# Civil Technology Grade 12 NSC November 2019 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2019 (English), 16 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-eng/53bd979c-a0bb-411f-960b-1f8755cd4874
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2019
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 16

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2019 Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-eng/53bd979c-a0bb-411f-960b-1f8755cd4874)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2019. Memorandum, 16 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                     GRAAD 12

                                   NATIONAL
                              SENIOR CERTIFICATE

                                     GRADE 12

                      CIVIL TECHNOLOGY: CIVIL SERVICES

                                  NOVEMBER 2019

                               MARKING GUIDELINES

MARKS: 200

                      These marking guidelines consist of 16 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Civil Services              2                        DBE/November 2019
                                   NSC – Marking Guidelines

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
            (GENERIC)

1.1        1.1.1        B                                                                      (1)

           1.1.2        I                                                                      (1)

           1.1.3        A                                                                      (1)

           1.1.4        G/H                                                                    (1)

           1.1.5        C                                                                      (1)

           1.1.6        F                                                                      (1)

           1.1.7        J                                                                      (1)

           1.1.8        E                                                                      (1)

1.2        Electroplating:
              •    protects metals against corrosion. 
              •    improves the engineering- and mechanical properties of metal. 
              •    may be used to increase the thickness of undersized parts.
              •    is decorative.
              •    will extend the life span.
           ANY TWO OF THE ABOVE                                                                 (2)

1.3        Curing                                                                              (1)
1.4        The moisture:
              • delays/prevents the rapid drying of fresh concrete.
              • prevents concrete from cracking. 
              • ensures that fresh concrete hardens properly.
              • allows adhesive bonding.
              • increases strength of fresh concrete.
           ANY ONE OF THE ABOVE                                                                 (1)

1.5            •When material is transported in bulk, it must be secured firmly. 
               •When material is transported to higher levels, make sure that workers
                maintain a safe distance from the material being moved overhead. 
             • When heavy material is transported with a lift/hoist/machine, a
                qualified person must take charge of operations.
             • Wear appropriate personal protective equipment(PPE).
             • Material must be transported in a safe way.
             • Transport should not be overloaded with material.
           ANY TWO OF THE ABOVE                                                                 (2)

Copyright reserved                                                           Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Civil Services                  3                          DBE/November 2019
                                           NSC – Marking Guidelines

1.6        Scaffold planks should:
              • be made of a solid wood at least 228 mm wide and 38 mm thick. 
              • be able to support the load.
              • be free from defects.
              • not be painted as it will hide defects/be slippery.
              • be supported at distances not exceeding 1,25 m.
              • not project less than 70 mm and not more than 230 mm beyond the
                  ends of the last prop.
              • be firmly secured to prevent its displacement.
              • be placed in such a way to prevent materials and tools from falling
                  through.
           ANY ONE OF THE ABOVE                                                                       (1)

1.7        1.7.1        Dumpy level                                                                  (1)

           1.7.2        If the dumpy level is not set up level:
                             • it will give inaccurate readings. 
                             • wrong levels will be transferred.
                             • true levels will not be transferred.
                        ANY ONE OF THE ABOVE                                                          (1)

1.8        1.8.1        A – Plastic plug/Plug/Rawl plug/Fisher plug/Fibre plug                       (1)

           1.8.2        A screw                                                                      (1)

           1.8.3        Plastic plugs are used to secure:
                           • cupboards against a wall. 
                           • mirrors against a wall.
                           • portraits and similar objects against a wall.
                           • objects, limited to certain weight, against walls.
                        ANY ONE OF THE ABOVE                                                          (1)
                                                                                                      [20]

Copyright reserved                                                                 Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Civil Services                4                           DBE/November 2019
                                     NSC – Marking Guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERICS)

ANSWER SHEET 2

NO.                   QUESTIONS                                 ANSWERS                      MARKS
  1     Identify the elevation in FIGURE A.      West Elevation                                    1

        Identify the type of roof that is used
  2                                              Hipped roof                                       1
        on the building in FIGURE A.

                                                 Ridge Capping/Ridge plate/Ridge
  3     Identify number 1.                                                                          1
                                                 tile/Hip cap 
                                                 Balcony/Floor slab of
  4     Identify number 4.                                                                          1
                                                 balcony/Cantilever/Concrete slab 
                                                 External door/Entrance
  5     Identify number 5.                                                                          1
                                                 door/Door/Outside door 

  6     Identify number 7.                       Gutter                                            1

                                                 Rainwater down pipe/RWDP/Down
  7     Identify number 8.                                                                          1
                                                 pipe 

  8     Identify number 12.                      Wash trough/Wash tub                              1

  9     Identify number 13.                      Built-in cupboard/BIC                             1

 10     Identify number 15.                      Landing                                           1
        Identify the company that printed
 11                                              Dlamini printers                                  1
        the building plan.
        Name a suitable material that can
                                                 Fibre cement/Galvanised sheeting/
 12     be used for the manufacturing of                                                            1
                                                 Timber/Plastic/PVC/Polyvinylchloride
        number 2.
        Name the drawing symbol in the
                                               Electricity meter/Electrical meter/Watt
 13     column for the notes in FIGURE 2                                                            1
                                               meter/Prepaid meter 
        that must be installed in the kitchen.
        Name the drawing symbol in the
        column for the notes in FIGURE 2
 14                                              Face brick                                        1
        that indicates the type of bricks for
        the building.
        Name a material that should NOT          Steel/Mild steel/Iron/Ferrous
 15     be used to manufacture the frame                                                            1
        of number 9 for coastal areas.           metals 

Copyright reserved                                                               Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology: Civil Services                 5                           DBE/November 2019
                                          NSC – Marking Guidelines

        Name a material that can be used          Stainless steel/Plastic/Ceramic/
 16     to manufacture the sanitary fitting       Granite/Acrylic/Fibre                             1
        indicated by number 11.                   Glass/Concrete
 17     Who checked the building plan?            P Carter                                         1
        How many types of windows are
 18                                               2                                                1
        used in FIGURE B?

        What does the abbreviation NGL at
 19                                               Natural ground level                             1
        number 6 stand for?

        Give the reference code for this
 20                                               QP 2-2019                                        1
        plan.

        Which room will electrical symbol
 21                                               Lounge                                           1
        16 serve?

                                                  Prevent people from falling off/through.
 22     Describe the purpose of number 3.                                                           2
                                                  

                                                  Electrical wiring/Wiring/Electrical
        Explain what the curved lines
                                                  cable/Wiring from light switch to
 23     between the electrical installations                                                        2
                                                  light/Shows which switch operates
        in FIGURE B indicate.
                                                  which electrical fitting. 

        Explain why the light switch is           To prevent steam/moisture entering
 24     mounted on the outside of the             the switch/To prevent electrical shock            1
        bathroom.                                 due to moisture/For safety purposes 

        Identify in FIGURE 2 which
 25                                               North elevation                                  1
        elevation does NOT have windows.

        Identify the thickness of the internal
 26                                               110 mm                                           1
        wall in FIGURE 2.
                                                  13 – Built-in cupboard: to store
                                                       items. 
        Differentiate between symbols 13
 27                                               15 – Landing: to rest/safety                      2
        and 15 in terms of their purpose.
                                                       feature/change of direction of
                                                       stairs 
                                                  Ground floorplan:
                                                     • does not indicate the roofline 
                                                     • does not indicate the balcony
                                                     • indicate an entrance door to the
        Justify why FIGURE B is a ground               house
 28                                                  • indicate a step at the entrance              1
        floor plan.
                                                       door
                                                     • the position of the windows and
                                                       door correlate with the positions
                                                       of the window and door on the
                                                       west elevation
Copyright reserved                                                               Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Civil Services              6                          DBE/November 2019
                                       NSC – Marking Guidelines

        Predict what will happen if number 10     Water/Damp will penetrate into the
 29                                                                                             1
        is NOT installed.                         wall. 

                                                           
        Redraw the staircase in FIGURE B in                       OR
 30     the adjacent column and indicate the                                                    2
                                                                  
        direction of the flight with arrows.

                                                  220  + 2 600  + 110  +
                                                  3 400  + 220 
                                                  = 6 550 mm or 6,55 m 
                                                  IF INCORRECT METHOD IS USED
                                                  TO CALCULATE THE ANSWER
                                                  USE THE FOLLOWING SLIDING
                                                  SCALE:
        Calculate the total length of the wall
 31     on the eastern side of the building.          • 4 MARKS WILL BE                         6
        Show ALL calculations.                          AWARDED IF ALL FIVE
                                                        VALUES ARE CORRECT
                                                      • 3 MARKS FOR FOUR
                                                        VALUES CORRECT
                                                      • 2 MARKS FOR THREE
                                                        VALUES CORRECT
                                                      • 1 MARK FOR 2 VALUES
                                                        CORRECT

                                                                             TOTAL:             40

Copyright reserved                                                           Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Civil Services               7                          DBE/November 2019
                                        NSC – Marking Guidelines

QUESTION 3:          CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA,
                     AND QUANTITIES (SPECIFIC)

3.1.1      Step irons/Ladder/Concrete/Cast iron lid (ANY ONE)                                   (1)
3.1.2      Step irons/Ladder/Concrete/Cast iron lid (ANY ONE)                                   (1)

3.2        3.2.1        Wedge                                                                   (1)

           3.2.2        300 mm                                                                  (1)

3.3        3.3.1        4                                                                       (1)

           3.3.2        3                                                                       (1)

           3.3.3          L x b x h OR Area of base x height OR Side x side x side OR S3
                        = 2,7 x 2,7  x 2,7 
                        = 19,68 m³                                                              (4)

                        = 19,68 m³ x 1 000 ℓ 
                        = 19 680 ℓ OR 19 683 ℓ                                                  (2)

3.4        3.4.1        D- Clip                                                                 (1)

           3.4.2        Rope grab                                                               (1)

           3.4.3        Breathing apparatus                                                     (1)

           3.4.4        Transparent pipe level                                                  (1)

           3.4.5        Manhole                                                                 (1)

3.5        A – Spirit level 
           B – Long straight edge/Straight edge 
           C – Steel peg/Peg                                                                    (3)

Copyright reserved                                                            Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Civil Services           8                         DBE/November 2019
                                    NSC – Marking Guidelines

3.6

                                                                   1st COURSE

                                                               2nd COURSE

                                            

                                     Correctness 

                                   ASSESSMENT CRITERIA                  MARK
                                   Bricks at corner drawn correctly       2
                                   2 x ¾ bricks                           4
                                   Full bricks on each side of ¾ bricks   2
                                   Full brick at T-junction               1
                                   Correctness of drawing                 1
                                                               TOTAL:    10                 (10)
                                                                                            [30]

Copyright reserved                                                       Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Civil Services                9                            DBE/November 2019
                                         NSC – Marking Guidelines

QUESTION 4:          HOT- AND COLD-WATER SUPPLY, TOOLS, EQUIPMENT AND
                     MATERIALS (SPECIFIC)
4.1        4.1.1        Solar geyser system/Solar panel with geyser                               (1)

           4.1.2        Water will get cold.                                                      (1)

           4.1.3        To ensure maximum operation/efficiency. 
                        So that dirt cannot accumulate on the glass panel.
                        ANY ONE OF THE ABOVE                                                       (1)

4.2        An airlock is a pocket of air  that is trapped inside  a pipe and it prevents
           constant water flow.                                                                   (3)

4.3        Causes of water hammer are:
             • Sudden drop in secondary supply pipes 
             • Loose jumpers in taps 
             • Pipes in walls are not properly caulked
             • Pipes are not properly secured in roof spaces above the ceiling
             • Draw-off pipe is bigger than the supply pipe
             • Bad/Poor installation
           ANY TWO OF THE ABOVE                                                                    (2)

4.4        4.4.1        Balancing device (hot water control)                                      (1)

           4.4.2        Shower (movable)/Movable shower                                           (1)

4.5        4.5.1          C            
                          H
                                                 Correctness of symbol = 2 marks                   (2)

           4.5.2
                                      
                                                 Correctness of symbol = 2 marks                   (2)

4.6        4.6.1        S-Trap                                                                    (1)

           4.6.2        40/50 mm                                                                  (1)

4.7        4.7.1        A – T Junction (Plain) 
                        B – 90º bend with inspection eye                                          (2)

           4.7.2        A – Where three soil pipes with the same
                            diameter meets/Where the branch pipe connects to the main
                            sewerage pipe. 
                        B – Above ground where soil pipes have to change direction at a
                            90º angle/Outside the external wall where the water closet is
                        . installed.                                                              (2)

Copyright reserved                                                              Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Civil Services                   10                  DBE/November 2019
                                            NSC – Marking Guidelines

4.8        4.8.1        Pipe-thread cutting machine                                          (1)
           4.8.2        Water pressure testing pump                                          (1)
           4.8.3        Drain-cleaning machine/Jetting machine                               (1)
4.9        Functions of the centrifugal pump:
              • To pump water out of excavations or trenches. 
              • To move liquids through pipes or pipelines. 
              • To move slurries or liquid containing suspended matter.
              • To convert rotational motion/kinetic energy to hydrodynamic energy.
              • To increase the pressure of water in pipes.
           ANY TWO OF THE ABOVE                                                               (2)

4.10       It is not recommended that copper pipes are joined to galvanised pipes
           because:
               • Negative effects on the pipeline can be caused due to the chemical
                   reactions between the metals and acidic water. 
               • Pit marks are caused by the chemical reaction between the two
                   metals. 
               • An electrochemical reaction can take place between two dissimilar
                  metals causing corrosion/dezincification.
           ANY TWO OF THE ABOVE                                                               (2)

4.11       4.11.1       Pillar tap                                                           (1)
           4.11.2       A pillar tap can be used at:
                           • Sinks/Kitchen 
                           • Baths/Bathroom/En-suite 
                           • Basins/Bathroom/En-suite
                        ANY TWO OF THE ABOVE                                                  (2)

4.12       4.12.1       Water meter                                                          (1)
           4.12.2       Full way valve/Stop cock 
                        To shut off the water supply                                         (2)
           4.12.3       Bibcock/Bib tap/Garden tap                                           (1)
           4.12.4       No reaction will take place/No                                       (1)
           4.12.5       Dezincification                                                      (1)

4.13       Water saving devices:
             •     Sensor taps 
             •     Demand pillar taps 
             •     Metered taps
           ANY TWO OF THE ABOVE                                                               (2)

Copyright reserved                                                         Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Civil Services            11                         DBE/November 2019
                                     NSC – Marking Guidelines

4.14       Pressure control valve reduces/control the incoming water pressure to a
           building.                                                                         (1)

           Temperature and pressure safety valve will reduce/relieve pressure in a hot
           water system in case of excessive pressure building up in the geyser.             (1)
                                                                                              [40]

Copyright reserved                                                         Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Civil Services                12                      DBE/November 2019
                                         NSC – Marking Guidelines

QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
            STORM WATER (SPECIFIC)

5.1        5.1.1
                                                                   
                                                                  
                                                        
                                        
                                                    ORTHOGRAPHIC VIEWS WILL
                          Correctness – 4 marks     ALSO BE ACCEPTED - ONLY 2
                                                    MARKS                                     (4)

           5.1.2        Fascia board/Rafter                                                  (1)

5.2        5.2.1        Surface channel                                                      (1)

           5.2.2        Rainwater shoe/Concrete shoe                                         (1)

           5.2.3        Road kerb/Kerb                                                       (1)

           5.2.4        Flashing                                                             (1)

5.3        Municipality/Local Government/Local Authorities.                                  (1)

Copyright reserved                                                         Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Civil Services                    13                                        DBE/November 2019
                                             NSC – Marking Guidelines

5.4

                                                           4

                                        6

                                                                          4

                                         5

                                                       5

                                                                5                  4

                                                            3                           3

                                                           5

                       1          1            5                            4
                                        2

                                                      6
                                                                     4

                                                                           DRAWING IS NOT
                                                                     A     ACCORDING TO SCALE

                                                       2                  USE A MASK TO MARK THIS
                                                                           QUESTION

                                        2       2

                                         NO.          ASSESSMENT                                     MARK
                                                      CRITERIA
                                             1        Projection lines to determine the apex            2
                                             2        Determine true length                             4
ANY ALTERNATIVE METHOD                       3        Top and bottom arc of pyramid                     2
TO OBTAIN TRUE LENGTH                        4        Development of base of pyramid                    5
WILL BE ACCEPTED                             5        Development of top of pyramid                     5
                                             6        3 mm seams                                        2
                                                                                         TOTAL:        20           (20)
                                                                                                                    [30]

Copyright reserved                                                                               Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Civil Services               14                            DBE/November 2019
                                        NSC – Marking Guidelines

QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)

6.1        6.1.1        D                                                                          (1)

           6.1.2        A                                                                          (1)

           6.1.3        D                                                                          (1)

           6.1.4        B                                                                          (1)

           6.1.5        C                                                                          (1)

6.2                                                                    ASSESSMENT     MARK
                                                                      CRITERIA
                                                                      Solder            1
                                                                       Plates            1
                                                                      Cover strip       1
                                                                             TOTAL:      3          (3)

6.3                DRAINAGE ABOVE GROUND                 DRAINAGE BELOW GROUND
            6.3.1  OR Water meter OR                6.3.2 OR Sewerage line OR

            6.3.4 OR Washbasin OR                   6.3.3 OR Inspection eye OR

                                                                       IE
                                                                                                    (4)

6.4        6.4.1        135°                                                                       (1)

           6.4.2        The purpose of the inspection eye is to gain access to the sewer
                        pipe to:
                            • inspect it. 
                            • clear blockages/allow for cleaning.
                        ANY ONE OF THE ABOVE                                                        (1)

6.5        Fittings in a drainage system should:
                • be made of material that is suitable for the piping. 
                • remain watertight under normal working conditions. 
                • be able to withstand internal water pressure of 50 kPa and external
                     pressure of 30 kPa without leaking.
           ANY TWO OF THE ABOVE                                                                     (2)

6.6            •     Ventilation pipes/Vent pipe 
               •     Vent valves                                                                   (2)

Copyright reserved                                                               Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Civil Services               15                         DBE/November 2019
                                        NSC – Marking Guidelines

6.7        Septic tanks:
              • Must be cleaned when the sludge level rises above the outlet and
                  starts flowing out. 
              • Soil water is discharged into a French drain.                                  (2)
           Vacuum tanks:
              • Must be emptied when it reaches its maximum capacity. 
              • Must be cleaned more regularly than a septic tank.
              • Sewage is stored until it is pumped out by the local municipality. 
                  ANY TWO OF THE ABOVE                                                          (2)

6.8

                                                                      
                                    

                                                                          

                          H       OR     C                 H              C

                                                                     OR

                          H             C

                                                                      
                                                                     M
                                         
                                                                            
                                   OR

                                                             
                                                                 H           C

                                    

                     H                        C

                                         

                                         ASSESSMENT CRITERIA                      MARK
                                         Cold water inlet                           1
                                         Hot water inlet                            1
                                         Cold water tap (NO mixer taps)             1
                                         Hot water tap (NO mixer taps)              1
                                         Flow direction on mixed pipe               1
                                                                      TOTAL:        5           (5)

Copyright reserved                                                           Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Civil Services                     16                            DBE/November 2019
                                           NSC – Marking Guidelines

                                                               RE

                                                                    
6.9              RE
                                                          
                                  
                                  
                      VP

                                                                                  GRANNY
                                                                                   FLAT
                                                                           
                                                          

                          PART OF
                          HOUSE

                                                          

                                                          1:40 /1:60

                               FIGURE 6.9
           ABREVIATIONS ALSO ACCEPTED IN THE PLACE OF THE SYMBOL
           A MAXIMUM OF 2 MARKS WILL BE AWARDED IF THE WRONG LINE
           TYPES ARE USED FOR THE BRANCH PIPES.
            ASSESSMENT         MARK
            CRITERIA
            BRANCH PIPES         3
            VENT PIPE            1
            GULLEY’S             2
            JUNCTION OF TWO
                                 1
            MAIN SEWER PIPES
            RODDING EYES         2
            INSPECTION EYES      3
            GRADIENT             1
                        TOTAL:  13                                                                     (13)
                                                                                                       [40]

                                                                                         TOTAL:        200

Copyright reserved

## Related documents

- [Civil Technology Nov 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-afr/13c03cd5-cfa4-42cf-9a7c-5d7b0e1069f0) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology Nov 2019 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-nov-2019-woodworking-eng/b6e1822a-1416-45e5-97a8-13da0db177cd) — Civil Technology · QP · 2019 · Eng
- [Civil Technology Nov 2019 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-eng/52c5e936-0c5c-4ea4-8929-a76fdaa48f02) — Civil Technology · QP · 2019 · Eng
- [Civil Technology Nov 2019 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-afr/560716c2-e3ed-412e-90e8-42d36162ee0d) — Civil Technology · QP · 2019 · Afr
- [Civil Technology Nov 2019 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-woodworking-afr/1a837a2b-2575-4096-939a-dd10f12a0bf9) — Civil Technology · QP · 2019 · Afr
- [Civil Technology May June 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-afr/2a9b9e1b-37dc-48dc-9aa7-67dd5fa19a10) — Civil Technology · Memo · 2019 · Afr

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
