# Civil Technology Grade 12 NSC November 2020 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2020 (English), 21 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2020-woodworking-memo-eng/e826fb9e-5fb3-4b9f-bb1a-0ea5748eb76d
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2020
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 21

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2020 Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2020-woodworking-memo-eng/e826fb9e-5fb3-4b9f-bb1a-0ea5748eb76d)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2020. Memorandum, 21 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                     GRAAD 12

                          SENIOR CERTIFICATE/
                      NATIONAL SENIOR CERTIFICATE

                                     GRADE 12

                      CIVIL TECHNOLOGY: WOODWORKING

                                  NOVEMBER 2020

                               MARKING GUIDELINES

MARKS: 200

                      These marking guidelines consist of 21 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Civil Services               2                         DBE/November 2020
                                   SC/NSC – Marking Guidelines

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
            (GENERIC)

1.1        1.1.1        E                                                                     (1)

           1.1.2        C                                                                     (1)

           1.1.3        D                                                                     (1)

           1.1.4        H                                                                     (1)

           1.1.5        B                                                                     (1)

           1.1.6        F                                                                     (1)

           1.1.7        A/I                                                                   (1)

           1.1.8        G/K                                                                   (1)

1.2        Galvanising:
            Adds strength to the original, uncoated metal. 
            Make it last longer/Preservation/Durable.
            Decorative/Enhance appearance.
            Makes metal thicker than the uncoated metal.
            Nails and screws prevent staining.
            Prevent the material from rusting/corroding.
           ANY ONE OF THE ABOVE                                                                (1)

1.3         Material safety data sheet. 
            Sufficient information regarding the protection of health and safety.
           ANY ONE OF THE ABOVE                                                                (1)

1.4            Materials can be moved manually/by means of a wheelbarrow/trolley. 
               Materials can be moved by means of machinery/builders hoist/truck/
                crane/tractor/conveyor/fork lift.                                             (2)

1.5        Water-based paint:
            Dry quickly. 
            Allows marks/smudges to be easily cleaned with water. 
            Give an elastic flexible finish.
            Durable
            Gives a decorative finish.
            Enhances the appearance.
            Resistant to cracking.
            Cost effective/Cheaper.
            Easy to apply.
           ANY TWO OF THE ABOVE                                                                (2)

Copyright reserved                                                          Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Woodworking                   3                         DBE/November 2020
                                         SC/NSC – Marking Guidelines

1.6       1.6.1       Multi detector                                                          (1)

          1.6.2       Care of the multi detector:
                       Place the multi-detector in its holder directly after use. 
                       Do not bump the instrument against objects or drop it. 
                       Protect the multi-detector against moisture and direct sunlight.
                       If the measuring tool is not used for a long period, remove the
                          battery.
                       Wipe away dirt or spots with a dry, soft cloth.
                       Switch off the device before storing.
                      ANY TWO OF THE ABOVE                                                     (2)

1.7           Drill a hole in the wall. 
              Insert the plastic plug into the hole. 
              Align the hole in the bracket with the hole in the wall, and fasten the
               screw.                                                                         (3)
                                                                                               [20]

Copyright reserved                                                          Please turn over

### Page 4

Downloaded from hlayiso.com
    Civil Technology: Woodworking               4                             DBE/November 2020
                                     SC/NSC – Marking Guidelines

    QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

    NO.                  QUESTION                                  ANSWER                      MARKS
           Identify the elevation in FIGURE
1                                               South Elevation                                    1
           A.

           Describe the type of house that is   Double-storey house/Building/Multi-storey
2                                                                                                   1
           indicated in FIGURE A.               building 

                                                Ridge Capping/Ridge tile/Ridge
3          Identify number 1.                                                                       1
                                                plate/Ridge 

4          Identify number 3.                   Fascia board                                       1

5          Identify number 4.                   Overhang/Eave/Dimension line                       1

           Identify the fastener indicated by
6                                               Holder bat/Clamp/Clip                              1
           number 5.
                                                Window/Window frame/Casement/
7          Identify number 6.                                                                       1
                                                Casement frame 
                                                Shoe/Down pipe outlet/
8          Identify number 7.                                                                       1
                                                Spout 
9          Identify number 8.                   Natural ground level/NGL                           1
           What does DPM stands for, as
10                                              Damp proof membrane                                1
           indicated in the notes?
11         Identify number 10.                  Built-in cupboard/BIC                              1
           Recommend a suitable material        Fibre cement/Galvanised sheeting/Sheet
           that can be used for the             metal/Timber/Wood/Plastic/Fibre
12                                              glass/Aluminium sheeting                           1
           manufacturing of number 2 in
           FIGURE A.
           Name the TWO elevations on           West elevation 
13                                                                                                  2
           which number 2 is installed.         East elevation 
           Describe the purpose of number       The gutter is fixed against it. 
14                                              It finishes off the roof.                           1
           3.
                                                Protect roofs/rafters from rainwater.
           Deduce ONE feature that has          Step missing at the door 
15         been omitted from the elevation in                                                       1
           FIGURE A.                            Sill missing at the window

           Recommend any TWO sanitary           Wash basin/Wash hand basin/Hand
           fitments carrying waste water        basin/Basin/WB/WHB/HB 
16         other than a bath that can be                                                            2
                                                Shower/SH 
           installed in the room indicated by
           number 11.

    Copyright reserved                                                           Please turn over

### Page 5

Downloaded from hlayiso.com
 Civil Technology: Woodworking                5                              DBE/November 2020
                                 SC/NSC – Marking Guidelines

        What sanitary fixture carrying soil   Water closet/WC 
17      water can be installed in the room                                                        1
        indicated by number 12?               Bidet/BT

                                              The two side windows are opening to the
        Describe the error that appears at    wrong sides/No window sill/The window
18      number 6 in the elevation in                                                              1
                                              drawn in FIGURE A is not the same as that
        FIGURE A.                             in the window schedule/Window opening.

        State the reference code for this
19                                            QP 4 - 2020                                        1
        plan.

20      Which room will number 13 serve? Bedroom 2                                               1
                                              Electrical wiring/cable/Wiring/Wiring from
21      What does the line between            light switch to light/Shows which switch
                                                                                                  1
        numbers 13 and 14 represent?          operates which electrical fitting/Electrical
                                              connection
                                              15: Single tube fluorescent light. 
                                              17: Double/ tube fluorescent light. 
        Differentiate between number 15       15: Will use less electricity/Watt than 17/
22      in FIGURE B and number 17 in          15: Will provide less light than 17/                2
        the notes.                            15: Running cost will be cheaper than 17.
                                              15: Has one tube/ 1 x 40 Watt.
                                              17: Has two tubes/ 2 x 40 Watt.
        Explain the installation of brick
                                            Brick force must be installed between
        force from the top of the window to
23                                          every course above the window up to wall              1
        the wall plate, as indicated by the
                                            plate. 
        architect.
                                              Face bricks 
                                              Plaster and paint/Plaster/Paint/Plaster
        Recommend a possible finish for
24                                            finish (Smooth finish/Splatter finish/Wavy          1
        the outside walls of the house.
                                              finish/Bagging finish)
                                              Cladding/Tiling

        Deduce from FIGURE 2 which
25      elevation does NOT have               East elevation                                     1
        windows.

        Deduce the thickness of the
26                                            220 mm                                             1
        external wall from FIGURE 2.
        Name a material that can be used
                                              Wood/Timber/Stainless steel/Mild
27      to close the open sides of number                                                         1
                                              steel/Steel/Aluminium/Glass/Perspex 
        16.
        Name the town in which the
28                                            Cradock                                            1
        proposed dwelling will be build.

 Copyright reserved                                                            Please turn over

### Page 6

Downloaded from hlayiso.com
 Civil Technology: Woodworking                6                          DBE/November 2020
                                 SC/NSC – Marking Guidelines

        Calculate the area of the               ℓxb             ℓxb
29      bathroom. Show ALL calculations.      = 2 m x 2 m OR 2 000 mm x 2 000 mm             3
        Give your answer in m².               = 4 m²          = 4 m²
30      Calculate the total length of the     220 + 3 000  + 110
        wall on the eastern side of the
        building. Show ALL calculations.      + 1 400 + 110 + 2 000 +220
        The length must be indicated in       = 7 060 mm
        metres.
                                              = 7,06 m 
                                              OR
                                              220 + 3 000 + 110 + 3 510 + 220
                                              = 7 060 mm
                                              = 7,06 m                                         6
                                                                                TOTAL:         40

 Copyright reserved                                                         Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Woodworking                   7                             DBE/November 2020
                                   SC/NSC – Marking Guidelines

QUESTION 3:          CASEMENTS,     CUPBOARDS,                   WALL-PANELLING        AND
                     QUANTITIES (SPECIFIC)

3.1       Give ONE term for the following descriptions:

          3.1.1       Quadrant                                                                    (1)

          3.1.2       Mullion                                                                     (1)

          3.1.3       Putty                                                                       (1)

          3.1.4       Tongue-and –groove                                                          (1)

          3.1.5       Top rail                                                                    (1)

3.2
                                                                           SLOPE
                                                                      

                                                                          
                                                            
                                                                           DRIP GROOVE
                                                             REBATE

          Correctness of drawing        

           ASSESSMENT CRITERIA                   MARK
           Rebate                                  1
           Drip groove                             1
           Slope                                   1
           Correctness of drawing                  1
                                 TOTAL:            4                                               (4)

Copyright reserved                                                              Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Woodworking                8                                  DBE/November 2020
                                SC/NSC – Marking Guidelines

3.3                                
                                                                          TOP
                                             
                                                                   TOP RAIL

                                                                  SIDES

                                                              

                                               
                                                                  MIDDLE SHELF

                                               
                                                                   DOORS

                                                                  BOTTOM SHELF

                                                                 KICK PLATE

          Correctness of drawing       

           ASSESSMENT CRITERIA                          MARK
           Kick plate                                     1
           Sides                                          1
           Top rail                                       1
           Bottom shelf                                   1
           Top 32 mm thick                                1
           Top overhang 30 mm on either side              1
           Middle shelf                                   1
           Doors                                          1
           Correctness of drawing/Scale drawing           1
                                           TOTAL:         9                                          (9)

THE SIDES CAN ALSO BE INDICATED IN DARK LINES IF THE DOORS ARE FITTED
BETWEEN THE SIDES

Copyright reserved                                                                Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Woodworking                9                           DBE/November 2020
                                SC/NSC – Marking Guidelines

3.4

                                                                              WALL

                                                                             ROUGH GROUND
  STRIP                                                                  
                                                                             SKIRTING
  BOARDS

                                            OR

                                                                                WALL

      STRIP                                                                     ROUGH GROUND
      BOARDS                                                                    SKIRTING

                         ASSESSMENT CRITERIA                  MARK
                         Rough ground                           1
                         Strip boards                           2
                         Skirting                               1
                                                 TOTAL:         4                             (4)

Copyright reserved                                                         Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Woodworking               10                         DBE/November 2020
                                SC/NSC – Marking Guidelines

           A         B     C       D
3.5.1                              LENGTH OF FASCIA BOARD NEEDED

                                   LENGTH OF THE ROOF
                                   230 + 12 000 + 230
                                   = 12 460 mm 

                                   WIDTH OF THE ROOF
                                   230 + 6 000 + 230
                                   = 6 460 mm 

                                   TOTAL LENGTH OF FASCIA BOARD NEEDED
                                   2(12 460 + 6 460) 
                                   = 37 840 mm 
                                      OR
                                   = 37,84 m                                                 (4)

3.5.2                              LENGTH OF SKIRTING NEEDED

                                   INSIDE LENGTH OF WALL
                                   12 000 – 220 – 220
                                   = 11 560 mm 

                                   INSIDE WIDTH OF WALL
                                   6 000 – 220 – 220
                                   = 5 560 mm 

                                   TOTAL LENGTH OF SKIRTING NEEDED
                                   2(11 560 + 5560) - 10 000 (door opening) 
                                   = 24 240 mm 
                                    OR
                                   = 24,24 m                                                 (4)
                                                                                             [30]

Copyright reserved                                                        Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Woodworking                 11                          DBE/November 2020
                                  SC/NSC – Marking Guidelines

QUESTION 4:          ROOFS, CEILINGS, TOOLS AND EQUIPMENT, AND MATERIALS
                     (SPECIFIC)

4.1       4.1.1       Belt sander/Portable belt sander                                        (1)

          4.1.2       If no personal safety equipment is worn:
                       Dust and debris can cause eye and body injuries. 
                       Dust may damage your lungs. 
                       Dust and debris may damage clothes.
                       Loose clothing can be caught in moving parts of the machine
                           and cause injury.
                      ANY TWO OF THE ABOVE                                                     (2)

          4.1.3       Prevent machine from being damaged by:
                       corrosion/rust/dust/dirt 
                       moisture.
                      ANY ONE OF THE ABOVE                                                     (1)

4.2       4.2.1       Adjusting the height of the table of the thickness planer while in
                      operation:
                       Can cause injury to the operator. 
                       Can cause the wood to get stuck in the thickness planer. 
                       Can put unnecessary strain on the thickness planer.
                       Thickness planer will stops working.
                       Thickness planer can be damaged.
                      ANY TWO OF THE ABOVE                                                     (2)

          4.2.2         Ensure that timber is free from metal objects before planing
                         commenced. 
                       Make sure the blades are sharp. 
                       Ensure that the blade is properly fastened.
                      ANY TWO OF THE ABOVE                                                     (2)

4.3       Different types of roof underlay:

          4.3.1       Polypropylene/Plastic membrane                                          (1)

          4.3.2       Aluminium foil or any other fireproof material                          (1)

          4.3.3       A synthetic/plastic membrane or metal waterproofing membrane            (1)

Copyright reserved                                                          Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Woodworking                   12                        DBE/November 2020
                                    SC/NSC – Marking Guidelines

4.4

                                        
                                                      VALLEY

                                

                           ASSESSMENT CRITERIA                     MARK
                           Inclined roof on top                      1
                           Valley                                    1
                           Inclined roof on left                     1
                                                          TOTAL:     3                         (3)

4.5       Eaves are closed because:
           it provides a more attractive finish. 
           it prevents birds from nesting in the roof.
           beam filling is not compulsory.
          ANY ONE OF THE ABOVE                                                                 (1)

4.6       Fibre cement board is water resistant.                                              (1)

4.7       4.7.1       Concrete roof tiles are:
                       quite prone to chemical weathering. 
                       fragile and must be handled with care. 
                       heavier than most other roofing materials.
                       not always uniform in colour.
                       not able to resists extreme weather conditions.
                       more expensive.
                       more labour intensive.
                       porous at times.
                      ANY TWO OF THE ABOVE                                                     (2)

          4.7.2       Thatch roofs:
                       are extremely vulnerable to fire and must be treated with fire
                          proof chemicals before use. 
                       are more expensive to install than other roof covering.
                       demands more maintenance.
                       are susceptible to decay because thatch is an organic
                          material.
                       need re-thatching of the ridge capping every four to six years.
                      ANY TWO OF THE ABOVE                                                     (2)

Copyright reserved                                                          Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Woodworking               13                            DBE/November 2020
                                SC/NSC – Marking Guidelines

          4.7.3       Corrugated roof sheeting:
                       Sharp edges can be dangerous. 
                       If sheets are too thin, they may bend when stepped upon. 
                       The sheets can rust along the edges if they have been cut
                          using an angle grinder.
                      ANY TWO OF THE ABOVE                                                     (2)

4.8       The trapdoor framework must be secured to the:
           Tie beam 
           Brandering                                                                        (2)

4.9       Mechanical graded timber:
           Indicates the quality/strength of timber. 
           Undergone mechanical tests using machines. 
           Machine stress- grading is highly effective and more accurate than visual
             grading.
           It provides a reliable and consistent method of grading timber.
           Mechanically graded timber is most commonly used in engineered
             connector plate roof trusses.
           Mechanically graded timber is easily available because the process is
             faster.
          ANY TWO OF THE ABOVE                                                                 (2)

4.10      Timber must be preserved:
           to enhance the appearance of timber. 
           to prevent fungi growth. 
           to prevent fungal discolouration of timber.
           to prevent insect attacks.
           to protect it from the elements of the nature.
           to prevent shrinkage and warping.
           so that projects have a tough, durable, water-resistant and clear finish.
           to bring out the grain of the timber.
           to make it resistant to water, heat, stains and scratches.
           extend the lifespan of the timber.
           because it takes time to decay.
          ANY TWO OF THE ABOVE                                                                 (2)

Copyright reserved                                                          Please turn over

### Page 14

Downloaded from hlayiso.com
  Civil Technology: Woodworking                14                                DBE/November 2020
                                   SC/NSC – Marking Guidelines

  4.11
                                                                 Application of scale
                                                                                        
      KING POST 114 X 38 mm
                                                                          WALL PLATES 114 X 38 mm
                                                                    

                                      
                                                                     
                                                                              TIE BEAM 114 X 38 mm

                                   SPAN OF 4 000 MM
220 mm WALL                                                                    220 mm WALL
WITH INSIDE                                                                      WITH INSIDE

            Correctness of drawing
                                     
             ASSESSMENT CRITERIA                            MARK
             220 mm walls with inside span of 4 000 mm        2
             Wall plates 114 x 38 mm                          2
             Tie beam 114 x 38 mm                             1
             Rafters 114 x 38 mm                              2
             King post 114 x 38 mm                            1
             Correctness of drawing                           1
             Application of scale
             ONE or TWO incorrect        =3
             THREE or FOUR incorrect = 2                      3
             More than FIVE incorrect    =1
             NO measurements correct = 0
                                                     TOTAL:  12                                        (12)
                                                                                                       [40]

  Copyright reserved                                                                Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Woodworking                15                           DBE/November 2020
                                 SC/NSC – Marking Guidelines

QUESTION 5:          CENTRING, FORMWORK, SHORING AND GRAPHICS AS MEANS
                     OF COMMUNICATION (SPECIFIC)

5.1       A – Rib 
          B – Tie/Opening between ribs
          C – Lagging 
          D – Bearer 
          E – Horizontal brace/Strut                                                           (5)

5.2       An adjustable steel prop is preferred because…
           it is stronger than a wooden prop. 
           it can be adjusted much easier than a wooden prop.
           it can provide a much more accurate height adjustment during
              installation.
          ANY ONE OF THE ABOVE                                                                  (1)

5.3       5.3.1       Double flying shore/Flying shore/Raking shore                            (1)

          5.3.2       A – Folding wedges:
                      Allow the raising or lowering of the dead shore to the required
                      height.                                                                  (1)

          5.3.3       Steel dogs:
                       are used to secure the joint between soleplate/needle and
                          dead shore. 
                       help to keep the construction more rigid/stable/firm.
                      ANY ONE OF THE ABOVE                                                      (1)

5.4
           No Mistakes in the construction of         Possible solutions to rectify
              the dead shore                          the mistakes
           1  The needle is not secured by            Secure with steel dog. 
              means of a steel dog 
           2  The dead shores have no          Sole plates should be installed at
              soleplates.                     the bottom of the dead shores.
           3  No folding wedges.               Folding wedges should be placed
                                               under the dead shores.
           4   The needle do not rest properly Move dead shore to the left and
               on the dead shore on the right  secure needle properly on dead
               side.                           shore.
           5   Needle is not level.            Set needle level.
           6   No brace between the needle and Secure a brace between the
               the dead shore.                 needle and dead shore.
          ANY TWO MISTAKES WITH THE CORRESPONDING SOLUTIONS OF
          THE ABOVE OR ANY OTHER                                                                (4)

Copyright reserved                                                           Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Woodworking                16                              DBE/November 2020
                                 SC/NSC – Marking Guidelines

5.5       Differentiate between a couple roof truss and a collar-tie roof truss.
                                              
                                                                              RIDGE BEAM

                                                          
                                                                              RAFTER

                                                                                  WALL
                                     COUPLE ROOF TRUSS
          Correctness of drawing 
                  ASSESSMENT CRITERIA – COUPLE ROOF    MARK
                  Walls                                  1
                  Rafters                                1
                  Ridge beam                             1
                  Correctness of drawing                 1
                                                TOTAL:   4                                        (4)

                                                                       RIDGE BEAM

                                                                 COLLAR BEAM
                                                                          RAFTER
                                                                 

                                                                                    WALL

                                 COLLAR-TIE ROOF TRUSS
          Correctness of drawing 
                ASSESSMENT CRITERIA – COLLAR-TIE ROOF                       MARK
                Rafters                                                       1
                Collar beam                                                   1
                Ridge beam                                                    1
                Correctness of drawing                                        1
                                                     TOTAL:                   4                   (4)

Copyright reserved                                                             Please turn over

### Page 17

Downloaded from hlayiso.com
 Civil Technology: Woodworking                   17                       DBE/November 2020
                                     SC/NSC – Marking Guidelines

 5.6
 CROSS BEARER                            SOFFIT/SHUTTER BOARD

                                                           
                                                                                   BEARER
                                                       

                                                                                     
                                                                                   WALL

                 
  PROP

FOLDING                          
WEDGES                               
SOLEPLATE
       Correctness of drawing 

                                 ASSESSMENT CRITERIA               MARK
                            Soffit/Shutter board                     1
                            Bearer                                   1
                            Cross bearer                             1
                            Prop                                     1
                            Folding wedges                           1
                            Soleplate                                1
                            Any TWO labels                           2
                            Correctness of drawing                   1
                                                   TOTAL:            9                         (9)
                                                                                               [30]

 Copyright reserved                                                         Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology: Woodworking                 18                           DBE/November 2020
                                  SC/NSC – Marking Guidelines

QUESTION 6:          SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
                     AND JOINING (SPECIFIC)

6.1       6.1.1        B                                                                        (1)

          6.1.2        A                                                                        (1)

          6.1.3        D                                                                        (1)

          6.1.4        C                                                                        (1)

          6.1.5        D                                                                        (1)

6.2       A - Wall plate 
          B - Floor joist 
          C - Brick pier 
          D – Bearer                                                                            (4)

6.3       The concrete base must be wider than the brick pier in order to distribute the
          load imposed on it to the ground.                                                     (1)

6.4
                                          
                  
                       
                                                  FLOOR JOIST

                                STRUT                                                            (3)

6.5       Ant guards are made from galvanized steel so that it will not rust or corrode.        (1)

6.6           Cut cupboard – bolts move in a horizontal direction. 
              Drawer/till locks – bolts move in a vertical position.                           (2)

Copyright reserved                                                            Please turn over

### Page 19

Downloaded from hlayiso.com
Civil Technology: Woodworking                19                       DBE/November 2020
                                 SC/NSC – Marking Guidelines

6.7

         RAISED PANELS
                                              

                                                    

                                                              LOCK RAIL

  CLEARANCE/OPENING FOR                           
  SHRINKAGE AND EXPANSION

                                              

                                                                 STILE

          Correctness of drawing 

                               ASSESSMENT CRITERIA             MARK
                           Raised panels                         2
                           Lock rail                             1
                           Clearance/opening for shrinkage
                           and expansion                        2
                           Correctness of drawing               1
                                                      TOTAL:    6                           (6)

6.8       A - Haunch
          B - Rail/Top rail
          C - Open tenon/Tenon
          D - Stile                                                                        (4)

Copyright reserved                                                       Please turn over

### Page 20

Downloaded from hlayiso.com
Civil Technology: Woodworking               20                   DBE/November 2020
                                SC/NSC – Marking Guidelines

6.9       6.9.1

                                                              BRACE

                                   A

                                   A

                                       FIGURE 6.9

           ASSESSMENT CRITERIA                          MARK
           Brace                                          1
                                             TOTAL:       1                           (1)

Copyright reserved                                                 Please turn over

### Page 21

Downloaded from hlayiso.com
Civil Technology: Woodworking                   21                          DBE/November 2020
                                      SC/NSC – Marking Guidelines

          6.9.2
                                                BRACE
                                  
                                      V TONGUE AND GROOVE BATTEN

                              
                                 

HATCHING
                                            BOTTOM RAIL

                                          STYLE 

           ASSESSMENT CRITERIA                                 MARK
           V tongue and groove batten                            1
           Brace                                                 1
           Bottom rail                                           1
           Hatching                                              1
           Arrow indicating the style                            1
                                                    TOTAL:       5                              (5)

6.10
                                                                     110 mm WALL

                                                     
                                                               
                                                                      THREE TREADS ON BOTH
                         OR                               OR
                                                                       SIDES OF THE LANDING
                                                    
                     
                                                                          LANDING
                                TWO NEWEL POSTS
           ASSESSMENT CRITERIA                              MARK
           110 mm wall                                        1
           Three treads on both sides of the landing          2
           Landing                                            1
           Handrail                                           1
           TWO newel posts                                    2
           Arrow – indicating the rise of the staircase       1
                                                     TOTAL:   8                                 (8)
                                                                                                [40]

                                                                                 TOTAL:         200

Copyright reserved

## Related documents

- [Civil Technology Nov 2020 (Construction) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-construction-memo-eng/f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca) — Civil Technology · Memo · 2020 · Eng
- [Civil Technology Nov 2020 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-memo-afr/8cffc125-69c0-44e9-b0eb-88ae7e930363) — Civil Technology · Memo · 2020 · Afr
- [Civil Technology Nov 2020 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-afr/b796705a-6588-4c35-a6ed-9d9659bce995) — Civil Technology · QP · 2020 · Afr
- [Civil Technology Nov 2020 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-woodworking-eng/f45b898c-a9ab-4069-ae4b-2b730f88cf1b) — Civil Technology · QP · 2020 · Eng
- [Civil Technology Nov 2020 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-construction-eng/6e24138d-3f1b-42f9-8076-7ae0b7db457a) — Civil Technology · QP · 2020 · Eng
- [Civil Technology Nov 2020 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-eng/8ecb8551-97e5-4a57-8187-0130f8d158da) — Civil Technology · QP · 2020 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
