# Civil Technology Grade 12 November 2024 NSC Memo (English)

> Grade 12 Civil Technology memorandum from the November 2024 NSC (English), 21 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-mg-eng/898ff365-3aa8-49fc-aa7a-8c58c79bf409
- Updated: 2026-10-29
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2024
- Exam period: November 2024 NSC
- Curriculum: CAPS
- Pages: 21

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 November 2024 NSC Memo (English)](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-mg-eng/898ff365-3aa8-49fc-aa7a-8c58c79bf409)

## About this document

Civil Technology · Grade 12 · November 2024 NSC · 2024. Memorandum. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

NATIONAL
                             SENIOR CERTIFICATE

                                     GRADE 12

                     CIVIL TECHNOLOGY: WOODWORKING

                                  NOVEMBER 2024

                              MARKING GUIDELINES

MARKS: 200

                     These marking guidelines consist of 21 pages.

Copyright reserved                                                   Please turn over

### Page 2

Civil Technology: Woodworking                 2                            DBE/November 2024
                                    NSC – Marking guidelines

INSTRUCTIONS FOR MARKERS
1.   Markers should:
     •    Familiarise themselves with the question and answer before evaluating the
          responses of candidates.
     •    Always interpret the responses of the candidates within the context of the
          question.
     •    Consider any relevant and acceptable answer during pre-marking but
          should strictly adhere to the answers after finalisation of the marking
          guideline.
     •    There are TWO approaches to answering questions; these are (1) to
          describe and (2) to explain.
             1. If a candidate is required to explain e.g., a process in 4 steps, only the
                 first 4 responses should be considered.
             2. However, if for example candidate is required to explain or describe a
                 process, we need to consider that that candidates may write a long
                 description, not necessarily well organised. In this case the marker
                 needs to evaluate the complete statement to judge if the candidate
                 explained the required outcome satisfactorily and allocate marks on
                 merit.
     •    Mark what the candidate wrote and do not interpret or predict responses.
     •    Indicate the tick or cross right at the position where the mark needs to be
          awarded or where the candidate made the error.
     •    Accept the letter corresponding with the correct answer as well as the
          answer written in full in multiple-choice questions or similar questions.
     •    Accept incorrect spelling in answers unless the spelling changes the
          meaning of the answer.
     •    If a learner writes two or more answers separated by a slash (/) mark only
          the first response, unless the additional answer/s are different names for the
          same item e.g., Yale lock/Night latch. In this case, the answer for the
          response should be awarded and the slash (/) should NOT be considered as
          an additional answer.

2.   For calculations:

     •    A mark is only awarded if the correct unit is written next to the answer. If the
          question states that the answer must be in a specific unit, a mark will ONLY
          be awarded if the answer has the correct unit as indicated in the question.
     •    Marks will only be allocated for the correct values if the candidates add
          instead of multiply. NO marks will be awarded for the calculations and the
          answer.
     •    Where an incorrect answer is correctly carried over, the marker must
          recalculate the values, using the incorrect answer from the first calculation.
          If correctly used, the candidate should receive the full marks for subsequent
          calculations.
     •    Alternative methods of calculations must be considered, provided that the
          correct answer is obtained.
     •    For the calculation of quantities marks will be awarded for the correct use of
          the dimension paper.

Copyright reserved

### Page 3

Civil Technology: Woodworking                   3                         DBE/November 2024
                                      NSC – Marking guidelines

3.       When marking drawings:
         • The member for which the mark should be awarded should be drawn
            correctly in the correct position to receive a mark.
         • A member incorrectly drawn but wrongfully repeated in another position will
            be awarded the mark for the repeated incorrect member provided that the
            marking guideline provide for TWO or more marks for that member (positive
            marking).
         • Marks can only be awarded for a label if the label is correctly indicating the
            correct member. Do not consider labels for members of which the labels
            were provided on the answer sheet.
         • Scale drawings should always be marked using an appropriate mask.
         • If the incorrect/wrong drawing was drawn, the candidate can be awarded for
            only what was provided for on the marking guideline.
         • If a line diagram or an orthographic view instead of a pictorial drawing
            (isometric/oblique/perspective) is drawn, the first assessment criteria for
            each member will be marked wrong, but marks will be awarded for the
            subsequent members if TWO or more marks are awarded for the same
            member.
         • If candidates draw/give more information than what is required, mark strictly
            according to the assessment criteria.

4.       Incorrect numbering of questions:

         •   If a candidate numbered an incorrectly, but the answer is in the correct
             position according to the sequence of the questions in the question paper,
             circle then the incorrect numbering and mark the response.
         •   If questions were answered randomly not following the same sequence as
             in the question paper and the learner numbered incorrectly, the response
             should NOT be marked.

5.       Duplication of responses and questions answered in the correct place:

     •       If a question is answered twice, mark the first response.
     •       If a question should be answered on an answer sheet and the candidate
             answered it on both the answer sheet and in the answer book, mark the
             response on the answer sheet and cancel the response in the answer book.
     •       If the question was answered in the answer book instead of on the answer
             sheet, mark the response in the answer book according to the assessment
             criteria on the marking guideline.

Copyright reserved                                                             Please turn over

### Page 4

Civil Technology: Woodworking                 4                          DBE/November 2024
                                    NSC – Marking guidelines

QUESTION 1:          OHSA, MATERIALS,        TOOLS,      EQUIPMENT     AND       JOINING
                     (GENERIC)
1.1       1.1.1       3m✓                                                                         (1)
          1.1.2       3m✓                                                                         (1)

          1.1.3       Fire-fighting measures ✓                                                    (1)

          1.1.4       ensure that the ladder does not protrude excessively ✓                      (1)

          1.1.5       Powder coating ✓                                                            (1)

          1.1.6       the thickness of under size parts can be increased ✓                        (1)

          1.1.7       head and pin ✓                                                              (1)

          1.1.8       preventing backing off ✓                                                    (1)

          1.1.9       wood preservatives ✓                                                        (1)

          1.1.10      spiral ✓                                                                    (1)

1.2       B✓                                                                                      (1)

1.3       Diameter of thread/Size of Rawl bolt ✓                                                  (1)

1.4       Properties and advantages of cured concrete:

          1.4.1       • Improves the protection of the steel reinforcement ✓
                      • Improves the protection against rust
                      ANY ONE OF THE ABOVE                                                        (1)

          1.4.2       Cured concrete can carry more weight. ✓                                     (1)

1.5       A multi-detector can be used:
          • to detect materials in or behind a wall/carpentry/plumbing/construction
             surface. ✓
          • to determine distances to and from an object.
          ANY ONE OF THE ABOVE

          A laser level can be used:
          • to indicate horizontal and/or vertical levels/heights/slopes. ✓                       (2)

Copyright reserved                                                             Please turn over

### Page 5

Civil Technology: Woodworking               5                          DBE/November 2024
                                  NSC – Marking guidelines

1.6       Uses of dumpy level:
          • Determine differences between levels and vertical heights ✓
          • Determine levels ✓
          • Determine slopes
          • Determine horizontal angles/angles
          • Setting out of buildings
          • Transferring levels and heights
          • Determine the distance from the dumpy level to an object/telescopic staff
          ANY TWO OF THE ABOVE                                                                (2)

1.7       Caring for the telescopic staff:
          • The staff must always be folded when it is transported ✓
          • Keep it in a bag to prevent damage/scratching of the graduation during
              transportation ✓
          • Ensure that the plastic or metal clips are in working order to keep the
              sections in position
          • Clean after use
          • Store in a safe dry place
          ANY TWO OF THE ABOVE                                                                (2)
                                                                                              [20]

Copyright reserved                                                         Please turn over

### Page 6

Civil Technology: Woodworking                6                          DBE/November 2024
                                   NSC – Marking guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
NO.            QUESTIONS                    ANSWERS                                      MARKS
       What is the measurement of the
 1.                                              12 000 mm/12 m ✓                               1
       dwelling facing Hibiscus Street?
 2.    Identify number 1.                        Manhole/MH ✓                                   1

       Identify the number indicating the
 3.                                              4✓                                             1
       building line.

 4.    Identify number 2.                        Boundary line ✓                                1

 5.    Identify number 3.                        Driveway/Entrance/Exit ✓                       1

       Write down the abbreviation for
 6.                                              RE ✓                                           1
       number 5.

                                                 Garage door:
 7.    Explain the purpose of number 6.                                                         1
                                                 To enter/close/secure the garage ✓

       How many fluorescent tubes are used
 8.                                              1 x 40W /1/One ✓                               1
       in number 7?

       How many one-way switch single-pole
 9.                                              4/Four ✓                                       1
       switches are in the dwelling?

       How many built-in cupboards are in
10.                                              2/Two ✓                                        1
       the dwelling?

       What is omitted in terms of electrical    Switch socket outlets/Socket
11.                                                                                             1
       installation in the bedrooms?             outlets/Wall plugs ✓
                                                 Access points:
                                                    • Sliding door/Lounge door/Door
                                                      at Number 8/Number 8 ✓
       Name TWO access points into the
12.                                                 • Garage doors/Rollup                       2
       dwelling.
                                                      door/Door at Number
                                                      6/Number 6 ✓

       How do you know in which direction
13.                                              By the direction of an arrow ✓                 1
       the door at number 8 will open?
                                                 Bath/Bidet/Urinal/Vanity/Bathroom
       Name ONE other fixture that can be
                                                 cabinet/Wash hand basin/Basin/
14.    installed in the bathroom indicated by                                                   1
                                                 Extractor fan/Heated towel rail ✓
       number 9.
                                                 (Abbreviations is NOT accepted)
15.    Identify number 10.                       Hot-water cylinder ✓                           1

Copyright reserved                                                           Please turn over

### Page 7

Civil Technology: Woodworking                  7                               DBE/November 2024
                                     NSC – Marking guidelines

       Which plot is on the eastern side of
16.                                                Plot number 27/Number 27/27 ✓                      1
       plot number 23?

       How many inside doors are in the
17.                                                4/Four ✓                                           1
       building?

       How many 2 600 mm x 1 400 mm
18.                                                3/Three ✓                                          1
       windows are in the building?

       Who checked the drawing of the new
19.                                                P Bot ✓                                            1
       dwelling?
                                                   No step ✓
       Why will it be difficult to enter the       No porch/stoep
20.    dwelling at number 8 if the NGL is                                                             1
       300 mm lower than the FFL?                  No ramp
                                                   The door is at a higher level
       Who was responsible for the printing
21.                                                Frog printers ✓                                    1
       of the building plan?

       Deduce from the notes column the
22.                                                14/04/2024 ✓                                       1
       date that revision 1 took place.

       In which town will the new dwelling be
23.                                                Malubu ✓                                           1
       erected?

                                                             ✓
       Draw the symbol for a sink unit –                         ✓ ✓
24.                                                                                                   5
       double.                                                  ✓ ✓       OR

                                                                  ✓
25.    Draw the symbol for hardcore filling.                          ✓                               2

                                                   25 000 ✓ + 25 000 ✓ + 30 000 ✓ +
       Calculate the metres of clear-view
                                                   30 000 ✓ – 4 000 mm ✓
       fencing that would be needed to fence
                                                   = 106 000 mm = 106 ✓m
       plot number 23, excluding the
26.                                                                                                   6
       driveway.                                                 OR
       Give your answer in metres and show         25 + 25 + 30 + 30 – 4 = 106 m
       ALL calculations.
                                                   39,6 m² ✓ = 6,6 m
       The internal area of the garage is            6m✓
       39,6 m². Calculate the internal length      = 6 600 mm ✓
27.    of number 11.                               OR                                                 3
       Give your answer in mm and show             39 600 000 mm²
       ALL calculations.                            6 000 mm
                                                   = 6 600 mm
                                                                                   TOTAL:         40

Copyright reserved                                                                 Please turn over

### Page 8

Civil Technology: Woodworking                    8                             DBE/November 2024
                                       NSC – Marking guidelines

QUESTION 3:          CUPBOARDS,     CASEMENTS,                    WALL-PANELLING          AND
                     QUANTITIES (SPECIFIC)
3.1       3.1.1        Kick plate ✓

          3.1.2        Hardboard ✓

          3.1.3        Hinges ✓

          3.1.4        Screws ✓

          3.1.5        Rail ✓                                                                         (5)
3.2
              Member            Quantity Unit    Length     Width Thickness

           Top                     1      mm      868 ✓      530        16

           Base front rail         1      mm       868       80 ✓       16

           Shelf board            4✓      mm       868       514        16

           Table top               1      mm      800 ✓      530        32 ✓

           Side of table           1      mm      750 ✓      530        16
           Back of
                                   1      mm     1 968 ✓ 868 ✓          16
           cupboard                                                                                   (8)

Copyright reserved                                                                 Please turn over

### Page 9

Civil Technology: Woodworking                   9                          DBE/November 2024
                                      NSC – Marking guidelines

3.3       3.3.1

                                                          1

                                                                     2

                                                                 3
                                                   4

                                                    OR

                                NO.   ASSESSMENT CRITERIA                   MARK
                                 1    Bevel (at an angle)                     1
                                 2    Nose                                    1
                                 3    Drip groove                             1
                                 4    Bottom                                  1
                                                                     TOTAL:   4
                                                                                                  (4)

          3.3.2      Mistake in the casement:
                     • The windowpane is placed incorrectly ✓ in the bottom rail of
                         the fanlight.
                     • The wooden bead/quarter round is placed incorrectly in the
                         bottom rail of the fanlight.
                     • No hatching of the wooden bead/quarter round in the top rail of
                         the casement.
                     • No drip groove on the bottom rail of the fanlight.
                     ANY ONE OF THE ABOVE                                                         (1)

3.4       Constructing wall panelling:

          1.   B – Rough grounds ✓
          2.   D – Tongue and groove boards ✓
          3.   C – Skirting ✓
          4.   A – Quadrant mould ✓                                                               (4)

Copyright reserved                                                             Please turn over

### Page 10

Civil Technology: Woodworking                 10                           DBE/November 2024
                                        NSC – Marking guidelines

    3.5

A

                                                             2

                                                                   6       1             SHELF
                                                                           6

                                                                                          SIDE

                                                                                          BACKING
                                                                           1

                                                             6                            BOTTOM

                                                                       3                  BOTTOM RAIL
                                                                                          FRONT/BASE
                                                             5                      4     FRONT RAIL
                          A                                                               BOTTOM RAIL
                                                                                          BACK/BASE
                                                                                          BACK RAIL
                              NO.   ASSESSMENT CRITERIA                 MARK
                               1    Shelves                               2
                               2    Backing                               1
                               3    Bottom                                1
                               4    Bottom rail (Front)                   1
                               5    Bottom rail (Back)                    1
                               6    Hatching (Correct parts)              2
                                                                 TOTAL:   8                           (8)
                                                                                                      [30]

    Copyright reserved                                                             Please turn over

### Page 11

Civil Technology: Woodworking                 11                             DBE/November 2024
                                    NSC – Marking guidelines

QUESTION 4:          ROOFS, CEILINGS, TOOLS, EQUIPMENT AND MATERIALS
                     (SPECIFIC)

4.1       4.1.1       F✓                                                                            (1)

          4.1.2       E✓                                                                            (1)

          4.1.3       J✓                                                                            (1)

          4.1.4       C✓                                                                            (1)

          4.1.5       B✓                                                                            (1)

          4.1.6       I✓                                                                            (1)

4.2       4.2.1       It provides a tough✓/durable✓/water-resistant/clear/
                      decorative/matte/sheen/glossy finish.                                         (2)

          4.2.2       •   The type of grading ✓
                      •   Mechanical grading
                      •   Visual grading
                      ANY ONE OF THE ABOVE                                                          (1)

          4.2.3       60 minutes/1 hour ✓                                                           (1)

          4.2.4       • 38 mm ✓
                      • 50 mm ✓
                      • 76 mm
                      • 28 mm
                      ANY TWO OF THE ABOVE                                                          (2)

4.3       4.3.1       Cover strip/Wooden strip ✓                                                    (1)

Copyright reserved                                                               Please turn over

### Page 12

Civil Technology: Woodworking                    12                              DBE/November 2024
                                       NSC – Marking guidelines

          4.3.2
                                                                                  TIE BEAM   6

                                                                 1                BRANDERING 6
                                                 2
                                                                                  BRANDERING
                  CEILING
                                           3                         4            TRAP DOOR
                   BOARD
                                                         5   5
                                COVER STRIP

                                                                     ALTERNATIVE COVER STRIPS

                                 NO.   ASSESSMENT CRITERIA                 MARK
                                  1    Brandering                            1
                                  2    Brandering (Square)                   1
                                  3    Ceiling board                         1
                                  4    Trap door                             1
                                  5    Cover strip (any type of strip)       2
                                  6    Any TWO labels                        2
                                                                    TOTAL:   8                          (8)

4.4       Methods of fixing parts of a roof truss together:
          • A – Gang nail/Nail plate ✓
          • B – Bolt and nut ✓
          • C – Screws/Nails ✓                                                                          (3)

4.5       Roof trusses:
          • Lean-to roof truss ✓
          • Coupled roof truss ✓
          • Close couple roof truss ✓
          • Collar-tie roof truss
          • King post roof truss
          ANY THREE OF THE ABOVE                                                                        (3)

4.6        Maximum spacing:

          4.6.1      1 200 mm ✓                                                                         (1)

          4.6.2      345 mm ✓                                                                           (1)

          4.6.3      300 mm ✓                                                                           (1)

Copyright reserved                                                                   Please turn over

### Page 13

Civil Technology: Woodworking                 13                      DBE/November 2024
                                    NSC – Marking guidelines

4.7       Reasons for using a closed eave:
          • Provide a more attractive finish ✓
          • Prevent birds/insects/vermin from nesting in the roof spacing ✓
          • Beam filling is not needed ✓
          • Prevent wind from lifting the roof covering
          ANY THREE OF THE ABOVE                                                             (3)

4.8       A – Hip/Corner rafter ✓
          B – Jack rafter/Jack truss ✓
          C – Wall plate ✓
          D – Fascia board ✓                                                                 (4)

4.9       Members of a Collar-tie roof truss:
          • Ridge beam ✓
          • Rafter ✓
          • Collar beam ✓                                                                    (3)
                                                                                             [40]

Copyright reserved                                                        Please turn over

### Page 14

Civil Technology: Woodworking                  14                               DBE/November 2024
                                     NSC – Marking guidelines

QUESTION 5:          CENTERING, FORMWORK, SHORING AND GRAPHICS                               AS
                     MEANS OF COMMUNICATION (SPECIFIC)

5.1

                                          1               2       1

                                                      3

                                     KING POST ROOF TRUSS

                        NO.     ASSESSMENT CRITERIA               MARK
                         1      Rafters (Must include overhang)     2
                         2      King post                           1
                         3      Tie beam                            1
                                                           TOTAL:   4

                                                  1       2   1

                                      4           3           3   4

                                              5

                                     SA HOWE ROOF TRUSS

                        NO.     ASSESSMENT CRITERIA                        MARK
                         1      Rafters (Must include overhang)              2
                         2      King post                                    1
                         3      Struts                                       2
                          4     Queen posts                                 2
                          5     Tie beam                                    1
                                                                  TOTAL:    8                          (12)

Copyright reserved                                                                  Please turn over

### Page 15

Civil Technology: Woodworking                 15                              DBE/November 2024
                                    NSC – Marking guidelines

5.2
                                                               RIB

                                                               TIE

                                         1                     BEARER 4
                                             2
                                                               FOLDING WEDGES
                                     2
                                         1                     BEARER

                                                               PROP

                                         3

                        NO.     ASSESSMENT CRITERIA                     MARK
                         1      Bearers                                   2
                         2      Folding wedges                            2
                          3     Prop                                      1
                          4     Any ONE label                             1
                                                           TOTAL:         6                          (6)

Copyright reserved                                                                Please turn over

### Page 16

Civil Technology: Woodworking               16                          DBE/November 2024
                                  NSC – Marking guidelines

5.3

                          WALL
         CEILING PROP/STRUT
            FOLDING WEDGES

               SECOND FLOOR

                 HEAD PIECE/
              HEADING BOARD

                        NEEDLE
                                          1
                         BRACE
                                      2                      2

                 DEAD SHORE

                                  3                              3

                NEW OPENING

                     SOLE PLATE

                          NO.     ASSESSMENT CRITERIA                MARK
                           1  Needle                                   1
                           2  Braces                                   2
                           3  Dead shores                              2
                                                  TOTAL:               5                       (5)

Copyright reserved                                                          Please turn over

### Page 17

Civil Technology: Woodworking                     17                          DBE/November 2024
                                        NSC – Marking guidelines

5.4
                                                                   WALL

                                                                   OUTER STRING
                                                                   SHUTTER BOARD
                                                                   CROSS BEARER/JOIST

                                                                   BEARER/JOIST
                                1                    1
                                                                   FISHPLATE

                                                                   PROP
                                2            3       2

                                                                   DIAGONAL BRACE/STRUT

                                                                   HORIZONTAL BRACE

                                4                    4             FOLDING WEDGES
                                                                   SOLEPLATE

                         NO.     ASSESSMENT CRITERIA                    MARK
                          1  Fishplates                                   2
                          2  Props                                        2
                          3  Diagonal brace/Strut                         1
                          4         Folding wedges                        2
                                                               TOTAL:     7                          (7)
                                                                                                     [30]

Copyright reserved                                                                Please turn over

### Page 18

Civil Technology: Woodworking                  18                          DBE/November 2024
                                     NSC – Marking guidelines

QUESTION 6:          SUSPENDED FLOORS, STAIRCASES, IRONMONGERY, DOORS
                     AND JOINING (SPECIFIC)

6.1       6.1.1       D✓                                                                          (1)

          6.1.2       A✓                                                                          (1)

          6.1.3       C✓                                                                          (1)

          6.1.4       B✓                                                                          (1)

          6.1.5       C✓                                                                          (1)

6.2       6.2.1       A door is fixed to a doorframe by using various types of hinges ✓
                      that are screwed onto the frame and the door. ✓                             (2)

          6.2.2       •  A galvanised strap/roof wire is built into/fixed onto the wall ✓
                         and strapped over the truss. ✓
                      • If the wall plate is fixed to the wall, the galvanised strap can be
                         nailed to the wall plate and strapped over the truss.
                      ANY ONE OF THE ABOVE                                                        (2)

Copyright reserved                                                             Please turn over

### Page 19

Civil Technology: Woodworking                   19                      DBE/November 2024
                                      NSC – Marking guidelines

6.3
                                  1                                STRUT
                                          1
                                                     2             FLOOR JOIST

                                      STAGGERED STRUTS
                                             OR

                                                                 STRUT
                                                                 FLOOR JOIST

                        NO.     ASSESSMENT CRITERIA                 MARK
                         1      Staggered struts                      2
                         2      Floor joists                          1
                                                             TOTAL:   3

                                                                    FLOOR JOIST
                                  1       1                         STRUT
                                               2

                                              INLINE STRUTS
                                                    OR

                                                                    STRUT
                                                                    FLOORJOIST

                        NO.     ASSESSMENT CRITERIA                 MARK
                         1      In-line struts                        2
                         2      Floor joists                          1
                                                             TOTAL:   3                        (6)

Copyright reserved                                                          Please turn over

### Page 20

Civil Technology: Woodworking                     20                          DBE/November 2024
                                        NSC – Marking guidelines

6.4

                                    1

                                                    2

                                                        2
                                1

                                                                3
                                              1

                                                            3

                                                                     3

                                                                         NOTE: DRAWING
                                                                         MAY BE ROTATED
                                                     OR

                        NO.     ASSESSMENT CRITERIA                        MARK
                         1      Top rail surfaces                            3
                         2      Haunch                                       2
                         3      Tenon surfaces                               3
                                                                    TOTAL:   8                       (8)

Copyright reserved                                                                Please turn over

### Page 21

Civil Technology: Woodworking                   21                              DBE/November 2024
                                      NSC – Marking guidelines

6.5
                                                                   4
   DIMINISHING                                                                        RAISED
          STILE                                                                       PANEL
                                        1           2     3        5
      CLEARANCE
                                                                       3
                                             5
                                                                   4                  LOCK RAIL

                          NO.    ASSESSMENT CRITERIA                       MARK
                           1     Diminishing stile                           1
                           2     Clearance                                   1
                           3     Raised panel                                2
                           4     Lock rail                                  2
                           5     Hatching (Correct parts)                   2
                                                              TOTAL:        8                       (8)

6.6       A-    Handrail ✓                                                                          (1)

          B-    Half landing ✓                                                                      (1)

          C-    Outer stringer ✓                                                                    (1)

          D-    Riser ✓                                                                             (1)

          E-    Tread ✓                                                                             (1)

          F-    Nosing of tread ✓                                                                   (1)

          G - Newel post ✓                                                                          (1)

          H-    Baluster ✓                                                                          (1)

          I-    Wall stringer ✓                                                                     (1)
                                                                                                    [40]

                                                                                      TOTAL:        200

Copyright reserved

## Related documents

- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — Civil Technology · QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — Civil Technology · QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — Civil Technology · QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — Civil Technology · QP · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2023-construction-english/9ab6f3f0-4774-49bf-8311-57f09822adf6) — Civil Technology · Memo · 2023 · Eng
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Civil Technology · Memo · 2023 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT 2023 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-afrikaans/97f8938d-02eb-46a4-a681-ef07b440e38f) — QP · 2023 · Afr
- [CIV TECH GR12 QP SEPT2023 Civil Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2023-civil-afrikaans/3d971330-fbba-4185-b58b-8e57fbcde1cc) — QP · 2023 · Afr
- [CIV TECH GR12 QP SEPT2023 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2023-woodworking-afrikaans/3e001b9e-95a3-4e0c-ad76-9bcfe29c6fff) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
