# Civil Technology Grade 12 NSC November 2022 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2022 (English), 20 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2022-construction-mg-eng/8e7b5c1a-808a-4e01-9d5d-1bb774e021da
- Updated: 2026-10-29
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2022
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 20

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2022 Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2022-construction-mg-eng/8e7b5c1a-808a-4e01-9d5d-1bb774e021da)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2022. Memorandum. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                                     GRAAD 12

                                   NATIONAL
                              SENIOR CERTIFICATE

                                      GRADE 12

                      CIVIL TECHNOLOGY: CONSTRUCTION

                                   NOVEMBER 2022

                               MARKING GUIDELINES

MARKS: 200

                      These marking guidelines consist of 20 pages.

Copyright reserved                                                    Please turn over

### Page 2

Downloaded from hlayiso.com
Civil Technology: Construction                2                           DBE/ November 2022
                                   NSC – Marking Guidelines

INSTRUCTIONS FOR THE MARKERS

1.       Markers should:
          Familiarise themselves with the question and answer before
            evaluating responses from candidates.
             Always interpret the responses of the candidates within the context of
              the question.
             Consider any relevant and acceptable answer during pre-marking but
              should strictly adhere to the answers after finalisation of the marking
              guideline.
             There are TWO approaches to answering questions; these are (1) to
              explain and (2) to describe.
              1. If a candidate is required to explain a process in a specific number
                 of steps, only the first required number of responses should be
                 considered.
              2. However, if for example a candidate is required to explain or
                 describe a process, we need to consider that candidates may write
                 a long description, not necessarily well organised. In this case the
                 marker needs to evaluate the complete statement to judge if the
                 candidate explained the required outcome satisfactorily and
                 allocate marks on merit.
             Mark what the candidate wrote and do not interpret or predict
              responses.
             Indicate the tick or cross right at the position where the mark needs to
              be awarded or where the candidate made the error.
             Accept the letter corresponding with the correct answer as well as the
              answer written in full in multiple-choice or similar questions.
             Accept incorrect spelling in answers unless the spelling changes the
              meaning of the answer.
             If a learner writes two or more answers separated by a slash (/) mark
              only the first response, unless the additional answer/s are different
              names for the same item e.g., Yale lock/Night latch. In this case, the
              answer for the response should be awarded and the slash (/) should
              NOT be considered as an additional answer.
2.       For calculations:
             A mark is only awarded if the correct unit is written next to the
              answer. If the question states that the answer must be in a specific
              unit, a mark will ONLY be awarded if the answer has the correct unit
              as indicated in the question.
             Marks will only be allocated for the correct values if the candidates
              add are instead of multiply. NO marks will be awarded for the
              calculations and the answer.
         

Copyright reserved                                                             Please turn over

### Page 3

Downloaded from hlayiso.com
Civil Technology: Construction                 3                          DBE/November 2022
                                    NSC – Marking Guidelines

             Where an incorrect answer is correctly carried over, the marker must
              recalculate the values, using the incorrect answer from the first
              calculation. If correctly used, the candidate should receive the full
              marks for subsequent calculations.

             Alternative methods of calculations must be considered, provided that
              the correct answer is obtained.

             For the calculation of quantities marks will be awarded for the correct
              use of the dimension paper.

3.       When marking drawings:

             The member for which the mark should be awarded must be drawn
              correctly in the correct position to receive a mark.

             A member incorrectly drawn but wrongfully repeated in another
              position will be awarded the mark for the repeated incorrect member
              provided that the marking guideline provide for TWO or more marks
              for that member (positive marking).

             Marks can only be awarded for a label if the label is correctly
              indicating the correct member that was drawn. Do not consider labels
              for members that were provided with labels on the answer sheet.

             Scale drawings should always be marked using an appropriate mask.

             If the incorrect/wrong drawing was drawn, the candidate can be
              awarded for only what was provided for on the marking guideline.

             If a two-dimensional drawing is required and a line
              diagram/pictorial/isometric drawing is drawn, members will be marked
              according to the assessment criteria and no marks will be awarded
              for the correctness of the drawing.

             If candidates draw/give more information than what is required, mark
              strictly according to the assessment criteria.

             The marks for the correctness of the drawing will only be awarded if
              the entire drawing with all members/parts is correctly drawn.

4.       Incorrect numbering of questions:

             If a candidate numbered an answer incorrectly, but the answer is in
              the correct position according to the sequence of the questions in the
              question paper, circle the incorrect numbering and mark the
              response.

             If questions were answered randomly not following the same
              sequence as in the question paper and the learner numbered
              incorrectly, the response should NOT be marked.

Copyright reserved                                                            Please turn over

### Page 4

Downloaded from hlayiso.com
Civil Technology: Construction                 4                          DBE/November 2022
                                    NSC – Marking Guidelines

5.       Duplication of responses and questions answered in the incorrect
         place:

             If a question is answered twice, mark the first response.

             If a question should be answered on an answer sheet and the
              candidate answered it on both the answer sheet and in the answer
              book, mark the response on the answer sheet and cancel the
              response in the answer book.

             If the question was answered in the answer book instead of on the
              answer sheet, mark the response in the answer book according to the
              assessment criteria on the marking guideline.

Copyright reserved                                                            Please turn over

### Page 5

Downloaded from hlayiso.com
Civil Technology: Construction                     5                       DBE/November 2022
                                        NSC – Marking Guidelines

QUESTION 1:          OHSA, MATERIALS,            TOOLS,      EQUIPMENT    AND     JOINING
                     (GENERIC)

1.1       1.1.1        Oil or water-based paint                                                   (1)

          1.1.2        Increases the strength of concrete                                         (1)

          1.1.3        Electrolysis                                                               (1)

          1.1.4        Plastic                                                                    (1)

          1.1.5        Zinc                                                                       (1)

1.2       1.2.1         50º/50 degrees 
                        38°/38 degrees
                        42°/42 degrees
                       ANY ONE OF THE ABOVE                                                        (1)

          1.2.2          Ensures stair rails/handrails/railings and or balustrades
                          are in place 
                        Keep treads free of dangerous obstacles
                        Keep treads free of protruding nails
                        Post warning signs
                        Ensure there is sufficient lighting
                        Ensure the surface is not slippery
                       ANY ONE OF THE ABOVE                                                        (1)

          1.2.3         To keep concrete in position 
                        To enable the filling of concrete
                        To act as formwork
                        To shape the treads
                       ANY ONE OF THE ABOVE                                                        (1)

1.3       When transporting/carrying long ladders:
           Ensure that it does not protrude excessively 
           Tie a red or orange flag/warning signs to the end of the ladder 
           Ensure that the ladder is firmly secured to the vehicle
           Protect the ladder during transportation or while carrying it
           Two people should carry the ladder
           It should be carried horizontally and on the same side
          ANY TWO OF THE ABOVE                                                                     (2)

1.4         Safety net/Net 
            Catch platform
           ANY ONE OF THE ABOVE                                                                    (1)

1.5       Brace/Strut                                                                             (1)

Copyright reserved                                                              Please turn over

### Page 6

Downloaded from hlayiso.com
Civil Technology: Construction                   6                         DBE/November 2022
                                      NSC – Marking Guidelines

1.6       If the scaffold planks protrude more than 230 mm beyond the last support:
            The scaffold planks might tilt if worker steps on it 
            The worker might fall from scaffold
            It might be hazardous to workers working around the scaffold
           ANY ONE OF THE ABOVE                                                                   (1)

1.7       3 m/3 000 mm                                                                           (1)

1.8
                                          
                                 
                                                   OR

                                                   OR

                                                  HOOK
                                      
                            

                                                   OR

                                                  EYE                                             (4)

1.9       1.9.1        Multi-detector                                                            (1)

          1.9.2        Laser level/Spirit level/Transparent pipe level                           (1)
                                                                                                  [20]

Copyright reserved                                                             Please turn over

### Page 7

Downloaded from hlayiso.com
Civil Technology: Construction                 7                         DBE/November 2022
                                    NSC – Marking Guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

NO.                    QUESTIONS                               ANSWERS                     MARKS
                                                  Ground floor: B/FIGURE B 
                                                  FIGURE B shows: No roofline/
        Name the FIGURE that represents the       Roofline in FIGURE A/
  1     ground floor. Give ONE reason for         Garage/Arrows on the                            2
        your answer.                              staircase/Ramp/Door at
                                                  lounge/Entrance door/Garage door/
                                                  Balcony in FIGURE A 
        Deduce the scale that was used to
  2     draw the floor plan of the house from     1:100                                          1
        the given building plan.

  3     Identify number 1.                        Landing                                        1

  4     Identify number 4.                        Balcony/Cantilever                             1

  5     Identify number 5.                        Shower                                         1

                                                  Wash hand basin/Wash
  6     Identify number 6.                                                                        1
                                                  basin/Basin/WHB 

        Give the abbreviation for the symbol at
  7                                             WC                                               1
        number 7.

  8     Identify number 8.                        Ramp                                           1

  9     Identify number 9.                        Roll-up door/Garage door                       1

 10     Identify number 10.                       Fluorescent light                              1

        Identify the number that indicates the
 11                                               No 11/11                                       1
        wall mounted light.

        Give the abbreviations for the
        following:                                FFL 
 12                                                                                               2
          Finished floor level                   NGL 
          Natural ground level
        Name a suitable material that can be      Concrete/Wood/Aluminium/Steel/
 13                                                                                               1
        used for constructing number 2.           Masonry/Bricks/Glass 

Copyright reserved                                                             Please turn over

### Page 8

Downloaded from hlayiso.com
Civil Technology: Construction                 8                           DBE/November 2022
                                    NSC – Marking Guidelines

                                                  Coffee nook/Kitchen/Playroom/
                                                  Private lounge/Office/TV room/
        Recommend ONE use for the area
 14                                               Bar/Dining room/Storage space/Any                1
        indicated by number 3.
                                                  use with utility value 

        Recommend ONE permanent fixture           Built-in cupboard/BIC/Cupboard/
 15     for bedroom 1 that can be used for        Closet/Bookshelf/Desk/                           1
        storage.                                  Drawer unit 

        Who is the architect that was
 16                                               HB Nel                                          1
        responsible for the drawing?

        Describe what is indicated by the
 17                                               Direction of the rise of the stairs             1
        arrows on the staircase in FIGURE B.

                                                  Revision 1 – Drawing of sanitary
        State what was done during revision 1                  fitments 
 18                                                                                                2
        and revision 2 of the house plan.
                                                  Revision 2 – Drawing of staircase 

        Deduce the reference code from the
 19                                               QP 6 – 2022                                     1
        building plan.
        Who must be notified when a
 20     contractor sets out levels on a site and Architect/HB Nel                                 1
        there are variances?
                                                  Ceiling light/Light/Light switch/
        Identify ONE important fixture that is
 21                                               Switch/Fan light/Extractor fan/                  1
        omitted in the bathroom.
                                                  Bath/Bidet/Socket outlet/Cabinet 

 22     Draw the symbol for face brick.                                                          2

 23     Draw the electrical symbol for earth.                                                    2

Copyright reserved                                                              Please turn over

### Page 9

Downloaded from hlayiso.com
Civil Technology: Construction                   9                              DBE/November 2022
                                      NSC – Marking Guidelines

 24     Draw the symbol for a grease trap.                                                            2

                                                      Total vertical dimensions:
                                                     Control test left    Control test right
                                                     220                 2 960 
                                                     5 450               110 
                                                     220                 2 820 
                                                     5 890               = 5 890 

        Prove by means of a control test that
        the total vertical dimensions on the left                        OR
 25                                                 Left side:                                          7
        and right of the plan in FIGURE B are
        equal.                                        220 + 5 450 + 220 = 5 890 mm
                                                    Right side:
                                                      2 960 + 110 + 2 820
                                                      = 5 890 mm
                                                     Note: If the alternative method is
                                                            used, one mark should be
                                                            allocated if both totals are
                                                            the same.
                                                    = 5,89  m x 8,11 m
                                                    = 47,77 m²
        Calculate the area of the first floor.      OR
 26     Show ALL calculations. Give your                                                                3
        answer in m².                               = 5 890 mm x 8 110 mm
                                                    = 47,77 m²
                                                    (47,7679 m2/47,8 m2/48,0 m2)
                                                                                     TOTAL:         40

Copyright reserved                                                                   Please turn over

### Page 10

Downloaded from hlayiso.com
Civil Technology: Construction                   10                        DBE/November 2022
                                       NSC – Marking Guidelines

QUESTION 3: ROOFS, STAIRCASES AND JOINING (SPECIFIC)

3.1       Fibre cement tiles/Thatch                                                              (1)

3.2       4 metres                                                                               (1)

3.3       Securing a wall plate to a wall:
           Timber bolted/Rawl bolted to the top of the wall 
           Nailed to the wall 
           Screwed to the wall
           A galvanised strap/hoop iron nailed or built into a wall
           Tie with roof wire that is built into wall
           Secure with a tie/strap
          ANY TWO OF THE ABOVE                                                                    (2)

3.4       A - Pre-drilled hole filled with grout/Baluster fixing onto the tread 
          B - Bolts/Rawl bolts/Plastic plugs with screws/Screws used to secure
              baluster/Baluster fixed onto the side of the string                                (2)

3.5

               LANDING
                       5

                       4               BALUSTER

                             3                  RISER
                                 3
                                                  5
               2

                                                 4       HANDRAIL

                                                                     TREAD/GOING

                   CORRECTNESS OF STAIRCASE: 1

                                 NO.   ASSESSMENT CRITERIA MARK
                                 1     Correctness of staircase    1
                                 2     Landing                     1
                                 3     Flight of stairs (steps)    2
                                 4     Balusters                   2
                                 5     Handrail                    2
                                                            TOTAL: 8                              (8)

Copyright reserved                                                             Please turn over

### Page 11

Downloaded from hlayiso.com
Civil Technology: Construction                   11                              DBE/November 2022
                                       NSC – Marking Guidelines

3.6                                           5   5
                                                      RIDGE BEAM

                                                                                RAFTER
                                                                  4

                           4

                                                                                         WALL PLATE

                3                                                                   3

      6                                                                                         6

                2                                     2                             2
                                              SPAN

                     WALL
                                     APPLICATION OF SCALE:        7    7    7

                                                          1   1
                     CORRECTNESS OF ROOF TRUSS:

                     USE A MASK TO MARK THIS QUESTION

                     NO.       ASSESSMENT CRITERIA                    MARK
                      1        Correctness of roof truss                2
                      2        Walls and span                           3
                      3        Wall plates                              2
                      4        Rafters                                  2
                      5        Ridge beam                               2
                      6        Overhang                                 2
                               Application of scale:
                               ONE or TWO incorrect       =3
                       7
                               THREE or FOUR incorrect = 2             3
                               More than FIVE incorrect = 1
                                                       TOTAL:          16
                                                                                                           (16)
                                                                                                           [30]

Copyright reserved                                                                      Please turn over

### Page 12

Downloaded from hlayiso.com
Civil Technology: Construction             12                   DBE/November 2022
                                 NSC – Marking Guidelines

QUESTION 4: EXCAVATIONS, FORMWORK, TOOLS, EQUIPMENT
            AND MATERIALS (SPECIFIC)

4.1       4.1.1        A                                                              (1)

          4.1.2        C                                                              (1)

          4.1.3        E                                                              (1)

          4.1.4        G                                                              (1)

          4.1.5        D                                                              (1)

          4.1.6        J                                                              (1)

          4.1.7        B                                                              (1)

          4.1.8        F                                                              (1)

4.2

                                                   
                                                            

                                          WEDGE 

                                         

                                             

                                      FOLDING WEDGES 
                                                                                       (6)

Copyright reserved                                                  Please turn over

### Page 13

Downloaded from hlayiso.com
Civil Technology: Construction                 13                        DBE/November 2022
                                     NSC – Marking Guidelines

          4.3.1        Apparatus for the slump test:
                        Open cone/Cone/Mould 
                        Square base/Base plate 
                        Tamping rod/Rod
                        Ruler
                        Tape measure
                        Spirit level/Straight edge
                        Shovel/Scoop/Trowel
                       ANY TWO OF THE ABOVE                                                     (2)

          4.3.2
                                                         

                                 COLLAPSED SLUMP                                                (2)

          4.3.3        Collapsed slump:
                        Too much water is added to the mixture 
                        Concrete not mixed well
                       ANY ONE OF THE ABOVE                                                     (1)

          4.4.1        Power trowel float/Power float/Power trowel                             (1)

          4.4.2        Taking care of the machine:
                        Maintain all the machinery 
                        Lubricate/Oil and adjust to manufacturer’s instructions 
                        Store in a safe dry place
                        Repair or replace damage parts
                        Service the machine regularly
                        Clean the machine after use
                       ANY TWO OF THE ABOVE                                                     (2)

          4.4.3        Safety aspects of the machine:
                        Operate with care 
                        Wear appropriate PPE 
                        Never use a defective machine
                        Do not place your hands and feet near moving parts
                        Avoid making any adjustments while the machine is moving
                        Use both hands to operate the machine
                        Ensure a well-balanced stance
                       ANY TWO OF THE ABOVE                                                     (2)

4.5       28 days                                                                              (1)

4.6       Perspex                                                                              (1)

Copyright reserved                                                           Please turn over

### Page 14

Downloaded from hlayiso.com
Civil Technology: Construction                        14                                   DBE/November 2022
                                            NSC – Marking Guidelines

                                              8
4.7                                                                             TIE
                                                                            CLEATS

                                        2             2                     SHUTTER BOARD SIDES

                         7                                          7                     BRACE/STRUT
                                   4                        4

                                                                                     WEDGE
                             6                                  6                     
                                              3                         5                     FIXING PLATE
                     5

                                                                                              BEARER/HEADTREE

                                                                                              SOFFIT BOARD/
                                                                                              SHUTTER BOARD

                                                                        BRACE/STRUT

                                                       PROP/STRUTS

                                       CORRECTNESS OF FORMWORK:             1    1

                  NO.            ASSESSMENT CRITERIA            MARK
                   1             Correctness of formwork          2
                   2             Shutter board sides              2
                   3             Soffit board                     1
                   4             Cleats                           2
                   5             Fixing plates                    2
                   6             Wedges                           2
                   7             Brace/Struts                     2
                   8             Tie                              1
                                                     TOTAL:      14                                               (14)
                                                                                                                  [40]

Copyright reserved                                                                             Please turn over

### Page 15

Downloaded from hlayiso.com
Civil Technology: Construction                 15                         DBE/November 2022
                                     NSC – Marking Guidelines

QUESTION 5: PLASTER AND SCREED, BRICKWORK AND
            GRAPHICS AS MEANS OF COMMUNICATION (SPECIFIC)

5.1       Tyrolean machine                                                                      (1)

5.2       5.2.1        A- Straight edge/Straight plank 
                       B- Clamp 
                       C- Brick/Wall                                                            (3)

          5.2.2        Reveals are exposed to more movement and rough handling.                 (1)

          5.2.3        Trowel/External corner trowel/Corner trowel                              (1)

5.3
                                                           2
                                                                         NOTE:
                                                                         RIBS CAN ALSO BE
                        CLOSED LAGGINGS                                  DRAWN INSTEAD OF
                                                                         FORMWORK BOARD
                                               2

                       FORMWORK BOARD                           3

           CORRECTNESS OF WOODEN TURNING PIECE/CENTRE:              1

            NO    ASSESSMENT CRITERIA                                          MARK
             1    Correctness of wooden turning piece/centre                     1
             2    Closed laggings (No space between laggings)                    2
             3    Formwork board                                                 1
                                                                        TOTAL:   4               (4)

Copyright reserved                                                            Please turn over

### Page 16

Downloaded from hlayiso.com
Civil Technology: Construction                         16                        DBE/November 2022
                                             NSC – Marking Guidelines

5.4

                                         5                       HEADER COURSE

                             6                   7

                                                                 WALL TIE

                                     4

                                                  3
                                     3
                                                                  WEEP HOLE
                                                                  DPC
                         2

                                                                   LINTEL ABOVE WINDOW

APPLICATION OF SCALE:            8   8

CORRECTNESS OF CAVITY WALL:                  1

USE A MASK TO MARK THIS QUESTION

          NO.              ASSESSMENT CRITERIA                          MARK
           1      Correctness of cavity wall                              1
           2      Weep hole                                               1
           3      DPC                                                     2
           4      Wall tie                                                1
           5      Header course                                           1
           6      Outer wall                                              1
           7      Inner wall                                              1
                  Application of scale:
                  ONE or TWO incorrect       =2
            8                                                               2
                  THREE or FOUR incorrect = 1
                  More than FIVE incorrect = 0
                                                TOTAL:                      10                          (10)

Copyright reserved                                                                   Please turn over

### Page 17

Downloaded from hlayiso.com
Civil Technology: Construction                17                           DBE/November 2022
                                    NSC – Marking Guidelines

5.5

                                                               3

                                            3

                                                                       3

                                                       3

          CORRECTNESS OF COURSE:            1

                                                   2

                                                                   2

                                        2

                                                               2

      CORRECTNESS OF COURSE:        1

                 NO.      ASSESSMENT CRITERIA              MARK
                  1      Correctness of courses              2
                  2      First course                        4
                  3      Second course                       4
                                             TOTAL:         10                                    (10)
                                                                                                  [30]

Copyright reserved                                                             Please turn over

### Page 18

Downloaded from hlayiso.com
Civil Technology: Construction                  18                       DBE/November 2022
                                      NSC – Marking Guidelines

QUESTION 6:            REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
                       FLOORS AND QUANTITIES (SPECIFIC)

6.1       6.1.1        B                                                                       (1)

          6.1.2        C                                                                       (1)

          6.1.3        B                                                                       (1)

          6.1.4        D                                                                       (1)

          6.1.5        D                                                                       (1)

6.2       6.2.1        Three mistakes:
                        There should be holes in the block 
                        The rib has no reinforcing 
                        There is no reinforcing mesh 
                        The block is not resting more than halfway on the wall
                        The outer skin of the wall should be higher
                        Members are too far from one another
                       ANY THREE OF THE ABOVE                                                   (3)

          6.2.2        Prop/Post/Pole                                                          (1)

6.3

                                  2
                                              STEEL CABLE

                                      3
                                                DROP HAMMER      4

                     CORRECTNESS OF TOOL: 1

                  NO   ASSESSMENT CRITERIA MARK
                   1   Correctness of tool        1
                   2   Steel cable                1
                   3   Drop hammer                1
                   4   Any ONE label              1
                                           TOTAL: 4
                                                                                                (4)

Copyright reserved                                                           Please turn over

### Page 19

Downloaded from hlayiso.com
Civil Technology: Construction                   19                        DBE/November 2022
                                       NSC – Marking Guidelines

6.4       6.4.1        Pile foundation                                                           (1)

          6.4.2         Strip foundation                                                         (1)

6.5       6.5.1        A - Stirrup 
                       B - Concrete/Concrete symbol                                              (2)

          6.5.2        40 mm                                                                     (1)

          6.5.3        Methods of joining steel bars:
                        Crosswise method 
                        Hair knot method 
                        Crown method
                       ANY TWO OF THE ABOVE                                                       (2)

          6.5.4        Ribbed bars ensure better bonding with the concrete                        (1)

          6.5.5
                                              2

                                                                  3

                       CORRECTNESS OF SHEAR FORCE:          1

                       SHEAR FORCE THAT ACTS ON A STRUCTURE

                         NO       ASSESSMENT CRITERIA             MARK
                          1      Correctness of shear force         1
                          2      Downward force                     1
                          3      Upward force                       1
                                                    TOTAL:          3                             (3)

          6.5.6
                                                                                    
                                                      MAIN BAR
                                                                                         
                                                    ANCHOR BAR
                                                                                                  (4)

6.6       6.6.1        Shear bar                                                                 (1)

          6.6.2        Helps to counteract shear force/This is where the shear force is
                       exerted the most                                                          (1)

Copyright reserved                                                             Please turn over

### Page 20

Downloaded from hlayiso.com
Civil Technology: Construction                 20                         DBE/ November 2022
                                     NSC – Marking Guidelines

6.7      Correct use of dimension paper                                                       (1)

          A          B           C            D
                                              Centre line of external wall:
                                              2/9 000                 = 18 000 mm 
                                              2/5 000                 = 10 000 mm 
                                              Total                     = 28 000 mm 
                                              Minus 4/220              = 880 mm 
                                              Total centre line         = 27 120  mm 
                                                                              OR
                                                                        = 27,12 m
                                                                                               (9)

                                                                                               [40]

                                                                                    TOTAL:     200

Copyright reserved

## Related documents

- [Civil Technology Nov 2022 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-nov-2022-woodworking-eng/78c3d6a1-0010-4aee-81c9-7e6f6b10ed07) — Civil Technology · QP · 2022 · Eng
- [Civil Technology Nov 2022 (Civil Services) Eng](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-eng/4c93bddd-9bc8-4067-b666-d6c8b761d7cd) — Civil Technology · QP · 2022 · Eng
- [Civil Technology Nov 2022 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-woodworking-afr/4a898ddd-8d12-4ea6-8261-ffb7c75301e3) — Civil Technology · QP · 2022 · Afr
- [Civil Technology Nov 2022 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-afr/ba5cb9a7-86fb-4eb0-952a-8496715cdd53) — Civil Technology · QP · 2022 · Afr
- [CIV TECH GR12 MEMO SEPT2022 Civil Services Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-afrikaans/e517a483-4536-458b-945a-1e2a6820fc1b) — Civil Technology · Memo · 2022 · Afr
- [CIV TECH GR12 MEMO SEPT2022 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-woodworking-afrikaans/84d33c64-7269-4f87-819c-8ea20dfff8f0) — Civil Technology · Memo · 2022 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.