# Civil Technology Grade 12 NSC November 2020 QP (Eng)

> Grade 12 Civil Technology question paper from the NSC November Exam 2020 (English), 21 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2020-construction-eng/6e24138d-3f1b-42f9-8076-7ae0b7db457a
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2020
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 21

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2020 QP (Eng)](https://www.hlayiso.com/library/civil-technology-nov-2020-construction-eng/6e24138d-3f1b-42f9-8076-7ae0b7db457a)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2020. Question paper, 21 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Down From hlayiso.com

>“ ¥
—“¥

\¢ Department:
() Basic Education
LSA REPUBLIC OF SOUTH AFRICA

SENIOR CERTIFICATE/
NATIONAL SENIOR CERTIFICATE

basic education

SSS SPSS SSSR SSSR SSSR SSS SRS SSSR SSS SESE SERS SEES
« CIVIL TECHNOLOGY: CONSTRUCTION i
i Ll
a NOVEMBER 2020 ‘
Mg ee
MARKS: 200
TIME: 3 hours

This question paper consists of 12 pages and 8 answer sheets.

Please turn over

Copyright reserved

### Page 2

Downloaded from hlayiso.com

Civil Technology: Construction 2 DBE/November 2020
SC/NSC

REQUIREMENTS:

1. Drawing instruments
2. A non-programmable calculator
3. ANSWER BOOK

INSTRUCTIONS AND INFORMATION
1. This question paper consists of SIX questions.
Answer ALL the questions.

Read all questions carefully.

Re KN

Answer each question as a whole. Do NOT separate subsections of
questions.

a

Number the answers correctly according to the numbering system used in this
question paper.

Start the answer to EACH question on a NEW page.
Do NOT write in the margins of the ANSWER BOOK.

You may use sketches to illustrate your answers.

oo nN fo

Write ALL calculations and answers in the ANSWER BOOK or on the
attached ANSWER SHEETS.

10. Use the mark allocation as a guide to the length of your answers.

11. Make drawings and sketches in pencil, fully dimensioned and neatly finished
off with descriptive titles and notes to conform to the SANS/SABS Code of
Practice for Building Drawings.

12. For the purpose of this question paper, the size of a brick should be taken as
220 mm x 110 mm x 75 mm.

13. Use your own discretion where dimensions and/or details have been omitted.

14, Answer QUESTIONS 2, 3.6, 3.7, 4.15, 5.6, 5.7, 6.5 and 6.6 on the attached
ANSWER SHEETS using drawing instruments, where necessary.

15. Write your CENTRE NUMBER and EXAMINATION NUMBER on every
ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
have used them or not.

16. Drawings in the question paper are NOT to scale due to electronic transfer.
17. Google Images was used as the source of all photographs and pictures.

18. Write neatly and legibly.

Copyright reserved Please turn over

### Page 3

Downloaded from hlayiso.com

Civil Technology: Construction 3 DBE/November 2020
SC/NSC

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)

Start this question on a NEW page.

1.1 Choose a description from COLUMN B that matches an item in COLUMN A.

Write only the letter (A-K) next to the question numbers (1.1.1 to 1.1.8) in the
ANSWER BOOK, e.g. 1.1.9 L.

COLUMN A COLUMN B

1.1.1 Powder coating A must be inclined slightly towards a
building

1.1.2 Rungs

B __ is used with the dumpy level to

1.1.3. Wing nut measure heights accurately

1.1.4 Rawl bolts C allows a worker to climb up or down a
ladder

1.1.5 Telescopic staff
D can be tightened or loosened without

1.1.6 Accident using a spanner

1.1.7 Putlog scaffold E _ suitable for outdoor furniture

1.1.8 Building rubble F result of an unsafe act or unsafe
condition

G must not be placed where it may
obstruct the access to or the exit from
a building site

H_ resists pull-out failure

I must be secured firmly when there is
any sagging

J prevent(s) workers from falling off a
scaffold

K disposal of waste materials and

debris
(8 x 1)
1.2 Explain ONE advantage of galvanising.
1.3 Name the document on hazardous chemical substances which the OHS Act
requires employers to provide to interested or affected persons.
1.4 Describe TWO methods that can be used to move building material around

the site.

Copyright reserved Please turn over

(8)
(1)

(1)

(2)

### Page 4

Downloaded from hlayiso.com

Civil Technology: Construction 4 DBE/November 2020

SC/NSC

1.5 State TWO specific advantages of water-based paint.

1.6 You were tasked to locate steel bars and copper pipes placed in a wall.
1.6.1 Name the tool you would use to detect these materials.
1.6.2 Describe how you would take care of this tool after using it.
1.7 FIGURE 1.7 below shows a joining fixture that is commonly used.

2
a

FIGURE 1.7

Explain how this joining fixture can be used to secure a bracket to a wall.

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

Start this question on a NEW page.

FIGURE 2 on the next page shows different drawings that appear on a building plan.

Analyse the drawings and complete the table on ANSWER SHEET 2.

Copyright reserved Please turn over

(1)
(2)

(3)
[20]

### Page 5

Downloaded from hlayiso.com

Civil Technology: Construction 5 DBE/November 2020
SC/NSC

NOTES:

Contractors must verify ali
dimensions and levels on site before
commencing work. Architects must
be notified of any discrepancies
immediately.

7

ARCHITECT'S SIGNATURE
CLIENT'S SIGNATURE ..

Brick force must be installed every
third course up to window height.
From the top of the window, brick
force must be installed between
every course up to wall plate height.

DPM must be fitted under the floor
slab to prevent water from
penetrating from the substructure.

The foliowing electrical fittings must
be installed in the kitchen:

FIGURE A 2x40W
SCALE 1: 100 REVISION DATE | DESCRIPTION
PRINTED BY: DATE OF PRINT:
2.500 — 2000 {p40 + MTANDO PRINTERS —_ 01/04/2020
2
Q| 220 110 yy 110 yy g .
i) DRAWING TITLE:
v1 A nN
il Y Wi W2 W2 _W1, e SITE PLAN STAND 101
: =I —I —————} 2
i BATHROOM || TOILET | PROJECT:
BEDROOM 1 BEDROOM 2 a PROPOSED DWELLING ON STAND 101,
| 3 JABULANI STREET, CRADOCK
5 ; PROJECT NO. DRAWING NO.
a f= | GR 448-210 559P7
c=)
&. = 3 DATE | DRAWN | CHECKED |SCALE
\ = 27/03/2020 | N DAMON} P HENSLO | 1 : 100
. | | =
2 REFERENCE CODE
| ® = ‘QP 4-2020
-||
| g WINDOW 1 WINDOW 2
ea 1x40W LOUNGE a
KITCHEN
Ti 1600
> | | SS 800.
; \ —— K k
FIGURE B “1 - =
SCALE 1 : 100
FIGURE 2 [40]

Copyright reserved Please turn over

### Page 6

Civil Technology: Construction 6 DBE/November 2020

Downloaded from hlayiso.com

SC/NSC

QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)

Start this question on a NEW page.

3.1

3.2

3.3
3.4
3.5

3.6

3.7

Copyright reserved

Give ONE word/term for each of the following descriptions by choosing a
word/term from the list below. Write only the word/term next to the question
numbers (3.1.1 to 3.1.5) in the ANSWER BOOK, e.g. 3.1.6 114 mm x 38 mm.

760 mm; _fire-proof material; corrugated iron sheets; 300 mm;
38x 38mm; sisalation; 1200 mm; fibre-cement tiles; 450 mm;
concrete and clay roof tiles; bitumen asphalt; 50 x 76mm

3.1.1 The maximum spacing between roof trusses for a thatch roof

3.1.2 The material that can be used as an underlay to reduce the fire
hazard during the construction of a thatch roof

3.1.3 The maximum spacing between the battens for a thatch roof

3.1.4 The type of roof covering if the maximum space between the roof
trusses is 760 mm

3.1.5 The dimensions of a batten that is used in an eaves construction
for corrugated iron sheet covering

State ONE principle to consider when designing a staircase in terms of the
following:

3.2.1 Minimum width of the staircase

3.2.2 Minimum headspace

3.2.3 Safety

Differentiate between a rise and riser as used in a staircase.
Name the template that is used to set out a staircase.

State any TWO purposes of a balustrade.

Use ANSWER SHEET 3.6 and draw a neat freehand sketch, in good
proportion, to show how a roof truss is joined to a wall.

Use the assessment criteria on the ANSWER SHEET as a guide.

Use ANSWER SHEET 3.7 and draw to scale of 1 : 10 the junction between
the tie beam, king post and struts of a gang-nailed South African (Howe) roof
truss. The angle between the struts and the tie beam is 30°. Label any TWO
parts with the dimensions and print the title and scale below the drawing.

Use the assessment criteria on the ANSWER SHEET as a guide.

Please turn over

(1)

(1)

(1)

(1)

(1)
(1)
(1)
(2)
(1)
(2)

(9)

(8)
[30]

### Page 7

Downloaded from hlayiso.com

Civil Technology: Construction 7 DBE/November 2020

SC/NSC

QUESTION 4: EXCAVATIONS, FORMWORK, TOOLS, EQUIPMENT AND

MATERIALS (SPECIFIC)

Start this question on a NEW page.

4.1
4.2

4.3

44

4.5

46

47

Define the term excavations.

Describe the consequence if heavy vehicles drive close to the edge of an
excavation.

Predict what will happen if the sides of an excavation are not dug at the
correct angle.

At which part of the formwork will you start when dismantling formwork in
excavations?

What precautions must be taken around a trench that is deeper than
2 metres?

Excavation of loose soil is necessary on a building site to reach a firm soil
base.

4.6.1 The location of different types of services should be determined
before excavation commences. Name any TWO of these services.

4.6.2 The trenches should be inspected regularly when working in deep
trenches. Explain when these inspections should take place.

FIGURE 4.7 below shows a tamping rammer that is used on a building site.

~ FIGURE 4.7,

47.1 Describe how one should operate the tamping rammer safely.

4.7.2 Why should this machine be stored in a safe, dry place?

Copyright reserved Please turn over

(1)

(1)

(1)

(1)

(1)

(2)

(1)

(2)
(4)

### Page 8

Downloaded from hlayiso.com

Civil Technology: Construction 8 DBE/November 2020
SC/NSC
48 FIGURE 4.8 below shows equipment that is used to test concrete on a

49

4.10

4.11

4.12

4.13

4.14

4.15

construction site. Study FIGURE 4.8 below and answer the questions that
follow.

~ FIGURE 4.8

4.8.1 Name the test used in FIGURE 4.8.
4.8.2 Identify A and B.

4.8.3 Indicate the time needed before testing can take place, after the
concrete has been immersed in water.

4.8.4 Which property of concrete is tested during this process?

State TWO properties of ductile cast iron. .

Name ONE material that can be used to fix cladding to a wall.

Describe the function of poling boards as used in shuttering for excavations.

Explain TWO functions of walling boards that are used in shuttering for
excavations.

How many walling boards must be used for an excavation that is 1 metre
deep?

Describe the spacing of poling boards for shuttering in firm soil and shuttering
in loose soil respectively.

FIGURE 4.15 on ANSWER SHEET 4.15 shows an incomplete drawing of
the formwork for a straight flight of concrete stairs with a landing. Use
ANSWER SHEET 4.15 and complete the drawing.

Use the assessment criteria on the ANSWER SHEET as a guide.

Copyright reserved Please turn over

(1)
(2)

(2)
(1)
(2)
(1)
(1)

(2)

(1)

(2)

(14)
[40]

### Page 9

Civil Technology: Construction 9 DBE/November 2020

Downloaded from hlayiso.com

SC/NSC

QUESTION 5: PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS

MEANS OF COMMUNICATION (SPECIFIC)

Start this question on a NEW page.

5.1

5.2

5.3

5.4

5.5

5.6

5.7

Copyright reserved

Classify the type of finish that can be obtained by using the following:
5.1.1 A Tyrolene machine

5.1.2 Hessian cloth or cement bag

State TWO purposes of screed.

Explain ONE method of preparing a smooth concrete floor to receive the
screed.

Identify the material that can be added to plaster to increase its workability
and plasticity.

Differentiate between a rough arch and a gauged arch in terms of the
respective shapes of the mortar joints.

Use ANSWER SHEET 5.6 and draw a neat sketch showing the alternate plan
courses of a one-and-a-half brick pier built in stretcher bond.

Use the assessment criteria on the ANSWER SHEET as a guide.

Use ANSWER SHEET 5.7 and draw to scale 1 : 10 a horizontal sectional
view through a wooden door frame built into a 220 mm wall.

Use the assessment criteria on the ANSWER SHEET as a guide.

Please turn over

(1)
(1)
(2)

(1)

(1)

(2)

(10)

(12)
[30]

### Page 10

Downloaded from hlayiso.com

Civil Technology: Construction 10 DBE/November 2020
SC/NSC
QUESTION 6: REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE

FLOORS AND QUANTITIES (SPECIFIC)

Start this question on a NEW page.

6.1 Various options are given as possible answers to the following questions.
Choose the answer and write only the letter (A-D) next to the question
numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.

6.1.1

6.1.3

6.1.4

6.1.5

Steel that is used as reinforcement in concrete is available in the
following thicknesses:

A 8mm, 25 mm and 40 mm
B 5mm, 7mm and 13mm
C 9mm, 18 mm and 28 mm
D 14mm, 26 mm and 35 mm

Reinforcement rods and bars are available in lengths of up to ...

A 3000mm.
B 6000 mm.
C 13000 mm.
D 15000 mm.

Spacers are used to prevent the reinforcement from ...

bending and buckling.

touching the sides of the formwork.
twisting.

All the above-mentioned

0DOWUPY

... Can be used as bars and rods for reinforcement.

A Square twisted bars

B_ Round bars

C_ Ribbed bars

D_ All the above-mentioned

The purpose of minimum concrete cover is to ensure ...

adequate bonding between the steel and concrete.
adequate protection of steel in the event of a fire.
protection of steel against corrosion.

All the above-mentioned

voor

6.2 Give TWO reasons for the installation of pile foundations.

Copyright reserved

Please turn over

(1)

(1)

(1)

(1)

(1)
(2)

### Page 11

Downloaded from hlayiso.com

Civil Technology: Construction 11 DBE/November 2020

SC/NSC

6.3 Draw a neat freehand sketch in your ANSWER BOOK showing the first step
of the installation of a driven in-situ pile.

Show the following in the drawing:

Steel cable

Steel pipe-casing
Drop hammer
Any ONE label

6.4 FIGURE 6.4 below shows a faulty installation of a rib and block floor
construction.

Analyse FIGURE 6.4 and answer the questions that follow.

4a--b-4 cee
REE Fyfe
FIGURE 6.4
6.4.1 Predict TWO consequences of installing the rib and block floor as
shown.

6.4.2 Draw a neat freehand drawing in your ANSWER BOOK and rectify
the faults in FIGURE 6.4.

6.4.3 What is the minimum recommended width of the load-bearing walls
that support this type of floor construction?

6.5 Use ANSWER SHEET 6.5 and draw a neat sectional view of a round
reinforced concrete column with eight main bars in good proportion.

Use the assessment criteria on the ANSWER SHEET as a guide.

Copyright reserved Please turn over

(5)

(2)

(6)

(1)

(7)

### Page 12

Downloaded from hlayiso.com

Civil Technology: Construction 12 DBE/November 2020
SC/NSC
6.6 FIGURE 6.6 below shows the floor plan of a storeroom in a construction
workshop. Study the floor plan and answer the questions that follow.
6 500
f=)
fos)
Ww)
x
FIGURE 6.6

Use the following specifications:

Outside measurements of the storeroom: 6 500 mm x 4 500 mm
Size of the window opening: 2 500 mm x 600 mm

Size of the door opening: 2 100 mm x 900 mm

Concrete floor: 75 mm thick

Walls: 220 mm wide

Tiles: 350 mm x 350 mm

eee0ee3ee

Use the dimension paper on ANSWER SHEET 6.6 and calculate the
following:

6.6.1 The area of the floor

6.6.2 The volume of concrete needed for the floor. Round off your
answer to TWO decimal places.

6.6.3 The number of tiles needed

TOTAL:

Copyright reserved

(5)

(2)

(5)
[40]

200

### Page 13

Downloaded from hlayiso.com

Civil Technology: Construction DBE/November 2020
SC/NSC
| CENTRE NUMBER: L[ [ [| [ J
[EXAMINATIONNUMBER: | | | | | | LT TT 7]
ANSWER SHEET 2
NO. QUESTION ANSWER MARKS
1 Identify the elevation in FIGURE A. 1
2 Describe the type of house that is
indicated in FIGURE A. 1
3 Identify number 1. 1
4 Identify number 3. 1
5 Identify number 4. 1
6 Identify the fastener indicated by 1
number 5.
7 Identify number 6. 1
8 Identify number 7. 1
9 Identify number 8. 1
10 What does DPM stand for, as 1
indicated in the notes?
11 Identify number 10. 4
Recommend a suitable material that
12 can be used for the manufacturing of 1
number 2 in FIGURE A.
13 Name the TWO elevations on which 2
number 2 is installed.
14 Describe the purpose of number 3. 1
Deduce ONE feature that has been
15 omitted from the elevation in 1
FIGURE A.
Recommend any TWO sanitary
16 fitments carrying waste-water, other 2
than a bath, that can be installed in
the room indicated by number 11.

Copyright reserved

### Page 14

Downloaded from hlayiso.com

Civil Technology: Construction DBE/November 2020
SC/NSC

What sanitary fixture carrying soil
17 water can be installed in the room
indicated by number 12?

Describe the error that appears at
18 number 6 in the elevation in
FIGURE A.

19 State the reference code for this plan.

20 Which room will number 13 serve?

21 | What does the line between
numbers 13 and 14 represent?

Differentiate between number 15 in
22 FIGURE B and number 17 in the
notes.

Explain the installation of brick force
23 from the top of the window to the wall
plate, as indicated by the architect.

Recommend a possible finish for the

24 outside walls of the house.

Deduce from FIGURE 2 which

eS elevation does NOT have windows.

26 Deduce the thickness of the external
wall from FIGURE 2.

27 Name a material that can be used to
close the open sides of number 16.

28 Name the town in which the proposed
dwelling will be build.

Calculate the area of the bathroom.
29 Show ALL calculations. Give your
answer in m?.

Calculate the total length of the wall
on the eastern side of the building.
Show ALL calculations. The length
must be indicated in metres.

30

TOTAL:

Copyright reserved

### Page 15

Downloaded from hlayiso.com

Civil Technology: Construction

SC/NSC

| CENTRE NUMBER: I

[|

DBE/November 2020

[EXAMINATION NUMBER: |

ANSWER SHEET 3.6

ASSESSMENT CRITERIA

MARK

CANDIDATES
MARK

Brick wall

Wall plate

Tie beam

Rafter

Hoop-iron strap

Clout nails

Correctness of drawing

TOTAL:

wl) a)o}a)/a)/a)/ a

Copyright reserved

### Page 16

Downloaded from hlayiso.com

Civil Technology: Construction DBE/November 2020
SCINSC

[CENTRENUMBER: | | | | | | | | |

[EXAMINATIONNUMBER: | | | | | | | | | | | | |_|

ANSWER SHEET 3.7

ASSESSMENT CRITERIA MARK | CANDIDATE'S
MARK

Tie beam
King post
Struts
Any ONE label with dimensions
| Application of scale
Correctness of drawing
TOTAL:

eo} /—/ro/ro} a} oa

Copyright reserved

### Page 17

Downloaded from hlayiso.com

Civil Technology: Construction

SC/NSC

DBE/November 2020

| CENTRE NUMBER: L_]

[EXAMINATION NUMBER: |__|

ANSWER SHEET 4.15

SHUTTER BOARD

WALL 220mm —__,

LANDING

|

Uy

D™D?DM'MY«Y(UWé«éi GG

FIGURE 4.15

\ SOLE PLATE

ASSESSMENT CRITERIA

MARK

CANDIDATE'S

MARK

Cross bearers

Bearer/Joist

| Props

Folding wedges

Cleats to support props

Wall string

| Bevelied riser

Cleats

Correctness of drawing

TOTAL:

Rlaly|y)s|sinjo|a/s

Copyright reserved

### Page 18

Downloaded from hlayiso.com

Civil Technology: Construction DBE/November 2020
SC/NSC

| CENTRE NUMBER: LTT TT TT yt

[EXAMINATION NUMBER: | | | | LTT? Tf, {Ty i

ANSWER SHEET 5.6

ASSESSMENT CRITERIA MARK | CANDIDATE'S

MARK
| Strecher bond — first course 5
Strecher bond — second course iS}
TOTAL: 10

Copyright reserved

### Page 19

Downloaded from hlayiso.com

Civil Technology: Construction

SC/NSC

| CENTRE NUMBER:

[| TT TT TT

DBE/November 2020

[EXAMINATIONNUMBER: | | | | | | | | J

ANSWER SHEET 5.7

ASSESSMENT CRITERIA MARK | CANDIDATE'S

MARK

Wall 220 mm

Plaster 12 mm

Exterior reveal

Door frame 110 mm x 70 mm

DPC attached to door frame

Quarter rounds

Any ONE label

Correctness of drawing

TOTAL:

plAlaiNy|siyl}aiyiny

Copyright reserved

### Page 20

Downloaded from hlayiso.com

Civil Technology: Construction DBE/November 2020
SC/NSC

[CENTRE NUMBER: _ TTT TTT Ty i

[EXAMINATIONNUMBER: | | | | | LT] [T |] 7 [TT J

ANSWER SHEET 6.5

ASSESSMENT CRITERIA MAR CANDIDATE'S

MARK

Column

Stirrup

Main bars

Cover depth indicated (min concrete
cover)

Correctness of drawing

aly|alyl x S

=

TOTAL: | 7 (7)

Copyright reserved

### Page 21

Downloaded from hlayiso.com

Civil Technology: Construction DBE/November 2020
SC/NSC

| CENTRE NUMBER: JT [TTT {TT 7 TJ

[EXAMINATIONNUMBER: | | | | | | | | | | | [| | J

ANSWER SHEET 6.6

A B c D

(12)

Copyright reserved

## Related documents

- [Civil Technology Nov 2020 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-afr/b796705a-6588-4c35-a6ed-9d9659bce995) — Civil Technology · QP · 2020 · Afr
- [Civil Technology Nov 2020 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-woodworking-eng/f45b898c-a9ab-4069-ae4b-2b730f88cf1b) — Civil Technology · QP · 2020 · Eng
- [Civil Technology Nov 2020 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-eng/8ecb8551-97e5-4a57-8187-0130f8d158da) — Civil Technology · QP · 2020 · Eng
- [Civil Technology Nov 2020 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-nov-2020-construction-afr/7e3d3218-d564-4a19-b535-b7ed8a417256) — Civil Technology · QP · 2020 · Afr
- [Civil Technology Nov 2020 (Construction) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-construction-memo-eng/f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca) — Civil Technology · Memo · 2020 · Eng
- [Civil Technology Nov 2020 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-memo-afr/8cffc125-69c0-44e9-b0eb-88ae7e930363) — Civil Technology · Memo · 2020 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
