# Civil Technology Grade 12 NSC November 2021 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2021 (English), 21 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2021-woodworking-mg-eng/3449ba5b-2333-4595-b266-3356cc64cb0b
- Updated: 2026-10-29
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2021
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 21

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2021 Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2021-woodworking-mg-eng/3449ba5b-2333-4595-b266-3356cc64cb0b)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2021. Memorandum. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                     GRAAD 12

                                    NATIONAL
                               SENIOR CERTIFICATE

                                       GRADE 12

                       CIVIL TECHNOLOGY: WOODWORKING

                                   NOVEMBER 2021

                                MARKING GUIDELINES

MARKS: 200

                      These marking guidelines consist of 21 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Woodworking                 2                           DBE/November 2021
                                   NSC – Marking Guidelines

INSTRUCTIONS FOR THE MARKERS

1.        Markers should:
           Familiarise themselves with the question and answer before evaluating the
             responses of candidates.
           Always interpret the responses of the candidates within the context of the
             question.
           Consider any relevant and acceptable answer during pre-marking, but
             should strictly adhere to the answers after finalisation of the marking
             guidelines.
           There are two approaches to answering questions, these are (1) to describe
             and (2) to explain.
           If a candidate is required to explain e.g. a process in 4 steps, only the first 4
             responses should be considered.
           If, however a candidate is required to e.g. explain or describe how to
             transfer heights from one point to another using a transparent pipe level we
             need to consider that candidates may write a long description not
             necessarily well organised as an intellectual response may do. In this case
             the marker needs to evaluate the complete statement to judge if the
             candidate explained the required outcome satisfactorily and allocate marks
             on merit. The marker should apply his/her professional judgement with
             these types of questions.
           Mark what the candidate wrote and do not award marks for answers that the
             marker thinks the candidate meant with what was written.
           Indicate the tick or cross right at the position where the mark needs to be
             awarded or where the candidate made the error.
           Accept the letter corresponding with the correct answer as well as the
             answer written in full in multiple-choice questions.
           Accept incorrect spelling in one-word answers unless the spelling changes
             the meaning of the answer.

2.        For calculations:
           A mark is only awarded if the correct unit is written next to the answer.
           If TWO marks are awarded, ONE mark is awarded for the answer and ONE
              mark for the correct unit.
           Where the candidate made a principle error, e.g. use an incorrect method to
              calculate the answer, marks will be awarded for the correct values used in
              the calculation. No marks will be awarded for the answer of the incorrect
              method that was followed.
           Where an incorrect answer could be carried over to the next step, the first
              answer will be deemed incorrect. However, should the incorrect answer be
              carried over correctly, the marker has to recalculate the values, using the
              incorrect answer from the first calculation. If correctly used, the candidate
              should receive the full marks for subsequent calculations.

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Woodworking                 3                          DBE/November 2021
                                   NSC – Marking Guidelines

              Markers should consider when and where a candidate has rounded off in
               a calculation, as well as the subsequent effect it has on the final answer
               obtained. The mark for calculations should therefore be awarded on
               merit.
              Alternative methods of calculations must be considered, provided that the
               correct answer is obtained.

3.        When marking drawings:
           The member for which the mark should be awarded should be drawn
             correctly in the correct position to receive a mark.
           A member incorrectly drawn but wrongfully repeated in another position will
             be awarded the mark for the repeated incorrect member, provided that the
             marking guidelines provide for TWO or more marks for that member
             (positive marking).
           Marks can only be awarded for a label if the label is correctly indicating the
             correct member.
           Scale drawings should always be marked using an appropriate mask.

          When a candidate drew the wrong drawing, e.g.:
           A horizontal sectional view instead of a vertical sectional view, no marks will
             be allocated to the drawing as the candidate did not respond to the
             expected outcome.
           An orthographic view instead of a sectional view, no marks will be allocated
             to the drawing as the candidate did not respond to the expected outcome.
           An orthographic view instead of an isometric view, no marks will be
             allocated to the drawing as the candidate did not respond to the expected
             outcome.

Copyright reserved                                                           Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Woodworking                  4                         DBE/November 2021
                                    NSC – Marking Guidelines

QUESTION 1: OHSA, SAFETY, MATERIALS, TOOLS, EQUIPMENT AND JOINING
            (GENERIC)

1.1       1.1.1       Galvanising                                                                (1)

          1.1.2       Paint                                                                      (1)

          1.1.3       Electroplating                                                             (1)

          1.1.4       Curing                                                                     (1)

          1.1.5       Powder coating                                                             (1)

1.2       1.2.1       Scaffolding must be:
                       Properly propped against displacement. 
                       Able to carry the mass or load. 
                       Securely and effectively braced to ensure stability/Stable.
                       Secured at suitable vertical and horizontal distances to the
                          structure.
                       Free of defects/sharp edges.
                       Constructed so that it has a safety factor of at least two.
                       Levelled.
                       Inspected regularly.
                      ANY TWO OF THE ABOVE                                                        (2)

          1.2.2       Toe-board/Kickboard                                                        (1)

          1.2.3       When working on scaffolding:
                       Wear a safety harness/safety equipment/PPE. 
                       Do not throw any materials from a scaffold. 
                       Do not throw any tools from a scaffold.
                       Never jump from a scaffold.
                       Do not overload a scaffold.
                       Remove or cover sharp edges or corners of a scaffold.
                       Scaffolds should be kept free of waste/obstructions.
                      ANY TWO OF THE ABOVE                                                        (2)

1.3       To remove waste:
           Use a chute/pipe chute 
           Use a conveyor belt/ramp 
           Use a bucket with a rope/pulley system
           Use a forklift/mobi-lift/TLB/crane with a bucket/builders’ hoist
          ANY TWO OF THE ABOVE                                                                    (2)

Copyright reserved                                                             Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology: Woodworking                 5                        DBE/November 2021
                                   NSC – Marking Guidelines

1.4       Safe use of trestle scaffolds:
           Scaffolds should be soundly constructed of solid material. 
           All precautionary measures should be taken to prevent the unexpected
              spreading of its supporting legs when in use. 
           Trestles should not exceed a height of 3 m.
           Trestles scaffolds should not consist of more than two tiers.
          ANY TWO OF THE ABOVE                                                                (2)

1.5       Hoisting materials and equipment in a builder’s hoist:
           Materials and equipment should be firmly stacked. 
           Materials and equipment should be correctly stacked.
           Materials and equipment should be properly secured.
           Gates must be shut when in use.
           Overhead protection must be provided.
           Qualified person must operate the builders' hoist.
           Emergency brake mechanism must be installed.
           Not exceed the working capacity of the hoist/Not overload the hoist.
           Safety measures must be displayed inside the cage.
          ANY ONE OF THE ABOVE                                                                (1)

1.6           Drill a hole through the two metal plates. 
              Insert the bolt into the drilled holes. 
              Fasten the two plates with a bolt and nut.                                    (3)

1.7       Used to locate:
           Materials behind walls. 
           Materials in ceilings.
           Materials under floors.
           Steel bars
           Copper pipes
           Ferrous metals
           Non-ferrous metals
           Electrical wiring
           Services
           Wood/Wooden/metal studs behind walls.
           The distance to and from an object.
          ANY ONE OF THE ABOVE                                                                (1)
          Care
          Protect the multi-detector against:
           Moisture/Water/Corrosion 
           Direct sunlight/heat
           Extreme temperature changes
           Bumps/Falling
           Damage caused by the release of acid from the battery
          ANY ONE OF THE ABOVE                                                                (1)
                                                                                              [20]

Copyright reserved                                                         Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Woodworking                 6                          DBE/November 2021
                                   NSC – Marking Guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

ANSWER SHEET 2

NO.                   QUESTIONS                               ANSWERS                    MARKS
       Identify the scale you will use for the    1 : 200 
1.     site plan and the floor plan                                                             2
                                                  1 : 100 
       respectively.
       Who is responsible to verify all
2.     dimensions and levels on site before       Contractors                                  1
       commencing work?
       What type of fencing does the
3.     architect recommend for the new            Palisade fencing/Palisade                    1
       dwelling?
       State the colour that you would use to
4.     indicate the new dwelling on the site      Red                                          1
       plan.
5.     Identify number 1.                         Boundary line                                1

6.     Identify number 2.                         Building line                                1

7.     Identify number 3.                         Electricity meter/Watt meter                 1

8.     Identify number 4.                         Entrance/Exit/Driveway                       1

9.     Identify number 5.                         Water storage tank/Water tank                1

10.    Identify number 6.                         Pavement/Walkway/Sidewalk                    1
                                                  North point/North symbol/North
11.    Identify number 7.                                                                       1
                                                  sign/North direction 
                                                  Municipal connection/Municipal
12.    Identify number 8.                                                                       1
                                                  manhole/Main sewer connection 
13.    Identify number 9.                         Manhole                                      1
       Determine the distance between
14.    number 2 and the new dwelling on the       4 000 mm/4 m                                 1
       eastern side of the building.
       Deduce the plot number of the new
15.                                               Plot 31                                      1
       dwelling from FIGURE A.
       Which elevation is the closest to
16.                                               South elevation/South                        1
       Loerie Street?
       What is the plot number of the
17.    property on the western side of the        Plot 35                                      1
       dwelling?

Copyright reserved                                                           Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Woodworking                7                           DBE/November 2021
                                  NSC – Marking Guidelines

                                                 No window in the dining room 
                                                 110 mm of outside wall is incorrect/
                                                 Internal wall thickness 
                                                 Light switch in bathroom is in wrong
                                                 place
                                                 220 mm inside wall in room A is
                                                 incorrect/External wall thickness
                                                 No step at the kitchen door
                                                 No door in dining room/living
                                                 room/door opening
                                                 No arch indicated at dining                    2
18.    Deduce TWO faults on FIGURE B.
                                                 room/living room
                                                 Floor covering not indicated in
                                                 rooms
                                                 No socket outlets/plugs in rooms
                                                 No hatching of floor plan
                                                 No ceiling light in passage
                                                 No dashed/hidden detail lines
                                                 shown between living/dining/kitchen
                                                 to indicate the arch
                                                 ANY TWO OF THE ABOVE

       Which natural feature is indicated on     Trees/Shrubs                                  1
19.
       the site plan?
       What is wrong with the electrical         The light switch is fitted on the
20.    installation in the bathroom in           inside of the bathroom/Switch is               1
       FIGURE B?                                 incorrectly placed. 
21.    Identify number 10.                       Ramp                                          1
                                                 Sink–double bowl/
22.    Identify number 11.                                                                      1
                                                 Double bowl sink/Double sink 
23.    Identify number 12.                       Two-way switch                                1
                                                 One-way switch single-pole/One-
24.    Identify number 13.                                                                      1
                                                 way switch/Single-pole switch 

25.    Draw the symbol of a socket outlet.                                                      2
                                                                           

26.    Draw the symbol for a shower.
                                                                                              2

Copyright reserved                                                           Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Woodworking              8                       DBE/November 2021
                                NSC – Marking Guidelines

       Draw the symbol for a wall-mounted                                               2
27.
       light.

                                             Dressing room/Walk-in closet 
                                             En-suite/Bathroom 
                                             Gym/Gymnasium
                                             Study/Office
28.    Recommend TWO uses for ROOM A.                                                     2
                                             Store/Rest/Baby/Play/Games/
                                             Guest/TV room
                                             Laundry
                                             ANY TWO OF THE ABOVE
                                             24 500  – 5 000  – 9 000  –
                                             3 000  – 5 000 
       Calculate the omitted horizontal      = 2 500  mm
29.    dimension on the site plan. Give your ANY OTHER CALCULATION                        6
       answer in mm. Show ALL calculations. METHOD TO ARRIVE AT THE
                                             ANSWER

                                                                       TOTAL:             40

Copyright reserved                                                     Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Woodworking                   9                              DBE/November 2021
                                     NSC – Marking Guidelines

QUESTION 3: CUPBOARDS, CASEMENTS, WALL-PANELING AND QUANTITIES
            (SPECIFIC)

3.1       3.1.1       Bottom rail of fanlight                                                       (1)

          3.1.2       Transom                                                                       (1)

          3.1.3       Wood/Wooden (glazing) bead/Quadrant/Quarter round                             (1)

          3.1.4       Reason for moulding:
                       To enhance appearance/Decorative appearance 
                       To provide a good finish
                      ANY ONE OF THE ABOVE                                                           (1)

          3.1.5       Small window above door/window                                                (1)

          3.1.6       To prevent water/moist from entering:
                       The house through the casement 
                       The casement
                      ANY ONE OF THE ABOVE                                                           (1)

3.2.1
         Member          Quantity Unit Length             Width        Thickness Material

         Side                   2    mm        2 400       550           16        Melamine

         Bottom                 1   mm       1 068         550           16        Melamine

         Top                    1    mm      1 068         550           16        Melamine
         Base front
                                1    mm        1 068            80       16        Melamine
         rail
         Shelf board            4    mm           550       526          16        Melamine
         Intermediate
                                1    mm      2 368         550           16        Melamine
         side
         Back                   1    mm      2 400       1 100           16        Melamine
                                                                                                      (7)

Copyright reserved                                                                Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Woodworking                 10                       DBE/November 2021
                                   NSC – Marking Guidelines

3.2.2
                                                        
                         SIDE RAIL                           FRONT RAIL
                                               
                                                              TOP

                                               
                                                              SHELF BOARD
                                BACK
                                       
                                               

                                                              INTERMEDIATE SIDE
                                                        

                                                              BOTTOM
                                               
                 BASE BACK RAIL                               BASE FRONT RAIL
                                                       
          HATCHING 
                  ASSESSMENT CRITERIA                  MARK
           Correctness of drawing:
           Side rail                                     1
           Front rail                                    1
           Top                                           1
           Shelve boards                                 2
           Intermediate side                             1
           Bottom                                        1
           Back/Back rail                                1
           Base front rail                               1
           Base back rail                                1
           Hatching                                      1
                                    TOTAL:               11                                    (11)

Copyright reserved                                                          Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Woodworking               11              DBE/November 2021
                                 NSC – Marking Guidelines

3.3

                                                               PLYWOOD
                                                              BOARD

                                                              SKIRTING

                                                             ROUGH GROUND

                                                              QUADRANT MOULD

                                                               FLOOR COVERING

                               
                     APPLICATION OF SCALE

                 ASSESSMENT CRITERIA              MARK
           Correctness of drawing:
           Plywood board                             1
           Skirting                                  1
           Rough ground                              1
           Quadrant mould                            1
           Floor covering                            1
           Application of scale                      1
                                   TOTAL:            6
          DRAWING NOT TO SCALE
          USE A MASK TO MARK THIS QUESTION                                        (6)
                                                                                  [30]

Copyright reserved                                             Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Woodworking                  12                    DBE/November 2021
                                    NSC – Marking Guidelines

QUESTION 4: ROOFS, CEILINGS, TOOLS, EQUIPMENT AND MATERIALS
            (SPECIFIC)

4.1       4.1.1       F                                                                       (1)

          4.1.2       H/B                                                                     (1)

          4.1.3       I                                                                       (1)

          4.1.4       K                                                                       (1)

          4.1.5       B                                                                       (1)

          4.1.6       J                                                                       (1)

          4.1.7       A                                                                       (1)

          4.1.8       E                                                                       (1)

4.2       Both machines must be:
           Switched on before coming into contact with the work piece. 
           Switched off when lifting the machine from the work piece.                        (2)

4.3       Safe handling of the square chisel with its drill (mortising attachment):
           The square chisel with its drill bit must be securely tightened. 
           Ensure a clearance of 1 mm between the tip of the bit and the cutting
              edge of the chisel. 
           Never use a blunt chisel and drill bit.
          ANY TWO OF THE ABOVE                                                                 (2)

4.4       When working with a belt sander and router:
           Place both hands on the handles when operating these machines. 
           Keep your hands away from moving parts.
          ANY ONE OF THE ABOVE                                                                 (1)

4.5       4.5.1       Metal T-strip                                                           (1)

          4.5.2       Tie beam                                                                (1)

          4.5.3       Materials for trapdoor:
                       Gypsum board/Rhino board 
                       Timber/Plywood/Masonite/Hardboard 
                       Block board 
                       Metal
                       Fibre-cement/Nu-tech
                       PVC/Plastic
                       ISO board
                       ANY THREE OF THE ABOVE                                                  (3)

Copyright reserved                                                          Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Woodworking                  13                         DBE/November 2021
                                    NSC – Marking Guidelines

          4.5.4       Aluminium is popular because:
                       It is light in weight. 
                       It provides an aesthetic finish/No need to paint it. 
                       It is durable/strong/corrosion free.
                       It is easy to fix against brandering.
                      ANY TWO OF THE ABOVE                                                          (2)

4.6           Lean-to roofs/Flat roofs 
              Couple roofs                                                                        (2)

4.7       King post roof: Tie beam 
          Collar-tie roof: Collar beam                                                             (2)

4.8       Ridge beam                                                                               (1)

4.9       To secure/fix the rafters to the ridge beam.                                             (1)

4.10      The number of the queen posts will be determined by the:
           Length of the tie-beam. 
           Span of the truss/building.
          ANY ONE OF THE ABOVE                                                                      (1)

4.11      Components used:
           Soffit hanger 
           Bearer 
           Soffit board
           Quarter-round moulding
           Ceiling board/Slats
           Fascia board
          ANY TWO OF THE ABOVE                                                                      (2)

4.12      2
          4
          6
          3
          5
          1
          MARK STRICTLY ACCORDING TO SEQUENCE                                                       (6)

4.13      Type of varnish finish:
           Glossy 
           Matt 
           Satin/Sheen
          ANY TWO OF THE ABOVE                                                                      (2)

Copyright reserved                                                               Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Woodworking                14              DBE/November 2021
                                  NSC – Marking Guidelines

4.14      Sanding sealer can be applied with a:
           Spray gun 
           Brush
          ANY ONE OF THE ABOVE

          Wax can be applied with a:
           Sponge 
           Shoe brush/Brush
           Cloth
          ANY ONE OF THE ABOVE                                                     (2)

4.15      Waxed surfaces tend to make:
           White spots on the surface 
           White rings on the surface
          ANY ONE OF THE ABOVE                                                     (1)
                                                                                   [40]

Copyright reserved                                              Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Woodworking                    15                           DBE/November 2021
                                      NSC – Marking Guidelines

QUESTION 5: CENTERING, FORMWORK, SHORING AND GRAPHICS AS MEANS
            OF COMMUNICATION (SPECIFIC)

5.1       5.1.1        C                                                                           (1)

          5.1.2        A                                                                           (1)

          5.1.3        D                                                                           (1)

          5.1.4        A                                                                           (1)

          5.1.5        B                                                                           (1)

5.2       5.2.1        A: Segmental arch/Oval/Elliptical arch                                      (1)

                       B: Semi-circular arch/Half round arch                                       (1)

          5.2.2        Closed laggings                                                             (1)

          5.2.3        450 mm                                                                      (1)

          5.2.4        Ribs can be secured by:
                        Ties 
                        Struts
                       ANY ONE OF THE ABOVE                                                         (1)

5.3
                                                                             KING POST
                                                                      
                                                      
        QUEEN POST                
                                                                         
                                                
                                                                  

                     TIE BEAM           STRUT                                 RAFTER 

                ASSESSMENT CRITERIA                    MARK
           Correctness of drawing:
           Rafters                                        2
           King post                                      1
           Queen posts                                    2
           Struts                                         2
           Tie beam                                       1
           Label (Any ONE)                                1
                                   TOTAL:                 9                                         (9)

Copyright reserved                                                               Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Woodworking                  16                   DBE/November 2021
                                    NSC – Marking Guidelines

5.4                                                             SHUTTERBOARD

                                                              BEARER JOIST
                                                                SIDE BEAM/SIDE
                                                              CLEAT/CLAMP
                                                                STRUT
                                                              WEDGE
                                                   
                                                              KICKER/FIXING PLATE

                                                                SOFFIT BOARD 

                        ASSESSMENT CRITERIA              MARK
                       Correctness of drawing:
                       Bearer joists                       2
                       Clamps/Cleats                       2
                       Struts                              2
                       Wedges                              2
                       Kicker/Fixing plates                2
                       Label (Any ONE)                     1
                                            TOTAL:         11
                                                                                           (11)
                                                                                           [30]

Copyright reserved                                                      Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Woodworking                  17                        DBE/November 2021
                                    NSC – Marking Guidelines

QUESTION 6: SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
            AND JOINING (SPECIFIC)

6.1       6.1.1       Night latch/lock                                                            (1)

          6.1.2       Mortise lock                                                                (1)

          6.1.3       Rim lock                                                                    (1)

          6.1.4       Straight cupboard lock                                                      (1)

6.2       6.2.1       Between the leg and the rail.                                              (2)

          6.2.2

                                                   
                                                      
                                               
                                                                
                                       

                                           

                                

                                                    ASSESSMENT CRITERIA            MARK
                                               Correctness of drawing:
                                               Rail                                   1
                                               Haunch                                 4
                                               Tenon                                  3
                                                                       TOTAL:         8            (8)

Copyright reserved                                                              Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology: Woodworking                      18                  DBE/November 2021
                                        NSC – Marking Guidelines

6.3
                                           WALL

                        FLOOR JOIST

                                                                   

                                                        

                     TRUSS OR JOIST HANGER

                                                                                             (3)

6.4                   STRAIGHT FLIGHT OF STAIRS WITH A LANDING

                                                            

                                                          OR

                                                                                             (2)

                                                          AND

Copyright reserved                                                        Please turn over

### Page 19

Downloaded from hlayiso.com
Civil Technology: Woodworking                  19              DBE/November 2021
                                    NSC – Marking Guidelines

                      STAIRWELL WITH A HALF-LANDING

                                

                                                 

                                

                                    OR

                                                                                     (3)

Copyright reserved                                                Please turn over

### Page 20

Downloaded from hlayiso.com
 Civil Technology: Woodworking                      20                              DBE/November 2021
                                         NSC – Marking Guidelines

 6.5
                                                           DIRECTION OF GRAIN
                                                           TONGUE AND GROOVE
                                                              FLOORBOARDS
                                         SKIRTING
    WALL                                QUADRANT
                                     

PLASTER                                                                             
                                           
                                                                                                    JOIST

AIRBRICK
                                                                                                   BEARER
                                 
                                                                                                    ANT GUARD
                                         WALL PLATE                     
                                                                                                    DPC

                                                                                                    BRICK
       NGL                                                                                         PIER

                                                                    

                                                      FOUNDATION

                            ASSESSMENT CRITERIA                                 MARK
              Correctness of drawing:
              Closure of opening between wall and floorboards                       2
              Members supporting flooring boards:
              Wall plate                                                             1
              Bearer                                                                 1
              Joists                                                                 2
              One-brick pier with foundation                                         2
              Prevention of termites and moisture at the pier                        2
                                                            TOTAL:                  10

 Copyright reserved                                                                      Please turn over

### Page 21

Downloaded from hlayiso.com
   Civil Technology: Woodworking              21                          DBE/November 2021
                                   NSC – Marking Guidelines

   6.6                                                                           SIDELIGHT
                                                                                 STILE

FRAME STILE                                                                     BOTTOM RAIL
      WITH                                     
                                    
    REBATE                                                                     RAISED AND
                                                                                 FIELDED PANEL
                                                                      
                                           GROOVE
                                   

                     ASSESSMENT CRITERIA            MARK
                 Correctness of drawing:
                 Frame stile with rebate               2
                 Sidelight stile                       1
                 Groove/Clearance for expansion        1
                 Bottom rail                           1
                 Raised and fielded panel              2
                 Hatching                              1
                                          TOTAL:       8                                      (8)
                                                                                              [40]

                                                                                TOTAL:        200

   Copyright reserved

## Related documents

- [Civil Technology May June 2021 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-may-june-2021-civil-services-eng/dcb7f976-b3d6-42a9-b2b1-44ae9b2d8e3f) — Civil Technology · QP · 2021 · Eng
- [Civil Technology Nov 2021 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2021-construction-eng/f39d7571-db9f-4ded-b5e7-27008235ca8b) — Civil Technology · QP · 2021 · Eng
- [CIV TECH GR12 MEMO SEPT2021 English Civil Services](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-civil-services/80eb9860-b118-41e2-98fd-5bea1b29a026) — Civil Technology · Memo · 2021 · Eng
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Civil Technology · Memo · 2023 · Afr
- [Civil Technology Nov 2020 (Construction) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-construction-memo-eng/f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca) — Civil Technology · Memo · 2020 · Eng
- [Civil Technology Nov 2020 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-memo-afr/8cffc125-69c0-44e9-b0eb-88ae7e930363) — Civil Technology · Memo · 2020 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.