# Civil Technology Grade 11 Eastern Cape November 2019 QP

> Grade 11 Civil Technology question paper from the Eastern Cape November 2019 (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/cvlt-gr11-qp-eng-nov-2019-civil-services-d/6f325849-236b-4d10-998c-6c9893d8ed5d
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 11
- Document type: Question paper
- Year: 2019
- Exam period: Eastern Cape November
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 11](https://www.hlayiso.com/library/grade-11) › [Civil Technology](https://www.hlayiso.com/library/grade-11/civil-technology) › [Civil Technology Grade 11 Eastern Cape November 2019 QP](https://www.hlayiso.com/library/cvlt-gr11-qp-eng-nov-2019-civil-services-d/6f325849-236b-4d10-998c-6c9893d8ed5d)

## About this document

Civil Technology · Grade 11 · Eastern Cape November · 2019. Question paper, 18 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                              NATIONAL
                         SENIOR CERTIFICATE

                                 GRADE 11

                             NOVEMBER 2019

           CIVIL TECHNOLOGY: CIVIL SERVICES

MARKS:     200

TIME:      3 hours

                                  *ICvlte1*\

        This question paper consists of 14 pages, including 3 pages answer sheets.

### Page 2

Downloaded from hlayiso.com
2                         CIVIL TECHNOLOGY: CIVIL SERVICES                  (EC/NOVEMBER 2019)

REQUIREMENTS:

1.     ANSWER BOOK

2.     Drawing instruments

3.     A non-programmable pocket calculator

INSTRUCTIONS AND INFORMATION

1.     This question paper consists of SIX QUESTIONS: THREE questions are
       generic and THREE questions are subject specific.

2.     Answer ALL the questions.

3.     Answer each question as a whole. Do NOT separate subsections of questions.

4.     Start the answer to EACH question on a NEW page.

5.     Do NOT write in the margins of the ANSWER BOOK.

6.     You may use sketches to illustrate your answers.

7.     Write ALL calculations and answers in the ANSWER BOOK or on the attached
       ANSWER SHEETS.

8.     Use the mark allocation as a guide to the length of your answers.

9.     Make drawings and sketches in pencil, fully-dimensioned and neatly finished
       off with descriptive titles and notes to conform to the SANS/SABS Code of
       Practice for Building Drawings.

10.    For the purpose of this question paper, the size of a brick should be taken as
       220 mm x 110 mm x 75 mm.

11.    Use your own discretion where dimensions and/or details have been omitted.

12.    Answer QUESTIONS 3.2, 5.1 and 6.2 on the attached ANSWER SHEETS,
       using drawing instruments where necessary.

13.    Write your NAME on every ANSWER SHEET and hand them in with your
       ANSWER BOOK, whether you have answered the question or not.

14.    Drawings in the question paper are NOT to scale due to electronic transfer.

Copyright reserved                                                            Please turn over

### Page 3

Downloaded from hlayiso.com
(EC/NOVEMBER 2019)                CIVIL TECHNOLOGY: CIVIL SERVICES                            3

QUESTION 1: SAFETY AND MATERIALS (GENERIC)

1.1     What is the meaning of the abbreviation PPE?                                         (1)

1.2     Name TWO requirements for protective footgear that is worn on a
        building site.                                                          (2 x 1)      (2)

1.3     General safety for small plant equipment is important. Briefly motivate why
        the following safety rules must be adhered to:

        1.3.1    Pre-operational checks should be conducted on equipment.                    (1)

        1.3.2    Petrol engines should only be used outside.                                 (1)

        1.3.3    Driving and rotating parts should be covered.                               (1)

        1.3.4    Operators should receive training with regards to equipment.                (1)

1.4     Answer the following questions with regard to the safe stacking of materials:

        1.4.1    What should workers use to climb up and down the stack?                     (1)

        1.4.2    Name TWO factors that should not be affected by a stack.       (2 x 1)      (2)

        1.4.3    Determine the maximum height of a stack if the material have a
                 width of 500 mm and a thickness of 250 mm.                                  (2)

        1.4.4    Why should a stack have no protruding parts?                                (1)

1.5     Name the TWO main elements of screed.                                   (2 x 1)      (2)

1.6     Name ONE example of a fine aggregate.                                                (1)

1.7     Name ONE purpose of lime in a building mixture.                                      (1)

1.8     Name TWO board products that are suitable for wall panelling.           (2 x 1)      (2)

1.9     Name TWO uses of stainless steel.                                       (2 x 1)      (2)

1.10    What element of ferrous metals makes it prone to corrosion?                          (1)

1.11    Define the term alloy.                                                               (3)

1.12    Name TWO uses of safety glass                                           (2 x 1)      (2)

1.13    Name ONE use of a mastic sealant.                                                    (1)

1.14    Define the term thermoplastic.                                                      (2)
                                                                                           [30]

Copyright reserved                                                              Please turn over

### Page 4

Downloaded from hlayiso.com
4                         CIVIL TECHNOLOGY: CIVIL SERVICES                (EC/NOVEMBER 2019)

    QUESTION 2: EQUIPMENT, TOOLS AND GRAPHICS (GENERIC)

2.1    Name the tools in FIGURES 2.1.1 to 2.1.4 and name ONE use of each. (4 x 2)          (8)

         FIGURE 2.1.1         FIGURE 2.1.2        FIGURE 2.1.3       FIGURE 2.1.4

2.2    Which power tool will be used for the following work:

       2.2.1    Sharpening of chisels                                                      (1)

       2.2.2    To cut rebates in wood                                                     (1)

2.3    Identify the tool in FIGURE 2.3 and name TWO uses of it.                (3 x 1)     (3)

                                         FIGURE 2.3

2.4    Name TWO maintenance measures which are applicable to straight edges.
                                                                         (2 x 1)           (2)

2.5    Briefly motivate why universal pliers cannot be used for clamping plumbing
       pipes.                                                                              (1)

Copyright reserved                                                           Please turn over

### Page 5

Downloaded from hlayiso.com
(EC/NOVEMBER 2019)                 CIVIL TECHNOLOGY: CIVIL SERVICES                        5

2.6    Answer the following questions with regard to the elevation in FIGURE 2.6.

                                         FIGURE 2.6

       2.6.1    Name the type of elevation.                                                (1)

       2.6.2    Name the parts labelled 2.6.A to 2.6.J.                                  (10)

       2.6.3    What are the width and thickness dimensions of part 2.6.F?                 (2)

       2.6.4    What is the purpose of part 2.6.G?                                         (1)

2.7    Name FOUR particularities with regard to roof constructions which must be
       indicated in elevations.                                           (4 x 1)          (4)

2.8    Make neat sketches to illustrate the following symbols:

       2.8.1    Plaster                                                                    (2)

       2.8.2    Undressed wood                                                             (2)

       2.8.3    Invert level                                                              (2)
                                                                                         [40]

Copyright reserved                                                           Please turn over

### Page 6

Downloaded from hlayiso.com
6                           CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/NOVEMBER 2019)

 QUESTION 3: QUANTITIES, JOINING AND GRAPHICS (GENERIC)

 3.1 Make neat sketches to illustrate the following symbols on a floor plan:

       3.1.1    Grease trap                                                                 (2)

       3.1.2    DPC (Damp-proof course)                                                     (2)

       3.1.3    Staircase                                                                   (2)

 3.2 FIGURE 3.2 below shows the floor plan of the foundation walls of a single
     room.

                                           FIGURE 3.2

       Use the following specifications:
        The floor slab is 85 mm thick
        Walls are 220 mm thick

       Use ANSWER SHEET 1 and calculate the volume of concrete needed to cast
       the floor slab between the external walls.                                         (12)

 3.3 Name THREE properties of silicone.                                        (3 x 1)      (3)

 3.4 Describe the application process of contact glue.                                      (3)

 3.5 Name ONE property of PVC-adhesive.                                                     (1)

 3.6 Name THREE functions of glass.                                            (3 x 1)      (3)

 3.7 Discus the difference between polythene and polyvinyl chloride.                       (2)
                                                                                          [30]

Copyright reserved                                                             Please turn over

### Page 7

Downloaded from hlayiso.com
(EC/NOVEMBER 2019)                 CIVIL TECHNOLOGY: CIVIL SERVICES                            7

 QUESTION 4: SAFETY, MATERIAL, EQUIPMENT AND JOINING (SPECIFIC)

 4.1    Plumbers may come into contact with harmful sewage. Name THREE steps
        that can be taken to prevent infections involving sewerage.    (3 x 1)               (3)

 4.2    Name TWO safety measures which must be applied to avoid breathing in of
        soldering fumes.                                                (2 x 1)              (2)

 4.3    Choose a term in COLUMN B that matches the description in COLUMN A.
        Write only the letter (A–E) next to the question number (4.3.1–4.3.3) in the
        ANSWER BOOK, for example 4.3.4 F.

                        COLUMN A                               COLUMN B
        4.3.1    Where concrete structures are not A       Cement
                 subjected to tensile and bending
                 stress

        4.3.2    To bind masonry                       B   Screed

        4.3.3    Smoothing of concrete floors          C   Mortar

                                                       D   Unreinforced concrete

                                                       E   Coarse aggregates
                                                                                   (3 x 1)   (3)

 4.4    Which type of board product will be used as formwork when a smooth finish
        for concrete is required?                                                            (1)

 4.5    Briefly motivate why meranti wood will not be used for the manufacturing of
        roof trusses.                                                                        (1)

 4.6    Explain the difference in use of filler bricks and face bricks.                      (2)

 4.7    Briefly motivate why copper is more suitable than malleable iron for the use
        of hot water supply.                                                                 (1)

 4.8    Which metal is used for the galvanising of iron?                                     (1)

 4.9    Which factor determines the thickness of the glass in window frames?                 (1)

 4.10   Name THREE properties of polypropylene which make it ideal for sewer
        pipes.                                                            (3 x 1)            (3)

Copyright reserved                                                             Please turn over

### Page 8

Downloaded from hlayiso.com
8                            CIVIL TECHNOLOGY: CIVIL SERVICES                (EC/NOVEMBER 2019)

 4.11   Answer the following questions with regard to the tools in FIGURES 4.11.A
        and 4.11.B.

                        FIGURE 4.11.A                       FIGURE 4.11.B

        4.11.1       Identify the tools in FIGURES 4.11.A and 4.11.B.                        (2)

        4.11.2       Name TWO maintenance measures which must be applied to
                     tool 4.11.A.                                           (2 x 1)          (2)

        4.11.3       Describe the use of tool 4.11.B.                                        (2)

 4.12   Briefly describe the preparation of the pipes which must be joined by heat
        fusion.                                                                              (2)

 4.13   Indicate whether the following statements are TRUE or FALSE. Write only the
        word ‘true’ or ‘false’ next to the question number (4.13.1–4.13.4) in the
        ANSWER BOOK.

        4.13.1       Galvanised pipes are bent with a pipe bending spring.                   (1)

        4.13.2       Polythene pipes are joined with thread connections.                     (1)

        4.13.3       Lead solder must never be used for connecting drink-water pipes.        (1)

        4.13.4       Sleeve anchors are used when pipework is anchored to wood.              (1)
                                                                                            [30]

Copyright reserved                                                             Please turn over

### Page 9

Downloaded from hlayiso.com
(EC/NOVEMBER 2019)                  CIVIL TECHNOLOGY: CIVIL SERVICES                          9

 QUESTION 5: GRAPHICS, CONSTRUCTION AND JOINING (SPECIFIC)

 5.1 FIGURE 5.1 on ANSWER SHEET 2 shows the plan and elevation of a square
     downpipe.
     Use ANSWER SHEET 2 and develop and draw the development of the square
     downpipe on scale 1 : 1.                                                                (16)

 5.2 Briefly motivate why concrete must be cured.                                             (2)

 5.3 Name TWO defects in concrete which are caused by inadequate curing. (2 x 1)              (2)

 5.4 Answer the following questions with regard to the wall construction in
     FIGURE 5.4.

                                           FIGURE 5.4

       5.4.1    What is this type of wall called?                                             (1)

       5.4.2    In which bond is this wall built?                                             (1)

       5.4.3    What is the thickness of the wall?                                            (1)

 5.5 Describe the consequences of a water supply pipework installation which has
     not been sturdily secured to the structure.                                              (2)

 5.6 Answer the following question with regard to pipe connection in FIGURE 5.6:

                                           FIGURE 5.6

       5.6.1    Which type of pipe is connected with this type of fitting connection?         (1)

       5.6.2    Describe the method which must be used to ensure a water tight
                connection.                                                                   (1)

 5.7 Briefly describe the working of a spring toggle bolt which makes it ideal for
     securing against drywalls.                                                               (2)

 5.8 Make a neat sketch to illustrate the shape of a grooved seam joint in sheet
     metal.                                                                                   (1)
                                                                                             [30]

Copyright reserved                                                              Please turn over

### Page 10

Downloaded from hlayiso.com
10                          CIVIL TECHNOLOGY: CIVIL SERVICES               (EC/NOVEMBER 2019)

 QUESTION 6: COLD AND HOT WATER SUPPLY, DRAINAGE AND SANITARY
             FITMENTS (SPECIFIC)
 6.1 Identify the type of pipe which is connected by means of each of the following
     joining methods:
       6.1.1    Soldering                                                                    (1)
       6.1.2    Compression joint                                                            (1)
       6.1.3    Threaded joint                                                               (1)
 6.2 FIGURE 6.2 on ANSWER SHEET 3 shows an incomplete sketch of a valve for
     cold water supply. Answer the following questions with regard to the valve.
       6.2.1    Complete the sketch on ANSWER SHEET 3 by drawing in the TWO
                missing parts of the valve.                                                  (2)
       6.2.2    What is this valve called?                                                   (1)
       6.2.3    Explain the purpose of the valve.                                            (2)
 6.3 Briefly motivate why pipes below a building must be laid inside a sleeve.               (2)
 6.4 Make neat sketches of symbols for the following hot water systems:
       6.4.1    Automatic shut-off valve                                                     (1)
       6.4.2    Non-return valve                                                             (1)
       6.4.3    Pressure-relief valve                                                        (1)
       6.4.4    Vacuum-relief valve                                                          (1)
 6.5 Briefly motivate why the hot water outlet is on top of the high pressure geyser.        (2)
 6.6 Name TWO factors which cause pressure relief valves to discharge.             (2 x 1)   (2)
 6.7 FIGURE 6.7 shows a roof plan and the position of a solar hot water geyser.
     Answer the following questions with regard to the position of the solar geyser.

                                                            SOLAR GEYSER

                                             FIGURE 6.7
       6.7.1    Motivate why the solar geyser in the FIGURE 6.7 is not in a good
                position.                                                                    (2)
       6.7.2    Identify the correct placing for the solar geyser.                           (1)

Copyright reserved                                                           Please turn over

### Page 11

Downloaded from hlayiso.com
(EC/NOVEMBER 2019)                   CIVIL TECHNOLOGY: CIVIL SERVICES                        11

 6.8    What is the purpose of the tank vent pipe of a solar geyser.                          (1)

 6.9    FIGURE 6.9 shows the cross-section of a high-pressure solar geyser. Identify
        the parts 6.9.A to 6.9.C.                                                             (3)

                                6.9.A

                                6.9.B
                                6.9.C

                                            FIGURE 6.9

 6.10   Indicate whether the following statements are TRUE or FALSE. Write only the
        word ‘true’ or ‘false’ next to the question number (6.10.1–6.10.3) in the
        ANSWER BOOK.

        6.10.1       Excess sewage must be discharged in stormwater channels.                 (1)

        6.10.2       Sanitary fittings must be made of impermeable material.                  (1)

        6.10.3       The water supply outlet to the waste appliances must be at least
                     120 mm above the flood level of the appliance.                           (1)

 6.11   Explain the consequence of siphonage in a sanitary pipe system.                       (4)

 6.12   How is siphonage in a sanitary pipe system eliminated?                                (1)

 6.13   What is the difference between a stub-stack sanitary system and a one-pipe
        sanitary system?                                                                      (1)

 6.14   Name TWO disadvantages of a one-pipe sanitary system.                     (2 x 1)     (2)

 6.15   Name TWO materials from which cisterns are manufactured.                  (2 x 1)     (2)

 6.16   Briefly explain the working of the outlet silencer pipe of a cistern.                 (2)
                                                                                             [40]

                                                                                 TOTAL:      200

Copyright reserved                                                              Please turn over

### Page 12

Downloaded from hlayiso.com



### Page 13

Downloaded from hlayiso.com
 12                         CIVIL TECHNOLOGY: CIVIL SERVICES               (EC/NOVEMBER 2019)

                               CIVIL TECHNOLOGY
                                 CIVIL SERVICES
  ANSWER SHEET          1           (GENERIC)
                                                           NAME:

3.2     Calculate the volume of concrete needed to cast the floor slab between the
        external walls.                                                              (12)

 A       B             C            D

                                    Internal measurements of long walls                  (3)

                                    =______________ - ____________ - ___________

                                    =

                                    Internal measurements of short walls                 (3)

                                    = _____________ - ___________ - ____________

                                    =

                                    Volume of concrete needed                            (6)

                                    Length of floor slab     =

                                    Width of floor slab      =

                                    Thickness of floor slab =
                                                                                        (12)

 Copyright reserved                                                          Please turn over

### Page 14

Downloaded from hlayiso.com



### Page 15

Downloaded from hlayiso.com
(EC/NOVEMBER 2019)                CIVIL TECHNOLOGY: CIVIL SERVICES                 13

                             CIVIL TECHNOLOGY
ANSWER SHEET             2     CIVIL SERVICES           NAME:
                                  (GENERIC)

5.1    FIGURE 5.1 on ANSWER SHEET 2 shows the plan and elevation of a
       square downpipe.
       Use ANSWER SHEET 2 and develop and draw the development of the
       square downpipe on scale 1 : 1.                                      (16)

                     PLAN VIEW

          ELEVATION VIEW

                                 Base lines:                                  3
                                 Seam lines:                                  2
                                 Vertical construction lines:                6
                                 Intersection lines:                         5
                                 TOTAL:                                      16

Copyright reserved                                                   Please turn over

### Page 16

Downloaded from hlayiso.com



### Page 17

Downloaded from hlayiso.com
14                       CIVIL TECHNOLOGY: CIVIL SERVICES               (EC/NOVEMBER 2019)

                              CIVIL TECHNOLOGY
  ANSWER SHEET          3       CIVIL SERVICES         NAME:
                                   (GENERIC)

6.2    FIGURE 6.2 on ANSWER SHEET 3 shows an incomplete sketch of a valve
       for cold water supply. Answer the following questions with regard to the
       valve.

       6.2.1   Complete the sketch on ANSWER SHEET C by drawing in the TWO
               lacking parts of the valve.                                            (2)

                                              Lacking parts                       2
                                              TOTAL:                              2

Copyright reserved                                                        Please turn over

### Page 18

Downloaded from hlayiso.com



## Related documents

- [CVLT GR11 QP ENG NOV2019 CONSTRUCTION D](https://www.hlayiso.com/library/cvlt-gr11-qp-eng-nov2019-construction-d/709fb2af-73d3-4acf-ac2b-9045cdb81727) — Civil Technology · QP · 2019 · Eng
- [CVLT GR11 QP AFR NOV2019 KONSTRUKSIE D](https://www.hlayiso.com/library/cvlt-gr11-qp-afr-nov2019-konstruksie-d/ede9f697-fbf0-4cfb-97db-cb74cfeee28b) — Civil Technology · QP · 2019 · Afr
- [CIV TECH GR11 QP NOV2019 Wood Eng D](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2019-wood-eng-d/11938d98-8c97-4171-8127-48764ea922be) — Civil Technology · QP · 2019 · Eng
- [CIV TECH GR11 QP NOV2019 Wood Afr D](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2019-wood-afr-d/9f1575af-0526-4b93-98d8-325076ed88a0) — Civil Technology · QP · 2019 · Afr
- [CVLT GR11 QP Afr Nov 2019 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr11-qp-afr-nov-2019-siviele-dienste-d/d73eb57e-4ef4-4636-bb3c-3b023a218df8) — Civil Technology · QP · 2019 · Afr
- [CVLT - GR11 MEMO - ENG - NOV2019 - CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr11-memo-eng-nov2019-construction/858329b3-c40a-4769-8f3b-ec1a964bbeae) — Civil Technology · Memo · 2019 · Eng

## More from Grade 11 Civil Technology

- [Gr 11 Cons ATP 2023-24](https://www.hlayiso.com/library/gr-11-cons-atp-2023-24/5adb6254-7b36-487a-a882-c42b36bf49b7) — ATP
- [Gr 11 Civil Ser ATP 2023-24](https://www.hlayiso.com/library/gr-11-civil-ser-atp-2023-24/91ce1dc1-91cc-4a38-926b-b3d45f5b5305) — ATP
- [CIV TECH GR11 MEMO NOV2022 Civil Services Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-civil-services-afrikaans/85a9ce14-da0c-4943-8570-643c7a62e6a8) — Memo · 2022 · Afr
- [CIV TECH GR11 MEMO NOV2022 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-construction-afrikaans/6d31745c-a94c-4612-8aef-4e9b624a57b0) — Memo · 2022 · Afr
- [CIV TECH GR11 MEMO NOV2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-woodworking-english/a7e06718-cada-4092-84e6-dffe9c65d79c) — Memo · 2022 · Eng
- [CIV TECH GR11 MEMO NOV2022 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-woodworking-afrikaans/16d10915-16d2-413b-a24e-24b5588c3601) — Memo · 2022 · Afr

## Collection

- [Grade 11 past papers](https://www.hlayiso.com/grade-11/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.