# Civil Technology Grade 12 November 2024 NSC Memo (English)

> Grade 12 Civil Technology memorandum from the November 2024 NSC (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-mg-eng/76c44500-7612-4bb6-b7f7-5132924763fe
- Updated: 2026-10-29
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2024
- Exam period: November 2024 NSC
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 November 2024 NSC Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-mg-eng/76c44500-7612-4bb6-b7f7-5132924763fe)

## About this document

Civil Technology · Grade 12 · November 2024 NSC · 2024. Memorandum. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

GRAAD 12

                                   NATIONAL
                              SENIOR CERTIFICATE

                                      GRADE 12

                       CIVIL TECHNOLOGY: CIVIL SERVICES

                                   NOVEMBER 2024

                               MARKING GUIDELINES

MARKS: 200

                     These marking guidelines consist of 18 pages.

Copyright reserved                                                   Please turn over

### Page 2

Civil Technology: Civil Services               2                            DBE/November 2024
                                     NSC – Marking guidelines

INSTRUCTIONS FOR MARKERS

1.    Markers should:
      •    Familiarise themselves with the question and answer before evaluating the
           responses of candidates.
      •    Always interpret the responses of the candidates within the context of the
           question.
      •    Consider any relevant and acceptable answer during pre-marking but
           should strictly adhere to the answers after finalisation of the marking
           guideline.
      •    There are TWO approaches to answering questions; these are (1) to
           describe and (2) to explain.
              1. If a candidate is required to explain e.g., a process in 4 steps, only the
                  first 4 responses should be considered.
              2. However, if for example candidate is required to explain or describe a
                  process, we need to consider that that candidates may write a long
                  description, not necessarily well organised. In this case the marker
                  needs to evaluate the complete statement to judge if the candidate
                  explained the required outcome satisfactorily and allocate marks on
                  merit.
      •    Mark what the candidate wrote and do not interpret or predict responses.
      •    Indicate the tick or cross right at the position where the mark needs to be
           awarded or where the candidate made the error.
      •    Accept the letter corresponding with the correct answer as well as the
           answer written in full in multiple-choice questions or similar questions.
      •    Accept incorrect spelling in answers unless the spelling changes the
           meaning of the answer.
      •    If a learner writes two or more answers separated by a slash (/) mark only
           the first response, unless the additional answer/s are different names for the
           same item e.g., Yale lock/Night latch. In this case, the answer for the
           response should be awarded and the slash (/) should NOT be considered as
           an additional answer.

2.    For calculations:

      •    A mark is only awarded if the correct unit is written next to the answer. If the
           question states that the answer must be in a specific unit, a mark will ONLY
           be awarded if the answer has the correct unit as indicated in the question.
      •    Marks will only be allocated for the correct values if the candidates add
           instead of multiply. NO marks will be awarded for the calculations and the
           answer.
      •    Where an incorrect answer is correctly carried over, the marker must
           recalculate the values, using the incorrect answer from the first calculation.
           If correctly used, the candidate should receive the full marks for subsequent
           calculations.
      •    Alternative methods of calculations must be considered, provided that the
           correct answer is obtained.
      •    For the calculation of quantities marks will be awarded for the correct use of
           the dimension paper.

Copyright reserved

### Page 3

Civil Technology: Civil Services                3                         DBE/November 2024
                                      NSC – Marking guidelines

3.       When marking drawings:
         • The member for which the mark should be awarded should be drawn
            correctly in the correct position to receive a mark.
         • A member incorrectly drawn but wrongfully repeated in another position will
            be awarded the mark for the repeated incorrect member provided that the
            marking guideline provide for TWO or more marks for that member (positive
            marking).
         • Marks can only be awarded for a label if the label is correctly indicating the
            correct member. Do not consider labels for members of which the labels
            were provided on the answer sheet.
         • Scale drawings should always be marked using an appropriate mask.
         • If the incorrect/wrong drawing was drawn, the candidate can be awarded for
            only what was provided for on the marking guideline.
         • If a line diagram or an orthographic view instead of a pictorial drawing
            (isometric/oblique/perspective) is drawn, the first assessment criteria for
            each member will be marked wrong, but marks will be awarded for the
            subsequent members if TWO or more marks are awarded for the same
            member.
         • If candidates draw/give more information than what is required, mark strictly
            according to the assessment criteria.

4.       Incorrect numbering of questions:

         •   If a candidate numbered an incorrectly, but the answer is in the correct
             position according to the sequence of the questions in the question paper,
             circle then the incorrect numbering and mark the response.
         •   If questions were answered randomly not following the same sequence as
             in the question paper and the learner numbered incorrectly, the response
             should NOT be marked.

5.       Duplication of responses and questions answered in the correct place:

     •       If a question is answered twice, mark the first response.
     •       If a question should be answered on an answer sheet and the candidate
             answered it on both the answer sheet and in the answer book, mark the
             response on the answer sheet and cancel the response in the answer book.
     •       If the question was answered in the answer book instead of on the answer
             sheet, mark the response in the answer book according to the assessment
             criteria on the marking guideline.

Copyright reserved                                                            Please turn over

### Page 4

Civil Technology: Civil Services                4                          DBE/November 2024
                                      NSC – Marking guidelines

QUESTION 1:          OHSA, MATERIALS, TOOLS, EQUIPMENT AND JOINING
                     (GENERIC)

1.1        1.1.1        3m✓                                                                         (1)

           1.1.2        3m✓                                                                         (1)

           1.1.3        Fire-fighting measures ✓                                                    (1)

           1.1.4        ensure that the ladder does not protrude excessively ✓                      (1)

           1.1.5        Powder coating ✓                                                            (1)

           1.1.6        the thickness of under size parts can be increased ✓                        (1)

           1.1.7        head and pin ✓                                                              (1)

           1.1.8        preventing backing off ✓                                                    (1)

           1.1.9        wood preservatives ✓                                                        (1)

           1.1.10       spiral ✓                                                                    (1)

1.2        B✓                                                                                       (1)

1.3        Diameter of thread/Size of Rawl bolt ✓                                                   (1)

1.4        Properties and advantages of cured concrete:

           1.4.1          • Improves the protection of the steel reinforcement ✓
                          • Improves the protection against rust
                        ANY ONE OF THE ABOVE                                                        (1)

           1.4.2        Cured concrete can carry more weight. ✓                                     (1)

1.5        A multi-detector can be used:
              • to detect materials in or behind a wall/carpentry/plumbing/construction
                  surface. ✓
              • to determine distances to and from an object.
           ANY ONE OF THE ABOVE

           A laser level can be used:
               • to indicate horizontal and/or vertical levels/heights/slopes. ✓                    (2)

Copyright reserved                                                               Please turn over

### Page 5

Civil Technology: Civil Services              5                         DBE/November 2024
                                    NSC – Marking guidelines

1.6        Uses of dumpy level:
             • Determine differences between levels and vertical heights ✓
             • Determine levels ✓
             • Determine slopes
             • Determine horizontal angles/angles
             • Setting out of buildings
             • Transferring levels and heights
             • Determine the distance from the dumpy level to an object/telescopic
                 staff
           ANY TWO OF THE ABOVE                                                                (2)

1.7        Caring for the telescopic staff:
              • The staff must always be folded when it is transported ✓
              • Keep it in a bag to prevent damage/scratching of the graduation during
                 transportation ✓
              • Ensure that the plastic or metal clips are in working order to keep the
                 sections in position
              • Clean after use
              • Store in a safe dry place
           ANY TWO OF THE ABOVE                                                                (2)
                                                                                               [20]

Copyright reserved                                                          Please turn over

### Page 6

Civil Technology: Civil Services              6                          DBE/November 2024
                                    NSC – Marking guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
NO. QUESTIONS                        ANSWERS                                              MARKS
    What is the measurement of the
1.                                   12 000 mm/12 m ✓                                     1
    dwelling facing Hibiscus Street?
2.      Identify number 1.                        Manhole/MH ✓                            1

        Identify the number indicating the
3.                                                4✓                                      1
        building line.
        Identify number 2.
4.                                                Boundary line ✓                         1

5.      Identify number 3.                        Driveway/Entrance/Exit ✓                1

        Write down the abbreviation for
6.                                                RE ✓                                    1
        number 5.

                                                  Garage door:
7.      Explain the purpose of number 6.                                                  1
                                                  To enter/close/secure the garage ✓

        How many fluorescent tubes are used
8.                                                1 x 40W /1/One ✓                        1
        in number 7?

        How many one-way switch single-pole
9.                                                4/Four ✓                                1
        switches are in the dwelling?

        How many built-in cupboards are in
10.                                               2/Two ✓                                 1
        the dwelling?

        What is omitted in terms of electrical    Switch socket outlets/Socket
11.                                                                                       1
        installation in the bedrooms?             outlets/Wall plugs ✓
                                                  Access points:
                                                    • Sliding door/Lounge door/Door
                                                       at Number 8/Number 8 ✓
        Name TWO access points into the
12.                                                 • Garage doors/Rollup                 2
        dwelling.
                                                       door/Door at Number
                                                       6/Number 6 ✓

        How do you know in which direction
13.                                               By the direction of an arrow ✓          1
        the door at number 8 will open?
                                                  Bath/Bidet/Urinal/Vanity/Bathroom
        Name ONE other fixture that can be
                                                  cabinet/Wash hand basin/Basin/
14.     installed in the bathroom indicated by                                            1
                                                  Extractor fan/Heated towel rail ✓
        number 9.
                                                  (Abbreviations is NOT accepted)

15.     Identify number 10.                       Hot-water cylinder ✓                    1

Copyright reserved                                                            Please turn over

### Page 7

Civil Technology: Civil Services                7                              DBE/November 2024
                                      NSC – Marking guidelines

        Which plot is on the eastern side of
16.                                                 Plot number 27/Number 27/27 ✓               1
        plot number 23?
        How many inside doors are in the
17.                                                 4/Four ✓                                    1
        building?
        How many 2 600 mm x 1 400 mm
18.                                                 3/Three ✓                                   1
        windows are in the building?
        Who checked the drawing of the new
19.                                                 P Bot ✓                                     1
        dwelling?
                                                    No step ✓
        Why will it be difficult to enter the       No porch/stoep
20.     dwelling at number 8 if the NGL is                                                      1
        300 mm lower than the FFL?                  No ramp
                                                    The door is at a higher level
        Who was responsible for the printing
21.                                                 Frog printers ✓                             1
        of the building plan?
        Deduce from the notes column the
22.                                                 14/04/2024 ✓                                1
        date that revision 1 took place.

        In which town will the new dwelling be
23.                                                 Malubu ✓                                    1
        erected?

                                                              ✓
                                                                  ✓ ✓
        Draw the symbol for a sink unit –
24.
        double.                                                  ✓ ✓                            5
                                                                          OR

                                                                  ✓

25.     Draw the symbol for hardcore filling.                         ✓                                2

        Calculate the metres of clear-view          25 000 ✓ + 25 000 ✓ + 30 000 ✓ +
        fencing that would be needed to fence       30 000 ✓ – 4 000 mm ✓
        plot number 23, excluding the               = 106 000 mm = 106 ✓m
26.     driveway.                                                                               6
                                                              OR
        Give your answer in metres and show         25 + 25 + 30 + 30 – 4 = 106 m
        all calculations.
                                                    39,6 m² ✓ = 6,6 m
        The internal area of the garage is            6m✓
        39,6 m². Calculate the internal length      = 6 600 mm ✓
27.     of number 11.                               OR                                          3
        Give your answer in mm and show all         39 600 000 mm²
        calculations.                                6 000 mm
                                                    = 6 600 mm
                                                    TOTAL:                                          40

Copyright reserved                                                                  Please turn over

### Page 8

Civil Technology: Civil Services                   8                    DBE/November 2024
                                         NSC – Marking guidelines

QUESTION 3: CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA
            AND QUANTITIES (SPECIFIC)

3.1        3.1.1        Incidence board ✓                                                      (1)

           3.1.2        Concrete lid ✓                                                         (1)

           3.1.3        Wedge ✓                                                                (1)

           3.1.4        1:90 ✓                                                                 (1)

           3.1.5        Queen closer ✓                                                         (1)

3.2        3.2.1        Safety harness ✓                                                       (1)

           3.2.2        Extractor fan/Blower/Fan/Ventilation ✓                                 (1)

           3.2.3        Respiratory mask/Respirator/Breathing apparatus ✓                      (1)

Copyright reserved                                                          Please turn over

### Page 9

Civil Technology: Civil Services               9                                    DBE/November 2024
                                     NSC – Marking guidelines

3.3                                          BRANCH CHANNEL

                           1                          2

                                                      4
           INLET                                                                        OUTLET
                                                                            3

                                                  5

                                         6    BENCHING
                                                                                         WALL

                                     Any TWO labels                 7           7

            DRAWING/BRANCH CHANNEL CAN BE ROTATED IN ANY DIRECTION
                                                      OR
                                                              BRANCH CHANNEL

                       1                          2

          INLET                                           4
                                                                                       OUTLET
                                                                        3

                                              5

                                     6       BENCHING
                                                                                       WALL

                                                                7           7

                               NO.   ASSESSMENT CRITERIA MARK
                                1    Walls                    1
                                2    Hatching                 1
                                3    Straight channel         1
                                4    Branch channel           1
                                5    Direction of flow        1
                                6    Benching labelled        1
                                7    Any TWO labels           2                                           (8)
                                                       TOTAL: 8

Copyright reserved                                                                     Please turn over

### Page 10

Civil Technology: Civil Services                       10                       DBE/November 2024
                                             NSC – Marking guidelines

3.4        3.4.1        Rodding eye ✓                                                                 (1)

           3.4.2        1✓                                                                            (1)

           3.4.3        110/100 mm ✓                                                                  (1)

           3.4.4        PVC ✓                                                                         (1)

           3.4.5        1✓                                                                            (1)

           3.4.6        3 pipes of 6 m lengths ✓                                                      (1)

           3.4.7        Straight coupling double socket/Kimberley socket ✓                            (1)

3.5
                             2                                          2

                                                                        3

                                   1                           1            1              1

                                       NO.        ASSESSMENT CRITERIA MARK
                                         1        Stretcher course        4
                                         2        1/ Bricks               2
                                                    2
                                         3        Any full brick          1
                                                                   TOTAL: 7                           (7)
                                                                                                      [30]

Copyright reserved                                                                 Please turn over

### Page 11

Civil Technology: Civil Services                11                          DBE/November 2024
                                      NSC – Marking guidelines

QUESTION 4: COLD- AND HOT-WATER SUPPLY, TOOLS, EQUIPMENT AND
            MATERIALS (SPECIFIC)
4.1        4.1.1        Mechanisms to open a full-way valve:
                        A - is opened with a wheel/hand wheel that move the tapered gate
                          up and down ✓
                        B - is opened with hand lever/lever that rotates the ball ✓               (2)

           4.1.2        Open and closing mechanism inside full-way valve:
                        Full-way valve with wheel: Gate ✓
                        Full-way valve with lever handle: Ball ✓                                  (2)

4.2        4.2.1        Pipe-thread cutting machine ✓                                             (1)

           4.2.2        Use of the pipe-tread cutting machine:
                        • To thread pipes ✓
                        • To cut pipes ✓
                        • To thread nuts
                        • To thread bolts
                        ANY TWO OF THE ABOVE                                                      (2)

           4.2.3        Grease/Lubricant oil/Oil ✓                                                (1)

4.3        4.3.1        Airlocks ✓                                                                (1)

           4.3.2        Airlock preventions:
                        • Pipes should be installed horizontally with an upwards slope in
                             the direction of flow/Pipes should be installed correctly ✓
                        • Install vent valves in the pipeline. ✓
                        • Do not install a small diameter feed pipe to a bigger diameter
                             pipe
                        ANY TWO OF THE ABOVE                                                      (2)

4.4        4.4.1        Element / Heating element ✓                                               (1)

           4.4.2        Anode ✓                                                                   (1)

           4.4.3        The thermostat regulates ✓ the temperature of the water ✓
                                               OR
                        The thermostat switches the heating element on or off                     (2)

4.5        4.5.1
                                        PS    ✓                  OR

                                         ✓                                                        (2)

Copyright reserved                                                             Please turn over

### Page 12

Civil Technology: Civil Services                  12                        DBE/November 2024
                                        NSC – Marking guidelines

           4.5.2
                                              ✓
                                    ✓
                                                                                                    (2)

           4.5.3
                                      ✓
                                               ✓
                                                                                                    (2)

4.6        4.6.1        A - Cold water inlet pipe/Pipe for cold water supply/Inlet ✓
                        B - Hot water outlet pipe/Pipe for hot water supply/Outlet ✓                (2)

           4.6.2        The purpose of the pressure reducing valve is to:
                        • lower the incoming water pressure ✓
                        • balance the water pressure of the hot- and
                            cold-water supply ✓                                                     (2)

           4.6.3        Safety valve/Temperature and pressure safety valve/TP Valve ✓               (1)

           4.6.4        The drip tray:
                        • collects water if the geyser leaks ✓
                        • prevents water damage to the building
                        • pipe connected to drip tray allows water to flow outside
                        ANY ONE OF THE ABOVE                                                        (1)

           4.6.5        Vacuum breaker ✓                                                            (1)

4.7        4.7.1        F✓                                                                          (1)

           4.7.2        B✓                                                                          (1)

           4.7.3        A✓                                                                          (1)

           4.7.4        G✓                                                                          (1)

           4.7.5        H✓                                                                          (1)

4.8        4.8.1        Dezincification ✓                                                           (1)

           4.8.2        Electrolytic reaction ✓                                                     (1)

           4.8.3        Galvanic corrosion ✓                                                        (1)

Copyright reserved                                                               Please turn over

### Page 13

Civil Technology: Civil Services                13                        DBE/November 2024
                                      NSC – Marking guidelines

4.9                           1

                                            OR

                  2                  3

                              1

                  NO.                 ASSESSMENT CRITERIA                   MARK
                   1       110 mm Soil pipe                                   2
                   2       Inspection eye                                     1
                   3       90° Reducing socket for waste pipe                 1
                                                                 TOTAL:       4                 (4)
                                                                                                [40]

Copyright reserved                                                           Please turn over

### Page 14

Civil Technology: Civil Services                  14                         DBE/November 2024
                                        NSC – Marking guidelines

QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK
            AND STORM WATER (SPECIFIC)

5.1
                                                                     2

                                                       1                 1
                              1

                                                       1             2

                                     PICTORIAL VIEW NOT ACCEPTED

                               NO.      ASSESSMENT CRITERIA        MARK
                                1     Development of stopped end     4
                                2     Edges/Seams                    2
                                                         TOTAL:      6                             (6)

5.2      Method of channelling storm water:
         •   Roof gutters/Gutters ✓
         •   Rainwater down pipe/Down pipe
         •   Channels/Surface channels
         •   Inclined surfaces
         •   Roadside gutters
         •   Road kerbs
         •   Storm water drains
         •   Furrows
         ANY ONE OF THE ABOVE                                                                      (1)

5.3

                                               ✓
                                                   ✓   ✓

                                                           ✓

                                            Precast open channel                                   (4)

Copyright reserved                                                              Please turn over

### Page 15

Civil Technology: Civil Services                               15                         DBE/November 2024
                                                     NSC – Marking guidelines

5.4

                                                                     NO.     ASSESSMENT CRITERIA           MARK
                                                                      1     Projection lines to apex         1
                                                                      2     Determine true length            2
                                                                      3     Projection lines and arcs
                                                                                                                 3
                                                                            from pyramid
                                     4                                4     Development of base of               5
                                                     6
                     4                                                      pyramid
                                                                      5     Development of top of                5
                                                                            pyramid
                     7                           5                    6     3 mm seams (any ONE)              1
                                             5
                                                                      7     Folding lines (any TWO)           2
       4
                                                                                                 TOTAL:      19
                                 3       5
                         3
                                                                   USE A MASK TO MARK THIS QUESTION
             7
                                             5
                                                              1
                                                 5

                 4
   3
                             4

                                         2

                                                                      A

                             2

                                                                                                                 (19)
                                                                                                                 [30]

Copyright reserved                                                                            Please turn over

### Page 16

Civil Technology: Civil Services                 16                         DBE/November 2024
                                       NSC – Marking guidelines

QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)

6.1       6.1.1       B✓                                                                            (1)

          6.1.2       D✓                                                                            (1)

          6.1.3       A✓                                                                            (1)

          6.1.4       C✓                                                                            (1)

          6.1.5       D✓                                                                            (1)

6.2       6.2.1       Single-bowl urinal /Single stall urinal ✓                                     (1)

          6.2.2       A – Flush valve/Automatic flush valve/Push button valve/Flush ✓
                      B – P-trap/Metal trap/Earthenware trap ✓                                      (2)

          6.2.3       The flush valve:
                         • releases water when pressed or after movement ✓
                         • flushes/cleans the urinal
                      ANY ONE OF THE ABOVE                                                          (1)

          6.2.4      Removable mesh guard/Urinal mat/Any object that can prevent
                     foreign matter to enter the urinal can be accepted ✓                           (1)

6.3       6.3.1       Pointed head/Head/Soldering iron/Non-electrical soldering iron ✓              (1)

          6.3.2      The head is made of copper because:
                     • copper is a good conductor of heat ✓
                     • copper retains heat well
                     ANY ONE OF THE ABOVE                                                           (1)

          6.3.3       The soldering stick has a composition of tin and lead. ✓                      (1)

          6.3.4       Reasons for applying flux:
                     • Cleans the joint/surface ✓
                     • Prevents oxidation/rust ✓
                     • Promotes the flow of solder/capillary action
                      ANY TWO OF THE ABOVE                                                          (2)

6.4      The process of joining PVC pipes to a straight coupler using a solvent:
        • Use sandpaper to remove wax surface of the pipe and coupler and create a
          chamfer. ✓
        • Clean ends of the pipes and the coupler. ✓
        • Apply solvent/PVC weld to outside of the pipes. ✓
        • Push in coupler over the pipes and clean excess solvent from the joint. ✓                 (4)

Copyright reserved                                                               Please turn over

### Page 17

Civil Technology: Civil Services                    17                                DBE/November 2024
                                          NSC – Marking guidelines

6.5

                               CONCRETE COVER SLAB                       MANHOLE COVER

                       WATERPROOF PLASTER                  PARTITION WALL
                                                   1   2

                            INFLOW
                            PIPE
                                                                DISCHARGE                            OUTFLOW
                               SETTLING        3                CHAMBER
                               CHAMBER                     3                                         PIPE
                   5                                                              6
                                           7                                  7
                             WATER LEVEL                         SCUM

                                           4   4               OPENING

                                CONCRETE SLAB

                       NO.         ASSESSMENT CRITERIA                     MARK
                        1      Partition wall                                1
                        2      Hatching of partition wall                    1
                        3      Plaster on both sides of
                                                                             2
                               partitioning wall
                        4      Opening in partition wall                     2
                        5      Indicating water level                        1
                        6      Indicating scum                               1
                        7      Labels: Water level
                                        Scum                                 2
                                                          TOTAL:             10

Copyright reserved                                                                       Please turn over

### Page 18

Civil Technology: Civil Services             18                    DBE/November 2024
                                        NSC – Marking guidelines

     6.6

      NO.           ASSESSMENT CRITERIA                 MARK
       1        Inspection eyes                           3
       2        Branch pipes - 45°                        3
       3        Junction of the main sewer lines          1
                quarter round/45°
        4       Vent pipe correct position                  1
        5       Gully                                       1
        6       Abbreviations – IE and VP                   2
                                           TOTAL:           11

                                                                      MUNICIPAL CONNECTION

                                                                           MH/RE

                                                        1
                                   1                        6
                                  IE                IE                      3
RE
                                               5
                          4       2                 2
                    6
                                           G
                        VP

                                                                                2    IE   1

                                                                                    RE
                                                                          [40]
                                                                   TOTAL: 200

     Copyright reserved

## Related documents

- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — Civil Technology · QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — Civil Technology · QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — Civil Technology · QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — Civil Technology · QP · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2023-construction-english/9ab6f3f0-4774-49bf-8311-57f09822adf6) — Civil Technology · Memo · 2023 · Eng
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Civil Technology · Memo · 2023 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT 2023 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-afrikaans/97f8938d-02eb-46a4-a681-ef07b440e38f) — QP · 2023 · Afr
- [CIV TECH GR12 QP SEPT2023 Civil Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2023-civil-afrikaans/3d971330-fbba-4185-b58b-8e57fbcde1cc) — QP · 2023 · Afr
- [CIV TECH GR12 QP SEPT2023 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2023-woodworking-afrikaans/3e001b9e-95a3-4e0c-ad76-9bcfe29c6fff) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
