# Civil Technology Grade 12 NSC November 2023 QP (Eng)

> Grade 12 Civil Technology question paper from the NSC November Exam 2023 (English), 20 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-eng/fd47df8e-afbf-4ba2-8858-18deaf33c455
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2023
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 20

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2023 QP (Eng)](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-eng/fd47df8e-afbf-4ba2-8858-18deaf33c455)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2023. Question paper, 20 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

basic education

Department:
Basic Education
REPUBLIC OF SOUTH AFRICA |

NATIONAL |
SENIOR CERTIFICATE

GRADE 12 |

Pe ee eee ee es q
F CIVIL TECHNOLOGY: CIVIL SERVICES .
ity a
" NOVEMBER 2023 a |
Waretetatetela a alarm oo reaver eee otra elle vate teva eleteleraraletal erate a?
MARKS: 200
TIME: 3 hours
This question paper consists of 14 pages and 4 answer sheets. |
Copyright reserved

Please turn over |

### Page 2

Downloaded from hlayiso.com

Civil Technology: Civil Services 2 DBE/November 2023
NSC

REQUIREMENTS:

1. Drawing instruments
2. A non-programmable calculator
3. ANSWER BOOK

INSTRUCTIONS AND INFORMATION
1. This question paper consists of SIX questions.
Answer ALL the questions.

Read ALL the questions carefully.

- © N

Answer each question as a whole. Do NOT separate subsections of
questions.

bd

Number the answers correctly according to the numbering system used in this
question paper.

Start the answer to EACH question on a NEW page.
Do NOT write in the margins of the ANSWER BOOK.

You may use sketches to illustrate your answers.

© @ N ®

Write ALL calculations and answers in the ANSWER BOOK or on the
attached ANSWER SHEETS.

10. Use the mark allocation as a guide to the length of your answers.

11. Make drawings and sketches in pencil, fully dimensioned and neatly finished
off with descriptive titles and notes to conform to the SANS/SABS Code of
Practice for Building Drawings.

12. For the purpose of this question paper, the size of a brick should be taken as
220 mm x 110 mm x 75 mm.

13. Use your own discretion where dimensions and/or details have been omitted.

14. Answer QUESTIONS 2, 3.6, 5.4 and 6.8 on the attached ANSWER SHEETS
using drawing instruments, where necessary.

15. Write your CENTRE NUMBER and EXAMINATION NUMBER on every
ANSWER SHEET and hand them in with your ANSWER BOOK, whether you
have used them or not.

16. Drawings in the question paper are NOT to scale due to electronic transfer.
17. Google Images was used as the source of all photographs and pictures.

18. Write neatly and legibly.

Copyright reserved Please turn over

### Page 3

Downloaded from hlayiso.com

Civil Technology: Civil Services 3 DBE/November 2023
NSC

QUESTION 1: OHSA, MATERIALS, TOOLS, EQUIPMENT AND JOINING
(GENERIC)

Start this question on a NEW page.

1.1 Various options are provided as possible answers to the following questions.
Choose the answer and write only the letter (A-D) next to the question
numbers (1.1.1 to 1.1.12) in the ANSWER BOOK, e.g. 1.1.13 D.

1.1.1 Electroplating is the process of ...

A applying a plastic coating on metal using electrolysis.
B_ coating a metal with another metal using electrolysis.
C_ applying paint to a metal by means of magnetism.

D_ applying liquid zinc to a metal using pressure.

1.1.2 The process of keeping freshly cast concrete damp will ...

A provide concrete with more volume.

B_ make concrete more watertight.

C_ increase the risk of cracking concrete.
D_ lead to poor bonding of concrete.

1.1.3 Why would you coat a metal with a layer of paint?

A To resist extreme temperatures
B_ To prevent corrosion

C_ To prevent warping

D OnlyAandB

1.1.4 The minimum size of a wooden scaffold plank:

A 300 mm wide x 60 mm thick
B 238 mm wide x 12 mm thick
C 150 mm wide x 20 mm thick
D 228 mm wide x 38 mm thick

1.1.5 When using a scaffold, it must be inspected to ensure that ...

A the scaffold is not attached to the building.

B_ the scaffold platform is supported every 4 m.
C_ the scaffold is free from any defects.

D_ All the above-mentioned

1.1.6 ... of scaffolds should be secured vertically.

Transoms
Diagonal braces
Standards

Base plates

0UOWD>

Copyright reserved Please turn over

(1)

(1)

(1)

(1)

(1)

(1)

### Page 4

Downloaded from hlayiso.com

Civil Technology: Civil Services 4
NSC
1.1.7 The guard rail on a scaffold will ensure that ...

1.1.8

1.1.9

1.1.10

1.1.11

1.1.12

Copyright reserved

A
B
c
D

a worker does not fall from the scaffold.
tools do not fall from the scaffold.

the scaffold is stable.

the scaffold is braced.

DBE/November 2023

Toe boards must be at least 150 mm high from the level of the ...

A
B
Cc
D

scaffold platform.
guard rail.
horizontal transoms.
base plate.

The employer must ensure that the rungs of wooden ladders are ...

A
B
c
D

not painted.
free from grease.
not cracked.

All the above-mentioned

The material safety data sheet for hazardous chemicals must have
the following information:

A
B
c
D

Quantity in the container
Cost of the chemicals
Disposal considerations
Manufacturing process

Stairways must be installed at a minimum of ... degrees from the
horizontal.

A
B
Cc
D

The purpose of the builder's hoist is to transport ...

0OUDY

50
30
40
60

workers and materials.

materials and heavy construction machines.
equipment and heavy machines.

materials and furniture.

Please turn over

(1)

(1)

(1)

(1)

(1)

(1)

### Page 5

Downloaded from hlayiso.com

Civil Technology: Civil Services 5 DBE/November 2023
NSC
1.2 You have been tasked by a contractor to install a 20 kg gate to the pier of a
boundary wall.
1.2.1 Name the joining fixture you will use to secure the gate to the pier. (1)
1.2.2 Motivate why you will use this joining fixture. (2)

1.2.3 Explain how you will install the gate by using the joining fixture in
QUESTION 1.2.1, if the positions of the holes have been marked

on the pier. (3)

1.3 Predict what will happen if a laser level is stored in extremely cold areas. (1)

1.4 How will you ensure the accuracy of a dumpy level? (1)
[20]

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
Start this question on a NEW page.

FIGURE A and FIGURE B on the next page show drawings that appear on a building
plan. Analyse the drawings and complete the table on ANSWER SHEET 2.

Copyright reserved Please turn over

### Page 6

Downloaded from hlayiso.com

Civil Technology: Civil Services

NSC

DBE/November 2023

3 000

|

2955
NX
a

2 955
NX
a

FFL

600|(a)

FIGURE A

NOTES:

Contractors must verify all
dimensions and levels on site
before commencing work.

Architects to be notified
of any discrepancies immediately.

Emergency escape staircase to be
made of mild steel.

Roof: Lean-to roof with parapet
walls

Finishing of walls: Plaster and paint

No. 3 indicates the balusters to be
made of aluminium.

Dimensions of balusters:
@ 50 mm x 1 200 mm

Architect's signature .................

Client's signature ..

000

3 340

220 ,

110

BATHROOM
N
=

2x40
OFFICE

W1

KITCHEN El

Ww1

BOARDROOM

&

wi»

1.500 | 1 500

3 300 .1 500

FIGURE B

@

DRAWING OF
INTERNAL
STAIRCASES

REVISION DATE:
1 18/04/2023

PRINTED BY:
FOX PRINTERS

DATE OF PRINT:
19/04/2023

DRAWING TITLE:
18T FLOOR AND SOUTH ELEVATION

PROJECT:
PROPOSED DWELLING OF MR NTOMBI
ON PLOT 42, ISIDINGO STREET, ALBANY

PROJECT NO.: DRAWING NO.:
GR 266-424 336P5

DATE:
12/04/2023

DRAWN:
NP KOK

CHECKED:
JBOK

ELEVATION AND
FLOOR PLAN

SCALE 1: 100

REFERENCE CODE
OP 8 ~ 2023

WINDOW SCHEDULE

1200
100

[40]

Copyright reserved

Please turn over

### Page 7

Downloaded from hlayiso.com

Civil Technology: Civil Services 7 DBE/November 2023

NSC

QUESTION 3: CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA

AND QUANTITIES (SPECIFIC)

Start this question on a NEW page.

3.1 FIGURE 3.1 below shows safety equipment.

FIGURE 3.1
3.1.1 Identify A and B.
3.1.2 To what should B be attached?
3.1.3 Name ONE safety item that a worker must wear in order to prevent
infections when working with raw sewage.
3.2 FIGURE 3.2 below shows a drawing of a faulty installation of a manhole.
A
7 q 7 [|=—c
B
=
FIGURE 3.2
3.2.1 Identify A to C.
3.2.2 Explain TWO faults that are illustrated in the installation of this
manhole.
3.2.3 Name a type of manhole that is NOT built with bricks.
3.2.4 A manhole cover is removed for maintenance. Describe ONE

Copyright reserved

safety precaution that needs to be applied to ensure the safety of

pedestrians.
Please turn over

(2)
(1)

(1)

(3)

(2)
(1)

(1)

### Page 8

Civil Technology: Civil Services 8

3.3

3.4
3.5

3.6

Copyright reserved

Downloaded from hlayiso.com

DBE/November 2023
NSC

FIGURE 3.3 below shows a drain pipe. Calculate the fall of pipe A with a
diameter of 100 mm and a total length of 2 m.

} 2.000 {
O
A
FIGURE 3.3 (4)
Describe the term backfilling. (1)

Use the information in FIGURE 3.5 below and take off the quantities of
materials needed as indicated in the table below. Write only the answer next
to the question numbers (3.5.1 to 3.5.6) in the ANSWER BOOK,

e.g. 3.5.7 Basin.

on
2—|
M
3
H c
4—+-®
FIGURE 3.5
ITEM NAMES OF PIPES/ MATERIAL DIAMETER

SANITARY FITTINGS
1 shower rose chrome -
2 3.5.1 3.5.2 3.5.3
3 3.5.4 3.5.5 -
4 3.5.6 chrome = (6)

ANSWER SHEET 3.6 shows the top view of a one-brick L-shaped corner wall

(quoin) built in stretcher bond. Project and draw the sectional front view on

section A-A. The front view must have THREE brick courses. (8)
[30]

Please turn over

### Page 9

Downloaded from hlayiso.com

Civil Technology: Civil Services 9 DBE/November 2023
NSC

QUESTION 4: COLD- AND HOT-WATER SUPPLY, TOOLS, EQUIPMENT AND
MATERIALS (SPECIFIC)
Start this question on a NEW page.

41 Change the underlined words in the following to make the statements TRUE.
Write the appropriate word(s) next to the question numbers (4.1.1 to 4.1.5) in

the ANSWER BOOK.

4.1.1 A thermostat is a self-sacrificing rod that protects the geyser. (1)

4.1.2 The water meter redirects cool water, before it reaches the tap, toa
rain-water tank. (1)

4.1.3 The vacuum breaker should be installed within 1 metre from the
geyser. (1)

4.1.4 The temperature and pressure safety valve must be made of
plastic or steel. (1)

4.1.5 The purpose of a drip tray of a geyser is to balance the pressure of
the cold- and hot-water supply. (1)

4.2 FIGURE 4.2 below shows a tap.

FIGURE 4.2
4.2.1 Identify the tap. (1)
4.2.2 Explain the working principle of the tap. (2)
4.2.3 Draw an orthographic side view of an electronic tap. (3)

Copyright reserved Please turn over

### Page 10

Downloaded from hlayiso.com

Civil Technology: Civil Services 10 DBE/November 2023
NSC

4.3 FIGURE 4.3 below shows a pipe coupling.

FIGURE 4.3
4.3.1 Identify the coupling. (1)
4.3.2 Name the type of pipe that this coupling is used for. (1)
4.3.3 Explain how you will use this coupling to fix a leaking pipe up to the
tightening of the coupling. (4)
4.4 Name a machine that can be used to move water from a reservoir to an
irrigation system. (1)
45 Explain TWO causes of a geyser dripping at the overflow. (2)
4.6 State ONE consequence of poorly installed hot-water pipes and loose
jumpers in taps. (1)
47 Name the approved hot-water SANS symbols and give the abbreviation for
EACH symbol.

4.7.1 =<}+erL-

(2)
4.7.2 —{UQk-

(2)

473 —>[-= (2)

48 Show, by means of a sketch, a T-waste junction 135° with an inspection eye. (5)

Copyright reserved Please turn over

### Page 11

Downloaded from hlayiso.com

Civil Technology: Civil Services

11
NSC

DBE/November 2023

4.9 Choose a description from COLUMN B that matches the item in COLUMN A.
Write only the letter (A-H) next to the question numbers (4.9.1 to 4.9.5) in the
ANSWER BOOK, e.g. 4.9.6 J.

COLUMN A

COLUMN B

4.9.1

4.9.2
4.9.3
4.9.4

4.9.5

90° bend with inspection
eye

P-trap
Stopcock
Ball valve

Bend 135° plain

is connected to the outlet under a
sink

located above solar panels

used above ground where soil
pipes have to change direction

to join the toilet pan and pipe

used underground where soil pipes
have to change direction

regulates water levels in
water-closet pans

used to shut off water supply

used to catch storm water

(5 x 1)

4.10 Differentiate between dezincification and galvanic corrosion processes.

4.11 Describe ONE way in which to prevent galvanic corrosion.

Copyright reserved

Please turn over

(5)
(2)

(1)
[40]

### Page 12

Downloaded from hlayiso.com

Civil Technology: Civil Services 12 DBE/November 2023
NSC

QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
STORM WATER (SPECIFIC)
Start this question on a NEW page.

5.1 FIGURE 5.1 below shows the incomplete installation of a rain-water system
that channels water away from the roof of a building.

FASCIA BOARD

WALL
NGL
FIGURE 5.1

5.1.1 What is used to close the end at A? (1)

5.1.2 Name the component that should be used to attach B to the wall. (1)

5.1.3 Name the pipe that connects A to B. (1)
5.2 Describe the process of installing galvanised mild steel brackets to the fascia

board of a roof. (5)
5.3 A concrete shoe can be placed underneath a down pipe to channel water

away from a house. Show, by means of a neat pictorial sketch, a

pre-fabricated concrete shoe. (4)

5.4 ANSWER SHEET 5.4 shows a drawing of a frustum of a cone for a lamp
shade. Use the drawing and information on ANSWER SHEET 5.4 and draw
the development of the frustrum of the cone. Show ALL construction lines and

start the drawing at point A. (18)

[30]

Copyright reserved Please turn over

### Page 13

Downloaded from hlayiso.com

Civil Technology: Civil Services 13 DBE/November 2023
NSC

QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)

Start this question on a NEW page.

6.1 Describe the process of joining a capillary elbow to a copper pipe with solder. (4)

6.2 Name TWO uses of a spring toggle fixer. (2)

6.3 Describe TWO characteristics of cast-iron pipes in terms of its strength and
corrosion. (2)

6.4 FIGURE 6.4 below shows the diagram of a test being conducted on a sewer
pipeline.

o8sses

FIGURE 6.4
6.4.1 Name the type of test. (1)

6.4.2 Identify measuring device A. (1)
6.4.3 Identify the component in the encircled part B. (1)

6.4.4 Describe the first THREE steps of how you would conduct the test. (3)

6.4.5 Explain the result if the reading starts to drop. (1)
6.5 A manhole ramp should be constructed.

6.5.1 Explain ONE reason for constructing a manhole ramp. (1)

6.5.2 Describe TWO advantages of a manhole ramp. (2)

Copyright reserved Please turn over

### Page 14

Downloaded from hlayiso.com

Civil Technology: Civil Services 14 DBE/November 2023
NSC
6.6 Differentiate by means of sketches between a P-trap and an S-trap for a gully
filled with water. Indicate the water levels in your sketches. (6)

6.7 FIGURE 6.7 below shows the incomplete drainage plan of a building.

FIGURE 6.7

6.7.1 Write down the abbreviation of component A. (1)
6.7.2 Explain how you would correct the connection at B of the drainage

plan. (1)
6.7.3 Identify component C. (1)
6.7.4 Name the component that must be installed at D to receive water

from the manhole. (1)
6.7.5 Name the prescribed angle for the pipe at E. (1)
6.7.6 Describe the fault at F. (1)

6.8 ANSWER SHEET 6.8 shows the incomplete drawing of a vacuum tank. Use
ANSWER SHEET 6.8 and draw the completed sectional view of the vacuum

tank with the draw-off valve. Print any TWO labels. (10)

[40]

TOTAL: 200

Copyright reserved

### Page 15

Downloaded from hlayiso.com

Civil Technology: Civil Services DBE/November 2023
NSC
| CENTRE NUMBER: L [ [ J]
[EXAMINATION NUMBER: | | | | L | J
ANSWER SHEET 2
NO. QUESTIONS ANSWERS MARKS
4 Give ONE reason why FIGURE B 4
represents the first floor plan.
2 Name the SI unit that is used to 1
indicate dimensions on building plans.
3 | Identify number 1. 1
4 _| Identify the number indicating the 1
emergency exit.
5 | What is the purpose of number 3? 1
6 | Identify number 4. 1
7 | Identify number 5. 1
8 | Identify number 6. 1
9 | Identify number 7. 1
Deduce from the window schedule the
10 | dimensions of the window that is 2
installed at number 8.
11 | Who is the owner of the new dwelling? 1
42 Name the elevation where the sink is 4
located.
13 | Identify the safety error in FIGURE A. “4
Deduce from the building plan why it
14 | was not approved after the first 1
submission.

Copyright reserved

### Page 16

Downloaded from hlayiso.com

Civil Technology: Civil Services DBE/November 2023
NSC
| CENTRE NUMBER: LT TT I
[EXAMINATIONNUMBER: | | | |_| [ 7]

15 Name the material that must be used
for the balusters.

16 Deduce from the notes column the
type of roof illustrated in FIGURE A.

47 How many signatures must be
indicated on this building plan?
What are the dimensions for the

18 | balusters as indicated by the
architect?
Name the material that must be used

19 | for the final finishing of the outside
wall.

20 Describe the end shape of the
balusters.
How many hinged openings are

21 | indicated on Window 1 in the window
schedule?

22 Draw the symbol for finished wood for
the boardroom table.

23 Draw the electrical symbol for a
three-pole one-way switch.

24 How many fluorescent tubes are
indicated in the office?

Copyright reserved

### Page 17

Downloaded from hlayiso.com

Civil Technology: Civil Services DBE/November 2023
NSC
[ CENTRE NUMBER: Ty] 7 [| [T 7 J 4
[EXAMINATIONNUMBER: | | | | | | | | | | | | | _4

Calculate the total height of the wall on
the left side of the building from the 4
finished floor level. Give your answer in
metre.

25

Calculate the area of the exterior wall
on the ground floor, that will consist of
bricks, from the finished floor level to 8
the top of the floor slab in the south
elevation in FIGURE A. Show ALL
calculations.

26

TOTAL: 40

Copyright reserved

### Page 18

Downloaded from hlayiso.com

Civil Technology: Civil Services

NSC

| CENTRE NUMBER:

| |

|]

DBE/November 2023

[EXAMINATION NUMBER: |__|

|]

ANSWER SHEET 3.6

>—}

A
FIGURE 3.6
ASSESSMENT CRITERIA
NO. [MARK] CANDIDATE'S MARK
1 2
2 2
3 2
4 1
5 1
TOTAL:| 8

Copyright reserved

### Page 19

Downloaded from hlayiso.com

Civil Technology: Civil Services DBE/November 2023
NSC

[ CENTRE NUMBER: LTT TTT Ty 4

[EXAMINATIONNUMBER: | | | | | | | | [| | [| | [ |

ANSWER SHEET 5.4
ASSESSMENT CRITERIA

NO. [MARK] CANDIDATE'S MARK

1 2

2 2 |

3 1

4 3 fae pe  - -

5 7

6 1 A '

i 2

TOTAL: | 18

Copyright reserved

### Page 20

Downloaded from hlayiso.com

Civil Technology: Civil Services DBE/November 2023
NSC
[ CENTRE NUMBER: IT TTTToCys4
LEXAMINATIONNUMBER: | | | | | || 1) [ | 7 7 4
ANSWER SHEET 6.8
WA

yO
ASSESSMENT CRITERIA
NO. [MARK] CANDIDATE'S MARK
1 1
2 1
3 2
4 1
5 2
6 1
7 2
TOTAL: | 10

Copyright reserved

## Related documents

- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — Civil Technology · QP · 2023 · Eng
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — Civil Technology · QP · 2023 · Afr
- [Civil Technology Nov 2023 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-woodworking-afr/f6f7ac38-fb55-4d61-bc66-5441e4cbcee0) — Civil Technology · QP · 2023 · Afr
- [Civil Technology Nov 2023 (Woodworking) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-woodworking-eng/fdfc3cf4-1a3a-4817-a3e9-a2c7f9fe5c2e) — Civil Technology · QP · 2023 · Eng
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Civil Technology · Memo · 2023 · Afr
- [CIV TECH GR12 QP SEPT 2023 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-afrikaans/97f8938d-02eb-46a4-a681-ef07b440e38f) — Civil Technology · QP · 2023 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
