# Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)

> Grade 12 Civil Technology memorandum from the Eastern Cape Mock Exam 2018 (English), 12 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-wood-working/5dd50869-1fe4-4a99-882a-794a6487aa98
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2018
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 12

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Mock 2018 Memo (Eng)](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-wood-working/5dd50869-1fe4-4a99-882a-794a6487aa98)

## About this document

Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2018. Memorandum, 12 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                           NATIONAL
                      SENIOR CERTIFICATE

                             GRADE 12

                      SEPTEMBER 2018

         CIVIL TECHNOLOGY: WOOD WORKING
                 MARKING GUIDELINE

MARKS:   200

                  This marking guideline consists of 12 pages.

### Page 2

Downloaded from hlayiso.com
2                          CIVIL TECHNOLOGY: WOOD WORKING                   (EC/SEPTEMBER 2018)

QUESTION 1: SAFETY, MATERIAL AND EQUIPMENT (GENERIC)

1.1    1.1.1     True                                                                          (1)
       1.1.2     False                                                                         (1)
       1.1.3     False                                                                         (1)
       1.1.4     True                                                                          (1)

1.2    Any THREE requirements to which a trestle scaffold must comply.
           Soundly constructed with a solid material
           Prevent spreading of supporting legs
           Not higher than 3 m
           Consists of not more than 2 tiers                                     (3 x 1)      (3)

1.3    Similar answer.
       (1) Aluminium conducts (2) electricity / workers subjected to electrical shock          (2)

1.4    Similar answer.
       (1) Paint will cover (2) weaknesses                                                     (2)

1.5    1.5.2     Improves the durability of concrete.                                          (1)

       1.5.5     It improves the strength of concrete.                                         (1)

       1.5.7     It makes concrete more watertight.                                            (1)

       1.5.8     It improves the resistance to abrasion.                                       (1)
1.6    (1) Plastic finish / coating (2) in powder form by (3) using a spray-gun                (3)

1.7    Briefly describe any ONE use of the dumpy level.
            (1) Determine (2) height differences
            (1) Determine (2) levels and slopes
            (1) Setting out (2) of buildings
            (1) Transferring of (2) levels and heights
            (1) Determine horizontal (2) distances                               (1 x 2)      (2)

1.8    1.8.1     1.5 m                                                                         (1)
       1.8.2     1.535 – 1,47 x 100 = 6,5 m                                                    (4)

1.9    Any THREE materials which can be detected in walls by the multi-detector.
           Ferrous metals
           Non-ferrous metals
           AC wiring
           Wood
           Metal studs
           Steel bars
           Copper pipes                                                   (3 x 1)             (3)

1.10 1.10.1      Dry, soft cloth / Not cleaning agents or solvents                            (1)
     1.10.2      Remove battery                                                               (1)
                                                                                             [30]

Copyright reserved                                                                Please turn over

### Page 3

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)       CIVIL TECHNOLOGY: WOOD WORKING                                    3

QUESTION 2: GRAPHICS AND JOINING (GENERIC)

2.1    Use the information on ANSWER SHEET A and complete the site plan on
       scale 1 : 200 according to the following requirements:

      2.1.1    The site boundaries are measured from point A
               The site boundaries in front and back are 23 m long
               The site boundaries on the sides are 25 m long                              (2)

      2.1.2    The front building line is 4 m from the site boundary
               The back and side building lines are 2 m from the site boundaries           (2)

      2.1.3    Show the site entrance, 3 m from the western site boundary                  (1)

      2.1.4    Show the datum level in the north-eastern corner of the site

               Complete the sewage lay-out and abbreviations of the sewage
               appliances according to the following requirements:                         (1)

      2.1.5    The main sewage from the bathroom to the municipal connection               (2)

      2.1.6    The branch sewage to the bathroom and kitchen                               (2)

      2.1.7    Manhole on the site, before the municipal connection                        (2)

      2.1.8    Rodding eyes                                                                (4)

      2.1.9    Inspection eyes                                                             (4)

2.2          Length of shank
             Diameter
             Type of thread
             Head size                                                         (4 x 1)    (4)

2.3 (1) When square shoulder is driven in (2) it resists rotation                          (2)

2.4 2.4 A – Nut
    2.4 B – Thread
    2.4 C – Runout
    2.4 D – Shank                                                                          (4)
                                                                                          [30]

Copyright reserved                                                            Please turn over

### Page 4

Downloaded from hlayiso.com
4                           CIVIL TECHNOLOGY: WOOD WORKING                 (EC/SEPTEMBER 2018)

QUESTION 3: CASEMENTS, DOORS AND WALL PANELLING (SPECIFIC)

3.1    FIGURE 3.1 illustrates the outside elevation of a window frame.

       3.1.1    A – Mullion                                                                (1)
                B – Frame stile / Jambs                                                    (1)
                C – Moulding                                                               (1)
                D – Glazing / Window pane                                                  (1)
                E – Sill                                                                   (1)

       3.1.2    Helps water to run off / Drip groove prevents wall from getting wet.       (2)

       3.1.3    76 mm x 150 mm                                                 (2 x 1)     (2)

3.2    3.2.1    1 200 mm                                                                   (1)

       3.2.2    1 768 mm                                                                   (1)

       3.2.3    1 768 mm                                                                   (1)

       3.2.4    1 768 mm                                                                   (1)

       3.2.5    1 200 mm                                                                   (1)

       3.2.6    900 mm                                                                     (1)

3.3    3.3.1    Gypsum plaster / Clout nail / Silicone                                     (1)

       3.3.2    Steel nails / Silicone                                                     (1)

       3.3.3    Clout nails / Dry wall screws                                              (1)

3.4    3.4.1    Stile                                                                      (1)

       3.4.2    50 mm                                                                      (1)

       3.4.3    600 mm                                                                     (1)

       3.4.4    3 mm                                                                       (1)

       3.4.5    713 mm                                                                     (1)

       3.4.6    2 032 mm                                                                   (1)

       3.4.7    20 mm                                                                      (1)

Copyright reserved                                                            Please turn over

### Page 5

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)       CIVIL TECHNOLOGY: WOOD WORKING                      5

3.5    ANSWER SHEET 3.5 (ANSWER SHEET B)

       Three-panel door

        ASSESSMENT CRITERIA             MARKS              LM
      Placement of door                   1
      Top rail                            2
      Lock rail                           2
      Top raised fielded panel            3
      Bottom raised fielded panel         2
      Bottom rail                         3
      Measurements                        2
      TOTAL                               15                               (15)
                                                                           [40]

Copyright reserved                                              Please turn over

### Page 6

Downloaded from hlayiso.com
6                            CIVIL TECHNOLOGY: WOOD WORKING   (EC/SEPTEMBER 2018)

    QUESTION 4: ROOFS AND CEILINGS (SPECIFIC)

4.1    4.1.1     Couple roof truss                                            (1)

       4.1.2     W or Fink roof truss                                         (1)

       4.1.3     Howe or South African roof truss                             (1)

       4.1.4     Lean-to-roof truss                                           (1)

4.2    4.2.1     F                                                            (1)

       4.2.2     K                                                            (1)

       4.2.3     G                                                            (1)

       4.2.4     C                                                            (1)

       4.2.5     J                                                            (1)

       4.2.6     H                                                            (1)

       4.2.7     I                                                            (1)

       4.2.8     A                                                            (1)

       4.2.9     D                                                            (1)

       4.2.10    B                                                            (1)

4.3    4.3.1    Rafter                                                        (1)

       4.3.2    Tie beam                                                      (1)

       4..3.3 Cornice                                                         (1)

       4.3.4    Plaster                                                       (1)

       4.3.5    Brick wall                                                    (1)

       4.3.6    Purlin                                                        (1)

       4.3.7    Roof sheeting                                                 (1)

       4.3.8    Wall plate                                                    (1)

Copyright reserved                                               Please turn over

### Page 7

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)      CIVIL TECHNOLOGY: WOOD WORKING                                     7

4.4    ANSWER SHEET FOR KING POST ROOF TRUSS (ANSWER SHEET C)

                                                                                         (15)

4.5    Cover the roof trusses / Finishing off the room / Dust / Temperature                (1)

4.6    Any TWO below:
           To allow access to the roof space
           To attend to the geyser
           For electrical wiring
           To install cables for television                                   (2 x 1)    (2)
                                                                                         [40]

Copyright reserved                                                            Please turn over

### Page 8

Downloaded from hlayiso.com
8                             CIVIL TECHNOLOGY: WOOD WORKING                   (EC/SEPTEMBER 2018)

    QUESTION 5: CENTERING, FORMWORK, SHORING AND IRONMONGERY
                (SPECIFIC)
5.1    5.1.1    Temporary support to stabilise walls (1) while cracks are being
                repaired or when new or large openings are being made (1).                      (2)
       5.1.2    Are used to provide temporary support to two parallel walls that are
                located between 9 metres and 15 metres apart (1), where one or both
                walls shows signs of failure (1).                                               (2)
5.2    5.2.1    To carry the weight by transferring the forces to the keystones.                (2)
       5.2.2     Choose a suitable scale and draw a horizontal line (birth line) of
                  span and mark the middle point.                                               (1)
                 Draw a perpendicular line through the middle of the mid-point (1) of
                  the span line and mark the desired height (1).                                (2)
                 Connect the height mark diagonally with one of the bottom points of
                  the arc.                                                                      (1)
                 Half the diagonal and draw a perpendicular line (spring line) from
                  were to cut the vertical line.                                                (1)
                 This point (centre of percussion) is the radius of the segmental arch.        (1)
       5.2.3    Formal compound and full arch.                                                  (2)
5.3    5.3.1    A – Drawer or till lock                                                         (1)
                B – Cut cupboard lock                                                           (1)
       5.3.2    Drawer or till lock: Used in a horizontal position (1) and fitted into a
                recess for drawers and tills (1).                                               (2)
                Cut cupboard: Fitted into a recess on the external surface of the door
                (1) and gives a neater appearance (1).                                          (2)
5.4    5.4.1    Vertical clamps                                                                 (1)
       5.4.2    Metal collar / Yoke                                                             (1)
       5.4.3    Lining material                                                                 (1)
       5.4.4    Laggings                                                                        (1)
       5.4.5    Bolts / Nut                                                                     (1)
5.5    5.5.1    Any FOUR below:
                        They are inserted under the bearers and props.
                        To support the formwork.
                        Wedges keep the different formwork components sturdy and
                         fixed.
                        Wedges facilitate the raising or lowering of the formwork to a
                         required height.
                        They are used for the levelling of formwork.
                        Wedges ease the striking of formwork after the concrete cured.         (4)

5.6    Better bonding with concrete / Resist tensile forces better                              (1)
                                                                                               [30]

Copyright reserved                                                                Please turn over

### Page 9

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)         CIVIL TECHNOLOGY: WOOD WORKING                                     9

 QUESTION 6: SUSPENDED FLOOR AND STAIRCASE (SPECIFIC)

6.1    6.1.1    Handrail                                                                       (1)

       6.1.2    Newel post                                                                     (1)

       6.1.3    Riser                                                                          (1)

       6.1.4    Half-landing                                                                   (1)

       6.1.5    Tread                                                                          (1)

       6.1.6    Stringer                                                                       (1)

6.2    6.2.1    750 mm                                                                         (1)

       6.2.2    150 mm                                                                         (1)

       6.2.3    240 mm                                                                         (1)

6.3    6.3.1    C                                                                              (1)

       6.3.2    D                                                                              (1)

       6.3.3    A                                                                              (1)

       6.3.4    E                                                                              (1)
       6.3.5    B                                                                              (1)
6.4    6.4.1    To ensure the circulation of fresh air to ventilate the interior area
                below the floor.                                                               (2)
       6.4.2    The floor joist rests on them.                                                 (2)
       6.4.3    To prevent ants or termite infestations that could damage and
                eventually destroy the timber.                                                 (2)
6.5    6.5.1    Floor boards                                                                   (1)
       6.5.2    Bearer                                                                         (1)
       6.5.3    Ant guard                                                                      (1)
       6.5.4    Damp proof coarse (DPC)                                                        (1)
       6.5.5    Brick pier / Brick wall                                                        (1)
       6.5.6    Foundation                                                                     (1)
6.6    (1) Prevent the damp in the debris to spread to (2) the floor parts/members             (2)
6.7    220 mm x 170 mm                                                                         (2)
                                                                                              [30]
                                                                                  TOTAL:      200

Copyright reserved                                                               Please turn over

### Page 10

Downloaded from hlayiso.com
10                                 CIVIL TECHNOLOGY: WOOD WORKING          (EC/SEPTEMBER 2018)

                                      CIVIL TECHNOLOGY
  ANSWER SHEET                 A           GENERIC
                                                               NAME:

2.1 Use the information on ANSWER SHEET A and complete the site plan to
    scale 1 : 200.

ERF 121                                        ERF 123                              ERF 125

                     RE
                                        IE                IE     RE

                                     KITCHEN             BATHROOM

                                                     A

                          MH

               A

                                       PARLEMENT STREET

                                                         Site boundaries           2
                                                         Building lines            2
                                                         Site entrance             1
                                                         Datum level               1
                                                         Main sewerage             2
                                                         Branch sewerage           2
                                                         Manhole                   2
                                                         Rodding eyes              4
                                                         Inspection eyes           4
                                                         TOTAL                    20

Copyright reserved                                                            Please turn over

### Page 11

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)      CIVIL TECHNOLOGY: WOOD WORKING                          11

                             CIVIL TECHNOLOGY
  ANSWER SHEET           B    WOOD WORKING
                                                   NAME:

3.5 Draw on ANSWER SHEET B the completed front elevation of a three-panel
    door with raised and fielded panels.                                     (15)

                                                          16

                                                           16
                                                  Scale                     1
                                                  Top rail                  2
                                                  Lock rail                 2
                                                  Panels                    3
                                                  Bottom rail               2
                                                  Stiles                    3
                                                  Measurements              2
                                                  TOTAL                     15

           X

Copyright reserved                                                  Please turn over

### Page 12

Downloaded from hlayiso.com
12                          CIVIL TECHNOLOGY: WOOD WORKING                (EC/SEPTEMBER 2018)

                               CIVIL TECHNOLOGY
  ANSWER SHEET          C       WOOD WORKING
                                                        NAME:

4.4    Use ANSWER SHEET C and draw to scale1 : 20 the front view of a king
       post roof truss.                                                               (15)

      RAFTER

 KING POST

                                                             APPLICATION OF SCALE
        X
                                TIE BEAM
                                                                   NEATNESS
                                 KING POST ROOF TRUSS

                                    SCALE 1 : 20

                                                        Rafter                        2
                                                        King post                     1
                                                        Tie beam                      1
                                                        Title                         1
                                                        Scale in print                1
                                                        Neatness                      2
                                                        Scale                         4
                                                        Labels                        3
                                                        TOTAL                         15

Copyright reserved                                                            Please turn over

## Related documents

- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction-1/b6d609b6-89a5-4b39-a9b7-0d878af45cd4) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste-d/f328c182-752d-488c-88b6-f2a5cadcbcf2) — Civil Technology · Memo · 2018 · Afr
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction/2e799de8-da85-41b4-ad09-68d5cdf064b6) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste/4e2739ce-136f-4b93-9ff9-009fc471f0b4) — Civil Technology · Memo · 2018 · Afr
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION D](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction-d/4950e454-8a04-433f-9ca3-4a3efac01994) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 KONSTRUKSIE](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-konstruksie/f87d6b3b-6b50-40ae-9a2e-2e545b5f5ce9) — Civil Technology · Memo · 2018 · Afr

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
