# Civil Technology Grade 12 NSC November 2018 QP (Eng)

> Grade 12 Civil Technology question paper from the NSC November Exam 2018 (English), 26 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-eng/da392f16-6be6-40f4-9e84-c4fa2180d50d
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2018
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 26

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2018 QP (Eng)](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-eng/da392f16-6be6-40f4-9e84-c4fa2180d50d)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2018. Question paper, 26 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                  NATIONAL
                             SENIOR CERTIFICATE

                                   GRADE 12

                      CIVIL TECHNOLOGY: WOODWORKING

                                 NOVEMBER 2018

MARKS: 200

TIME: 3 hours

            This question paper consists of 19 pages and 7 answer sheets.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Woodworking                2                          DBE/November 2018
                                            NSC

REQUIREMENTS:

1.        Drawing instruments

2.        A non-programmable calculator

3.        ANSWER BOOK

INSTRUCTIONS AND INFORMATION

1.        This question paper consists of SIX questions.

2.        Answer ALL the questions.

3.        Answer each question as a whole. Do NOT separate subsections of
          questions.

4.        Start the answer to EACH question on a NEW page.

5.        Do NOT write in the margins of the ANSWER BOOK.

6.        You may use sketches to illustrate your answers.

7.        Write ALL calculations and answers in the ANSWER BOOK or on the
          attached ANSWER SHEETS as required.

8.        Use the mark allocation as a guide to the length of your answers.

9.        Make drawings and sketches in pencil, fully dimensioned and neatly finished
          off with descriptive titles and notes to conform to the SANS/SABS Code of
          Practice for Building Drawings.

10.       For the purpose of this question paper, the size of a brick should be taken as
          220 mm x 110 mm x 75 mm.

11.       Use your own discretion where dimensions and/or details have been omitted.

12.       Answer QUESTIONS 2, 3.5, 5.9, 6.3 and 6.7 on the attached ANSWER
          SHEETS using drawing instruments, where necessary.

13.       Write your CENTRE NUMBER and EXAMINATION NUMBER on every
          ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
          have used them or not.

14.       Drawings in the question paper are NOT to scale due to electronic transfer.

15.       Google Images was used as the source of all photographs and pictures.

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Woodworking                 3                             DBE/November 2018
                                             NSC

QUESTION        1:   OHSA, MATERIALS,            TOOLS,   EQUIPMENT        AND      JOINING
                     (GENERIC)

Start this question on a NEW page.

1.1       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–G) next to the question numbers (1.1.1 to 1.1.5) in the
          ANSWER BOOK, e.g. 1.1.6 H.

                         COLUMN A                                 COLUMN B
           1.1.1     Sole plate              A      not to be used in the proximity of
                                                    electrical wires
           1.1.2     Aluminium ladder
                                             B      to cover iron or steel with a layer of
           1.1.3     Scaffold                       zinc to prevent it from rusting

           1.1.4     Safety net              C      prevents splashing of chemicals

           1.1.5     Galvanising             D      protect metal, wood and other
                                                    materials against corrosion and
                                                    decay

                                             E      prevents falling objects from injuring
                                                    workers

                                             F      prevents vertical standards from
                                                    sinking into the ground

                                             G      should be provided with toe boards
                                                    to prevent objects from falling off
                                                                                      (5 x 1)       (5)

1.2       Describe TWO safety precautions that must be adhered to when working on a
          scaffold.                                                                                 (2)

1.3       What is the purpose of the guard rail of a scaffold in terms of safety?                   (2)

1.4       Explain the purpose of painting.                                                          (2)

1.5       Describe ONE advantage of the curing process of concrete.                                 (1)

Copyright reserved                                                               Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Woodworking                 4                         DBE/November 2018
                                             NSC

1.6       FIGURE 1.6 below shows a tool that is used in the building construction
          industry.

                                                                            A

                                            FIGURE 1.6

          1.6.1       Identify tool A.                                                         (1)

          1.6.2       Explain TWO uses of tool A.                                              (2)

          1.6.3       Explain why the batteries should be removed from the tool if the
                      tool is not going to be used for a long time.                            (1)

1.7       FIGURE 1.7 below shows joining fixtures that are used on building sites and
          in workshops.

                                A                                   B
                                            FIGURE 1.7

          1.7.1       Identify fastener A and fastener B.                                      (2)

          1.7.2       Explain ONE use of fastener A and fastener B respectively.               (2)
                                                                                               [20]

QUESTION 2: GRAPHICS AS METHOD OF COMMUNICATION (GENERIC)

FIGURE 2 on the next page shows different drawings that appear on a building plan.
Analyse the drawings and complete the table on ANSWER SHEET 2.

Copyright reserved                                                          Please turn over

### Page 5

Downloaded from hlayiso.com
     Civil Technology: Woodworking                               5                             DBE/November 2018
                                                                NSC

                                                                            1       NOTES:
                                                                                    Contractors must verify all
                                                                                    dimensions and levels on site before
                                                                                    commencing work. Architects to be
                                                                                    notified immediately of any
                                                                            2       discrepancies.

 7                                                                                  ARCHITECT'S SIGNATURE ………………….
                                                                                    CLIENT'S SIGNATURE ……………….…….
                                                                            3
                                                                                    The following must be placed in
                        W1                      W2                                  front of the sliding door:
                                                                            4
                                                                                                    1 : 10

 8
                                                                            5
                                                W3                                  Access to the first floor must be by
                                                     FFL                    6       means of a:

                                      FIGURE A

                                                                                    REVISION       DATE           DESCRIPTION

                                                                                    PRINTED BY:        DATE OF PRINT:
        220              3 000                 110
220                                                                         220
                                                                                    NKOSI PRINTERS      2018/10/02

                                                                                    DRAWING TITLE:
                                                                                    SITE PLAN STAND 1843

                    9                                                               PROJECT:
                                                                                    PROPOSED DWELLING ON STAND 1843,

2 000                                                                       2 000
                                                                                    DIEPRIVIER
              W4        10 BATHROOM

                        11                                                          PROJECT NO.           DRAWING NO.
          12                                     LOUNGE                             GR 557-102              557P9

         13    W   14                                                                DATE      DRAWN CHECKED            SCALE
                               15
110                                                               W3                25/4/2018 JP MALOI P BRITZ          1 : 100

              W3
                                                                            4 000            REFERENCE CODE
                                                                                                QP 1 - 2018
                             OFFICE

                                                           19                        WINDOW 2                     WINDOW 3
                   16

                                                                                             900                      2 000
                              17          18     W2
                                                                            220      1 200                1 200
                                110             2 800                 220

                                       FIGURE B
                                                                            19

                                                                FIGURE 2                                                   [40]

     Copyright reserved                                                                            Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Woodworking                 6                          DBE/November 2018
                                             NSC

QUESTION 3:          CASEMENTS, CUPBOARDS, WALL-PANELLING AND QUANTITIES
                     (SPECIFIC)

Start this question on a NEW page.

3.1       Give ONE word/term for EACH of the following descriptions by choosing a
          word/term from the list below. Write only the word/term next to the question
          numbers (3.1.1 to 3.1.5) in the ANSWER BOOK, e.g. 3.1.6 Casement.

                  fanlight; 600 mm–650 mm; skirting; tongue and groove boards;
                          frame head; 520 mm–570 mm; window; cornice;
                                    melamine boards; drip groove

          3.1.1       Boards that are usually made of knotty pine and fit easily into one
                      another by means of a specific feature on each side of the board           (1)

          3.1.2       The recommended depth of free-standing cupboards                           (1)

          3.1.3       To close the opening between the wall and the ceiling                      (1)

          3.1.4       Prevent rainwater from being blown into the casement and
                      penetrating the room                                                       (1)

          3.1.5       The small window that is built above the opening of a door or
                      window                                                                     (1)

Copyright reserved                                                            Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Woodworking                7                    DBE/November 2018
                                            NSC

3.2       FIGURE 3.2 below shows an external elevation of a double casement with
          fanlights. Study the picture and answer the questions that follow.

                                                                 A

                                                                 B

                                                                 C

                                       FIGURE 3.2

          3.2.1       What type of material can be used for part A and part B
                      respectively?                                                     (2)

          3.2.2       Explain the purpose of C.                                         (1)

Copyright reserved                                                   Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Woodworking                    8                       DBE/November 2018
                                                NSC

3.3       FIGURE 3.3 below shows the inside of a built-in cupboard without doors.
          Study the drawing and answer the questions that follow.

                                                                     E

                                    A                  A

                                    C
                                                                     F
                                    C                  B
                                                                     G
                                    C                                G

                                        D
                                        D
                                                                     H
                                                                     G

                                               FIGURE 3.3

          3.3.1       A well-designed cupboard should consist of four main parts/units.
                      Name parts/units A to D in the drawing above.                            (4)

          3.3.2       Justify the use of melamine rather than plain chipboard for the
                      inside of a built-in cupboard.                                           (1)

          3.3.3       Identify parts E to H.                                                   (4)

Copyright reserved                                                          Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Woodworking                   9                        DBE/November 2018
                                               NSC

3.4       FIGURE 3.4 below shows the sectional view of a tongue and groove wall
          panel from the floor to the ceiling, fastened to a 110 mm thick wall. Study the
          drawing and answer the questions that follow.

                                                     A

                                                     110 mm brick wall

                                                     wall panel

                                                     B

                                                     C

                                          FIGURE 3.4

          3.4.1       Identify parts A to C.                                                    (3)

          3.4.2       Give TWO reasons for panelling a wall.                                    (2)

Copyright reserved                                                           Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Woodworking                       10                   DBE/November 2018
                                                   NSC

3.5            FIGURE 3.5 below shows the floor plan of a building with a gable roof.
               The external measurements are 9 000 mm x 5 000 mm.

       5 000

                                                                                   500
                                                                             150

                                                      9 000

                                                   FIGURE 3.5

               Use the following specifications:

                  Walls are 220 mm thick
                  Type of roof – South African (Howe) roof
                  Centre-to-centre spacing between purlins = 900 mm
                  True length of rafter (principal rafter) = 3 600 mm

               Use ANSWER SHEET 3.5 and calculate the following:

               3.5.1      Length of the wall plates                                            (4)

               3.5.2      Number of purlins needed                                             (4)
                                                                                               [30]

Copyright reserved                                                          Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Woodworking                 11                          DBE/November 2018
                                             NSC

QUESTION 4:          ROOFS, CEILINGS, TOOLS AND EQUIPMENT, AND MATERIALS
                     (SPECIFIC)

Start this question on a NEW page.

4.1       Choose a description from COLUMN B that matches an item in COLUMN A.
          Write only the letter (A–H) next to the question numbers (4.1.1 to 4.1.5) in the
          ANSWER BOOK, e.g. 4.1.6 J.

                     COLUMN A                              COLUMN B
           4.1.1      King post          A    placed and attached perpendicularly to
                                              the rafters to support the roof sheeting
           4.1.2      Purlin                  metal

           4.1.3      Eaves              B    always check the tension of the blade

           4.1.4      Jig saw            C    is attached at right angles to the tie beam

           4.1.5      Wax                D    the portion of a roof that projects beyond
                                              the outside walls of a building

                                         E    used to cut out circles in a piece of wood

                                         F    suitable for indoor use after the wood
                                              has been treated with other finishes

                                         G    available in a glossy to matt finish

                                         H    can be applied by hand or with a spray
                                              gun
                                                                                  (5 x 1)        (5)

Copyright reserved                                                            Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Woodworking                   12                           DBE/November 2018
                                               NSC

4.2       FIGURE 4.2 below shows a pictorial view of a roof with a hipped end and a
          gable end with a valley. The roof will be covered with corrugated iron
          sheeting. Study FIGURE 4.2 below and answer the questions that follow.

                                                    C
                                    B
                                                                         D

                     A
                                                                                       E

                                                                                        F

                                              FIGURE 4.2

          4.2.1          Identify members A to F.                                                  (6)

          4.2.2          What are the breadth and thickness of part B in mm?                       (1)

4.3       Explain why the corrugated iron sheeting is protruding 50 mm over the end of
          the rafter.                                                                              (1)

4.4       Explain TWO characteristics of a good roof covering.                                     (2)

4.5       Differentiate between the profiles of IBR sheeting and corrugated iron
          sheeting by means of single-line sketches. Name EACH sketch.                             (4)

4.6       Describe TWO advantages a steel roof sheet.                                              (2)

4.7       Explain the consequences if roof underlay is not installed under roof covering.          (2)

Copyright reserved                                                              Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Woodworking                 13                          DBE/November 2018
                                             NSC

4.8       FIGURE 4.8 below shows a sectional view of a conventional trap door. Study
          the sketch en give ONE word/term for each letter (A to D) by choosing a
          word/term from the list below. Write only the word/term next to the letter (A–D)
          in the ANSWER BOOK, e.g. E – Rafter.

           tie beam; rafter; strut; brandering; trap door; ceiling board; cover strip

                                    A                         B

                                         C                   D

                                        FIGURE 4.8                                               (4)

4.9       FIGURE 4.9 below shows two woodworking machines. Study the pictures and
          answer the questions that follow.

                                A                                   B
                                             FIGURE 4.9

          4.9.1       Identify machines A and B.                                                 (2)

          4.9.2       Recommend TWO ways of storing A after use.                                 (2)

          4.9.3       What aspects would you take into consideration when taking care
                      of B?                                                                      (2)

          4.9.4       Name THREE types of woodworking machines that you can use to
                      cut wood.                                                                  (3)

Copyright reserved                                                            Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Woodworking                 14                           DBE/November 2018
                                             NSC

4.10      FIGURE 4.10 below shows two graded wooden planks.

                        M           6                         V             6

                                             FIGURE 4.10

          4.10.1      Explain the grading of each plank as indicated by the letters.               (2)

          4.10.2      Explain the number on each plank.                                            (1)

          4.10.3      Name the symbol that indicates that grading has been done, but
                      which is missing on each plank.                                              (1)
                                                                                                   [40]

Copyright reserved                                                              Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Woodworking               15                          DBE/November 2018
                                           NSC

QUESTION 5:          CENTERING, FORMWORK, SHORING AND GRAPHICS                         AS
                     MEANS OF COMMUNICATION (SPECIFIC)

Start this question on a NEW page.

5.1       FIGURE 5.1 below shows a vertical sectional view through formwork for two
          concrete beams. Study FIGURE 5.1 and identify members A to D. Write only
          the answer next to the letter (A–D) in the ANSWER BOOK, e.g. E – Rib.

                                                                            A

                                                                            B

                                                                            C

                                                                            D

                                      FIGURE 5.1                                               (4)

5.2       Recommend FOUR wooden board products that can be used as sides for
          formwork.                                                                            (4)

5.3       Explain the purpose of folding wedges during the construction of formwork.           (3)

5.4       Explain the reason why the bottom soffit board in the construction of formwork
          for a concrete beam is thicker than the sides of the formwork.                       (1)

Copyright reserved                                                          Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Woodworking                   16                        DBE/November 2018
                                               NSC

5.5       FIGURE 5.5 below shows a pictorial view of closed laggings. Study the
          picture and answer the questions that follow.

                                   A
                                   B
                                   B

                                   C
                                   D

                                            FIGURE 5.5

          5.5.1       Identify parts A to C.                                                     (3)

          5.5.2       Explain ONE use of A if it is used in a closed position, as shown in
                      FIGURE 5.5.                                                                (1)

          5.5.3       Name ONE other position in which A can be used in laggings.                (1)

5.6       Explain ONE use of the following shores:

          5.6.1       Dead shore                                                                 (1)

          5.6.2       Double-flying shore                                                        (1)

5.7       Describe the function of the following components of a dead shore:

          5.7.1       Steel dog                                                                  (1)

          5.7.2       Prop/Strut                                                                 (1)

          5.7.3       Sole plate                                                                 (1)

5.8       At what angle must the braces above and beneath the horizontal shores be
          placed on a double-flying shore?                                                       (1)

5.9       Use ANSWER SHEET 5.9 and draw a neat line diagram of a couple roof truss
          on top of the indicated walls. The slope of the roof truss is 45°.

          Show the following on the drawing:

              The span by means of dimension lines
              Wall plates
              Rafters
              Ridge beam
              Slope of the roof                                                                 (7)
                                                                                                 [30]

Copyright reserved                                                            Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Woodworking                 17                          DBE/November 2018
                                             NSC

QUESTION 6:          SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
                     AND JOINING (SPECIFIC)

Start this question on a NEW page.

6.1       Various options are given as possible answers to the following questions.
          Choose the answer and write only the letter (A–D) next to the question
          numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.

          6.1.1       The spacing between the floor joists …

                      A   will not affect the strength of the suspended floor.
                      B   depends on the thickness of the joist.
                      C   depends on the availability of timber planks.
                      D   should be 400 mm to 600 mm from centre to centre.                      (1)

          6.1.2       Suspended timber floors …

                      A   can only be used on upper levels.
                      B   can be placed directly on the floor.
                      C   can be used on ground levels or upper levels.
                      D   do not need any air bricks or vents underneath the floor.              (1)

          6.1.3       Floorboards should have a ...

                      A   mortice and tenon joint along the edges.
                      B   tongue along the one edge and a groove along the other edge.
                      C   clearance of at least 50 mm from the plaster or the wall.
                      D   width of at least 40 mm and not exceed 180 mm.                         (1)

          6.1.4       A framed ledged and braced batten door …

                      A   can be used for back doors (kitchen).
                      B   has solid panels.
                      C   has braces of 40 mm.
                      D   can be made of board products.                                         (1)

          6.1.5       A three-panel door with raised and fielded panels …

                      A   is ideal for the front entrance of a house.
                      B   should not be less than 1 000 mm away from the wall.
                      C   should have a total length of 1 800 mm.
                      D   has no lock rail.                                                      (1)

Copyright reserved                                                            Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology: Woodworking                   18                       DBE/November 2018
                                               NSC

6.2       At suspended floors of multistorey buildings there are two methods that are
          commonly used to fix the ends of the floor joist to the walls.

          Differentiate between the TWO methods by means of neat freehand sketches.
          Write the name of the method below EACH drawing.                                      (4)

6.3       FIGURE 6.3 on ANSWER SHEET 6.3 shows the foundation, NGL and the
          starting point of the wall of a brick pier. Use ANSWER SHEET 6.3 and draw a
          neat sketch, in good proportion, of a sectional view of a suspended timber
          floor that is supported by brick piers.

          Show the following on your drawing:

              One-brick pier
              DPC
              Antguard
              Bearer
              Part of the floor joist on both sides of the brick pier
              Floor boards                                                                     (6)

  6.4     Draw a neat line diagram, in good proportion, of a staircase in your ANSWER
          BOOK.

          Show the following on your drawing:

              Landing
              Rise
              Tread/Going
              Newel/Newel post
              Handrail                                                                         (5)

6.5       Explain the purpose of the landing in a staircase.                                    (2)

6.6       The lock is an important part of a door. On which part of a three-panel door or
          door frame will you mount the following parts of a lock?

          6.6.1       Box lock/Casing                                                           (1)

          6.6.2       Back plate/Striker plate                                                  (1)

          6.6.3       Keeper                                                                    (1)

          6.6.4       Night lock                                                                (1)

6.7       Use ANSWER SHEET 6.7 and draw neat top views of a raised panel and a
          raised and fielded panel in the given spaces.                                         (4)

Copyright reserved                                                           Please turn over

### Page 19

Downloaded from hlayiso.com
Civil Technology: Woodworking                   19                      DBE/November 2018
                                               NSC

6.8       Explain the purpose of opening A in FIGURE 6.8 below.

                                               A

                                           FIGURE 6.8                                       (1)

6.9       Study FIGURE 6.9 below which shows the inside bottom corner of a framed
          ledge and braced batten door. Identify members A to C.

                                                     A

                                                                    B

                     C

                                            FIGURE 6.9                                      (3)

6.10      Use the descriptions below and explain the method of joining the
          components. Write only the answer next to the question number in your
          ANSWER BOOK.

          6.10.1      Door to door frame                                                    (1)

          6.10.2      Ceiling board to ceiling battens/brandering                           (1)

          6.10.3      Brandering to tie beam                                                (1)

          6.10.4      Adjacent members of a roof truss                                      (1)

6.11      State TWO methods that can be used to fix opening window frames to the
          jambs of casements.                                                               (2)
                                                                                            [40]
                                                                             TOTAL:         200

Copyright reserved

### Page 20

Downloaded from hlayiso.com
Civil Technology: Woodworking                             DBE/November 2018
                                              NSC

EXAMINATION NUMBER:

CENTRE NUMBER:

ANSWER SHEET 2

NO.                   QUESTIONS                     ANSWERS             MARKS

  1    Identify FIGURE A.                                                     1

  2    Identify FIGURE B.                                                     1

  3    Identify number 4.                                                     1

  4    Identify number 5.                                                     1

  5    Identify number 9.                                                     1

  6    Identify number 10.                                                    1

  7    Identify number 11.                                                    1

  8    On what date was the plan printed?                                     1

  9    Who drew the building plan?                                            1

       Name the feature in the column for the
 10    notes in FIGURE 2 that must be                                         1
       installed in front of the sliding door.

       Name the feature in the column for the
 11    notes in FIGURE 2 that must give                                       1
       access to the first floor.

       Identify the type of roof that is used for
 12                                                                           1
       the building in FIGURE A.

 13    Explain the purpose of number 1.                                       1

 14    Explain the purpose of number 2.                                       1

Copyright reserved

### Page 21

Downloaded from hlayiso.com
Civil Technology: Woodworking                       DBE/November 2018
                                              NSC

       Explain the abbreviation FFL at
 15                                                                     1
       number 6.

 16    Explain the purpose of number 7.                                 1

       Explain the meaning of the arrow on
 17    the feature that must be installed in                            1
       front of the sliding door.

       Explain what is meant by 1 : 10
 18                                                                     1
       indicated on the symbol in the notes.

 19    Which room will feature 15 serve?                                1

       Explain the short dashed lines on the
 20                                                                     1
       windows.

       Deduce the height of window 2 from
 21                                                                     1
       the window schedule.

       Deduce the width of window 3 from
 22                                                                     1
       the window schedule.

       On what elevation of the building is
 23                                                                     1
       the bathroom window situated?

       Differentiate between component
 24                                                                     2
       number 3 and component number 8.

       Differentiate between the light in the
 25                                                                     2
       lounge and the light in the bathroom.

       Recommend a suitable floor covering
 26                                                                     1
       for the bathroom.

       Recommend an appropriate scale to
 27    which FIGURE A should be drawn,                                  1
       according to SANS.

       Recommend an alternative sanitary
 28    fitment to replace number 11 that will                           1
       serve a similar purpose.

Copyright reserved

### Page 22

Downloaded from hlayiso.com
Civil Technology: Woodworking                              DBE/November 2018
                                             NSC

       Calculate the internal area of the office
 29                                                                            3
       in m². Show ALL calculations.

       Calculate the perimeter of the building.
 30                                                                            7
       Show ALL calculations.

                                                   TOTAL                       40

Copyright reserved

### Page 23

Downloaded from hlayiso.com
Civil Technology: Woodworking                                   DBE/November 2018
                                      NSC

EXAMINATION NUMBER:

CENTRE NUMBER:

ANSWER SHEET 3.5

          A     B          C    D
3.5.1                           Internal measurements of long walls:
                                = _________ - _________ =

                                Length of wall plates needed:
          __/ _______ _______

3.5.2                           Number of purlins needed
                                Number of purlins =      Length of rafter    +1
                                                    Distance between centres
                                                  = __________

                                                 =
                                                 =              purlins

                                                                              (8)

Copyright reserved

### Page 24

Downloaded from hlayiso.com
Civil Technology: Woodworking                        DBE/November 2018
                                       NSC

EXAMINATION NUMBER:

CENTRE NUMBER:

ANSWER SHEET 5.9

                                       CANDIDATE'S
 ASSESSMENT CRITERIA            MARK
                                         MARK
Span                             1
Wall plates                      2
Rafters                          2
Ridge beam                       1
Slope of roof                    1
                       TOTAL:    7

Copyright reserved

### Page 25

Downloaded from hlayiso.com
Civil Technology: Woodworking                         DBE/November 2018
                                       NSC

EXAMINATION NUMBER:

CENTRE NUMBER:

ANSWER SHEET 6.3

                                                      NGL

DRAWING NOT TO SCALE

                                        CANDIDATE'S
 ASSESSMENT CRITERIA            MARK
                                           MARK
ONE one-brick pier               1
NGL                              1
Ant guard                        1
Bearer                           1
Joist                            1
Floor boards                     1
                       TOTAL:    6

Copyright reserved

### Page 26

Downloaded from hlayiso.com
Civil Technology: Woodworking                                   DBE/November 2018
                                       NSC

EXAMINATION NUMBER:

CENTRE NUMBER:

ANSWER SHEET 6.7

       Raised panel/Front view               Raised and fielded panel/Front view

              Top view                                  Top view

DRAWING NOT TO SCALE

                                               CANDIDATE'S
      ASSESSMENT CRITERIA             MARK
                                                  MARK
Raised panel top view                  2
Raised and fielded panel top view      2
                             TOTAL:    4

Copyright reserved

## Related documents

- [Civil Technology Nov 2018 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-afr/be54c81a-cc52-4da7-a74c-ec3f0bddf626) — Civil Technology · QP · 2018 · Afr
- [Civil Technology Nov 2018 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-afr/8a4b5aba-d78e-4505-aae9-e127ef45df85) — Civil Technology · QP · 2018 · Afr
- [Civil Technology Nov 2018 (Woodworking) Memo FINAL Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-memo-final-eng/2cdca6a9-a7a6-411c-9a30-4575c8e6a5cf) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology Nov 2018 (Civil Services) FINAL Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-civil-services-final-memo-eng/f4e1d2a3-db17-47d5-8ae8-6332d121a6d3) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology Nov 2018 (Construction) FINAL Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-final-memo-eng/90041771-68e0-4915-bc37-7a4f246b369f) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 QP AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-qp-afr-sept2018-siviele-dienste-d/831c422e-f613-4a8c-adf9-061114273b23) — Civil Technology · QP · 2018 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng