# Engineering Graphics and Design Grade 12 P1 2016 QP (Eng)

> Grade 12 Engineering Graphics and Design Paper 1 question paper from the Eastern Cape Mock Exam 2016 (English), 6 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/egd-gr-12-sep-2016-p1-eng/20f243c0-8dcf-4e71-b514-6974fc8aca16
- Updated: 2026-09-27
- Subject: Engineering Graphics and Design
- Grade: Grade 12
- Document type: Question paper
- Year: 2016
- Exam period: Eastern Cape Mock Exam
- Paper: 1
- Curriculum: CAPS
- Pages: 6

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Engineering Graphics and Design](https://www.hlayiso.com/library/grade-12/engineering-graphic-and-design) › [Engineering Graphics and Design Grade 12 P1 2016 QP (Eng)](https://www.hlayiso.com/library/egd-gr-12-sep-2016-p1-eng/20f243c0-8dcf-4e71-b514-6974fc8aca16)

## About this document

Engineering Graphic And Design · Grade 12 · Eastern Cape Mock Exam · 2016. Question paper, 6 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com
                                                         INSTRUCTIONS AND INFORMATION
                                                         1.    The question paper consists of FOUR questions.
                                                         2.    Answer ALL the questions.
                                                         3.    All drawings must be drawn to scale 1 : 1, unless otherwise stated.
                                                         4.    The questions must be answered on the answer sheets provided.
                                                         5.    All the answers sheets must be re-stapled in numerical sequence and
                                                               handed in irrespective of whether the question was attempted or not.
                                                         6.    Careful time management is essential in order to complete all the questions.
                                                         7.    Print your name in the block provided on every ANSWER SHEET.
                       ISEBE LEMFUNDO LEMPUMA KOLONI     8.    All answers must be drawn accurately and neatly.
                     EASTERN CAPE EDUCATION DEPARTMENT   9.    Any details or dimensions not given must be estimated in good proportion.
                       OOS-KAAP ONDERWYSDEPARTEMENT      10.   ALL drawings are in first angle orthographic projection, unless stated
                                                               otherwise.

                                                                                        FOR OFFICIAL USE ONLY
                               NATIONAL
                                                                                                                    MODERATED
                                                                                                                      MARK

                          SENIOR CERTIFICATE                                        1
                                                                                    2
                                                                                    3
                                                                                    4
                                    GRADE 12                                     TOTAL

                                                                                             2 0 0
                                                                                  FINAL CONVERTED             CHECKED BY
                                                                                        MARK

                ENGINEERING GRAPHICS AND DESIGN P1
                                                                                        100
                               SEPTEMBER 2016
                                                                                        COMPLETE THE FOLLOWING:
                       PREPARATORY EXAMINATION
                                                                                                     NAME

                                                                                                     NAME
MARKS: 200                                                                                  EXAMINATION CENTRE

TIME: 3 hours
                                                                                            EXAMINATION CENTRE
This question paper consists of 6 pages.

Copyright reserved
                                           *GRDSE*                                                                 Please turn over   1

### Page 2

Engineering graphichs and design / P1                                              Downloaded from hlayiso.com      NOTE:
                                                                                                                                                                            NCS                                                                                                               EC DBE/September 2016

                                                                                                                    Contractors must verify all dimensions and                              QUESTION 1: ANALYTICAL (CIVIL)
   ST
      AP                                                                                                            levels on site before commencing work.
                                                                                                                    Architects to be notified immediately of any                            Given:
         LE

                                                                                                                    discrepancies.
                  LAND SURVEYOR'S CERTIFICATE OF THE                                                                                                                                        The site plan for an existing house with a proposed new room, a title panel and a table of questions. The drawing has
                   SIDE LENGTHS AND CORNER HEIGHTS                                                                                                                                          not been prepared to the indicated scale.
                              ON ERF 132.                                                                          ARCHITECT'S SIGNATURE ...........................

                         SURVEYED ON 2016-08-05
                                                                                                                   CLIENT'S SIGNATURE ...................................                   Instructions:
                       LENGTHS IN           CORNER HEIGHTS                                                                                                                                  Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title
                       MILLIMETERS            IN METERS                                                                                                                                     panel.                                                                                                 [29]
                                                                                                                               ANSWER 19
                                                                                                                                                                                                              QUESTIONS                                                        ANSWERS
                         AB = 38500               A = 1372
                                                                                                                   In the space provided below, draw, in
                         BC = 25000               B = 1372,5                                                       neat freehand, the top view of the
                                                                                                                   SANS 10143 convention for a                                                What is the drawing number?
                         CD = 38500               C = 1371,25                                                                                                                           1                                                                                                             1
                                                                                                                   GREASE TRAP.
                         DA = 25000               D = 1372,1                                                                                                                            2     Who prepared the drawing?                                                                               1
                                                                                                                                                                                        3     Which company printed the site plan?                                                                    1
                                                                                                                                                                                        4     How many revisions were done to the site plan?                                                          1
                                                                                                                                                                                        5     How many people must sign the drawing?                                                                  1
                                                  ERF 131
                                   72
                                                                  6000
                                                                                                                                                                                              What feature is partially visible on the erf to the south east of
                                13
                                        A                                                            D                                                                                  6                                                                                                             2
                                                                                                                                                                                              ERF 132?
                      B                                                       2000 BL                                          ANSWER 20
                                                                                                                   In the space provided below, draw, in                                7     What is the length of boundary line DA in meters?                                                       1
                                        EXISTING
                                                                EXISTING                                           neat freehand, the front view and top
                                        DRIVEWAY                             RE
                                                     7800       GARAGE RE IE                                       view of the SANS 10143 convention                                    8     What does the abbreviation IC stand for?                                                                1
                                                                                                                   for a WALLMOUNTED URINAL.
                                                                                                                                                                                        9     What does the abbreviation RE stand for?                                                                1
                                                                       PROPOSED               5000                                                                                      10 What does the abbreviation MH stand for?                                                                   1
              KIPLING DRIVE                                                                                 C
                                                               3000    NEW ROOM              IE
                                                                                                                                                                                        11 How many inspection eyes are indicated on the drawing?                                                     1
              15 m WIDE
                                                                3000     7000
                                                                                                                                                                                        12 What feature is indicated by arrow A?                                                                      1

                                                                          RE
                                                                                                                                                                                        13 What feature is indicated by arrow B?                                                                      1
                                        3000 BL
                                                  ERF 132                          IE                    ERF 133
                                                                                        IE                                                                                              14 What colour is used on the siteplan for all proposed work?                                                 1
                                                                                             IC
                                                                                                                                                                                        15 What colour is used in elevations for new concrete?                                                        1
                                                                 EXISTING
                                                                RESIDENCE                                                                                                                  The feature indicated by arrow C is a drainage pipe. Draw
                                                                                                                                                                                        16 the correct line type for a drainage pipe in the block to the                                              1
                                                                                        3000 BL                                                                                            right.
                                                                         IC                                                                                                             17 In the space provided below, determine the perimeter of erf 132 in meters.                                 3
                                                                                                                                                                                           In the space provided below, determine the total area of the existing garage and proposed new
                                                                                                                                                                                        18 room in square meters.                                                                                     3
                                                                          1500 BL
                                        B                                                            C
                                                                                                                          A              2016-08-12
                                                                                                                                                             CORRECT GREASE                   In the space provided in the title panel, draw, in neat freehand, the top view of the SABS 10143
                                                                         13                                                                                  TRAP SYMBOL                19                                                                                                            3
                                                                              72                                                                                                              convention for a GREASE TRAP.
                                                                                                                    REVISION                 DATE               DESCRIPTION                   In the space provided in the title panel, draw, in neat freehand, the front view and top view of the
                                            A
                                                                                                                                                                                        20                                                                                                            4
                                                                                                                   PRINTED BY                              DATE OF PRINT                      SABS 10143 convention for a WALL MOUNTED URINAL.
                                                                                                                       PRINT ALL CC                               2016-08-15                                                                                                                TOTAL     30
                                MH                                       MH
                                                                                                                   DRAWING TITLE
                                                                                                                                            SITE PLAN                                                   ANSWER 17                                                              ANSWER 18
                                                                                                                                                                                                    Show ALL calculations.                                                 Show ALL calculations.
                                                                                                                   PROJECT

                                                                                                                     PROPOSED NEW ROOM FOR
                                                                                                                     MR A. RHADEBE ON ERF 132
                                                                                                                     13 KIPLING DRIVE, ABERDEEN.

                                                                                                                   PROJECT NUMBER                          DRAWING NUMBER
                                                                                                                       ECDBE1-2016                                    10810

                                                                                                                                                                                                                                                                                        NAME
                                                                                                                   DATE                DRAWN              CHECKED             SCALE
                                                                                                                   2016-08-10 FREDDIE                       KRUGER            1 : 300
                                                                                                                   REFERENCE CODE
                                                                                                                              QU1-2016                                                                                                                                                  NAME                            2
Copyright reserved                                                                                                                                                                                                                                                                                         Please turn over

### Page 3

Engineering graphichs and design / P1       Downloaded from hlayiso.com
                                                        NCS                                                     EC DBE/September 2016

                                                                    b   QUESTION 2: INTERPENETRATION AND
   ST
      AP
         LE
                                                                                    DEVELOPMENT

                                                                        Given:
                                                                        The incomplete front view and the top view of a hexagonal
                                                                        main pipe and equilateral triangular branch pipe. The
                                                                        auxiliary view of the branch pipe with center point Q.
                                                                        The center point P for the top view of the hexagon and the
                                                                        ground line XY. A right angle labeled B as the start for the
                                                                        development.

                                                                        Instructions:
                                                                        Draw, to scale 1 : 1, the following views of the two
                                                                        interpentraint pipes:
                                                                        2.1 The top view
                                                                        2.2 The complete front view clearly showing the
                                                                             interpenetration between the two parts
                                                                        2.3 Develop the surface of the branch pipe and make AB
                                                                             the seam.

                                                                        Show ALL hidden detail and fold lines.
                                                                        AB is the seam of the branch pipe.               [32]

                                                                                                     25

                                                                            90

        X                                           Y                         28                              30°

                                                                          X                                         Y

                                                                                           P
                                                                                                                              Q
                                                                              7

                                                                                     30        a          b
                                        P                                                                                50

                                                                                                   ASSESSMENT CRITERIA
                                                                                       CONSTRUCTION +
                                                                                     1 CENTRE LINES +               8
                                                                                       TOP VIEW
                                                                                     2 FRONT VIEW                   12
                                                                                     3 DEVELOPMENT                  12
                                                                                     PENALTIES (-)

                                                                                                          TOTAL     32
                                                                                                          NAME

                                                                                                          NAME                         3
Copyright reserved                                                                                                        Please turn over

### Page 4

Engineering graphichs and design / P1   Downloaded from hlayiso.com
                                                      NCS                                      DoE EC/September 2016

                                                                      QUESTION 3: PERSPECTIVE
   ST
      AP

                                                                      Given:
         LE

                                                                      Two views of a monument and the information
                                                                      needed to draw a two-point perspective
                                                                      drawing
                                                                      PP − Picture plane
                                                                      HL − Horizon line
                                                                      GL − Ground line
                                                                      SP − Station point

                                                                      Instructions:
                                                                      Complete the perspective drawing.

                                                                      · Align the drawing sheet with the ground line
                                                                       (GL).
                                                                      · Determine and label the vanishing points.
                                                                      · Show ALL necessary construction.
                                                                      · Show the wall thickness at the openings.
                                                                      · NO hidden detail is required.            [40]

     PP

     HL                                                                                           HL

                                                                                  ASSESSMENT CRITERIA
                                                                           CONSTRUCTION +
                                                                       1                            7
                                                                           VPs
                                                 GL
                                                                       2 STAIRS + BASE             12

                                                                       3 WALLS + HEXAGON           14

                                                                       4 SEMI-CIRCLE                7

                                                             SP                          TOTAL     40
                                                                                          NAME

                                                                                          NAME                          4
Copyright reserved                                                                                         Please turn over

### Page 5

Engineering graphichs and design / P1                                                   Downloaded from hlayiso.com                                                       NCS

                                                                                                                                                                                                                                                                  QUESTION 4: CIVIL DRAWING
                                                                                                                                                                                                                                                                                                           EC DBE/September 2016

                                                                                                                          FLOOR FINISHES
                                                                                      ROOF 2                              1 BEDROOM:                   CARPET                                                                                                     Given:
   ST
                                                                                                 200 x 20 mm BARGE
                                                                                                                                                                                                    DOOR AND WINDOW SCHEDULE
      AP

                                                                                                                                                                                                                                                                  · The incomplete south east elevation of a bachelors flat,
                                         ROOF 1                                                                           2 BATHROOM:                  TILE
         LE

                                                                                                 BOARD WITH 75 mm
                                                                                                 WEATHER BOARD            3 OPEN PLAN AREA:            TILE
                                                                                                                          4 PASSAGE:                   TILE                              1000                                                                       showing the walls, the window, the door opening, the roof and
                                                                                                                                                                                                                                           TO FIT            50
                                                                                                                                                                                                                                                                    notes
                                                                                                                                                                                                                                                                  · The incomplete floor plan showing the walls, position of the
                                                                                                                                                                                                                                                                    doors, windows, fixtures and electrical layout
                                                                                                                                                           RWDP

                                                                                                100 x 150 mm GUTTER                          2         2                                A       B
                                                                                                                                                                                                                                                                  · Roof notes with schematic diagrams of two roof trusses
                                                                                                                                                                                                       800
                                                                                                200 x 20 mm FACIA BOARD         1
                                                                                                DOOR OPENING
                                                                                                WINDOW OPENING
                                                                                                                                                 4                                                                                                                · The incomplete foundation and wall detail
                                                                                                 RWDP
                                                                                                                                                                                      WINDOW (W1)                                                                 · Room designations and floor finish
                                                                                                                                                                                                                                                                  · A door and window schedule
                                                                                                                                                           RWDP

                                                                                                                                                                                                                                 2100
                                                                                                                                 3                                                     600
                                                                                                                                                                                                                                                                  · A table of sanitary fixtures
                                                                                                FLOOR LEVEL
                                                                                                GULLEY
                                                                                                GROUND LINE                                                                                              WINDOW NOTES                                             · A table of roof components
                                                                                                                                                                                        A
                                                                                                                                                                                              600        A = OPENING SIDE                                         · A table of electrical symbols
                        INCOMPLETE SOUTH EAST ELEVATION
                                                                                                                                                                                                         B = FIXED PANE
                                                                                                                                                                                                         FRAMES 40 mm
                                                                                                                                                                                                                                                                  · A table of rainwater items
                                                                                          FEATURES
                                                                                                                           ROOM DESIGNATIONS
                                                                                                                                                                                  WINDOW (W2)
                                                                                                                                                                                                                                                                  · The floor plan of the proposed bachelors flat, drawn to scale
                                                                                          D1  DOOR                                                                                                                                DOOR FRAME AND                    1 : 50 on page 6
                        ROOF LINE                                                         W1 WINDOW                                                                                           1500                                   DOOR (D1)
                                                                                          W2 WINDOW
                                    W3                     W2        W1                                                                                                                                                                                           Instructions:
                                                                          RWDP

                                                                                          W3 WINDOW                                                                                                                                 NOTE: 175 x 20 mm
                                                      SH 4           WB                                                                                                                                                             FIBRE CEMENT                  Answer this question on page 6.
                                                                      4 WC W2
                                4
                                                                                          FIXTURES
                                                                                                                                         100
                                                                                                                                                                                        A          B     A   1000                   SILL UNDER ALL                4.1 Using the given incomplete floor plan, draw, in first-angle
                        6                                                                 WC TOILET
                                                 1              D1   D1
                                                                                          WB WASH BASIN
                                                                                                                                                                                                                                    WINDOWS                            orthographic projection and to scale 1 : 50, the following
                                                           1               1
                                                 D1                              W2       SH SHOWER                                                                                                                                                                    views of the new bachelors flat:
                                                                                          S    SINK                                                                                           WINDOW (W3)                                                              4.1.1 THE COMPLETE FLOOR PLAN
                                                                                                                                                                                                                                                                       Add the following features to the drawing:
                                                                          RWDP

                        D1
                        2
                                                                                          ELECTRICAL FITTINGS
                                                                                          1. LIGHT SWITCH - SINGLE-POLE
                                                                                                                                                                                                                                                                       · ALL doors and windows
                                                                                          2. LIGHT SWITCH - DOUBLE-POLE                                                            RAINWATER                            ROOF COMPONENTS                                · ALL fixtures as indicated by abbreviations
                        6
                                           3               6                              3. FLUORESCENT LIGHT 2 x 40 W                                                              ITEMS                                                                             · ALL electrical fittings as indicated by numbers
                    5                                                                     4. CEILING LIGHT                                                                                                                      200 x 20 mm FASCIA BOARD               · ALL hatching detail
                                                                                          5. WALL MOUNTED LIGHT
                                                                                                                                      3000                                      100
                                                                                                                                                                                       150                            300                                              4.1.2 THE SOUTH EAST ELEVATION
                                                                                          6. SWITCHED SOCKET OUTLET                                                                                                             ROOF CAP
                             S
                                                       7                                  7. DISTRIBUTION BOARD                                                                           300   100                                                                    Show the following features on the drawing:
                             W3
                                                 D1
                                                                                                                                                                                20°
                                                                                                                                                                                                                                                                       · The outside walls, window and door detail
                                                                                          NOTE:                                                                                                                                 75 x 50 mm PURLINS
                                                                                                                                                                                                                                                                       · The roof detail, including the fascia board, gutter, rain-
                                                                                          THE ARROWS ON THE FLOOR
                                                                                                                                                       25 mm SCREED                                                                                                      water down pipe, gully and barge board
                                     INCOMPLETE FLOOR PLAN                                PLAN SHOW THE LIGHT
                                                                                                                                                                                                                                                                       · The finished floor level
                                                                                          CONNECTION TO THE SWITCH.                                                                                                    ELECTRICAL SYMBOLS
  ROOF NOTES:                                                                                                                                                     100
                                                                                                     200
  ROOF PITCH 20° WITH 200 x 20 mm FACIA BOARD ON SIDES                                                                         GROUND                                                                                                                             4.2 In the space provide on page 6, draw, to scale 1 : 20, a
                                                                                                                               LEVEL                                    700            Ø75                                                                           DETAILED SECTION according to cutting plane A-A of the
  200 x 20 mm BARGE BOARDS AND 75 mm WEATHER BOARD ON
  EAVES                                                                                                                                                           500
                                                                                                                                                                                      RWDP                                                                           area in the ellipse shown on the floor plan.
                                                                                                                                                                                                                                                                      · Show the following features on the drawing:
                                                                                                                                                                                75

                                                                                                                                                                                                                                                                      · The complete foundation, external wall with window and
  ROOF COVER 15 mm FIBRE CEMENT SHEET ON 75 x 50 mm                                                                                              400
                                                                                                                                                       200                        150
  PURLINS @ 920 mm c/c
                                                                                                                                      INCOMPLETE NON LOAD
                                                                                                                                                                                                                                                                        internal wall with door detail
                                                                                                                                                                                                                                                                      · The roof detail, including the fascia board and gutter
                                                                                                                                                                                                400                         W                     n x 40 W
  114 x 38 mm ROOF TRUSS ON 114 x 38 mm WALL PLATES                                                                                     BEARING WALL AND
                                                                                                                       100 x 200 mm    FOUNDATION DETAILS                                    400                                                                      · ALL features to the right of the section
                                                                                                                                                                                                                                                                      · ALL hatching detail. ONLY the substructure hatching
  9 mm CEILING BOARD ON 38 x 38 mm BRANDERING STRIPS @                                                                 LINTEL
                                                                                                   3000                                                                                 GULLEY (G)
  440 mm c/c                                                                                                           ABOVE DOOR
                                                                                                                       AND WINDOW                                                                                                                                       may be drawn in neat freehand
  100 x 150 mm GUTTER ON ALL SIDES                                                                                     OPENINGS                                                                                                                                       · Start at the given starting point
                            c/c
                                                                                                                                                                                              SANITARY FIXTURES
                       8 40                                                                                                                                                                                                                                       Label the following:
              8 40
                   c/c
                                                                                                                       25 mm SCREED
                                                                                                                                                              500
                                                                                                                                                                                        400
                                                                                                                                                                                                                                                                  · The south east elevation including the scale
         c/c                                                                                                                                                                                                                                                      · The room designations and floor finishes
                                                      20°
    8 40                                                                                                                                                                                                                                      400
                                                                                                                                                                                                                                                                  · Using the correct abbreviations, label the following features in
                                                                                                                   100
                                                                                               GROUND                                                                                                                 2100
                                                                                               LEVEL
                                                                                                                                                 850                  200
                                                                                                                                                                              750                                                                                   the correct view: ground level; finished floor level and damp
                        SCHEMATIC DIAGRAM OF ROOF 1 TRUSS                                                                800                                                400                                                  500                350             proof course
                                                                                                                   600                                            FLOOR LEVEL

                                           c/c
                                                                                                                 300
                                    9 20
                                                                                                                                                                                                                                           1200                   NOTE:
                                                                                                           600
                                                                                                                                                                                                                                         SINK (S)                 ALL drawings must comply with the guidelines and graphical
              c/c
                                                                                                                                                                     400
                                                                                                                                                                                                                                                                  symbols contained in the SANS 10143.              [98]
                                                                                                                                                                            600 200                     850
       9 20
                                                      20°
                                                                                               INCOMPLETE FOUNDATION
                                                                                                   AND WALL DETAIL                                                                                              850
                                                                                                                                                       WASH BASIN                  TOILET
                                                                                                                                                                                                              SHOWER
                        SCHEMATIC DIAGRAM OF ROOF 2 TRUSS                                                                                                (WB)                       (WC)
                                                                                                                                                                                                                (SH)

                                                                                                                                                                                                                                                                                                                                     5
Copyright reserved                                                                                                                                                                                                                                                                                                      Please turn over

Text truncated here. Open the document page to read the rest.

## Related documents

- [Engineering Graphics Design P1 Nov 2016 Afr](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2016-afr/05b3d710-b189-4476-95e1-04246ee42fc5) — Engineering Graphic and Design · QP · 2016 · Afr
- [COVER PAGE](https://www.hlayiso.com/library/cover-page/140b2ccb-82fb-4f2b-a439-03fa13a23734) — Engineering Graphic and Design · QP · 2013
- [EGD P2 AFR MEMO](https://www.hlayiso.com/library/egd-p2-afr-memo/c6b21474-f0e4-474b-bc71-1ce595afce9a) — Engineering Graphic and Design · Memo · 2016 · Afr
- [EGD P1 Feb March 2016 Memo Eng](https://www.hlayiso.com/library/egd-p1-feb-march-2016-memo-eng/8b7dc43c-f8a8-40ce-a7a0-bb3f073a330e) — Engineering Graphic and Design · Memo · 2016 · Eng
- [EGD p1 Memo protected watermark](https://www.hlayiso.com/library/egd-p1-memo-protected-watermark/4afe999d-829f-4029-81f4-f01ba594587f) — Engineering Graphic and Design · Memo · 2025
- [EGD P1 GR12 MEMO SEPT2023 Afr+Engl](https://www.hlayiso.com/library/egd-p1-gr12-memo-sept2023-afr-engl/f0ef5f18-cddf-486c-9131-1f3fc1806ba4) — Engineering Graphic and Design · Memo · 2023 · Afr

## More from Grade 12 Engineering Graphics and Design

- [EGD P2 ENG MEMO DD watermark](https://www.hlayiso.com/library/egd-p2-eng-memo-dd-watermark/19628a3f-1387-4c5c-bbbd-fa7b7d8dfa52) — Memo · 2025 · Eng
- [Engineering Graphics and Design P2 June 2025 Possible Answers](https://www.hlayiso.com/library/engineering-graphics-and-design-p2-june-2025-possible-answers/33c95b30-d504-42bd-acc1-56b020ec92fb) — Memo · 2025
- [EGD P2 GR12 MEMO SEP2024 English](https://www.hlayiso.com/library/egd-p2-gr12-memo-sep2024-english/aa083dea-fbb2-497c-bf52-437fbe9dc226) — Memo · 2024 · Eng
- [Pages from Exam Paper September 2023 Final-5](https://www.hlayiso.com/library/pages-from-exam-paper-september-2023-final-5/ce3ac88f-c3a8-47ff-81b7-09ccce136455) — QP · 2023
- [EGD P2 QP SEPT2023 AFR](https://www.hlayiso.com/library/egd-p2-qp-sept2023-afr/bcd511cb-4c3a-4c53-afc7-47f820a47af7) — QP · 2023 · Afr
- [Engineering Graphics & Design P1 Nov 2023 Eng](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2023-eng/15d72a8f-e8dc-4d1e-82bc-86650e523125) — QP · 2023 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
