# Civil Technology Grade 12 NSC November 2018 QP (Eng)

> Grade 12 Civil Technology question paper from the NSC November Exam 2018 (English), 24 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2018-construction-eng/0d98f624-bc2d-4159-9798-1c3b3a54048c
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2018
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 24

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2018 QP (Eng)](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-eng/0d98f624-bc2d-4159-9798-1c3b3a54048c)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2018. Question paper, 24 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                 NATIONAL
                            SENIOR CERTIFICATE

                                   GRADE 12

                      CIVIL TECHNOLOGY: CONSTRUCTION

                                NOVEMBER 2018

MARKS: 200

TIME: 3 hours

            This question paper consists of 15 pages and 9 answer sheets.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Construction               2                          DBE/November 2018
                                            NSC

REQUIREMENTS:

1.        Drawing instruments

2.        A non-programmable calculator

3.        ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.        This question paper consists of SIX questions.

2.        Answer ALL the questions.

3.        Answer each question as a whole. Do NOT separate subsections of
          questions.

4.        Start the answer to EACH question on a NEW page.

5.        Do NOT write in the margins of the ANSWER BOOK.

6.        You may use sketches to illustrate your answers.

7.        Write ALL calculations and answers in the ANSWER BOOK or on the
          attached ANSWER SHEETS.

8.        Use the mark allocation as a guide to the length of your answers.

9.        Make drawings and sketches in pencil, fully dimensioned and neatly finished
          off with descriptive titles and notes to conform to the SANS/SABS Code of
          Practice for Building Drawings.

10.       For the purpose of this question paper, the size of a brick should be taken as
          220 mm x 110 mm x 75 mm.

11.       Use your own discretion where dimensions and/or details have been omitted.

12.       Answer QUESTIONS 2, 3.7, 4.3, 5.2, 5.4, 6.2 and 6.6 on the attached
          ANSWER SHEETS using drawing instruments, where necessary.

13.       Write your CENTRE NUMBER and EXAMINATION NUMBER on every
          ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
          have used them or not.

14.       Drawings in the question paper are NOT to scale due to electronic transfer.

15.       Google Images was used as the source for all photographs and pictures.

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Construction                3                             DBE/November 2018
                                             NSC

QUESTION        1:   OHSA, MATERIALS,            TOOLS,   EQUIPMENT        AND      JOINING
                     (GENERIC)

Start this question on a NEW page.

1.1       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–G) next to the question numbers (1.1.1 to 1.1.5) in the
          ANSWER BOOK, e.g. 1.1.6 H.

                          COLUMN A                                COLUMN B
           1.1.1      Sole plate             A      not to be used in the proximity of
                                                    electrical wires
           1.1.2      Aluminium ladder
                                             B      to cover iron or steel with a layer of
           1.1.3      Scaffold                      zinc to prevent it from rusting

           1.1.4      Safety net             C      prevents splashing of chemicals

           1.1.5      Galvanising            D      protect metal, wood and other
                                                    materials against corrosion and
                                                    decay

                                             E      prevents falling objects from injuring
                                                    workers

                                             F      prevents vertical standards from
                                                    sinking into the ground

                                             G      should be provided with toe boards
                                                    to prevent objects from falling off
                                                                                      (5 x 1)       (5)

1.2       Describe TWO safety precautions that must be adhered to when working on a
          scaffold.                                                                                 (2)

1.3       What is the purpose of the guard rail of a scaffold in terms of safety?                   (2)

1.4       Explain the purpose of painting.                                                          (2)

1.5       Describe ONE advantage of the curing process of concrete.                                 (1)

Copyright reserved                                                               Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Construction                 4                         DBE/November 2018
                                              NSC

1.6       FIGURE 1.6 below shows a tool that is used in the building construction
          industry.

                                                                             A

                                             FIGURE 1.6

          1.6.1        Identify tool A.                                                         (1)

          1.6.2        Explain TWO uses of tool A.                                              (2)

          1.6.3        Explain why the batteries should be removed from the tool if the
                       tool is not going to be used for a long time.                            (1)

1.7       FIGURE 1.7 below shows joining fixtures that are used on building sites and
          in workshops.

                                 A                                   B
                                             FIGURE 1.7

          1.7.1        Identify fastener A and fastener B.                                      (2)

          1.7.2        Explain ONE use of fastener A and fastener B respectively.               (2)
                                                                                                [20]

QUESTION 2: GRAPHICS AS METHOD OF COMMUNICATION (GENERIC)

FIGURE 2 on the next page shows different drawings that appear on a building plan.
Analyse the drawings and complete the table on ANSWER SHEET 2.

Copyright reserved                                                           Please turn over

### Page 5

Downloaded from hlayiso.com
     Civil Technology: Construction                              5                             DBE/November 2018
                                                                NSC

                                                                            1       NOTES:
                                                                                    Contractors must verify all
                                                                                    dimensions and levels on site before
                                                                                    commencing work. Architects to be
                                                                                    notified immediately of any
                                                                            2       discrepancies.

 7                                                                                  ARCHITECT'S SIGNATURE ………………….
                                                                                    CLIENT'S SIGNATURE ……………….…….
                                                                            3
                                                                                    The following must be placed in
                        W1                      W2                                  front of the sliding door:
                                                                            4
                                                                                                    1 : 10

 8
                                                                            5
                                                W3                                  Access to the first floor must be by
                                                     FFL                    6       means of a:

                                      FIGURE A

                                                                                    REVISION       DATE           DESCRIPTION

                                                                                    PRINTED BY:        DATE OF PRINT:
        220              3 000                 110
220                                                                         220
                                                                                    NKOSI PRINTERS      2018/10/02

                                                                                    DRAWING TITLE:
                                                                                    SITE PLAN STAND 1843

                    9                                                               PROJECT:
                                                                                    PROPOSED DWELLING ON STAND 1843,

2 000                                                                       2 000
                                                                                    DIEPRIVIER
              W4        10 BATHROOM

                        11                                                          PROJECT NO.           DRAWING NO.
          12                                     LOUNGE                             GR 557-102              557P9

         13    W   14                                                                DATE      DRAWN CHECKED            SCALE
                               15
110                                                               W3                25/4/2018 JP MALOI P BRITZ          1 : 100

              W3
                                                                            4 000            REFERENCE CODE
                                                                                                QP 1 - 2018
                             OFFICE

                                                           19                        WINDOW 2                     WINDOW 3
                   16

                                                                                             900                      2 000
                              17          18     W2
                                                                            220      1 200                1 200
                                110             2 800                 220

                                       FIGURE B
                                                                            19

                                                                FIGURE 2                                                   [40]

     Copyright reserved                                                                            Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Construction                6                           DBE/November 2018
                                             NSC

QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)

Start this question on a NEW page.

3.1       What is the minimum pitch of a roof when class A corrugated iron sheeting
          are used to cover a roof?                                                                (1)

3.2       State the maximum distance for the spacing between roof trusses for
          corrugated iron roof sheeting.                                                           (1)

3.3       Differentiate between the timber used to fix a roof tile and roof sheeting by
          means of neat freehand drawings of EACH in your ANSWER BOOK. Print the
          correct name under each drawing.                                                         (2)

3.4       What are the measurements of a purlin for corrugated iron roof sheeting?                 (1)

3.5       Differentiate between the spacing of roof trusses for clay tiles and roof trusses
          for fibre-cement tiles. Copy the table below in your ANSWER BOOK.

                     CLAY ROOF TILES                      FIBRE-CEMENT TILES
                                                                                                   (2)

3.6       FIGURE 3.6 below shows a vertical cross section of a part of the construction
          at the ridge of a roof truss. Identify parts A–D.

                                                                           A

                                                                           B

                                                                            C

                                                            D

                                            FIGURE 3.6                                                   (4)

Copyright reserved                                                              Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Construction                  7                          DBE/November 2018
                                               NSC

3.7       Use ANSWER SHEET 3.7 and draw, in good proportion, a neat sketch of a
          collar tie roof truss with a pitch of 45° resting on two supporting walls.

          Show the following on your drawing:

              Walls
              Wall plates
              Rafters
              Collar beam/Collar tie
              Ridge beam                                                                         (8)

3.8       Give ONE word/term for EACH of the following descriptions by choosing
          a word/term from the list below. Write only the word/term next to the question
          numbers (3.8.1 to 3.8.5) in the ANSWER BOOK, e.g. 3.8.6 Riser.

                        run;     landing; nosing; going/tread; apron; riser;
                                 pitch line; baluster; handrail; stairwell

          3.8.1        The vertical distance between two consecutive treads                       (1)

          3.8.2        Vertical posts that hold up the handrail                                   (1)

          3.8.3        The flat, horizontal surface of a step on which one walks when
                       descending or ascending a stair case                                       (1)

          3.8.4        The top horizontal area on top of a staircase                              (1)

          3 8.5        The horizontal distance covered by the stairs                              (1)

3.9       Draw a neat sketch, in good proportion, of a square and round profile that can
          be used for handrails in your ANSWER BOOK.                                              (2)

3.10      Explain ONE method of mounting handrails onto a wall.                                   (1)

3.11      Describe TWO methods of securing a wall plate to a brick wall.                          (2)

3.12      Steel sections can be joined to a concrete base by means of a base plate and
          steel pin connection. Explain the purpose of the pin in this joining method.            (1)
                                                                                                  [30]

Copyright reserved                                                             Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Construction               8                             DBE/November 2018
                                            NSC

QUESTION 4:           EXCAVATIONS, FORMWORK, TOOLS AND EQUIPMENT AND
                      MATERIALS (SPECIFIC)

Start this question on a NEW page.

4.1       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–G) next to the question numbers (4.1.1 to 4.1.5) in the
          ANSWER BOOK, e.g. 4.1.6 H.

                           COLUMN A                            COLUMN B
            4.1.1     Excavations               A    used to fasten the various
                                                     sections of formwork
            4.1.2     Formwork
                                                B    installing ceilings and floor tiles
            4.1.3     Sole plate
                                                C    remove earth to allow the
            4.1.4     Plywood                        construction of a foundation or
                                                     basement
            4.1.5     Threaded rods and nuts
                                                D    mould into which fresh concrete
                                                     is poured

                                                E    consists of thin layers of wood
                                                     with grains crossing in different
                                                     directions

                                                F    shuttering props rest on this

                                                G    used in flying shores
                                                                                     (5 x 1)       (5)

4.2       Excavation of loose soil is necessary on a building site to reach a firmer soil
          base.

          4.2.1        Explain THREE safety factors that should be considered after
                       excavations have been completed.                                            (3)

          4.2.2        Describe THREE tasks that must be performed after the site
                       inspection in order to prepare the site.                                    (3)

4.3       FIGURE 4.3 on ANSWER SHEET 4.3 shows a trench that has been
          excavated.

          Use ANSWER SHEET 4.3 and draw a neat sectional drawing, in good
          proportion, of the shuttering for firm soil.

          Show the following on your drawing:

              Folding wedges
              Walling boards
              Poling boards
              Struts
              Any TWO labels                                                                      (8)

Copyright reserved                                                              Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Construction                  9                             DBE/November 2018
                                               NSC

4.4       Describe ONE property of good formwork.                                                   (1)

4.5       FIGURE 4.5 below shows formwork in the construction process. Study the
          drawing and answer the questions that follow.

                                                                          A

                                                                          B

                                                                          C

                                                                          D

                                                                      E

                                         FIGURE 4.5

          4.5.1        Identify the type of formwork in FIGURE 4.5.                                 (1)

          4.5.2        Name A to D.                                                                 (4)

          4.5.3        Justify the use of E.                                                        (1)

4.6       State TWO properties of steel shuttering.                                                 (2)

Copyright reserved                                                               Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Construction              10                       DBE/November 2018
                                           NSC

4.7       FIGURE 4.7 below shows a construction machine that is used on a building
          site.

          Study FIGURE 4.7 and answer the questions that follow.

                                          FIGURE 4.7

          4.7.1        Describe TWO safety precautions that must be adhered to when
                       using the machine in FIGURE 4.7.                                    (2)

          4.7.2        Explain, in your own words, how you will take care of this
                       construction machine.                                               (2)

4.8       FIGURE 4.8 below shows a machine that is used on a building site. State
          TWO ways in which you will take care of this machine.

                                          FIGURE 4.8                                       (2)

4.9       Describe TWO disadvantages of ready-mixed concrete.                              (2)

4.10      Explain TWO purposes of the slump test.                                          (2)

4.11      Name TWO different types of methods that can be used for the curing of
          concrete.                                                                        (2)
                                                                                           [40]

Copyright reserved                                                      Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Construction                 11                            DBE/November 2018
                                              NSC

QUESTION 5:          PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
                     MEANS OF COMMUNICATION (SPECIFIC)

Start this question on a NEW page.

5.1       FIGURE 5.1 below shows a worker plastering a wall. Study the drawing and
          answer the questions that follow.

             A                       B                   C                      D
                                         FIGURE 5.1

          5.1.1        Describe the processes that take place from A to D.                         (4)

          5.1.2        What type of tool is used in C?                                             (1)

5.2       ANSWER SHEET 5.2 shows the outlines of the front and side views of a
          cavity wall. Use ANSWER SHEET 5.2 as a guide and draw FOUR courses of
          the external view of the cavity wall showing the front and left views.                   (6)

5.3       FIGURE 5.3 below shows TWO different paving patterns. Study the
          photographs and answer the questions that follow.

                                 A                                    B
                                             FIGURE 5.3

          5.3.1        Name paving patterns A and B.                                               (2)

          5.3.2        State ONE paving method that is commonly used.                              (1)

          5.3.3        Describe the term jointing when laying paving bricks.                       (1)

Copyright reserved                                                              Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Construction                  12                DBE/November 2018
                                               NSC

5.4       Use ANSWER SHEET 5.4 and draw to a scale of 1 : 10 a detailed vertical
          section through the foot of a roof truss showing open eaves. Show the
          following on your drawing:

                Wall: 220 mm wide, face brick
                Wall plate: 114 mm x 38 mm
                Tie beam: 114 mm x 38 mm
                Rafter: 114 mm x 38 mm
                Eaves overhang: 400 mm
                Purlins: 76 mm x 50 mm
                Corrugated iron roof covering
                Fascia board: 230 mm x 38 mm

          Print the scale below the drawing.

          Print any TWO labels on the drawing.                                          (15)
                                                                                        [30]

Copyright reserved                                                   Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Construction                  13                          DBE/November 2018
                                               NSC

QUESTION 6:          REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
                     FLOORS AND QUANTITIES (SPECIFIC)

Start this question on a NEW page.

6.1       Various options are given as possible answers to the following questions.
          Choose the answer and write only the letter (A–D) next to the question
          numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.

          6.1.1        Reinforcement is indicated on a construction drawing according to
                       a code. In the code 9 R 16 01 200, the 200 indicates the …

                       A    diameter of the bar.
                       B    centre-to-centre spacing.
                       C    number of bars in the group.
                       D    bar number.                                                             (1)

          6.1.2        Which of the following is a force that can act on a structure?

                       A    Tensile force
                       B    Compression force
                       C    Shear force
                       D    All the above-mentioned                                                 (1)

          6.1.3        During the planning of a rib and block floor, the following need to
                       be considered:

                       A    Straightness of units
                       B    Water absorbing properties of units
                       C    Nature of props
                       D    Cross bracing for sturdiness                                            (1)

          6.1.4        Steel tube caisson piles make use of a …

                       A    wet concrete plug.
                       B    casing driven into the ground.
                       C    steel tip.
                       D    precast concrete pile.                                                  (1)

          6.1.5        Type of soil where precast piling can be used:

                       A    Soft soil
                       B    Firm soil
                       C    Stable soil
                       D    All the above-mentioned                                                 (1)

Copyright reserved                                                               Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Construction                   14                       DBE/November 2018
                                                NSC

6.2       Use ANSWER SHEET 6.2 and draw a neat sectional view of a square
          reinforced concrete column in good proportion.

          Show the following on your drawing:

              Column
              8 main bars
              Stirrups/Binders
              Minimum concrete cover
              TWO labels                                                                        (10)

6.3       State THREE advantages of using pile foundations.                                      (3)

6.4       Explain the method of installing in situ driven piles.                                 (3)

6.5       FIGURE 6.5 below shows material for a floor component. Study the diagram
          and answer the questions that follow.

                                                                    A

                        B

                                               FIGURE 6.5

          6.5.1        Identify the part in FIGURE 6.5.                                          (1)

          6.5.2        What is the purpose of the hole at A?                                     (1)

          6.5.3        Name the part that will fit in at B.                                      (1)

          6.5.4        Name THREE materials that are used for this type of floor
                       construction.                                                             (3)

          6.5.5        State ONE important safety factor that should be adhered to after
                       the installation of this type of floor construction.                      (1)

          6.5.6        Explain TWO disadvantages of this type of floor construction.             (2)

Copyright reserved                                                            Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Construction                 15                                DBE/November 2018
                                              NSC

6.6       FIGURE 6.6 below shows the floor plan of a storeroom with an opening for a
          door and a window.

                                                                         5 000

                                            8 000

                                             FIGURE 6.6

          SPECIFICATIONS:

              Outside measurements of the storeroom: 8 000 mm x 5 000 mm
              The superstructure is a one-brick wall: 220 mm wide and 2 700 mm high
              Size of the opening for the window: 1 200 mm x 900 mm
              Size of the opening for the door: 2 100 mm x 900 mm

          Use ANSWER SHEET 6.6 and calculate the following:

              Total length of the skirting for the store room (ignore the reveals)                    (6)
              Volume of screed for the floor if the screed is 25 mm thick                             (4)

          Round off your answers to TWO decimal places.
                                                                                                       [40]

                                                                                       TOTAL:          200

Copyright reserved                                                                  Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Construction                              DBE/November 2018
                                                NSC

EXAMINATION NUMBER:

CENTRE NUMBER:

ANSWER SHEET 2

NO.                    QUESTIONS                      ANSWERS               MARKS

  1     Identify FIGURE A.                                                         1

  2     Identify FIGURE B.                                                         1

  3     Identify number 4.                                                         1

  4     Identify number 5.                                                         1

  5     Identify number 9.                                                         1

  6     Identify number 10.                                                        1

  7     Identify number 11.                                                        1

  8     On what date was the plan printed?                                         1

  9     Who drew the building plan?                                                1

        Name the feature in the column for the
 10     notes in FIGURE 2 that must be                                             1
        installed in front of the sliding door.

        Name the feature in the column for the
 11     notes in FIGURE 2 that must give                                           1
        access to the first floor.

        Identify the type of roof that is used for
 12                                                                                1
        the building in FIGURE A.

 13     Explain the purpose of number 1.                                           1

 14     Explain the purpose of number 2.                                           1

Copyright reserved                                              Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Construction                       DBE/November 2018
                                               NSC

        Explain the abbreviation FFL at
 15                                                                        1
        number 6.

 16     Explain the purpose of number 7.                                   1

        Explain the meaning of the arrow on
 17     the feature that must be installed in                              1
        front of the sliding door.

        Explain what is meant by 1 : 10
 18                                                                        1
        indicated on the symbol in the notes.

 19     Which room will feature 15 serve?                                  1

        Explain the short dashed lines on the
 20                                                                        1
        windows.

        Deduce the height of window 2 from
 21                                                                        1
        the window schedule.

        Deduce the width of window 3 from
 22                                                                        1
        the window schedule.

        On what elevation of the building is
 23                                                                        1
        the bathroom window situated?

        Differentiate between component
 24                                                                        2
        number 3 and component number 8.

        Differentiate between the light in the
 25                                                                        2
        lounge and the light in the bathroom.

        Recommend a suitable floor covering
 26                                                                        1
        for the bathroom.

        Recommend an appropriate scale to
 27     which FIGURE A should be drawn,                                    1
        according to SANS.

        Recommend an alternative sanitary
 28     fitment to replace number 11 that will                             1
        serve a similar purpose.

Copyright reserved                                      Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology: Construction                              DBE/November 2018
                                              NSC

        Calculate the internal area of the office
 29                                                                               3
        in m². Show ALL calculations.

        Calculate the perimeter of the building.
 30                                                                               7
        Show ALL calculations.

                                                    TOTAL                         40

Copyright reserved                                             Please turn over

### Page 19

Downloaded from hlayiso.com
Civil Technology: Construction                                 DBE/November 2018
                                          NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 3.7

        ASSESSMENT CRITERIA               MARK   CANDIDATE'S
                                                    MARK
Walls                                      2
Wall plates                                2
Rafters                                    2
Collar beam/Collar tie                     1
Ridge beam correctly drawn                 1
                                 TOTAL:    8

Copyright reserved                                                Please turn over

### Page 20

Downloaded from hlayiso.com
Civil Technology: Construction                                    DBE/November 2018
                                             NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 4.3

                       FIGURE 4.3

        ASSESSMENT CRITERIA                  MARK   CANDIDATE'S
                                                       MARK
Folding wedges                                 1
Walling boards                                 1
Poling boards                                  2
Struts                                         1
Shuttering correctly drawn                     1
Any TWO labels                                 2
                                    TOTAL:     8

Copyright reserved

### Page 21

Downloaded from hlayiso.com
Civil Technology: Construction                                  DBE/November 2018
                                           NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.2

           ASSESSMENT CRITERIA                   MARK   CANDIDATE'S
                                                           MARK
Full bricks and ½ brick every alternate course
                                                  4
on front view
Left view full brick every course                 1
Left view ¼ brick every course                    1
                                      TOTAL:      6

Copyright reserved

### Page 22

Downloaded from hlayiso.com
Civil Technology: Construction                                       DBE/November 2018
                                             NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 5.4

           ASSESSMENT CRITERIA                MARK     CANDIDATE'S
                                                          MARK
Wall: 220 mm wide, face brick                      1
Beam filling                                       1
Wall plate: 114 mm x 38 mm                         1
Tie beam: 114 mm x 38 mm                           1
Rafter: 114 mm x 38 mm                             1
Purlins: 76 mm x 50 mm                             2
Corrugated iron roof covering                      1
Fascia board: 230 mm x 38 mm                       1
Any TWO labels                                     2
Print the scale below the drawing                  1
Application of scale:
One or two incorrect        =3
Three or four incorrect     =2                     3
More than five incorrect    =1
No measurement correct = 0
                                    TOTAL:     15

Copyright reserved

### Page 23

Downloaded from hlayiso.com
Civil Technology: Construction                                  DBE/November 2018
                                          NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.2

        ASSESSMENT CRITERIA                MARK   CANDIDATE'S
                                                     MARK
Column 500 mm x 500 mm                       2
8 main bars                                  2
Binders/Stirrups                             2
Minimum concrete cover                       1
Any TWO labels                               2
Proportion                                   1
                                 TOTAL:     10

Copyright reserved

### Page 24

Downloaded from hlayiso.com
Civil Technology: Construction                                                 DBE/November 2018
                                                 NSC

CENTRE NUMBER:

EXAMINATION NUMBER:

ANSWER SHEET 6.6

 A          B              C                                D
                                      Skirting: Inside length of building

                                                    - __________

                                      =                                        (2)
                                      Skirting: Inside width of the building

                                                    – __________

                                      = _________                               (2)

                                      Total length = ________ + _________x 2

                                      = __________

                                      =                 - __________

                                      = __________ metres of skirting needed
                                                                           (2)

                                      Screed: Inside area of building:
1/
        _______

        _______

        _______ ______           m³   = _________                               (4)

Copyright reserved

## Related documents

- [Civil Technology Nov 2018 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-afr/be54c81a-cc52-4da7-a74c-ec3f0bddf626) — Civil Technology · QP · 2018 · Afr
- [Civil Technology Nov 2018 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-afr/8a4b5aba-d78e-4505-aae9-e127ef45df85) — Civil Technology · QP · 2018 · Afr
- [Civil Technology Nov 2018 (Woodworking) Memo FINAL Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-memo-final-eng/2cdca6a9-a7a6-411c-9a30-4575c8e6a5cf) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology Nov 2018 (Civil Services) FINAL Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-civil-services-final-memo-eng/f4e1d2a3-db17-47d5-8ae8-6332d121a6d3) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology Nov 2018 (Construction) FINAL Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-final-memo-eng/90041771-68e0-4915-bc37-7a4f246b369f) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 QP AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-qp-afr-sept2018-siviele-dienste-d/831c422e-f613-4a8c-adf9-061114273b23) — Civil Technology · QP · 2018 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.