# Civil Technology Grade 12 NSC November 2018 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2018 (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2018-civil-services-final-memo-eng/f4e1d2a3-db17-47d5-8ae8-6332d121a6d3
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2018
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2018 Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2018-civil-services-final-memo-eng/f4e1d2a3-db17-47d5-8ae8-6332d121a6d3)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2018. Memorandum, 18 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                     GRAAD 12

                                   NATIONAL
                              SENIOR CERTIFICATE

                                     GRADE 12

                      CIVIL TECHNOLOGY: CIVIL SERVICES

                                  NOVEMBER 2018

                               MARKING GUIDELINES

MARKS: 200

                      These marking guidelines consist of 18 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Civil Services                   2                        DBE/ November 2018
                                        NSC – Marking Guidelines

QUESTION           1:   OHSA, MATERIALS,          TOOLS,      EQUIPMENT      AND    JOINING
                        (GENERIC)

1.1
           1.1.1         F                                                                      (1)

           1.1.2         A                                                                      (1)

           1.1.3         G                                                                      (1)

           1.1.4         E                                                                      (1)

           1.1.5         B                                                                      (1)

1.2            •    Do not throw any tools or materials from a scaffold. 
               •    Never jump on to and off a scaffold. 
               •    Never overload a scaffold.
               •    Remove or cover sharp edges or corners.
               •    Always attach free-standing scaffoldings to a building.
               •    Use a ladder to get on and off a scaffold.
               •    Keep free of waste or any other obstruction.
               •    Never jump on a scaffold while working on it.
               •    Responsible/qualified person must ensure that scaffolding is safe,
                    rigid, stable and firm or has no defects.
               •    Scaffold must be supplied with guard rails/toe boards.
               •    Scaffolds must be levelled on uneven ground.
               •    Do not work on a scaffold in bad weather.
               •    Wear a safety harness when working on scaffolding.
               •    Do not throw tools on/off a scaffold.

           ANY TWO OF THE ABOVE                                                                  (2)

1.3            •     It prevents workers from falling off the scaffold. 
               •     It is used as a handrail. 
               •     It is used to strap on safety harnesses.
               •     To protect the worker working on the scaffold.

           ANY TWO OF THE ABOVE                                                                  (2)
1.4        •        The primary purpose of painting is to protect metals, wood and other
                    material against corrosion and decay. 
           •        Provides a decorative/aesthetic appearance/finishing. 
           •        Protects surfaces from moisture penetration.
           •        Protects surfaces from rust/uv rays.

           ANY TWO OF THE ABOVE                                                                  (2)

Copyright reserved

### Page 3

Downloaded from hlayiso.com
Civil Technology: Civil Services               3                            DBE/November 2018
                                      NSC – Marking Guidelines

1.5        The curing of concrete:
           •     Increases the strength of concrete. 
           •     Decreases the permeability of hardened concrete.
           •     Improves durability of concrete by reducing cracks.
           •     Makes concrete more watertight.
           •     Minimises shrinkage cracks in concrete.
           •     Provides volume stability.
           •     Cured concrete can carry more weight without breaking/crumbling
                 than uncured concrete.
           •     Prevents rapid drying of concrete.
           •     Curing ensures that the hydration process continues.

           ANY ONE OF THE ABOVE                                                                      (1)

1.6

           1.6.1        Multi detector                                                              (1)

           1.6.2        Tool A is used:
                        •      to detect materials found in/behind walls, ceilings and
                               underneath floors, including ferrous and non-ferrous metals,
                               electrical wiring, wood and metal studs. 
                        •      to locate steel bars and copper pipes. 
                        •      in carpentry, plumbing, and construction.
                        •      to measure the distance to/from covered objects.

                        ANY TWO OF THE ABOVE                                                         (2)

           1.6.3        The batteries must be removed from the tool:
                        •     to prevent the battery from running flat/battery can die. 
                        •     to prevent acid leaks from batteries damaging the tool.

                        ANY ONE OF THE ABOVE                                                         (1)

1.7

           1.7.1        A – Bolt and nut/Bolt 
                        B – Rawl bolt                                                               (2)

           1.7.2        Bolt and nut
                        •      Bolts and nuts are used to secure pipe supports to metal
                               parts. 
                        •      To join components together.
                        Rawl bolt
                        •      A Rawl bolt is used to fix a truss hanger to a wall. 
                        •      To fix brackets/structures/panels to a wall/concrete.
                        •      For construction, renovation and industrial work

                        ANY TWO OF THE ABOVE                                                         (2)
                                                                                                     [20]

Copyright reserved                                                                Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Civil Services              4                              DBE/November 2018
                                     NSC – Marking Guidelines

QUESTION 2: GRAPHICS AS METHOD OF COMMUNICATION (GENERIC)

ANSWER SHEET 2
NO.                     QUESTIONS                                 ANSWERS                     MARKS

  1     Identify FIGURE A.                           South Elevation/Elevation                       1

  2     Identify FIGURE B.                           Ground floor plan/Floorplan                     1

                                                     First floor level/Second floor
  3     Identify number 4.                           level/Suspended floor/Floor level/               1
                                                     Dash line/ FFL/Expansion joint 

  4     Identify number 5.                           Window Sill                                     1

                                                     Hand wash basin/Wash
  5     Identify number 9.                                                                            1
                                                     basin/Washing basin/HWB/Basin 

  6     Identify number 10.                          Water closet/WC/Toilet pan                      1

  7     Identify number 11.                          Bath/B                                          1

  8     On what date was the plan printed?           2018/10/02                                      1

  9     Who drew the building plan?                  JP Maloi                                        1

        Name the feature in the column for the
 10     notes in FIGURE 2 that must be          Ramp                                                 1
        installed in front of the sliding door.

        Name the feature in the column for the
 11     notes in FIGURE 2 that must give       Staircase/Stairs/Stairway                             1
        access to the first floor.

        Identify the type of roof that is used for
 12                                                  Gable roof                                      1
        the building in FIGURE A.

                                                     To cover the opening/close the gap
                                                     between the two slopes of the roof.
                                                     
 13     Explain the purpose of number 1.             Prevent water and other elements                 1
                                                     from entering the roof.
                                                     ANY ONE OF THE ABOVE

Copyright reserved                                                                 Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology: Civil Services             5                              DBE/November 2018
                                    NSC – Marking Guidelines

                                                  •    To prevent water from falling
                                                       onto the ground 
                                                  •    To collect rainwater
                                                  •    To channel the rainwater into
                                                       the downpipe
 14     Explain the purpose of number 2.          •    To protect the wall from water                1
                                                  •    To hide the rafters/finish off the
                                                       roof
                                                  ANY ONE OF THE ABOVE

        Explain the abbreviation FFL at
 15                                               Finished floor level                              1
        number 6.

                                                  To channel the water from the gutter
 16     Explain the purpose of number 7.                                                             1
                                                  to the ground. 

        Explain the meaning of the arrow on
                                                  It indicates the direction of the slope
 17     the feature that must be installed in                                                        1
                                                  of the ramp/it indicates the slope. 
        front of the sliding door.

                                                  It indicates the slope or the gradient
        Explain what is meant by 1:10             of the ramp/for every 10 metres
 18                                                                                                  1
        indicated on the symbol in the notes.     horizontally rises 1 metre
                                                  vertically.

 19     Which room will feature 15 serve?         The bathroom.                                     1

                                                  •    Indicates what direction the
                                                       window is opening/window
                                                       opening. 
                                                  •    Indicates the location of the
        Explain the short dash lines on the            hinges.
 20                                                                                                  1
        windows.                                  •    Indicates the location of the
                                                       casement stay.
                                                  ANY ONE OF THE ABOVE

        Deduce the height of window 2 from
 21                                               1,2 m or 1 200 mm (Ignore units)                  1
        the window schedule.

        Deduce the width of window 3 from
 22                                               2 m or 2 000 mm (Ignore units)                    1
        the window schedule.

        On what elevation of the building is
 23                                               Western elevation/Western side                    1
        the bathroom window situated?

Copyright reserved                                                                Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Civil Services              6                               DBE/November 2018
                                     NSC – Marking Guidelines

                                                   3 – window/window frame/reveal
                                                   frame stile/casement stile 
        Differentiate between component
 24                                                                                                     2
        number 3 and component number 8.
                                                   8 – sliding door /door frame/
                                                   door/reveal /sliding door stile 

                                                   The light in the lounge is a
                                                   fluorescent light/1 x 40W/2x40/3x40
        Differentiate between the light in the
 25                                                fluorescent light  and the light in                 2
        lounge and the light in the bathroom.
                                                   the bathroom is a normal ceiling
                                                   light 

                                                   Tile/ Vinyl flooring(Novilon)/
                                                   Coloured screed/Polished or stained
        Recommend a suitable floor covering        concrete flooring/Water proof
 26                                                                                                     1
        for the bathroom.                          laminated floor/carpet. 
                                                   ANY ACCEPTABLE ANSWER

        Recommend an appropriate scale to
 27     which FIGURE A should be drawn,            1:50/100/200                                        1
        according to SANS.

        Recommend an alternative sanitary
 28     fitment to replace number 11 that will     Shower                                              1
        serve a similar purpose.

        Calculate the internal area of the office 4 m  x 3 m  = 12 m²  OR 12
 29                                                                                                     3
        in m² Show ALL calculations.              4 000 X 3 000 = 12 000 000mm2
                                                   Positive marking

                                                    (220 + 3 000 + 110 + 2 800 + 220)  x 2 

                                                   = 6 350 x 2

                                                   =12 700 mm 

        Calculate the perimeter of the building. (220 + 4 000 + 110 + 2 000 + 220)  x 2 
 30                                                = 6 550 x 2
                                                                                                        7
         Show ALL calculations.
                                                   = 13 100 mm 

                                                   12 700 + 13 100 mm

                                                   = 25 800 mm  OR

                                                   = 25,8 m

                                                                                    TOTAL           40

Copyright reserved                                                                   Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Civil Services               7                              DBE/November 2018
                                      NSC – Marking Guidelines

QUESTION 3: CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHS AND
            QUANTITIES (SPECIFIC)

3.1        3.1.1        A manhole is a chamber that allows entrance to a drain.                       (1)
                        Allow access to the sewage pipes of a sewage system.

                        ANY ONE OF THE ABOVE

           3.1.2        Benching/Sloping/Haunching                                                    (1)

           3.1.3        Pipe channel/Open channel/Channel                                             (1)

           3.1.4        Manholes are set in frames and have greased double seals for the
                        following reasons:
                            •      To make the manhole airtight. 
                            •      To make the manhole watertight. 
                            •      To ensure that gasses cannot escape.
                            •      To ensure that liquids cannot escape.                               (2)
3.2
                                                      
                                                                
                                                                      
                                                      √
                                                                
                                                      √
                                                                     
                                                                
                                                          Correctly drawn 

                                            A                    A

                      ASSESSMENT CRITERIA                    MARK         LEARNER
                                                                           MARK
                      FIVE courses of bricks in stretcher
                                                                 5
                      bond correctly drawn
                      Alternate half bricks on left side         3
                      Section correctly drawn                    1
                      Hatching lines                             1                                     (10)
                      TOTAL:                                     10

Copyright reserved                                                                  Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Civil Services                     8                           DBE/November 2018
                                            NSC – Marking Guidelines

3.3                           •    If the sides are not properly supported, no person is allowed
                                   to work in the trench. 
                              •    The supervisor ensures that no load, material or heavy
                                   machinery is placed near the edge of any excavation. 
                              •    Excavations must be adequately protected by a fence. 
                              •    Red warning lights and signs should be placed at regular
                                   intervals and be clearly visible.
                              •    Orange warning signals must always be visible.
                              •    Deep trenches should have shoring.
                              •    Wear a harness.
                              •    Any person entering an excavation trench must wear
                                   personal protective equipment.
                                                                                                         (3)
                           ANY THREE OF THE ABOVE
3.4        3.4.1           Shoring A                                                                    (1)
           3.4.2           Vertical members/poling boards are closer together. This means
                           loose or waterlogged soil cannot filter through the openings. 
                           The loose or waterlogged soil will easily filter through the openings
                           of B.

                           ANY ONE OF THE ABOVE                                                          (1)
3.5        3.5.1           Manhole                                                                      (1)
           3.5.2           Lifeline                                                                     (1)
3.6

          A            B                C                            D
3.6.1                                            Volume of concrete for foundation:

                                                 Volume = l x b x h
         1/     1,150 

                1,0 

                0,125            0,14 m³       0,14 m³ of concrete is needed
                                                                                                         (4)
3.6.2                                            Number of bricks needed for the manhole:

         1/                                      Centre line of wall = 4,96 m
                     4,96 

                     1,0 
                                                 496 bricks are needed
                     100         496                                                               (4)
                                                                                                       [30]

Copyright reserved                                                                    Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Civil Services               9                             DBE/November 2018
                                      NSC – Marking Guidelines

QUESTION 4: COLD AND HOT-WATER SUPPLY, TOOLS, EQUIPMENT AND
            MATERIALS (SPECIFIC)
4.1
      4.1.1   High pressure geyser/Electrical geyser                                                 (1)

           4.1.2        Element                                                                      (1)

           4.1.3        Gas geyser/Solar geyser/Coal/Biofuel/Wood geyser/Donkey/Solar
                        panel                                                                        (1)

4.2

           4.2.1        A dripping geyser overflow may be an indication that the pressure
                        control/relief valve/vacuum breaker is faulty/pipe joint leakage.            (1)

           4.2.2        If there is no hot water, one of the following may be the cause:
                             •     No power to the geyser 
                             •     Circuit breaker is faulty
                             •     Electricity supply is interrupted
                             •     Thermostat may be faulty
                             •     Element may be faulty
                             •     Blocked hot-water pipe
                             •     No sun for solar geyser
                             •     No gas for gas geyser
                                                                                                      (1)
                        ANY ONE OF THE ABOVE

           4.2.3        If water is leaking through the ceiling, one of the following may be
                        the reason:
                            •     Burst geyser or major leak. 
                            •     Drip tray outlet pipe is blocked or overflowing.
                            •     The drip tray may be cracked/no drip tray.
                            •     Pipe joint leakage.

                        ANY ONE OF THE ABOVE                                                          (1)

4.3        4.3.1        F                                                                            (1)

           4.3.2        G                                                                            (1)

           4.3.3        E                                                                            (1)

           4.3.4        D                                                                            (1)

           4.3.5        B                                                                            (1)

Copyright reserved                                                                 Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Civil Services              10                             DBE/November 2018
                                      NSC – Marking Guidelines

4.4
           4.4.1
                                            
                                                                                                      (2)
           4.4.2
                                            
                                                                                                      (2)
           4.4.3
                                               OR
                                                                                                      (2)
4.5            •     Cut the damaged section from the pipe, using a pipe cutter/. 
               •     Move the pipe slightly sideways to allow the fixing of compression
                     fittings. 
               •     Measure and cut the length of pipe to be replaced. 
               •     Slip the nuts over the pipes followed by the ferrules. Push the pipes
                     into the fittings and tighten using the correct tools. 
                     OR
               •     Dismantle the joint
               •     Ensure sealing of joint (thread sealing tape)                                    (4)
               •     Replace compression joint
               •     Tighten all nuts properly
               •     Test for leaks

4.6
           4.6.1        P-Trap/Water trap                                                            (1)

           4.6.2        PVC/Plastic/Rubber                                                           (1)

           4.6.3        B                                                                            (1)

           4.6.4        The seal will ensure a watertight seal and prevent it from leaking.          (1)

4.7

4.7.1      A            Bibcock/Bib tap                                                              (1)

           B            Stopcock/Stop tap                                                            (1)

4.7.2      A            A bibcock can be used for sanitary fitments such as kitchen sinks,
                        wash troughs, washbasins, dishwashers, washing machine,
                        fridges, ice machines and baths.                                             (1)
                        Outside of a house for hose pipes.

           ANY ONE OF THE ABOVE

           B            A stopcock is used to close or shut off the water supply.                    (1)

Copyright reserved                                                                 Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Civil Services              11                             DBE/November 2018
                                      NSC – Marking Guidelines

4.7.3          •      Plastic taps do not have the same resale value as brass taps and
                     is therefore not worth stealing/cheaper.
               •      Plastic taps are cheaper than brass taps.                                       (1)

4.8            •     To enable local authorities/consumer to calculate the amount of
                     water consumed by a household. 
               •     To indicate if there is a leakage in water pipes.
               •     To enable the user to upload pre-paid water coupons.                             (1)

4.9        4.9.1        Description of dezincification:
                          •     Dezincification is the selective leaching of zinc from copper
                                alloys. 
                          •     It is an electrochemical reaction between zinc and water.            (2)

           4.9.2        Problems caused:
                           •   Zinc gradually dissolves from the surface of an alloy. 
                           •   The material that remains is a weak, spongy copper
                                layer. 
                           •   It can progress through the part/fitting, causing leaks. 
                           •   It can form blockages if it forms a deposit.                           (3)

           ANY THREE OF THE ABOVE

4.10       Electrolytic cleaning/chemicals/scrubbing with wire brush/sand paper.                     (1)

4.11       Hydro-dynamic energy                                                                      (1)

4.12           •      Drain cleaning rods 
               •      Jetting machine/drain cleaning machine/plunger

           ANY ONE OF THE ABOVE                                                                       (1)

4.13       Compressed-air test apparatus                                                             (1)

                                                                                                      [40]

Copyright reserved                                                                 Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Civil Services               12                    DBE/November 2018
                                       NSC – Marking Guidelines

QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
            STORM WATER (SPECIFIC)

5.1

           5.1.1        Stop end                                                            (1)

           5.1.2        Pitch of the roof                                                   (1)

           5.1.3        Galvanised sheet metal                                              (1)

           5.1.4        Gutter                                                              (1)

           5.1.5        Kerb                                                                (1)

5.2

                       
                       

                       

                            
                                   
                             

                                          ASSESSMENT              MARK LEARNER
                                          CRITERIA                      MARK
                                          Square gutter             2
                                          Downpipe with offset      3
                                          Holder bat                2
                                          TOTAL:                    7                        (7)

Copyright reserved                                                        Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Civil Services                  13                                  DBE/November 2018
                                          NSC – Marking Guidelines

5.3
                                                         
                                                         7
                                                        4

                                                        6
                                               
                                              2

                                                   5
                                              5
                                   1
                        1           
                                              
                                             5                   4

                                   5

                                          7                              2

                            5                                  6
                                               4

                                        5 

                                    3                       Candidates can use any one of the 2
                                                             methods:

                                                                 1. Calculate the circumference
                                                                     and divide by 12
                                                                    C= 2 x3.14 x25 =157/12 = 13
                                                                    1 mark
                                                                       OR
                                                                 2. Measure distance between any
                                                                     2 parts on top view(circle)

                      ASSESSMENT CRITERIA                                                      MARK          CM
                      Construction lines to top of cone                                   1      2
                      Construction lines of outer circle                                  2      2
                      Divide outer circle in 12 parts                                     3      1
                      Construction lines from top of cone to outer circle                 4      3
                      Cone measurement (marked/transferred) from front view to            5
                      determine top part of development (ONE mark for every FOUR
                      coordinates = 3)                                                              6
                      Outside lines of development                                        6         2
                      3 mm seam on both sides                                             7         2
                      TOTAL:                                                                       18

                                                   OR

Copyright reserved                                                                            Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Civil Services                   14                                 DBE/November 2018
                                           NSC – Marking Guidelines

5.3
                                                          
                                                          7
                                                         4

                                                         6
                                                
                                               2

                                                    5

                                    1               5
                          1          
                                               
                                              5                  4

                                   5

                                           7                              2

                              5                                6
                                                4

                                         5 

                                                              Candidates can use any one of the 2
                                                              methods:
                                     3 
                                                                    1 Calculate the circumference
                                                                    and divide by 12
                                                                      C= 2 x3.14 x25 =157/12 = 13
                                                                      1 mark
                                                                         OR
                                                                  2    Measure distance between
                                                                      any 2 parts on top view(circle)

                     ASSESSMENT CRITERIA                                          MARK      CM
                     Construction lines to top of cone                        1     2
                     Construction lines of outer circle                       2     2
                     Divide outer circle in 12 parts                          3     1
                     Construction lines from top of cone to outer circle      4     3
                     Cone measurement (marked/transferred) from front         5     6
                     view to determine top part of development
                     Outside lines of development                             6      2
                     3 mm seam on both sides                                  7      2
                     TOTAL:                                                         18

                                                                                                                [30]

Copyright reserved                                                                           Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Civil Services                  15                           DBE/November 2018
                                          NSC – Marking Guidelines

QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)

6.1

           6.1.1        B                                                                              (1)

           6.1.2        A                                                                              (1)

           6.1.3        A                                                                              (1)

           6.1.4        C                                                                              (1)

           6.1.5        B                                                                              (1)

6.2

           6.2.1        C    Waste junction135°/Y-junction 135°                                        (1)

           6.2.2            • To allow access to the drainage system. 
                            • To remove blockages from the drainage system.

                        ANY ONE OF THE ABOVE                                                            (1)

           6.2.3            •      So that drain rods can be inserted easily into the pipe with
                                   the direction of flow. 
                            •      A 90° junction at this point will make it impossible to use
                                   drain rods.
                            •      A 90º junction will damage the main sewerage pipe if drain
                                   rods are forced into the pipe.

                        ANY ONE OF THE ABOVE
                                                                                                        (1)

Copyright reserved                                                                   Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Civil Services                      16                             DBE/November 2018
                                              NSC – Marking Guidelines

6.3
                     RE 
                                                                       RE
                                     IE                 IE
                                                                          
                                                               VP
                 IE                                                

                                               WB
                                                             WC
                                    B

                  IE

                              G           S
                   IE

                                     ASSESSMENT CRITERIA                      MARK    CANDIDATE'S
                                                                                         MARK
                             2 x rodding eyes correctly positioned             2
                             5 x inspection eyes correctly positioned          5
                             1 x ventilation pipe correctly positioned         1
                     MH      Drain pipes drawn correctly (Main and
                                                                               2
                             branch pipes)
                             TOTAL                                             10                            (10)

           6.4.1          15 mm                                                                             (1)

           6.4.2          Shower rose/head                                                                  (1)

           6.4.3          To channel the water towards C.                                                   (1)

           6.4.4             •      The shower trap allows water to flow down the drainage
                                    pipes. 
                             •      Keeps unwanted odours from entering the atmosphere.
                             •      To ensure that water flows to the shower trap.                           (1)

           6.4.5          Capillary joint/Soldered joint                                                    (1)

6.5        The function of an anti-siphonage pipe is:
              •    To supply air to the short branch pipe of the lower fixture at the time
                   of suction to prevent loss of the water seal. 
              •    To act as a ventilation pipe for the lower fixtures.

           ANY ONE OF THE ABOVE                                                                              (1)

Copyright reserved                                                                        Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Civil Services               17                        DBE/November 2018
                                       NSC – Marking Guidelines

6.6        FIGURE A: Used above ground where soil pipe must bend. 
                     Where access to sewage pipes are needed/unblocking of pipes.
                     To join sewage pipes at 90º.

           FIGURE B: Used to connect soil pipes at an angle. 
                     To join three soil pipes at an angle of 135º                                (2)
6.7            •     Water closet 
               •     Bidet
               •     Urinal

           ANY ONE OF THE ABOVE                                                                  (1)

6.8
           6.8.1
                                        OR            
                                                                                                 (2)
                             Urinal
           6.8.2
                                             
                                                                                                 (2)
                         Grease trap
           6.8.3
                                          
                                                                                                 (2)
                           Shower
6.9        Materials that are commonly used for sanitary fittings are:
             •       Ceramics 
             •       Cast iron 
             •       Stainless steel
             •       Plastic/PVC
             •       Pressed steel
             •       Terrazzo
             •       Glass fibre/fibreglass
                                                                                                 (2)
             •       Copper/aluminium

           ANY TWO OF THE ABOVE
6.10           •      50/50 solder (plain/tinman's solder) 
               •      Wiping solder (plumber's solder) 
               •      60/40 solder (fine solder)
               •      Lead-free solder

           ANY TWO OF THE ABOVE                                                                  (2)

Copyright reserved                                                            Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology: Civil Services                 18                    DBE/ November 2018
                                       NSC – Marking Guidelines

6.11       Chemical anchors can be used to:
             •     Mount air conditioners 
             •     Fit outdoor lights
             •     Fix brackets to walls
             •     Fix brackets to secure I-beams
             •     Fix balconies
             •     Fix railings
             •     Repair bathrooms

           ANY ONE OF THE ABOVE                                                             (1)

6.12

           6.12.1       Rivet head                                                         (1)

           6.12.2       Flange is created by the rivet gun to complete the bond between
                        the two pieces of material/keep/secure the two parts together.     (1)
                                                                                            [40]

                                                                                TOTAL:      200

Copyright reserved

## Related documents

- [Civil Technology Nov 2018 (Woodworking) Memo FINAL Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-memo-final-eng/2cdca6a9-a7a6-411c-9a30-4575c8e6a5cf) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology Nov 2018 (Construction) FINAL Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-final-memo-eng/90041771-68e0-4915-bc37-7a4f246b369f) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology Nov 2018 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-afr/be54c81a-cc52-4da7-a74c-ec3f0bddf626) — Civil Technology · QP · 2018 · Afr
- [Civil Technology Nov 2018 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-afr/8a4b5aba-d78e-4505-aae9-e127ef45df85) — Civil Technology · QP · 2018 · Afr
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction-1/b6d609b6-89a5-4b39-a9b7-0d878af45cd4) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste-d/f328c182-752d-488c-88b6-f2a5cadcbcf2) — Civil Technology · Memo · 2018 · Afr

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
