# Civil Technology Grade 12 Eastern Cape Mock 2018 QP (Eng)

> Grade 12 Civil Technology question paper from the Eastern Cape Mock Exam 2018 (English), 17 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/cvlt-gr12-qp-eng-sept2018-wood-working/271342ad-4a51-42b6-8fb6-76f3bd4c40ce
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Question paper
- Year: 2018
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 17

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 Eastern Cape Mock 2018 QP (Eng)](https://www.hlayiso.com/library/cvlt-gr12-qp-eng-sept2018-wood-working/271342ad-4a51-42b6-8fb6-76f3bd4c40ce)

## About this document

Civil Technology · Grade 12 · Eastern Cape Mock Exam · 2018. Question paper, 17 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                             NATIONAL
                        SENIOR CERTIFICATE

                              GRADE 12

                         SEPTEMBER 2018

         CIVIL TECHNOLOGY: WOOD WORKING

MARKS:   200

TIME:    3 hours

         This question paper consists of 17 pages, including 3 answer sheets.

### Page 2

Downloaded from hlayiso.com
 2                         CIVIL TECHNOLOGY: WOOD WORKING                   (EC/SEPTEMBER 2018)

REQUIREMENTS:

1.   ANSWER BOOK

2.   Drawing instruments

3.   A non-programmable pocket calculator

INSTRUCTIONS AND INFORMATION

1.   This question paper consists of SIX questions: TWO questions are generic and FOUR
     questions are subject specific.

2.   Answer ALL the questions.

3.   Answer each question as a whole. Do NOT separate subsections of questions.

4.   Start the answer to EACH question on a NEW page.

5.   Do NOT write in the margins of the ANSWER BOOK.

6.   You may use sketches to illustrate your answers.

7.   Write ALL calculations and answers in the ANSWER BOOK or on the attached ANSWER
     SHEETS.

8.   Use the mark allocation as a guide to the length of your answers.

9.   Make drawings and sketches in pencil, fully dimensioned and neatly finished off with
     descriptive titles and notes to conform to the SANS/SABS Code of Practice for Building
     Drawings.

10. For the purpose of this question paper, the size of a brick should be taken as
    220 mm x 110 mm x 75 mm.

11. Use your own discretion where dimensions and/or details have been omitted.

12. Answer QUESTIONS 2.1, 3.5 and 4.4 on the attached ANSWER SHEETS using drawing
    instruments where necessary.

13. Write your NAME on every ANSWER SHEET and hand them in with your ANSWER
    BOOK, whether you have answered the question or not.

14. Due to electronic transfer, drawings in the question paper are NOT to scale.

 Copyright reserved                                                      Please turn over

### Page 3

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)                 CIVIL TECHNOLOGY: WOOD WORKING                         3

  QUESTION 1: SAFETY, MATERIAL AND EQUIPMENT (GENERIC)

  1.1 Indicate whether the following statements with regard to scaffolding are TRUE
      or FALSE. Write only the word ‘true’ or ‘false’ next to the number in the answer
      book.

        1.1.1    The planks of a solid wooden scaffold platform are at least 228 mm
                 wide.                                                                     (1)

        1.1.2    The planks of a solid wooden scaffold platform may not project more
                 than 250 mm beyond the last prop.                                         (1)

        1.1.3    The guard rails must be at least 800 mm high.                             (1)

        1.1.4    Toe boards must be at least 150 mm high.                                  (1)

  1.2 Name THREE requirements to which a trestle scaffold must comply with before
      employers should use it.                                             (3 x 1)         (3)

  1.3 Briefly motivate why aluminium ladders should not be used near electrical
      wires.                                                                               (2)

  1.4 Briefly motivate why wooden ladders must not be painted.                             (2)

  1.5 Choose from the descriptions below the FOUR correct descriptions which are
      applicable to the curing of concrete.
      Write only the FOUR correct question numbers in the ANSWER BOOK.

        1.5.1    It protects concrete against rust.

        1.5.2    Improves the durability of concrete.

        1.5.3    It provides a gloss finish to concrete.

        1.5.4    Curing is done by means of a tampering rod.

        1.5.5    It improves the strength of concrete.

        1.5.6    It provides a protective layer over the concrete.

        1.5.7    It makes concrete more watertight.

        1.5.8    It improves the resistance to abrasion.                          (4 x 1) (4)

Copyright reserved                                                      Please turn over

### Page 4

Downloaded from hlayiso.com
4                            CIVIL TECHNOLOGY: WOOD WORKING                  (EC/SEPTEMBER 2018)

1.6     Describe in point form the powder-coating process for metals.                           (3)

1.7     Briefly describe ONE use of the dumpy level.                                 (1 x 2)    (2)

1.8     FIGURE 1.8 shows the dumpy level reading which is taken on the telescopic
        staff. Answer the following questions with regard to the reading.

                                          1.5

                                                1.4

                                       FIGURE 1.8

        1.8.1        What is the height reading on the staff?                                   (1)

        1.8.2        Determine the distance between the dumpy level and the staff.
                     Show all calculations, formulas and units.                                 (4)

1.9     Name THREE materials which can be detected in walls by the multi-detector.
                                                                             (3 x 1)            (3)

1.10    Name the maintenance measures for the multi-detector with reference to the
        following facets:

        1.10.1       Cleaning method                                                            (1)

        1.10.2       Storage over a long period                                                 (1)
                                                                                               [30]

Copyright reserved                                                        Please turn over

### Page 5

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)               CIVIL TECHNOLOGY: WOOD WORKING                              5

 QUESTION 2: GRAPHICS AND JOINING (GENERIC)

 2.1 Use the information on ANSWER SHEET A and complete the site plan on scale
     1 : 200 according to the following requirements:

       2.1.1    The site boundaries are measured from point A
                The site boundaries in front and back are 23 m long
                The site boundaries on the sides are 25 m long                                 (2)

       2.1.2    The front building line is 4 m from the site boundary
                The back and side building lines are 2 m from the site boundaries              (2)

       2.1.3    Show the site entrance, 3 m from the western site boundary                     (1)

       2.1.4    Show the datum level in the north-eastern corner of the site                   (1)

                Complete the sewage lay-out and abbreviations of the sewage
                appliances according to the following requirements:

       2.1.5    The main sewage from the bathroom to the municipal connection                  (2)

       2.1.6    The branch sewage to the bathroom and kitchen                                  (2)

       2.1.7    Manhole on the site, before the municipal connection                           (2)

       2.1.8    Rodding eyes                                                                   (4)

       2.1.9    Inspection eyes                                                                (4)

 2.2 Name the FOUR particulars of a bolt which must be provided when it is
     purchased.                                                                     (4 x 1)    (4)

 2.3 Briefly describe the advantage of the square shoulder bolt.                               (2)

 2.4 Name the parts 2.4.A to 2.4.D of the bolt in FIGURE 2.4.                       (4 x 1)    (4)

                2.4.A

               2.4.B                   2.4.C      2.4.D
                                     FIGURE 2.4
                                                                                              [30]

Copyright reserved                                                       Please turn over

### Page 6

Downloaded from hlayiso.com
6                         CIVIL TECHNOLOGY: WOOD WORKING                (EC/SEPTEMBER 2018)

 QUESTION 3: CASEMENTS, DOORS AND WALL PANELLING (SPECIFIC)
 Start the question on a NEW page.
 3.1 Answer the following questions with regard to the window frame in FIGURE 3.1.

                                                                   3.1.A

                                                                   3.1.B
                                                                   3.1.A
                                                                   3.1.C.
                                                                   .7.A
                                                                   A

                                                                   3.1.D

                                                                   3.1.E

                                         FIGURE 3.1
       3.1.1    Name the parts 3.1.A to 3.1.E.                                (5 x 1)    (5)
       3.1.2    What is the purpose of part 3.1.E?                                       (2)
       3.1.3    What is the breadth and thickness of part 3.1.E?                         (2)
 3.2 FIGURE 3.2 shows a drawing of a wall-mounted cabinet made out of 16 mm
     thick melamine chipboard, with a 3 mm thick hardboard back. Butt joints are
     used in the construction of the cabinet.

                                         FIGURE 3.2

Copyright reserved                                                   Please turn over

### Page 7

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)               CIVIL TECHNOLOGY: WOOD WORKING                          7

       Use the following following specifications:
        One shelf
        Two doors
        The outside measurements of the cabinet is1 200 mm high, 1 800 mm wide
         and 500 mm deep
        Thickness of chipboard is 16 mm

       Determine the sizes of the parts and write down the answer next to the
       question number (3.2.1–3.2.6) in your ANSWER BOOK.                                 (6)

       DESCRIPTION         AMOUNT      LENGTH       WIDTH           THICKNESS
       Sides                 2           3.2.1      500 mm            16 mm
       Top                   1           3.2.2      500 mm            16 mm
       Bottom                1           3.2.3      500 mm            16 mm
       Shelf                 1           3.2.4      500 mm            16 mm
       Doors                 2           3.2.5       3.2.6            16 mm

 3.3 Name ONE joining agent that can be used to fix the following materials in place
     when finishing off a room:

       3.3.1    Cornice                                                                   (1)

       3.3.2    Skirting                                                                  (1)

       3.3.3    Ceiling boards to brandering                                              (1)

Copyright reserved                                                     Please turn over

### Page 8

Downloaded from hlayiso.com
8                        CIVIL TECHNOLOGY: WOOD WORKING                 (EC/SEPTEMBER 2018)

3.4 FIGURE 3.4 shows the front view of a hollow-core flush panel door. Study the
    drawing and complete the incomplete cutting list.
    Write down the answer next to the question number (3.4.1–3.4.7) in your
    ANSWER BOOK.                                                                              (7)

                                        FIGURE 3.4

 MEMBER       QUANTITY      UNIT    LENGTH     WIDTH      THICKNESS     MATERIAL
3.4.1         2             mm      2032       50         38            SA pine
Top rail      1             mm      713        3.4.2      38            SA pine
Lock block    2             mm      3.4.3      50         38            SA pine
Plywood       1             mm      2032       813        3.4.4         Plywood
Bottom rail   1             mm      3.4.5      50         38            SA pine
Cardboard     1             mm      3.4.6      690        38            Chip-board
Edging        1             mm      2032       44         3.4.7         Meranti

3.5 Draw on ANSWER SHEET B the completed front elevation of a three-panel door
    with raised and fielded panels. Use the following specifications:

         Use scale 1 : 10
         Door measurements = 2030 mm x 810 mm
         Top rail = 114 mm x 44 mm
         Bottom rail = 220 mm x 44 mm
         Muntin = 75 mm x 44 mm
         Stile = 144 mm x 44 mm
         Hanging stile = 144 mm x 44 mm
         Lock rail = 220 mm x 44 mm
         Top raised and fielded panel = 16 mm thick
         Bottom raised and fielded panel = 16 mm thick                                  (15)
                                                                                         [40]

Copyright reserved                                                   Please turn over

### Page 9

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)                CIVIL TECHNOLOGY: WOOD WORKING                             9

 QUESTION 4: ROOFS AND CEILINGS (SPECIFIC)

 4.1 Identify the type of roof constructions in FIGURES 4.1.1 to 4.1.4.

                                                                                              (2)
                      FIGURE 4.1.1                           FIGURE 4.1.2

                                                                                              (2)
                      FIGURE 4.1.3                           FIGURE 4.1.4

 4.2 Choose a description from COLUMN B that matches the correct item in
     COLUMN A. Write only the correct letter (A–K) next to the question number
     (4.2.1–4.2.10) in the ANSWER BOOK, for example 4.2.11 M.              (10 x 1)          (10)

                COLUMN A                                COLUMN B
       4.2.1     Queen post           A    Part which is situated on top of the wall

       4.2.2     Batten               B    Internal angle formed when two parts of a
                                           pitched roof cross

       4.2.3     IBR- roof sheeting   C    76 x 50 mm

       4.2.4     Purlin size          D    228 x 28 mm

       4.2.5     Gang nailed plate    E    114 x 38 mm

       4.2.6     Truss hangers        F    Vertical post on both sides of the king post

       4.2.7     Ridge                G    Type of roof covering

       4.2.8     Wall plate size      H    They are U shaped

       4.2.9     Fascia board         I    Highest point of roof

       4.2.10    Valley               J    Pressed galvanised rectangles of various
                                           sizes for joining

                                      K    K 38 x 38 mm

Copyright reserved                                                        Please turn over

### Page 10

Downloaded from hlayiso.com
10                           CIVIL TECHNOLOGY: WOOD WORKING                   (EC/SEPTEMBER 2018)

 4.3 FIGURE 4.3 shows a detailed sectional view of part of a king post roof truss.
     Study the drawing and name the parts 4.3.1 to 4.3.8.                                      (8)

                                              4.3.1

                                           4.3.2
                                   4.3.3
                     4.3.4
           4.3.5

                                                                   4.3.6
                                                                   4.3.7
                                                                   4.3.8

                                            FIGURE 4.3

 4.4 Use ANSWER SHEET C and draw to scale1:20 the front view of a king post
     roof truss.

       Use the following specifications:
        Pitch of roof is 30˚
        Length of the tie beam is 3 000 mm
        All timber for roof truss is 114 mm x 38 mm
        Eaves overhang is 250 mm
        Show any THREE labels of the drawing
        Print the title and scale below the drawing                                          (15)

 4.5 What is the purpose of a ceiling?                                                         (1)

 4.6 Briefly describe the purpose of a trap door in a ceiling construction.                    (2)
                                                                                              [40]

Copyright reserved                                                       Please turn over

### Page 11

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)                CIVIL TECHNOLOGY: WOOD WORKING                              11

 QUESTION 5: CENTERING, FORMWORK, SHORING AND IRONMONGERY
             (SPECIFIC)

 5.1 Explain in your own words the difference between the following:

       5.1.1    Dead shoring                                                                    (2)

       5.1.2    Flying shoring                                                                  (2)

 5.2 FIGURE 5.2 shows a type of arch that can be constructed for the purpose of
     visually enhancing the appearance of buildings. Answer the following questions
     with regard to arches.

                                            FIGURE 5.2

       5.2.1    Briefly describe the purpose of an arch?                                        (2)

       5.2.2    Briefly describe the steps that you will follow when setting out a
                segmental arch.                                                                 (6)

       5.2.3    Name any TWO other types of arches.                                  (2 x 1)    (2)

 5.3 Answer the following questions with regard to the locks in FIGURES 5.3.A and
     5.3.B.

                      FIGURE 5.3.A                             FIGURE 5.3.B

       5.3.1    Name the different locks.                                            (2 x 1)    (2)

       5.3.2    Briefly describe the use of each lock.                               (2 x 2)    (4)

Copyright reserved                                                         Please turn over

### Page 12

Downloaded from hlayiso.com
12                      CIVIL TECHNOLOGY: WOOD WORKING                    (EC/SEPTEMBER 2018)

 5.4 FIGURE 5.4 shows the formwork for a round concrete column. Name the parts
     5.4.1 to 5.4.5 of the formwork.

                                                            5.4.1

                                                           5.4.2

                                                           5.4.3

                                                           5.4.4

                                                           5.4.5

                                       FIGURE 5.4
                                                                                (5 x 1)    (5)

 5.5 FIGURE 5.5 shows a pair of wedges for formwork. Describe the purpose of the
     wedge pair for formwork construction.

                                       FIGUUR 5.5                                          (4)

 5.6 Briefly motivate why ribbed bars rather than plain round bars will be used as
     concrete reinforcement.                                                               (1)
                                                                                          [30]

Copyright reserved                                                     Please turn over

### Page 13

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)                CIVIL TECHNOLOGY: WOOD WORKING                               13

 QUESTION 6: SUSPENDED FLOOR AND STAIRCASE (SPECIFIC)

 6.1 Answer the following questions with regard to the staircase construction in
     FIGURE 6.1.

                      6.1.1                                                   6.1.4

                      6.1.2
                                                                              6.1.5

                                                                              6.1.6
                      6.1.3

                                           FIGURE 6.1

       6.1.1    Name the parts 6.1.1 to 6.1.6 of the staircase.                       (6 x 1)    (6)

 6.2 6.2.1      What is the maximum height of part 6.1.1?                                        (1)

       6.2.2    What is the minimum height of part 6.1.3?                                        (1)

       6.2.3    What is die minimum length of part 6.1.5?                                        (1)

 6.3 Choose a description from COLUMN B that matches the correct item in
     COLUMN A. Write only the correct letter (A–E) next to the question number
     (6.3.1–6.3.5) in the ANSWER BOOK, for example 6.3.6 F.

                KOLOM A                                    KOLOM B
       6.3.1   Baluster                A     Flat platform at the top of a flight of stairs

       6.3.2   Handrail                B     Inclined members used in timber staircase

       6.3.3   Landing                 C     The vertical post that holds up the handrail

       6.3.4   Half landing            D     Used as a support when using the stairs

       6.3.5   String                  E     Small platforms
                                                                                      (5 x 1)    (5)

Copyright reserved                                                           Please turn over

### Page 14

Downloaded from hlayiso.com
14                          CIVIL TECHNOLOGY: WOOD WORKING               (EC/SEPTEMBER 2018)

6.4 Describe the function of the following members of suspended wooden floors.

     6.4.1      Airbricks                                                                   (2)

     6.4.2      Bearers                                                                     (2)

     6.4.3      Ant guard                                                                   (2)

6.5 FIGURE 6.5 shows a part of a suspended wooden floor. Name parts 6.5.1–6.5.6.

                                            6.5.1
                                                                         6.5.2

                                                                         6.5.3
                                                                         6.5.4

                                                                         6.5.5

                                                                         6.5.6

                                        FIGURE 6.5
                                                                                 (6 x 1)    (6)

6.6 Briefly motivate why all the debris below the suspended timber floor must be
    removed.                                                                                (2)

6.7 What are the length and width measurements of an air brick?                             (2)
                                                                                           [30]

                                                                             TOTAL:        200

Copyright reserved                                                    Please turn over

### Page 15

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)             CIVIL TECHNOLOGY: WOOD WORKING                        15

                              CIVIL TECHNOLOGY       NAME:
   ANSWER SHEET          A         GENERIC

 2.1    Use the information on ANSWER SHEET A and complete the site plan to
        scale 1 : 200.

ERF 121                                ERF 123                                ERF 125

                             KITCHEN             BATHROOM

               A

                              PARLEMENT STREET

                                                 Site boundaries             2
                                                 Building lines              2
                                                 Site entrance               1
                                                 Datum level                 1
                                                 Main sewerage               2
                                                 Branch sewerage             2
                                                 Manhole                     2
                                                 Rodding eyes                4
                                                 Inspection eyes             4
                                                 TOTAL                      20

Copyright reserved                                                 Please turn over

### Page 16

Downloaded from hlayiso.com
16                        CIVIL TECHNOLOGY: WOOD WORKING                (EC/SEPTEMBER 2018)

                               CIVIL TECHNOLOGY       NAME :
  ANSWER SHEET           B      WOOD WORKING

3.5       Draw on ANSWER SHEET B the completed front elevation of a three-panel
          door with raised and fielded panels.                                  (15)

                                                      Scale                        1
                                                      Top rail                     2
                                                      Lock rail                    2
                                                      Panels                       3
                                                      Bottom rail                  2
                                                      Stiles                       3
                                                      Measurements                 2
                                                      TOTAL                       15

      X
Copyright reserved                                                   Please turn over

### Page 17

Downloaded from hlayiso.com
(EC/SEPTEMBER 2018)            CIVIL TECHNOLOGY: WOOD WORKING                             17

                             CIVIL TECHNOLOGY       NAME:
    ANSWER SHEET         C    WOOD WORKING

4.4    Use ANSWER SHEET C and draw to scale1 : 20 the front view of a king
       post roof truss.                                                            (15)

.

      X

                                                    Rafter                        2
                                                    King post                     1
                                                    Tie beam                      1
                                                    Title                         1
                                                    Scale in print                1
                                                    Neatness                      2
                                                    Scale                         4
                                                    Labels                        3
                                                    TOTAL                         15

Copyright reserved                                                   Please turn over

## Related documents

- [CVLT GR12 QP AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-qp-afr-sept2018-siviele-dienste-d/831c422e-f613-4a8c-adf9-061114273b23) — Civil Technology · QP · 2018 · Afr
- [CVLT GR12 QP AFR SEPT2018 KONSTRUKSIE D](https://www.hlayiso.com/library/cvlt-gr12-qp-afr-sept2018-konstruksie-d/c7a77714-a0da-45da-ac8d-6473db3fe9d4) — Civil Technology · QP · 2018 · Afr
- [CVLT GR12 QP ENG SEPT2018 CIVIL SERVICES D](https://www.hlayiso.com/library/cvlt-gr12-qp-eng-sept2018-civil-services-d/47b99167-7c6c-48d3-ab92-70a0cc6c7ac7) — Civil Technology · QP · 2018 · Eng
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction-1/b6d609b6-89a5-4b39-a9b7-0d878af45cd4) — Civil Technology · Memo · 2018 · Eng
- [CVLT GR12 MEMO AFR SEPT2018 SIVIELE DIENSTE D](https://www.hlayiso.com/library/cvlt-gr12-memo-afr-sept2018-siviele-dienste-d/f328c182-752d-488c-88b6-f2a5cadcbcf2) — Civil Technology · Memo · 2018 · Afr
- [CVLT GR12 MEMO ENG SEPT2018 CONSTRUCTION](https://www.hlayiso.com/library/cvlt-gr12-memo-eng-sept2018-construction/2e799de8-da85-41b4-ad09-68d5cdf064b6) — Civil Technology · Memo · 2018 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology (Woodworking) (Afrikaans) June 2025 Possible Answers](https://www.hlayiso.com/library/civil-technology-woodworking-afrikaans-june-2025-possible-answers/c0a65d19-28ca-4ac3-8c61-d4627d2a3133) — Memo · 2025 · Afr
- [Civil Technology Nov 2025 (Construction) MG Eng](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392) — Memo · 2025 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-afrikaans/162bcc65-80ad-4384-b293-36da22468b06) — Memo · 2024 · Afr
- [CIV TECH GR12 MEMO SEPT2024 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-civil-services-english/c1f2441d-22ba-4ae6-9e56-137cc442080c) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-construction-english/4d9c54ef-f526-46ad-82d4-8dd419eafb50) — Memo · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2024 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2024-woodworking-english/6e7f4be5-4ffb-4654-b98b-b4cc4dfc4cc7) — Memo · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.