2.7

                                   FIGURE 2.7

      ASSESSMENT            MARK    CANDIDATE'S
         CRITERIA                      MARK
Shear bar drawn correctly    1
Stirrups drawn correctly     1
TOTAL                        2

Copyright reserved

### Page 24

Downloaded from hlayiso.com
Civil Technology                                               DBE/November 2017
                                           NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 2.11

                                      FIGURE 2.11

               ASSESSMENT                      MARK   CANDIDATE'S
                  CRITERIA                               MARK
Cladding drawn correctly                         1
Moulding at ceiling and wall drawn correctly     1
Moulding at floor and wall drawn correctly       1
TOTAL                                            3

Copyright reserved

### Page 25

Downloaded from hlayiso.com
Civil Technology                                            DBE/November 2017
                                         NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.6

                                         C         FRIDGE

                                  A

                       B

                                      FIGURE 3.6

    ASSESSMENT             MARK   CANDIDATE'S
       CRITERIA                      MARK
Fluorescent light           2
Distribution board          2
Double-pole light
                            2
switch (one-way)
Electrical wiring           2
TOTAL                       8

Copyright reserved

### Page 26

Downloaded from hlayiso.com
Civil Technology                                  DBE/November 2017
                                    NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.7

                                                     MH

                                                CONSERVANCY

                                                   TANK

                                 FIGURE 3.7

      ASSESSMENT          MARK    CANDIDATE'S
         CRITERIA                    MARK
Rodding eye                1
Gully                      1
Ventilation pipe           1
Branch pipes 45°           2
Inspection eyes            2
Any THREE abbreviations    3
TOTAL                      10

Copyright reserved

### Page 27

Downloaded from hlayiso.com
Civil Technology                                                     DBE/November 2017
                                           NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 4.6

Complete your answers in the spaces indicated with _____________.

         A           B      C                               D
                                    Inside measurements of room:
                                    Long walls = ______ – 2/_____
                                                 = ______
                                    Short walls = ______ – 2/_____
                                                 = ______
                                                                            (4)
         1/    _____                Inside area of room:
               _____     _____ m²
                                                                            (2)
                                    Area of one ceiling board:
         1/    _____                One board is ______ mm x ______ mm
               _____     _____ m²                                           (3)

                                    Length of skirting:
                                    =
                                    =
                                    =

                                                                            (4)

Copyright reserved

### Page 28

Downloaded from hlayiso.com
Civil Technology                                                            DBE/November 2017
                                               NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.2
                                               40 N

                                           B
                                  60 N
                                                          C

                                           F          G
                           A
                                  E
                           45°           45°                  45°
                                                      D
                                               10 m
                     RL = 65 N                                      RR = 35 N

                                                                                       a

                                                                                                (8)
  MEMBER             NATURE        MAGNITUDE
AE
DG

Tolerance of 1 N to either side                                                                 (4)

Copyright reserved

### Page 29

Downloaded from hlayiso.com
Civil Technology                                            DBE/November 2017
                                       NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.3

                          5N   5 N/m   7N         4N

                     2m         4m           3m        3m
        A                 B      C      D         E           F
      RL = 22 N                                         RR = 14 N

            A             B      C     D          E          F

Copyright reserved

### Page 30

Downloaded from hlayiso.com
Civil Technology                                                 DBE/November 2017
                                            NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.1

NO.                  QUESTIONS                         ANSWERS          MARKS
  1     What is the title of the drawing?                                   1

  2     Identify number 1.                                                  1

  3     Identify number 2.                                                  1

  4     Identify number 3.                                                  1

  5     Identify number 4.                                                  1

  6     Identify number 5.                                                  1

  7     Identify number 6.                                                  1

  8     Identify number 7.                                                  1

        Name the type of roof on the eastern
  9                                                                         1
        side of the house.
        Name the type of roof on the western
 10                                                                         1
        side of the house.
        Name the material that can be used
 11                                                                         1
        for the fascia board.
        On how many sides of the building
 12                                                                         1
        will you find fascia boards?
        Draw the top view (roofline) of the
 13     roof for the elevation indicated in                                 3
        FIGURE 6.1.
                                               TOTAL                       15

Copyright reserved

### Page 31

Civil Technology
                      Downloaded from hlayiso.com                   DBE/November 2017
                                  NSC
                                              ASSESSMENT CRITERIA            MARKS   LM
CENTRE NUMBER:
                                              Correctness of drawing           3
EXAMINATION NUMBER:                           External wall                    1
ANSWER SHEET 6.2                              Symbol for wall                  1
                                              Plaster                          2
                                              Wall plate                       1
                                              Tie beam                         1
                                              Rafters                          2
                                              Strut                            1
                                              Queen post                       1
                                              King post                        1
                                              Fascia board                     1
                                              Hanger                           1
                                              Bearer                           1
                                              Fibre-cement ceiling board       1
                                              Any THREE labels                 3
                                              Print title                      1
                                              Application of scale
                                              One or two incorrect = 3
                                              Three or four incorrect = 2
                                              More than five incorrect = 1
                                              No measurement correct = 0       3
                                              TOTAL                           25

              A

Copyright reserved

### Page 32

Downloaded from hlayiso.com
Civil Technology                                                             DBE/November 2017
                                               NSC

                                        FORMULA SHEET

IMPORTANT ABBREVIATIONS

SYMBOL         DESCRIPTION       SYMBOL          DESCRIPTION        SYMBOL DESCRIPTION
   c             Centroid           b             Breadth/Width        r      Radius
   ℓ              Length            s                 Side             A       Area

FORMULAE

   AREA OF                FORMULA                  FORMULA             FORMULA FOR THE
                          (in words)              (in symbols)       POSITION OF CENTROIDS
                                                                       X-axis      Y-axis
                                                                         s           s
Square                    side x side                  sxs
                                                                         2           2
                                                                          ℓ          b
Rectangle              length x breadth                ℓxb
                                                                         2           2
Right-angled                                                             b           h
                      ½ x base x height              ½b x h
triangle                                                                 3           3
Equilateral
triangle/                                                                b                h
                      ½ x base x height              ½b x h
Isosceles                                                                2                3
triangle

                                               (A1× d) ± (A2 × d)
                      Position of centroid =
                                                 Total area

                                               OR

                                           Y=
                                                ∑ Ay
                                                ∑A

                                               OR

                                           X=
                                                ∑ Ax
                                                ∑A

Copyright reserved

## Related documents

- [Civil Technology Nov 2017 Afr](https://www.hlayiso.com/library/civil-technology-nov-2017-afr/59a80aae-d41e-40e8-bcbc-0c068d0e5fb6) — Civil Technology · QP · 2017 · Afr
- [CIVIL TECH GR12 QP SEPT2017 Afrikaans](https://www.hlayiso.com/library/civil-tech-gr12-qp-sept2017-afrikaans/34ee00b4-5e69-4625-8608-29bedd7c351e) — Civil Technology · QP · 2017 · Afr
- [Civil Technology Feb March 2017 Afr](https://www.hlayiso.com/library/civil-technology-feb-march-2017-afr/7edd3752-0a76-447c-9045-6774cbc6d9ac) — Civil Technology · QP · 2017 · Afr
- [Civil Technology Feb March 2017 Eng](https://www.hlayiso.com/library/civil-technology-feb-march-2017-eng/f64054c6-cf10-48ae-b3d8-ab4a4f6d275a) — Civil Technology · QP · 2017 · Eng
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — Civil Technology · QP · 2023 · Eng
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — Civil Technology · QP · 2023 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.