# Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)

> Grade 12 Civil Technology memorandum from the Eastern Cape Mock Exam 2018 (English), 12 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-civil-services/87e1cb25-7c84-4d29-bae2-79066dfa2ebd
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2018
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 12

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-civil-services/87e1cb25-7c84-4d29-bae2-79066dfa2ebd)

## About this document

Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2018. Memorandum, 12 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                           NATIONAL
                      SENIOR CERTIFICATE

                             GRADE 12

                      SEPTEMBER 2018

         CIVIL TECHNOLOGY: CIVIL SERVICES
                 MARKING GUIDELINE

MARKS:   200

                  This marking guideline consists of 12 pages.

### Page 2

Downloaded from hlayiso.com
2                           CIVIL TECHNOLOGY: CIVIL SERVICES                (EC/SEPTEMBER 2018)

QUESTION 1: SAFETY, MATERIAL AND EQUIPMENT (GENERIC)

1.1    1.1.1     True                                                                          (1)
       1.1.2     False                                                                         (1)
       1.1.3     False                                                                         (1)
       1.1.4     True                                                                          (1)

1.2    Any THREE requirements to which a trestle scaffold must comply.
           Soundly constructed with a solid material
           Prevent spreading of supporting legs
           Not higher than 3 m
           Consists of not more than 2 tiers                                     (3 x 1)      (3)

1.3    Similar answer.
       (1) Aluminium conducts (2) electricity / workers subjected to electrical shock          (2)

1.4    Similar answer.
       (1) Paint will cover (2) weaknesses                                                     (2)

1.5    1.5.2     Improves the durability of concrete.                                          (1)

       1.5.5     It improves the strength of concrete.                                         (1)

       1.5.7     It makes concrete more watertight.                                            (1)

       1.5.8     It improves the resistance to abrasion.                                       (1)
1.6    (1) Plastic finish / coating (2) in powder form by (3) using a spray-gun                (3)

1.7    Briefly describe any ONE use of the dumpy level.
            (1) Determine (2) height differences
            (1) Determine (2) levels and slopes
            (1) Setting out (2) of buildings
            (1) Transferring of (2) levels and heights
            (1) Determine horizontal (2) distances                                (1 x 2)     (2)

1.8    1.8.1     1.5 m                                                                         (1)
       1.8.2     1.535 – 1,47 x 100 = 6,5 m                                                    (4)

1.9    Any THREE materials which can be detected in walls by the multi-detector.
           Ferrous metals
           Non-ferrous metals
           AC wiring
           Wood
           Metal studs
           Steel bars
           Copper pipes                                                   (3 x 1)             (3)

1.10 1.10.1      Dry, soft cloth / Not cleaning agents or solvents                            (1)
     1.10.2      Remove battery                                                               (1)
                                                                                             [30]

Copyright reserved                                                                Please turn over

### Page 3

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)        CIVIL TECHNOLOGY: CIVIL SERVICES                                 3

QUESTION 2: GRAPHICS AND JOINING (GENERIC)

2.1    Use the information on ANSWER SHEET A and complete the site plan on
       scale 1 : 200 according to the following requirements:

      2.1.1    The site boundaries are measured from point A
               The site boundaries in front and back are 23 m long
               The site boundaries on the sides are 25 m long                              (2)

      2.1.2    The front building line is 4 m from the site boundary
               The back and side building lines are 2 m from the site boundaries           (2)

      2.1.3    Show the site entrance, 3 m from the western site boundary                  (1)

      2.1.4    Show the datum level in the north-eastern corner of the site

               Complete the sewage lay-out and abbreviations of the sewage
               appliances according to the following requirements:                         (1)

      2.1.5    The main sewage from the bathroom to the municipal connection               (2)

      2.1.6    The branch sewage to the bathroom and kitchen                               (2)

      2.1.7    Manhole on the site, before the municipal connection                        (2)

      2.1.8    Rodding eyes                                                                (4)

      2.1.9    Inspection eyes                                                             (4)

2.2          Length of shank
             Diameter
             Type of thread
             Head size                                                                    (4)

2.3 (1) When square shoulder is driven in (2) it resists rotation                          (2)

2.4 2.4 A – Nut
    2.4 B – Thread
    2.4 C – Runout
    2.4 D – Shank                                                                          (4)
                                                                                          [30]

                                                                               TOTAL:      60

Copyright reserved                                                            Please turn over

### Page 4

Downloaded from hlayiso.com
4                            CIVIL TECHNOLOGY: CIVIL SERVICES               (EC/SEPTEMBER 2018)

QUESTION 3: SAFETY, MATERIAL, EQUIPMENT AND GRAPHICS (SPECIFIC)

3.1    Similar answer.
       (1) Prevent (2) material / people / tools falling into the manhole                   (2)

3.2    3.2.1    Stairs                                                                      (1)
       3.2.2    Safety net                                                                  (1)
       3.2.3    Cover                                                                       (1)

3.3    Any ONE responsibility of the contractor when working in elevated positions:
           (1) Appoint a competent person (2) responsible for the preparation
            (3) of a fall protective plan
           (1) Ensure that the protective plan (2) is implemented and
            (3) amended when necessary
           (1) Ensure that steps are taken (2) in order to adhere to (3) the fall
             protective plan                                                   (1 x 3)      (3)

3.4    (1) When selectively removing zinc (2) from an alloy                                 (2)

3.5    Any ONE consequence of dezincification when it occurs in an alloy:
           Leaves a porous metal
           -Leaves a metal with little mechanical strength                                 (1)

3.6    White powder on the metal surface.                                                   (1)

3.7    Describe any TWO methods of preventing corrosion in metals:
          (1) Electrically (2) insulating the two metals
          (1) Make sure that there is no contact (2) with an electrolyte
          (1) Applying an antioxidant paste (2) to copper and aluminium
             surfaces
          (1) Choosing metals that (2) have similar electrode potentials
          (1) Connecting a DC current supply to (2) oppose the corrosive
             galvanic current                                             (2 x 2)           (4)

3.8    3.8.1    Drain cleaning rods                                                         (1)
       3.8.2    Coil spring                                                                 (1)
       3.8.3    (1) Jet wash with (2) soapy water and (3) disinfectant                      (3)

3.9    3.9.1    Centrifugal pump                                                            (1)
       3.9.2    Pipe-thread cutting machine                                                 (1)
       3.9.3    Water pressure testing pump                                                 (1)

3.10 FIGURE 3.10 on ANSWER SHEET B shows a square-based truncated
     pyramid.
     Draw on ANSWER SHEET B the pattern development for the pyramid.                      (16)
                                                                                          [40]

Copyright reserved                                                             Please turn over

### Page 5

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)              CIVIL TECHNOLOGY: CIVIL SERVICES                                  5

QUESTION 4: QUANTITIES AND JOINING (SPECIFIC)

4.1    4.1.1         Polycop                                                                     (1)
       4.1.2         1 3240 mm (13,24 m)                                                         (1)
       4.1.3         Polycop                                                                     (1)
       4.1.4         8 800 mm (1,5 + 5,48 + 1,82 = 8,8 m)                                        (1)
       4.1.5         Copper                                                                      (1)
       4.1.6         1                                                                           (1)
       4.1.7         Copper                                                                      (1)
       4.1.8         1                                                                           (1)
       4.1.9         Copper                                                                      (1)
       4.1.10        1                                                                           (1)
       4.1.11        Copper                                                                      (1)
       4.1.12        1                                                                           (1)

4.2    4.2.1         Branch pipe. (1) Pipe that branches off from (2) the main sewerage          (2)
       4.2.2         Cleaning eye. (1) Opening to (2) access the inside of a pipe                (2)
       4.2.3         Soil water. (1) Discharged from (2) water closet / Water that
                     contains human waste                                                        (2)
4.3    4.3.1         Soil pipe – Green                                                           (1)
       4.3.2         Soil-water vent pipe – Blue                                                 (1)
       4.3.3         Existing sewerage – Black                                                   (1)
4.4    4.4.1         Pipe clip                                                                   (1)
       4.4.2         40 mm and 50 mm                                                             (2)
       4.4.3         (1) To bind/fix polycop pipes (2) to surfaces                               (2)
4.5    = πr²h
       = 22 x 1,05 x 1,05 x 2,4
         7
       = 8,316 m³                                                                                (4)
4.6    4.6.1         True                                                                        (1)
       4.6.2         True                                                                        (1)
       4.6.3         False                                                                       (1)
       4.6.4         False                                                                       (1)
4.7    4.7.1         Compression joint                                                           (1)
       4.7.2         4.7.A – Compression rubber seal
                     4.7.B – Compression screw                                                   (2)
       4.7.3         uPVC-pipes                                                                  (1)
4.8    (1) Thin layer of tin / solder is (2) melted onto the tip of the soldering iron          (2)
                                                                                               [40]

Copyright reserved                                                                   Please turn over

### Page 6

Downloaded from hlayiso.com
6                             CIVIL TECHNOLOGY: CIVIL SERVICES           (EC/SEPTEMBER 2018)

QUESTION 5: CONSTRUCTION, COLD-WATER AND HOT-WATER SUPPLY
            (SPECIFIC)

5.1 FIGURE 5.1 on ANSWER SHEET C shows layer 1 of a double return angle in
    a one-brick wall in stretcher bond. Draw in good ratio on ANSWER SHEET C
    the alternative layer for the brick wall.                                              (6)

5.2 FIGURE 5.2 on ANSWER SHEET D shows the incomplete top view of a
    concrete manhole. Complete in good ratio the branch connection and pipe
    work in the manhole.                                                                   (3)

5.3 Any TWO reasons why the concrete benching in a manhole is constructed at a
    slope:
        Sewer spills can backslide into channel pipe
        So that rats and other vermin cannot settle there              (2 x 1)            (2)

5.4 Any TWO positions where manholes must be installed:
        (1) Close as possible to municipal connection (2) but not further than
         2 m from the boundary fence
        (1) Every 20–25 m on a (2) straight section of a drain line
        (1) At all important (2) changes of direction
        (1) At changes of (2) gradient and levels
        (1) At all important (2) junctions                                  (2 x 2)       (4)

5.5 5.5.1     Full-way valve                                                               (1)

     5.5.2    5.5.A – Non-rising spindle
              5.5.B – Valve head
              5.5.C – Tapering gate
              5.5.D – Seating                                                              (4)

     5.5.3    Any TWO positions where this type of valve must be installed.
                  At the geyser
                  At the water meter
                  Low- and high-pressure cold water installations
                  Low- and high-pressure hot water installations               (2 x 1)    (2)

5.6 (1) Prevent the siphoning of water out of the cylinder (2) when the cold water is
    shut off                                                                               (2)

5.7 5.7.1     Geyser                                                                       (1)
    5.7.2     Heating                                                                      (1)
    5.7.3     Northern side                                                                (1)

5.8 (1) After a disruption in the water supply / burst pipe / faulty plumbing
    (2) causing gas to be trapped in high points of the hot-water system.
    (3) When pressure is applied / taps are opened, the gas blocks the pipes,
    preventing the flow of water.                                                          (3)
                                                                                          [30]

Copyright reserved                                                            Please turn over

### Page 7

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)           CIVIL TECHNOLOGY: CIVIL SERVICES                                7

QUESTION 6: ROOFING, STORM WATER, DRAINAGE AND SANITARY
            APPLIANCES (SPECIFIC)

6.1    25 mm for each 4,8 m (3 mm for each 1 m of 10 mm for each 6 m of 1 : 600)            (1)

6.2    Gutter bracket                                                                       (1)

6.3    (1) Discharged storm water to (2) rivers and dams                                    (2)

6.4    At least 5 m                                                                         (1)

6.5    6.5.1         Inside of pipes – Be smooth                                            (1)

       6.5.2         Joints in pipes – Prevent gases from escaping                          (1)

       6.5.3         Sharp bendings – Must be avoided                                       (1)

       6.5.4         Minimum diameter of pipes – 100 mm                                     (1)

       6.5.5         Height of vent pipes – At least 1 m                                    (1)

6.6    Waste water – Comes from sink/bath/washbasin/shower
       Soil water – Comes from water closet                                                 (2)

6.7    6.7.1         Vent valve/Air admittance valve                                        (1)

       6.7.2         (1) Valve opens and (2) reduces the vacuum and allows (3) air into
                     the system so that (4) the water can flow away freely / without
                     releasing gases into the building                                      (4)

6.8    Ground water may become polluted                                                     (1)

6.9    Any TWO causes of blockages in main sewer pipes:
           Material or objects that should not be flushed
           Tree roots growing into pipe joints
           Soil that seeps through joints
           Heavy traffic over low-lying pipes                                   (2 x 1)    (2)

6.10 0,25 kPa                                                                               (1)

6.11 Any TWO properties of each of the following materials for sanitary fitments:

       6.11.1        Ceramic
                         Durable
                         Pleasant surface
                         Glazed surface
                         Variety colours
                         Strong                                                 (2 x 1)    (2)

Copyright reserved                                                              Please turn over

### Page 8

Downloaded from hlayiso.com
8                              CIVIL TECHNOLOGY: CIVIL SERVICES         (EC/SEPTEMBER 2018)

       6.11.2        Stainless steel
                         Readily available
                         Very hygienic                                      (2 x 1)    (2)

6.12 Choose a dimension from COLUMN B that matches a term in COLUMN A.
     Write only the letter (A-H) next to the question number (6.12.1 – 6.12.5) in
     the ANSWER BOOK, for example 6.12.6 J.

       6.12.1        Sewer pipe size                   F   100 mm

       6.12.2        Washbasin height above floor level H 800 mm

       6.12.3        Washbasin water supply pipes      E   15 mm

       6.12.4        Washbasin waste pipe              G 32 mm

       6.12.5        Bathwater supply pipes            A   22 mm

                                                       B   45 mm

                                                       C 950 mm

                                                       D 12 mm
                                                                            (5 x 1)     (5)
                                                                                       [30]

                                                                          TOTAL: 200

Copyright reserved                                                         Please turn over

### Page 9

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)            CIVIL TECHNOLOGY: CIVIL SERVICES                        9

                                   CIVIL TECHNOLOGY
  ANSWER SHEET                 A        GENERIC
                                                             NAME:

2.1 Use the information on ANSWER SHEET A and complete the site plan to
    scale 1 : 200.

ERF 121                                      ERF 123                           ERF 125

                     RE
                                      IE                IE     RE

                                   KITCHEN             BATHROOM

                                                   A

                          MH

               A

                                     PARLEMENT STREET

                                                       Site boundaries       2
                                                       Building lines        2
                                                       Site entrance         1
                                                       Datum level           1
                                                       Main sewerage         2
                                                       Branch sewerage       2
                                                       Manhole               2
                                                       Rodding eyes          4
                                                       Inspection eyes       4
                                                       TOTAL                20

Copyright reserved                                                       Please turn over

### Page 10

Downloaded from hlayiso.com
10                           CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/SEPTEMBER 2018)

                                CIVIL TECHNOLOGY
  ANSWER SHEET          B         CIVIL SERVICES
                                                              NAME:

3.10      FIGURE 3.10 on ANSWER SHEET B shows a square-based truncated
          pyramid. Draw on ANSWER SHEET B the pattern development for the
          pyramid.

                        D4

                                                    D3

     D5
                        G4
                 G5                     G3

            G6                          C2

            F1                                     G2
                                                          D2
                              A3
                                              G1
D6
                                             F2
                                                         C1

                                                   D1
                        SIDE VIEW
                                                                 Accuracy + neatness
                                   A1
                                                         Construction lines A1 – A3    3
                                                   A2
                                                         Arc lines C1 + C2             2
                                                         Base points D1 – D6           6
                                                         Seam lines F1 + F2            1
                                                         Side lines G1 – G6            2
                                                         Accuracy + neatness           2

                                                         TOTAL                         16

                       TOP VIEW

Copyright reserved                                                            Please turn over

### Page 11

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)       CIVIL TECHNOLOGY: CIVIL SERVICES                       11

                                                       NAAM:
                               CIVIL TECHNOLOGY
   ANSWER SHEET          C       CIVIL SERVICES
                                                       NAME:

5.1    FIGURE 5.1 on ANSWER SHEET C shows layer 1 of a double return angle
       in a one-brick wall in stretcher bond. Draw in good ratio on ANSWER
       SHEET C the alternative layer of the brick wall.

                                                                          (6)

Copyright reserved                                                  Please turn over

### Page 12

Downloaded from hlayiso.com
12                        CIVIL TECHNOLOGY: CIVIL SERVICES            (EC/SEPTEMBER 2018)

                               CIVIL TECHNOLOGY
     ANSWER SHEET       D        CIVIL SERVICES
                                                       NAME:

5.2    FIGURE 5.2 on ANSWER SHEET D shows the incomplete top view of a
       concrete manhole. Complete in good ratio the branch connection and pipe
       work in the manhole.

                                                                                 (3)

Copyright reserved                                                       Please turn over

## Related documents

- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction-1/b6d609b6-89a5-4b39-a9b7-0d878af45cd4) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste-d/f328c182-752d-488c-88b6-f2a5cadcbcf2) — Civil Technology · Memo · 2018 · Afr
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction/2e799de8-da85-41b4-ad09-68d5cdf064b6) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste/4e2739ce-136f-4b93-9ff9-009fc471f0b4) — Civil Technology · Memo · 2018 · Afr
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION D](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction-d/4950e454-8a04-433f-9ca3-4a3efac01994) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 KONSTRUKSIE](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-konstruksie/f87d6b3b-6b50-40ae-9a2e-2e545b5f5ce9) — Civil Technology · Memo · 2018 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.