# Civil Technology Grade 12 NSC November 2019 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2019 (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2019-construction-memo-eng/2f081e6a-f6fc-46d7-8476-45e41c5ebc3a
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2019
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2019 Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2019-construction-memo-eng/2f081e6a-f6fc-46d7-8476-45e41c5ebc3a)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2019. Memorandum, 18 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                     GRAAD 12

                                   NATIONAL
                              SENIOR CERTIFICATE

                                     GRADE 12

                      CIVIL TECHNOLOGY: CONSTRUCTION

                                  NOVEMBER 2019

                               MARKING GUIDELINES

MARKS: 200

                      These marking guidelines consist of 18 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Construction               2                        DBE/November 2019
                                  NSC – Marking Guidelines

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
            (GENERIC)

1.1       1.1.1        B                                                                    (1)

          1.1.2        I                                                                    (1)

          1.1.3        A                                                                    (1)

          1.1.4        G/H                                                                  (1)

          1.1.5        C                                                                    (1)

          1.1.6        F                                                                    (1)

          1.1.7        J                                                                    (1)

          1.1.8        E                                                                    (1)

1.2       Electroplating:
             •    protects metals against corrosion. 
             •    improves the engineering- and mechanical properties of metal. 
             •    may be used to increase the thickness of undersized parts.
             •    is decorative.
             •    will extend the life span.
          ANY TWO OF THE ABOVE                                                               (2)

1.3       Curing                                                                            (1)
1.4       The moisture:
             • delays/prevents the rapid drying of fresh concrete.
             • prevents concrete from cracking. 
             • ensures that fresh concrete hardens properly.
             • allows adhesive bonding.
             • increases strength of fresh concrete.
          ANY ONE OF THE ABOVE                                                               (1)

1.5           •When material is transported in bulk, it must be secured firmly. 
              •When material is transported to higher levels, make sure that workers
               maintain a safe distance from the material being moved overhead. 
            • When heavy material is transported with a lift/hoist/machine, a
               qualified person must take charge of operations.
            • Wear appropriate personal protective equipment(PPE).
            • Material must be transported in a safe way.
            • Transport should not be overloaded with material.
          ANY TWO OF THE ABOVE                                                               (2)

Copyright reserved                                                        Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Construction                    3                        DBE/November 2019
                                       NSC – Marking Guidelines

1.6       Scaffold planks should:
             • be made of a solid wood at least 228 mm wide and 38 mm thick. 
             • be able to support the load.
             • be free from defects.
             • not be painted as it will hide defects/be slippery.
             • be supported at distances not exceeding 1,25 m.
             • not project less than 70 mm and not more than 230 mm beyond the
                 ends of the last prop.
             • be firmly secured to prevent its displacement.
             • be placed in such a way to prevent materials and tools from falling
                 through.
          ANY ONE OF THE ABOVE                                                                      (1)

1.7       1.7.1        Dumpy level                                                                 (1)

          1.7.2        If the dumpy level is not set up level:
                            • it will give inaccurate readings. 
                            • wrong levels will be transferred.
                            • true levels will not be transferred.
                       ANY ONE OF THE ABOVE                                                         (1)

1.8       1.8.1        A – Plastic plug/Plug/Rawl plug/Fisher plug/Fibre plug                      (1)

          1.8.2        A screw                                                                     (1)

          1.8.3        Plastic plugs are used to secure:
                          • cupboards against a wall. 
                          • mirrors against a wall.
                          • portraits and similar objects against a wall.
                          • objects, limited to certain weight, against walls.
                       ANY ONE OF THE ABOVE                                                         (1)
                                                                                                    [20]

Copyright reserved                                                               Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Construction                  4                           DBE/November 2019
                                     NSC – Marking Guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERICS)

ANSWER SHEET 2

NO.                  QUESTIONS                                  ANSWERS                      MARKS
  1     Identify the elevation in FIGURE A.      West Elevation                                    1

        Identify the type of roof that is used
  2                                              Hipped roof                                       1
        on the building in FIGURE A.

                                                 Ridge Capping/Ridge plate/Ridge
  3     Identify number 1.                                                                          1
                                                 tile/Hip cap 
                                                 Balcony/Floor slab of
  4     Identify number 4.                                                                          1
                                                 balcony/Cantilever/Concrete slab 
                                                 External door/Entrance
  5     Identify number 5.                                                                          1
                                                 door/Door/Outside door 

  6     Identify number 7.                       Gutter                                            1

                                                 Rainwater down pipe/RWDP/Down
  7     Identify number 8.                                                                          1
                                                 pipe 

  8     Identify number 12.                      Wash trough/Wash tub                              1

  9     Identify number 13.                      Built-in cupboard/BIC                             1

 10     Identify number 15.                      Landing                                           1
        Identify the company that printed
 11                                              Dlamini printers                                  1
        the building plan.
        Name a suitable material that can
                                                 Fibre cement/Galvanised sheeting/
 12     be used for the manufacturing of                                                            1
                                                 Timber/Plastic/PVC/Polyvinylchloride
        number 2.
        Name the drawing symbol in the
                                               Electricity meter/Electrical meter/Watt
 13     column for the notes in FIGURE 2                                                            1
                                               meter/Prepaid meter 
        that must be installed in the kitchen.
        Name the drawing symbol in the
        column for the notes in FIGURE 2
 14                                              Face brick                                        1
        that indicates the type of bricks for
        the building.
        Name a material that should NOT          Steel/Mild steel/Iron/Ferrous
 15     be used to manufacture the frame                                                            1
        of number 9 for coastal areas.           metals 

Copyright reserved                                                               Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology: Construction                  5                           DBE/November 2019
                                     NSC – Marking Guidelines

        Name a material that can be used         Stainless steel/Plastic/Ceramic/
 16     to manufacture the sanitary fitting      Granite/Acrylic/Fibre                             1
        indicated by number 11.                  Glass/Concrete
 17     Who checked the building plan?           P Carter                                         1
        How many types of windows are
 18                                              2                                                1
        used in FIGURE B?

        What does the abbreviation NGL at
 19                                              Natural ground level                             1
        number 6 stand for?

        Give the reference code for this
 20                                              QP 2-2019                                        1
        plan.

        Which room will electrical symbol
 21                                              Lounge                                           1
        16 serve?

                                                 Prevent people from falling off/through.
 22     Describe the purpose of number 3.                                                          2
                                                 

                                                 Electrical wiring/Wiring/Electrical
        Explain what the curved lines
                                                 cable/Wiring from light switch to
 23     between the electrical installations                                                       2
                                                 light/Shows which switch operates
        in FIGURE B indicate.
                                                 which electrical fitting. 

        Explain why the light switch is          To prevent steam/moisture entering
 24     mounted on the outside of the            the switch/To prevent electrical shock            1
        bathroom.                                due to moisture/For safety purposes 

        Identify in FIGURE 2 which
 25                                              North elevation                                  1
        elevation does NOT have windows.

        Identify the thickness of the internal
 26                                              110 mm                                           1
        wall in FIGURE 2.
                                                 13 – Built-in cupboard: to store
                                                      items. 
        Differentiate between symbols 13
 27                                              15 – Landing: to rest/safety                      2
        and 15 in terms of their purpose.
                                                      feature/change of direction of
                                                      stairs 
                                                 Ground floorplan:
                                                    • does not indicate the roofline 
                                                    • does not indicate the balcony
                                                    • indicate an entrance door to the
        Justify why FIGURE B is a ground              house
 28                                                 • indicate a step at the entrance              1
        floor plan.
                                                      door
                                                    • the position of the windows and
                                                      door correlate with the positions
                                                      of the window and door on the
                                                      west elevation
Copyright reserved                                                              Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Construction                  6                         DBE/November 2019
                                     NSC – Marking Guidelines

        Predict what will happen if number 10      Water/Damp will penetrate into the
 29                                                                                              1
        is NOT installed.                          wall. 

                                                            
        Redraw the staircase in FIGURE B in                     OR
 30     the adjacent column and indicate the                                                     2
                                                                
        direction of the flight with arrows.

                                                   220  + 2 600  + 110  +
                                                   3 400  + 220 
                                                   = 6 550 mm or 6,55 m 
                                                   IF INCORRECT METHOD IS USED
                                                   TO CALCULATE THE ANSWER
                                                   USE THE FOLLOWING SLIDING
                                                   SCALE:
        Calculate the total length of the wall
 31     on the eastern side of the building.           • 4 MARKS WILL BE                         6
        Show ALL calculations.                           AWARDED IF ALL FIVE
                                                         VALUES ARE CORRECT
                                                       • 3 MARKS FOR FOUR
                                                         VALUES CORRECT
                                                       • 2 MARKS FOR THREE
                                                         VALUES CORRECT
                                                       • 1 MARK FOR 2 VALUES
                                                         CORRECT

                                                                              TOTAL:             40

Copyright reserved                                                            Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology (Construction)                7                    DBE/ November 2019
                                    NSC – Marking Guidelines

QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)

3.1       3.1.1        10°                                                                 (1)

          3.1.2        650 mm                                                              (1)

          3.1.3        38 mm round poles                                                   (1)

3.2       Predrilled hole filled with grout 
          Bolt baluster onto the tread
          Baluster bolted/screwed to the side of the tread/string
          Bolt and nut
          ANY ONE OF THE ABOVE                                                              (1)

3.3       Clout nails/Nails/Screws/Bolts                                                   (1)

Copyright reserved                                                       Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Construction                     8                               DBE/November 2019
                                        NSC – Marking Guidelines

3.4

                     WALL

                                         LANDING             
                                                                      HANDRAIL 

                                                             

                                                                     BALUSTER
                                                                     RISE

                                                                     THREAD
                                                                      CONCRETE

                                 CORRECTNESS 

                                                         OR

                                                                  

                      HANDRAIL           
                                                          HANDRAIL                       WALL 
                                                     
                                                          BALUSTER

                                                              LANDING
                                  THREAD                                 
                                                                        
                                                                               

                     RISE               CORRECTNESS 

                          ASSESSMENT CRITERIA                                MARK
                          Wall                                                 1
                          Landing                                              1
                          Baluster                                             1
                          Handrails                                            2
                          THREE treads                                         1
                          Concrete                                             1
                          Any TWO labels                                       2
                          Correctness of drawing                               1
                                                                  TOTAL:      10                          (10)

Copyright reserved                                                                     Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Construction              9                       DBE/November 2019
                                 NSC – Marking Guidelines

3.5
                                                     RIDGE BEAM 

                                                            
                             
                                                                    RAFTER 

                                                      TIE BEAM              WALL PLATE 
                      30º                 

                                                                      

                                           

                                       SPAN 3 m

                      WALL
                                                                       
                                        Scale   

          DRAWING NOT TO SCALE
          A MASK MUST BE USED TO MARK THIS QUESTION
           ASSESSMENT CRITERIA              MARK
           Walls                              2
           Wall plates                        2
           Rafters                            2
           Ridge beam                         1
           Tie beam                           1
           Any THREE labels                   3
           Dimension of the span              1
           Application of scale:
           ONE or TWO incorrect     =3          3
           THREE or FOUR incorrect = 2
           More than FIVE incorrect = 1
                                 TOTAL:         15                                         (15)
                                                                                           [30]

Copyright reserved                                                      Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Construction                   10                        DBE/November 2019
                                       NSC – Marking Guidelines

QUESTION 4:          EXCAVATIONS, FORMWORK,                 TOOLS,    EQUIPMENT        AND
                     MATERIALS (SPECIFIC)

4.1       4.1.1        600 mm                                                                     (1)

          4.1.2        1 meter                                                                    (1)

          4.1.3          • Heavy rains 
                         • Poor soil strata, structure or composition 
                         • Sides not dug at correct angle
                         • Improper use of formwork or shoring to support the walls
                         • Vibration by machinery or heavy vehicles nearby
                         • Water seeping into the excavated area
                         • Contact with underground service pipes
                         • Access to and exit from the excavation
                         • Trucks must not go near the edge of the excavation
                         • Soil slides due to cracks or loose soil
                       ANY TWO OF THE ABOVE                                                        (2)

          4.1.4        1,5 meter                                                                  (1)

          4.1.5        Benching can be done/Formwork/Shuttering can be installed                  (1)

4.2       4.2.1        A- will be used in shallow trenches/loose soil 
                       B- will be used in firm soil                                               (2)

          4.2.2        C- Poling boards 
                       D- Walling boards                                                          (2)

          4.2.3        A – Has no space between the boarding 
                       B – Has open spaces between the boards                                     (2)

4.3       4.3.1        Power trowel float/Power float                                             (1)

          4.3.2            •Maintain like all machinery - lubricate and adjust according
                            to the manufacturers, instruction. 
                         • Clean after use. 
                         • Store in a safe dry place.
                         • Service the power trowel float/power float regularly.
                       ANY TWO OF THE ABOVE                                                        (2)

          4.3.3            •     Check for wear and damage parts before use. 
                           •     Check controls for proper response before use.                   (2)

Copyright reserved                                                              Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Construction             11               DBE/November 2019
                                 NSC – Marking Guidelines

4.4       25/30 MPa                                                               (1)

4.5           •   True slump 
              •   Shear slump 
              •   Collapsed slump 
                  IF THE SECOND PART OF THE ANSWER “SLUMP” IS NOT
                  MENTIONED A MAXIMUM OF 2 MARKS WILL BE AWARDED FOR
                  THE QUESTION.                                                    (3)

4.6         • Damp sand/Sand 
            • Clean sand
            • Soil
            • Sacking
            • Straw
            • Wood shavings
            • Canvas
            • Hessian
          ANY ONE OF THE ABOVE                                                     (1)

Copyright reserved                                              Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Construction                 12                           DBE/November 2019
                                     NSC – Marking Guidelines

4.7

                            CLEAT

                                                           
            SHUTTERING
            BOARD SIDES                 
                                                      
               WEDGE                                                 FIXING PLATE 
                                                            
                                                           
                                 
                       

                                                                
                                     
                                                                    BRACE/STRUT

                                                          PROP/STRUT 

                                                                       Correctness 

ASSESSMENT CRITERIA                              MARK
Shutter board sides                                2
Cleats                                             2
Fixing plates                                      2
Wedges                                             2
Braces/Struts                                      4
Joining of braces to bearer                        1
Any THREE labels                                   3
Correctness of drawing                             2
                                     TOTAL:       18
                                                                                                   (18)
                                                                                                   [40]

Copyright reserved                                                              Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Construction                 13                          DBE/November 2019
                                     NSC – Marking Guidelines

QUESTION 5:          PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
                     MEANS OF COMMUNICATION (SPECIFIC)

5.1         • Smooth plaster finish 
            • Wavy plastered surface
            • Bagging plaster finish
            • Spatter dash finish
          ANY ONE OF THE ABOVE                                                                    (1)

5.2       Wet the wall thoroughly                                                                (1)

5.3       Property of good plaster:
             • Workable 
             • Cohesive
             • Good water retention ability
          ANY ONE OF THE ABOVE                                                                    (1)

5.4       15 mm to 40 mm                                                                         (1)

5.5       5.5.1        A- Brick/Pavers/Cement paver 
                       B- Bedding/Sand/Bedding sand/Screed 
                       C- Base (mass concrete) 
                       D- Damp proof membrane/DPM/Plastic sheeting/Damp proof
                       course/DPC                                                                (4)

          5.5.2            •The concrete haunch is too thin to support itself. 
                           •There is too little weight to retain the structure and to keep
                            the paving in place.
                         • The bond between the haunch and the edge units is weak.
                         • The sub-base is not contained and will be washed out by
                            ground water.
                         • Poor ground preparation.
                       ANY ONE OF THE ABOVE                                                       (1)

Copyright reserved                                                             Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Construction                 14                          DBE/November 2019
                                     NSC – Marking Guidelines

5.6
                                                     
                                 
                                                                           
                                            
                                                                       

                                                Correctness 

                                                  OR
                                                         
                                 

                                                                          

                                                                       

                                                Correctness 

           ASSESSMENT CRITERIA                                  MARK
           Dead end                                               2
           Inner skin of cavity wall                              1
           Outer skin of cavity wall                              1
           Wall tie (Any type)                                    1
           Correctness of drawing                                 2
                                                  TOTAL:          7                               (7)

Copyright reserved                                                             Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Construction                 15                         DBE/November 2019
                                     NSC – Marking Guidelines

5.7
                                         FRAME STILE

                           DPC

                                                                INTERNAL SILL
                                     
                                         
                                             
                                                                GLASS 3MM THICK
                                                                 PUTTY
                                                      

                                                   WINDOW CASEMENT/STILE
          FRAME TIE/LUG                       EXTERNAL SILL 
                      Application of scale 1:5 
          DRAWING NOT TO SCALE.
          USE A MASK TO MARK THIS QUESTION.

           ASSESSMENT CRITERIA                                  MARK

           Frame stile: 105 mm x 70 mm                           2
           Window stile/Casement stile: 60 mm x 45 mm            2
           Frame tie/lug: 25 mm wide                             1
           Glass: 3 mm thick                                     1
           Putty                                                 1
           Internal window sill                                  1
           External window sill                                  1
           DPC                                                   1
           Any ONE label                                         1
           Application of scale:
           ONE or TWO incorrect      =3
                                                                 3
           THREE or FOUR incorrect = 2
           More than FIVE incorrect = 1
                                                TOTAL:           14                              (14)
                                                                                                 [30]

Copyright reserved                                                            Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Construction              16                        DBE/November 2019
                                  NSC – Marking Guidelines

QUESTION 6:          REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
                     FLOORS AND QUANTITIES (SPECIFIC)

6.1       6.1.1        D                                                                    (1)

          6.1.2        A/B                                                                  (1)

          6.1.3        C                                                                    (1)

          6.1.4        A                                                                    (1)

          6.1.5        D                                                                    (1)

6.2       Pile foundations:
              • Should be used when ground conditions are not stable or solid enough
                 to support ordinary foundations. 
              • Foundation piles distribute the load to more stable ground and can be
                 used as underground or under water supports. 
              • Piles provide stability when a raft or floating foundation is used.
              • When structures are subjected to horizontal forces, pile foundations
                 resist bending stress while still lending vertical support.
              • Where soils are prone to swelling and shrinking according to the
                 moisture content.
              • When the superstructure is exposed to up-lifting forces.
              • Where soil erosion is possible, piles should be used to carry the load
                 of the super structure.
          ANY TWO OF THE ABOVE                                                               (2)

6.3         • Drills 
            • Tampers 
            • Pile drop hammer/Drop hammer 
            • Trucks
            • Cranes
          ANY THREE OF THE ABOVE                                                             (3)

6.4        Steel tube caisson piles             Pre-cast concrete piles
           Steel tube casing driven into the The whole pre-cast pile is driven into
           ground using a drop hammer and the ground using a drop hammer. 
           filled with concrete/cast in situ.                                               (2)

Copyright reserved                                                        Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Construction                 17                           DBE/November 2019
                                     NSC – Marking Guidelines

6.5       6.5.1        Rib-and-block floor                                                            (1)

          6.5.2            •Allow 28 days for the setting of the concrete slab. 
                           •The concrete has to be kept moist for 7 days after casting to
                             ensure curing. 
                         • Temporary propping can be removed when the in-situ
                             concrete has reached a crushing strength of 17 MPa. 
                         • Adhere to the normal formwork striking times.
                         • Ensure minimum movement on the rib-and- block floor after
                             casting.
                         • Normal construcion activities can only continue after the
                            concrete has set properly.
                         • Inspect for visible defects.
                       ANY THREE OF THE ABOVE                                                          (3)

          6.5.3        In-situ concrete/Mass concrete/Reinforced concrete                             (1)

          6.5.4        The width/length/size of the concrete hollow block.                            (1)

          6.5.5            •The concrete can crack. 
                           •The structural integrity of the             concrete      may     be
                            compromised.
                         • Concrete/Structure can collapse.
                       ANY ONE OF THE ABOVE                                                            (1)

6.6
                                      ANCHOR BAR         SHEAR BAR 
                                                                       
                                                    
                                                                            
                                        
                                                                
                                                                                
                                                                                    

                                           STIRRUP                  MINIMUM CONCRETE COVER
                                                           MAIN BAR

                                                        Correctness 
                                             ASSESSMENT CRITERIA                    MARK
                                           Anchor bar                                 2
                                           Shear bar                                  2
                                           Spacing of Stirrups/Binders                2
                                           Main bar                                   2
                                           Minimum concrete cover                     1
                                           Any ONE label                              1
                                           Correctness of drawing                     1
                                                                   TOTAL:            11                (11)

Copyright reserved                                                                  Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology (Construction)                   18                       DBE/November 2019
                                        NSC – Marking Guidelines

6.7

           A         B            C           D
6.7.1                                         Total length of wall plate needed:

                                              Length of the wall = 9 000 mm – 2/220 
            2/      8,56        17,12 m                                                     (5)
                                                                 = 8 560 mm
                                              NO UNIT IN FINAL ANSWER NO MARK
6.7.2                                         Number of roof trusses needed:
                                              Internal dimension         + 1 roof truss
                                              Distance between centres
                                              8 560 mm  + 1 roof truss 
                                              1 070 mm 
                                              = 8 + 1 roof truss 
                                              = 9 roof trusses needed                          (5)
                                                                                               [40]

                                                                                   TOTAL:      200

Copyright reserved

## Related documents

- [Civil Technology Nov 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-afr/13c03cd5-cfa4-42cf-9a7c-5d7b0e1069f0) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology Nov 2019 (Civil Services) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-eng/53bd979c-a0bb-411f-960b-1f8755cd4874) — Civil Technology · Memo · 2019 · Eng
- [Civil Technology Nov 2019 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-nov-2019-woodworking-eng/b6e1822a-1416-45e5-97a8-13da0db177cd) — Civil Technology · QP · 2019 · Eng
- [Civil Technology Nov 2019 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-eng/52c5e936-0c5c-4ea4-8929-a76fdaa48f02) — Civil Technology · QP · 2019 · Eng
- [Civil Technology Nov 2019 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-afr/560716c2-e3ed-412e-90e8-42d36162ee0d) — Civil Technology · QP · 2019 · Afr
- [Civil Technology Nov 2019 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-woodworking-afr/1a837a2b-2575-4096-939a-dd10f12a0bf9) — Civil Technology · QP · 2019 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.