# Civil Technology Grade 12 NSC November 2018 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2018 (English), 19 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-memo-final-eng/2cdca6a9-a7a6-411c-9a30-4575c8e6a5cf
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2018
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 19

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2018 Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-memo-final-eng/2cdca6a9-a7a6-411c-9a30-4575c8e6a5cf)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2018. Memorandum, 19 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                     GRAAD 12

                                   NATIONAL
                              SENIOR CERTIFICATE

                                     GRADE 12

                       CIVIL TECHNOLOGY: WOODWORKING

                                   NOVEMBER 2018

                                MARKING GUIDELINES

MARKS: 200

                      These marking guidelines consist of 19 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Woodworking                    2                           DBE/November 2018
                                      NSC – Marking Guidelines

QUESTION          1:   OHSA, MATERIALS,         TOOLS,      EQUIPMENT      AND    JOINING
                       (GENERIC)

1.1
          1.1.1         F                                                                          (1)

          1.1.2         A                                                                          (1)

          1.1.3         G                                                                          (1)

          1.1.4         E                                                                          (1)

          1.1.5         B                                                                          (1)

1.2           •    Do not throw any tools or materials from a scaffold. 
              •    Never jump on to and off a scaffold. 
              •    Never overload a scaffold.
              •    Remove or cover sharp edges or corners.
              •    Always attach free-standing scaffoldings to a building.
              •    Use a ladder to get on and off a scaffold.
              •    Keep free of waste or any other obstruction.
              •    Never jump on a scaffold while working on it.
              •    Responsible/qualified person must ensure that scaffolding is safe, rigid,
                   stable and firm or has no defects.
              •    Scaffold must be supplied with guard rails/toe boards.
              •    Scaffolds must be levelled on uneven ground.
              •    Do not work on a scaffold in bad weather.
              •    Wear a safety harness when working on scaffolding.
              •    Do not throw tools on/off a scaffold.

          ANY TWO OF THE ABOVE                                                                      (2)

1.3           •    It prevents workers from falling off the scaffold. 
              •    It is used as a handrail. 
              •    It is used to strap on safety harnesses.
              •    To protect the worker working on the scaffold.

          ANY TWO OF THE ABOVE                                                                      (2)
1.4       •   The primary purpose of painting is to protect metals, wood and other
              material against corrosion and decay. 
          •   Provides a decorative/aesthetic appearance/finishing. 
          •   Protects surfaces from moisture penetration.
          •   Protects surfaces from rust/uv rays.

          ANY TWO OF THE ABOVE                                                                      (2)

Copyright reserved                                                               Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Woodworking                  3                           DBE/November 2018
                                    NSC – Marking Guidelines

1.5       The curing of concrete:
          • Increases the strength of concrete. 
          • Decreases the permeability of hardened concrete.
          • Improves durability of concrete by reducing cracks.
          • Makes concrete more watertight.
          • Minimises shrinkage cracks in concrete.
          • Provides volume stability.
          • Cured concrete can carry more weight without breaking/crumbling
             than uncured concrete.
          • Prevents rapid drying of concrete.
          • Curing ensures that the hydration process continues.

          ANY ONE OF THE ABOVE                                                                     (1)

1.6

          1.6.1       Multi detector                                                              (1)

          1.6.2       Tool A is used:
                      • to detect materials found in/behind walls, ceilings and
                         underneath floors, including ferrous and non-ferrous metals,
                        electrical wiring, wood and metal studs. 
                      • to locate steel bars and copper pipes. 
                      • in carpentry, plumbing, and construction.
                      • to measure the distance to/from covered objects.

                      ANY TWO OF THE ABOVE                                                         (2)

          1.6.3       The batteries must be removed from the tool:
                      • to prevent the battery from running flat/battery can die. 
                      • to prevent acid leaks from batteries damaging the tool.

                      ANY ONE OF THE ABOVE                                                         (1)

1.7

          1.7.1       A – Bolt and nut/Bolt 
                      B – Rawl bolt                                                               (2)

          1.7.2       Bolt and nut
                      • Bolts and nuts are used to secure pipe supports to metal
                         parts. 
                      • To join components together.
                      Rawl bolt
                      • A Rawl bolt is used to fix a truss hanger to a wall. 
                      • To fix brackets/structures/panels to a wall/concrete.
                      • For construction, renovation and industrial work

                      ANY TWO OF THE ABOVE                                                         (2)
                                                                                                   [20]

Copyright reserved                                                              Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Woodworking                  4                             DBE/November 2018
                                    NSC – Marking Guidelines

QUESTION 2: GRAPHICS AS METHOD OF COMMUNICATION (GENERIC)

ANSWER SHEET 2
NO.                   QUESTIONS                                  ANSWERS                    MARKS

  1    Identify FIGURE A.                           South Elevation/Elevation                   1

  2    Identify FIGURE B.                           Ground floor plan/Floorplan                 1

                                                    First floor level/Second floor
  3    Identify number 4.                           level/Suspended floor/Floor level/           1
                                                    Dash line/ FFL/Expansion joint 

  4    Identify number 5.                           Window Sill                                 1

                                                    Hand wash basin/Wash
  5    Identify number 9.                                                                        1
                                                    basin/Washing basin/HWB/Basin 

  6    Identify number 10.                          Water closet/WC/Toilet pan                  1

  7    Identify number 11.                          Bath/B                                      1

  8    On what date was the plan printed?           2018/10/02                                  1

  9    Who drew the building plan?                  JP Maloi                                    1

       Name the feature in the column for the
 10    notes in FIGURE 2 that must be          Ramp                                             1
       installed in front of the sliding door.

       Name the feature in the column for the
 11    notes in FIGURE 2 that must give       Staircase/Stairs/Stairway                         1
       access to the first floor.

       Identify the type of roof that is used for
 12                                                 Gable roof                                  1
       the building in FIGURE A.

                                                    To cover the opening/close the gap
                                                    between the two slopes of the roof.
                                                    
 13    Explain the purpose of number 1.             Prevent water and other elements             1
                                                    from entering the roof.
                                                    ANY ONE OF THE ABOVE

Copyright reserved                                                                Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology: Woodworking                 5                             DBE/November 2018
                                   NSC – Marking Guidelines

                                                 •    To prevent water from falling
                                                      onto the ground 
                                                 •    To collect rainwater
                                                 •    To channel the rainwater into
                                                      the downpipe
 14    Explain the purpose of number 2.          •    To protect the wall from water            1
                                                 •    To hide the rafters/finish off the
                                                      roof
                                                 ANY ONE OF THE ABOVE

       Explain the abbreviation FFL at
 15                                              Finished floor level                          1
       number 6.

                                                 To channel the water from the gutter
 16    Explain the purpose of number 7.                                                         1
                                                 to the ground. 

       Explain the meaning of the arrow on
                                                 It indicates the direction of the slope
 17    the feature that must be installed in                                                    1
                                                 of the ramp/it indicates the slope. 
       front of the sliding door.

                                                 It indicates the slope or the gradient
       Explain what is meant by 1:10             of the ramp/for every 10 metres
 18                                                                                             1
       indicated on the symbol in the notes.     horizontally rises 1 metre
                                                 vertically.

 19    Which room will feature 15 serve?         The bathroom.                                 1

                                                 •    Indicates what direction the
                                                      window is opening/window
                                                      opening. 
       Explain the short dash lines on the       •    Indicates the location of the
 20                                                   hinges.                                   1
       windows.
                                                 •    Indicates the location of the
                                                      casement stay.
                                                 ANY ONE OF THE ABOVE

       Deduce the height of window 2 from
 21                                              1,2 m or 1 200 mm (Ignore units)              1
       the window schedule.

       Deduce the width of window 3 from
 22                                              2 m or 2 000 mm (Ignore units)                1
       the window schedule.

       On what elevation of the building is
 23                                              Western elevation/Western side                1
       the bathroom window situated?

Copyright reserved                                                               Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Woodworking                  6                               DBE/November 2018
                                    NSC – Marking Guidelines

                                                  3 – window/window frame/reveal
       Differentiate between component            frame stile/casement stile 
 24                                                                                                2
       number 3 and component number 8.           8 – sliding door /door frame/
                                                  door/reveal /sliding door stile 

                                                  The light in the lounge is a
                                                  fluorescent light/1 x 40W-/2x40-
       Differentiate between the light in the
 25                                               /3x40 fluorescent light  and the                2
       lounge and the light in the bathroom.
                                                  light in the bathroom is a normal
                                                  ceiling light 

                                                  Tile/ Vinyl flooring(Novilon)/
                                                  Coloured screed/Polished or stained
       Recommend a suitable floor covering        concrete flooring/Water proof
 26                                                                                                1
       for the bathroom.                          laminated floor/carpet. 
                                                  ANY ACCEPTABLE ANSWER

       Recommend an appropriate scale to
 27    which FIGURE A should be drawn,            1:50/100/200                                    1
       according to SANS.

       Recommend an alternative sanitary
 28    fitment to replace number 11 that will     Shower                                          1
       serve a similar purpose.

       Calculate the internal area of the office 4 m  x 3 m  = 12 m²  OR 12
 29                                                                                                3
       in m² Show ALL calculations.              4 000 X 3 000 = 12 000 000mm2
                                                  Positive marking

                                                   (220 + 3 000 + 110 + 2 800 + 220)  x 2 

                                                  = 6 350 x 2

                                                  =12 700 mm 

       Calculate the perimeter of the building. (220 + 4 000 + 110 + 2 000 + 220)  x 2 
 30                                               = 6 550 x 2
                                                                                                   7
        Show ALL calculations.
                                                  = 13 100 mm 

                                                  12 700 + 13 100 mm

                                                  = 25 800 mm  OR

                                                  = 25,8 m

                                                                                   TOTAL          40

Copyright reserved                                                                  Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Woodworking                      7                             DBE/November 2018
                                        NSC – Marking Guidelines

QUESTION 3:          CASEMENTS, CUPBOARDS, WALL-PANELLING AND QUANTITIES
                     (SPECIFIC)
3.1
          3.1.1       Tongue and groove boards                                                        (1)

          3.1.2       520 mm - 570 mm                                                                 (1)

          3.1.3       Cornice                                                                         (1)

          3.1.4       Drip groove                                                                     (1)

          3.1.5       Fanlight                                                                        (1)

3.2
          3.2.1          • A – Wood/Timber                                                            (1)
                         • B – Glass/Perspex                                                          (1)

          3.2.2       This part is holding the glass/pane in its place.                               (1)

3.3
          3.3.1          •   A Storage space/top unit 
                         •   B Hanging space 
                         •   C Shelves/storage space/shelf 
                         •   D Drawers                                                                (4)

          3.3.2                 Melamine:
                         •      is waterproof. 
                         •      is easier to clean.
                         •      is more durable.
                         •      enhance inside appearance.
                         •      has a smooth finish.
                                OR
                                Chipboard:
                         •      Is not water proof
                         •      Is not easy to clean
                         •      Is less durable
                         •      Does not enhance the inner appearance
                         •      Is not as smooth                                                       (1)
                      ANY ONE OF THE ABOVE

          3.3.3          •      E – Front rail/Top rail 
                         •      F – Oval hanging rail/Hanging rail/Pipe rail 
                         •      G – Side 
                         •      H – Kick plate/base/Bottom rail/Plinth                                (4)

Copyright reserved                                                                  Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Woodworking                   8                            DBE/November 2018
                                     NSC – Marking Guidelines

3.4

         3.4.1           •   A – Cornice 
                         •   B – Horizontal rough grounds 
                         •   C – Quarter round/Quadrant                                            (3)

         3.4.2           •   To enhance appearance. 
                         •   To give an aesthetic appearance. 
                         •   There is no need to plaster the wall where panelling is to
                             be done.
                         •   It serves as insulation against sound and heat.
                         •   For durability

                     ANY TWO OF THE ABOVE
                                                                                                    (2)

Copyright reserved                                                               Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Woodworking                    9                         DBE/November 2018
                                      NSC – Marking Guidelines

3.5

           A     B              C       D
3.5.1                                   Internal measurements of long walls:
                                        = 9 000 – 2/220 = 8 560 mm 
                                        OR
                                        = 9 000 - 440    = 8 560 mm

                                        Length of wall plates needed:
           2/ 8,56            17,12  17,12 m wall plate needed
3.5.2                                                                                             (4)

                                        Number of purlins needed
                                        Number of purlins = Length of rafter        +1
                                                        Distance between centres
                                                  = 3,6  + 1      OR        3 600 + 1
                                                     0,9                    900
                                                          = (4 + 1) 2 OR (5x2)
                                                          = 10 purlins 
                                                                                                  (4)
                                                                                                  [30]

Copyright reserved                                                             Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Woodworking                  10                           DBE/November 2018
                                     NSC – Marking Guidelines

QUESTION 4:          ROOFS, CEILINGS, TOOLS AND EQUIPMENT, AND MATERIALS
                     (SPECIFIC)

4.1

          4.1.1       C                                                                          (1)

          4.1.2       A                                                                          (1)

          4.1.3       D                                                                          (1)

          4.1.4       E                                                                          (1)

          4.1.5       F                                                                          (1)

4.2

          4.2.1        •   A Hipped end 
                       •   B Purlin 
                       •   C Ridge/Ridge plate 
                       •   D Valley rafter/Valley 
                       •   E Overhang/Eaves overhang 
                       •   F Gable end/Gable wall/Wall/Side of building                          (6)

          4.2.2       76 mm x 50 mm 
                      76 mm x 76 mm

          ANY ONE OF THE ABOVE                                                                    (1)

4.3           •   It allows rain water to be directed into the gutter. 
              •   So that water does not damage the end of the rafters.
                                                                                                  (1)
          ANY TWO OF THE ABOVE

4.4           •   A good roof covering must be able to resist weather conditions such as
                  rain and wind/resistance against corrosion. 
              •   Should look durable and enhances the appearance of the building. 
              •   Should be fire resistant.
              •   Should provide insulation against heat and cold.

          ANY TWO OF THE ABOVE                                                                    (2)

Copyright reserved                                                             Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Woodworking                  11                             DBE/November 2018
                                     NSC – Marking Guidelines

4.5
                                                                               

                       IBR sheeting                   Corrugated iron sheeting                       (4)

4.6       •    The installation of steel roofing is faster. 
          •    The installation of steel roofing is more economical. 
          •    The installation of steel roofing is simpler.
          •    Steel roof covering is cheaper than tiles.
          •    Steel roof covering is environment friendly.

          ANY TWO OF THE ABOVE                                                                         (2)

4.7       •    If roof underlay is not installed there will be more dust inside the roof
               space. 
          •    If roof underlay is not installed, the roof may not be fully
               waterproof. 
          •    The risk of wind lifting tiles becomes greater.
          •    Insulating would not be good.
          ANY TWO OF THE ABOVE                                                                         (2)

4.8       •    A - Tie beam 
          •    B - Brandering 
          •    C - Trapdoor 
          •    D - Cover strip                                                                        (4)

          4.9.1       •   A – Router 
                      •   B – Combination belt and disc sander.                                       (2)

          4.9.2       Store in a safe, dry place. 
                      Store it in a wooden or plastic box away from moisture.                         (2)

          4.9.3       •   Maintain like all machinery – lubricate and adjust according to
                          the manufacturer’s instructions. 
                      •   Clean the belt/disc sander after use. 
                      •   Repair or replace damaged electrical cords.
                      •   Handle the sander so as not to damage or impair its accuracy.
                      •   Use machinery only for the intended purpose.
                      •   Do not force material onto the belt/disc of the sander.
                      •   Avoid the use of worn out (clogged) belts and discs.
                      •   Service the machine regularly.
                      ANY TWO OF THE ABOVE                                                             (2)

Copyright reserved                                                                  Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Woodworking                 12                 DBE/November 2018
                                    NSC – Marking Guidelines

          4.9.4       •   Table saw/Circular saw/Mitre saw 
                      •   Band saw 
                      •   Radial arm saw 
                      •   Jigsaw
                      •   Scroll saw

                      ANY THREE OF THE ABOVE                                           (3)

          4.10.1      M – Mechanical grading 

                      V – Visual grading                                              (2)

          4.10.2      6 - The number indicates the strength.                          (1)

          4.10.3      The SABS symbol. 

                                                                                       (1)
                                                                                       [40]

Copyright reserved                                                  Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Woodworking                    13                         DBE/November 2018
                                       NSC – Marking Guidelines

QUESTION 5:          CENTERING, FORMWORK, SHORING AND GRAPHICS                          AS
                     MEANS OF COMMUNICATION (SPECIFIC)
5.1       A - Concrete beam/Concrete 
          B - Brace/Strut 
          C - Prop/Adjustable prop 
          D - Sole plate                                                                          (4)
5.2           •   Block board 
              •   Laminated board 
              •   Shutter board 
              •   Plywood 
              •   Timber
              •   Hard board/Masonite
          ANY FOUR OF THE ABOVE                                                                    (4)
5.3           •   Wedges are inserted under the bearers and props to support the
                  formwork. 
              •   Wedges keep the different formwork components sturdy and fixed. 
              •   Wedges help with the lowering and raising of the formwork. 
              •   Wedges are used for the levelling of the formwork.
              •   Wedges ease the striking of formwork.
          ANY THREE OF THE ABOVE                                                                   (3)
5.4           •      It supports more weight. 
              •      Support the weight of the fresh concrete.
          ANY ONE OF THE ABOVE                                                                     (1)
5.5       5.5.1             •   A – Laggings 
                            •   B – Ribs 
                            •   C – Bearer                                                        (3)

          5.5.2         Brick arches because they have a solid surface.                           (1)

          5.5.3         Openly spaced laggings/Open laggings/Open 
                        Laggings are not close to each other.                                      (1)
                        There are spacing’s between the openings of the laggings.

          ANY ONE OF THE ABOVE

5.6       5.6.1             •   Dead shores are used to support structures. 
                            •   Dead shores carry dead weight above the dead shores, e.g.
                                walls, floors.
                            •   Support existent walls if openings are made.
                            •   Transfer the weight of the structure to firm ground during
                                structural renovations.
                            •   Support a wall if alterations are made.

                        ANY ONE OF THE ABOVE                                                       (1)
Copyright reserved                                                              Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Woodworking                  14                          DBE/November 2018
                                     NSC – Marking Guidelines

          5.6.2       Double flying shores provide temporary support to TWO parallel
                      walls where one or two walls show signs of failure. 
                      Double flying shores give temporary support to TWO parallel
                      defective walls.
                      Double flying shores can only be used with TWO parallel defective
                      walls between 9 and 15 meters.

                      ANY ONE OF THE ABOVE                                                         (1)

5.7       5.7.1       The steel dog is used to secure the joint between prop and
                      needle.                                                                     (1)

          5.7.2       Props are used to strengthen or brace the floors and ceiling.               (1)

          5.7.3       Sole plates spread the weight transferred by the props over a wider
                      area.
                      Prevent vertical props/pipes from sinking into the ground.
                      The soleplate create a level area where the props rest on.                   (1)

5.8       45°                                                                                     (1)

5.9

                                                      

                                                                
                                                                      Slope of roof 45° 

                                                                           

                                                           
                                      Span/3 000 mm

                     ASSESSMENT CRITERIA                  MARK   CANDIDATE'S
                                                                    MARK
                     Span                                  1
                     Wall plates                           2
                     Rafters                               2
                     Ridge beam                            1
                     Slope of the roof 45°                 1
                                             TOTAL:        7
                                                                                                   (7)

                                                                                                   [30]

Copyright reserved                                                              Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Woodworking                  15               DBE/November 2018
                                     NSC – Marking Guidelines

QUESTION 6:          SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
                     AND JOINING (SPECIFIC)

6.1       6.1.1          D                                                           (1)

          6.1.2          C                                                           (1)

          6.1.3          B                                                           (1)

          6.1.4          A                                                           (1)

          6.1.5          A                                                           (1)

6.2

                                
                     

          Joist built into wall

           ASSESSMENT               MARK    CANDIDATE'S
           CRITERIA                            MARK
           Joist                     1
           Built into wall           1
                   TOTAL             2

                          
                                

          Joist secured to wall with truss/joist hanger

               ASSESSMENT          MARK          CANDIDATE'S
               CRITERIA                             MARK
               Joist                 1
               Truss/Joist hanger    1
                            TOTAL:   2
                                                                                      (4)

Copyright reserved                                                 Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Woodworking                 16                             DBE/November 2018
                                    NSC – Marking Guidelines

6.3 Alternative drawing will also be acceptable

                                                                   

                                                  
                                                               

                                                               
                                                  

                                                               

                                                      

                                                          OR

                                           

                                                      
                                                          
                                          

                                                                                                         (

                                                          

                                              

                           ASSESSMENT             MARK         CANDIDATE'S
                             CRITERIA                             MARK
                     ONE one-brick pier               1
                     DPC/Proportion                   1
                     Ant guard                        1
                     Bearer                           1
                     Joist                            1
                     Floor boards                     1
                     TOTAL                            6
                                                                                                   (6)

Copyright reserved                                                              Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Woodworking                  17                           DBE/November 2018
                                     NSC – Marking Guidelines
6.4
                                                                  HAND RAIL
                                                                NEWEL/NEWEL POST 
                                                                LANDING 

                                                                RISE   

                                      

                                                                                                  (5)
                                     TREAD

                  2 OR 3 DIMENSIONAL DRAWINGS WILL BE ACCEPTED

6.5           •   Serves as a place of rest. 
              •   For safety in case of a falling accident.
              •   Facilitates a change in direction when moving up or down stairs.

                  ANY ONE OF THE ABOVE                                                            (1)

6.6

          6.6.1       Door stile/Lock rail                                                       (1)

          6.6.2       Frame stile/Door frame/Stile                                               (1)

          6.6.3       Frame stile/Door frame/Stile                                               (1)

          6.6.4       Door stile                                                                 (1)

Copyright reserved                                                             Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology: Woodworking                  18                     DBE/November 2018
                                     NSC – Marking Guidelines

6.7

                                                                           

                                                           OR

    ASSESSMENT                  MARK      CANDIDATE'S
       CRITERIA                              MARK
Raised panel top view            2
Raised and fielded panel
                                 2
top view
TOTAL                            4

                                                                                               (4)

6.8       The opening allows shrinkage  and expansion of the panel/wood.                      (1)

6.9       A – Brace/Strut 
          B – Tongue and groove battens/V- Tongue and groove battens 
          C – Stile                                                                           (3)

Copyright reserved                                                          Please turn over

### Page 19

Downloaded from hlayiso.com
Civil Technology: Woodworking                   19                    DBE/November 2018
                                      NSC – Marking Guidelines

6.10

          6.10.1        Hinge (Any hinge accepted)                                       (1)

          6.10.2        Clout nail/Chipboard screws/Drywall screw                        (1)

          6.10.3        Nail/Skew nail/Perm fix nail                                     (1)

          6.10.4        Gang nail/Bolt and nut/Nails                                     (1)

6.11          •      Hinges 
              •      Casement fasteners 
              •      Casement stays

          ANY TWO OF THE ABOVE                                                            (2)
                                                                                          [40]

                                                                          TOTAL:          200

Copyright reserved

## Related documents

- [Civil Technology Nov 2018 (Civil Services) FINAL Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-civil-services-final-memo-eng/f4e1d2a3-db17-47d5-8ae8-6332d121a6d3) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology Nov 2018 (Construction) FINAL Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-final-memo-eng/90041771-68e0-4915-bc37-7a4f246b369f) — Civil Technology · Memo · 2018 · Eng
- [Civil Technology Nov 2018 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-construction-afr/be54c81a-cc52-4da7-a74c-ec3f0bddf626) — Civil Technology · QP · 2018 · Afr
- [Civil Technology Nov 2018 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2018-woodworking-afr/8a4b5aba-d78e-4505-aae9-e127ef45df85) — Civil Technology · QP · 2018 · Afr
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction-1/b6d609b6-89a5-4b39-a9b7-0d878af45cd4) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste-d/f328c182-752d-488c-88b6-f2a5cadcbcf2) — Civil Technology · Memo · 2018 · Afr

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
