# Engineering Graphics and Design Grade 12 2019 Memo

> Grade 12 Engineering Graphics and Design memorandum from the Eastern Cape Mock Exam 2019, 7 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/egd-gr-12-sept-2019-memo-ea-d/3c1c063c-28f1-4b67-b215-f412e22c2ec8
- Updated: 2026-09-27
- Subject: Engineering Graphics and Design
- Grade: Grade 12
- Document type: Memorandum
- Year: 2019
- Exam period: Eastern Cape Mock Exam
- Curriculum: CAPS
- Pages: 7

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Engineering Graphics and Design](https://www.hlayiso.com/library/grade-12/engineering-graphic-and-design) › [Engineering Graphics and Design Grade 12 2019 Memo](https://www.hlayiso.com/library/egd-gr-12-sept-2019-memo-ea-d/3c1c063c-28f1-4b67-b215-f412e22c2ec8)

## About this document

Engineering Graphic And Design · Grade 12 · Eastern Cape Mock Exam · 2019. Memorandum, 7 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

ISEBE LEMFUNDO LEMPUMA KOLONI
EASTERN CAPE EDUCATION DEPARTMENT
OOS-KAAP ONDERWYSDEPARTEMENT

NATIONAL SENIOR CERTIFICATE
NASIONALE SENIOR SERTIFIKAAT

GRADE 12
GRAAD 12

ENGINEERING GRAPHICS AND DESIGN P1
INGENIEURSGRAFIKA EN -ONTWERP V1

SEPTEMBER 2019
MARKING GUIDELINE / NASIENRIGLYN

MARKS / PUNTE: 200
TIME / TYD: 3 hours / uur

This memorandum consists of 7 pages.
Hierdie memorandum bestaan uit 7 bladsye.

Copyright reserved / Kopiereg voorbehou

### Page 2

Downloaded from hlayiso.com

Engineering graphichs and design/P1 NCS EC /September 2019
1 SITE- 4200-19 1 1 SITE- 4200-19 1
2) 5 1 2/5 1
3 1 1 3 1 1
4 | ANJE & JANKE ARGITEKTE 1 4 | ANJE & JANKE ARGITEKTE 1
5 Mr. W. HALLAT 1 5 Mnr. W. HALLAT 1
6 | SCHOOL PLAYGROUND 2 6 | SKOOL SPEELGROND 2
7 | 1m 2 7 | 1m 2
8 INSPECTION CHAMBER 1 8 INSPEKSIE KAMER 1
9 | BUILDING LINE 1 9 | BOULYN 1
10 | 4 1 10 | 4 1
11 | WATER METER 1 11 | WATERMETER 1
12 | BROWN 2 12 | BRUIN 2
43 YES. THE GYMNASIUM IS NOT 2 43 JA. DIE GIMNASIUM IS NIE 2

OVER THE BUILDING LINE OOR DIE BOULYN NIE.
TOTAL | 28 TOTAAL 28
ANTWOORD / QUESTION 16
- ANTWOORD / QUESTION 14
Vryhand Toon alle berekeninge / Show all calculations
Freehand . a
calculation: (+)(-) 28.5 + 28.5 + 56.83 = 113.83 bere! ig: (+)(-)
corr alues = korre aardes
(5x 2.1) + 4.2 = 14.7
(1) correct answer _ korrekte antwoord
B correctunit, 113.83 - 14.7 = 99.43M | oirekie eenheid (41
0
° o o ANTWOORD / QUESTION 15
Toon alle berekeninge /Show all calculations
3
i] 5.4 x 5.7 = 30.78
3.3x 1.8 = 5.94
30.78 + 5.94 = 36.72m?
calculation (X), (+) optel berekening (X), (+)
correct values korrekte waardes
correct answer korrekte antwoord
correct unit m? korrekte eenheid m? [4] 2

Copyright reserved

Please turn over

### Page 3

Downloaded from hlayiso.com

Ingenieursgrafika en -ontwerp/V1

NSS

EC / September 2019

ASSESSMENT CRITERIA

(1)
4 | FRONT VIEW 4
2 | TOP VIEW 5
3 | LEFT VIEW 6
9 4| constructions | 3
Y , 5 | DEVELOPMENT 13
ee" PENALTIES (-)
4
ft TOTAL| 31
x
ASSESSERINGSKRITERIA
@. 1 | VOORAANSIG 4
2 | BOAANSIG
3 | LINKERAANSIG 6
@ y 4 | KONSTRUKSIE 3
5 | ONTWIKKELING 13
PENALISERING (-)
TOTAAL

3

Kopiereg voorbehou

Blaai om asb.

### Page 4

Downloaded from hlayiso.com

Engineering graphichs and design/P1 NCS EC / September 2019
\ 4
\ X
\ \ 4
\ a ‘ 4
7 e \ a
PP N ow
i
0

[] SE a
~@ |
|
| |
||
SP
ASSESSERINGSKRITERIA ASSESSMENT CRITERIA
1 | KONSTRUKSIE EN VPte 6 41 | CONSTRUCTION AND VPs 6
2 | DAK 14 2 | ROOF 14
3 | MURE 5 3 | WALLS 5
4 | DEURE EN VENSTER 93 4 | DOORS AND WINDOW 93
5 | SIRKEL EN OPRIT 63 5 | CIRCLE AND RAMP 63
TOTAAL| 41 TOTAL| 41

SP 4

Copyright reserved Please turn over

### Page 5

Downloaded from hlayiso.com

Engineering graphichs and design/P1 NCS EC / September 2019
A
TT ST
mn |
T 1
| | |
op | é Ve |
OF cloned SLAAPIAMER ©
3] ps8 LO BEDROOM |
CARPET
A
on VL I |_|
7
<T BATHROOM |
\ TILES |
Ay
‘ |
XN
|
, |
N |
\ |
|
r| ro) |
lien \— ee _|
|
Go | FLOOR PLAN
| :
ai SCALE 1: 50
| VLOERPLAN
LEEFAREA @ | SKAAL 1 : 50
HOUT @ |
LIVING AREA |
woop |
| Arsering: Alles gearseer v
| Korrekte tipe v
Met instrumente ¥
Hatching: All hatched v
| Correct type v
| Instruments used ¥
|
L a ol
5 X VENSTERS
ASSESSMENT CRITERIA ASSESSERINGSKRITERIA Sx WINDOWS
Li
FLOOR PLAN VLOERPLAN ; o o a
DOORS AND .
1 15 DEURE EN
WINDOWS 1 | VENSTERS 15
2 = | ELECTRICAL 8 2 | ELEKTRIES 8 oO
4X DOORS
3. | FIXTURES 7 3 | TOEBEHORE 7 4X DEURE
4 | HATCHING 3 4 | ARSERING 3 4x1=4
5 | LABELS 4 5 | BYSKRIFTE 4
SUBTOTAL 37 SUBTOTAAL 37

Copyright reserved

Please turn over

### Page 6

Downloaded from hlayiso.com

Engineering graphichs and design/P1 NCS EC / September 2019
Oo
Li
op ab
~ —- i
2 ry
2)
(3) 6
@ 6 3) a € Go
12) (2.
(3)
3 (3
ry &
es WV DY
0 _ _ ~~ — _ _
ao [—_* —» 00] ner
SUIDAANSIG
SOUTH ELEVATION
ASSESSMENT CRITERIA ASSESSERINGSKRITERIA
SOUTH ELEVATION SUID ELEVASIE
ROOF, GUTTER, DAK, GEUT, RWAP,
4 | RwopP, FACIA AND 11 1 | FASSIE EN 1
BARGE BOARD WINDVEER
2 | WALLS AND STEPS 4 2 | MURE EN TRAPPE 4
DOORS AND 1 DEURE EN 4
3 | winnows 113 3 | VensTers 113
4 | LABELS iA 4 | BYSKRIFTE 13
SUBTOTAL 28 SUBTOTAAL 28

Copyright reserved Please turn over

### Page 7

Downloaded from hlayiso.com

Engineering graphichs and design/P1

NCS

EC / September 2019

@ppPc

G. ROOF DETAIL: MARK ALLOCATION
6. DAKBESONDERHEDE:
PUNTETOEKENNING

ROOF ANGLE

81 | DAKHELLING

ROOF SHEET

62 | DAKPLAAT

ROOF TRUSS

83 | DaKKAP

PURLIN + SPACING

64 | BLAFONLAT + SPASIE

BARGE BOARD

88 | WinDVEER

86 | pLAFONLAT EN SPASIE

BRANDERNG + SPACING

CEILING BOARD

87 | BLAFON

WALL PLATE

68 | MUURPLAAT

FACIA BOARD

69 | FASSIEBORD

GUTTER

SCALE 1 : 20

Ghat GEUT 4
TOTAL/TOTAAL | 17]
ASSESSERINGSKRITERIA
DEURSNEE-AANSIG
1 | RwWAP 4
FONDASIES, MURE EN
2 | vioeR 8
3, | VERSTERBANK, VENSTER, 5
STORT EN LATEIE
4 | ARSERING 53
5 | BYSKRIFTE 13
@ 6 | DAKBESONDERHEDE 1
SUBTOTAAL 35
ASSESSMENT CRITERIA
DETAILED SECTION
RWDP 4
FOUNDATIONS, WALLS 8
EN SLAB
WINDOW SILL,
WINDOW, SHOWER AND 5
LINTELS
HATCHING 54
LABELS. 13
ROOF DETAIL 11
SUBTOTAL 35

GEDETAILEERDE SNIT A-A

SKAAL 1 : 20

Copyright reserved

## Related documents

- [EGD Gr12 Sept 2019 Afr](https://www.hlayiso.com/library/egd-gr12-sept-2019-afr/486172d3-87cc-4c1e-90e4-47b2f7c1920d) — Engineering Graphic and Design · QP · 2019 · Afr
- [IGO Gr .12 SEPT 2019 V1](https://www.hlayiso.com/library/igo-gr-12-sept-2019-v1/6c22011f-9e1a-48aa-baab-e8ad6827b38a) — Engineering Graphic and Design · QP · 2019
- [EGD Gr .12 SEPT 2019 QP A3 AFR D](https://www.hlayiso.com/library/egd-gr-12-sept-2019-qp-a3-afr-d/7f1f8a71-2e36-440e-a090-97b9eabec971) — Engineering Graphic and Design · QP · 2019 · Afr
- [EGD Gr .12 SEPT 2019 QP A3 ENG D](https://www.hlayiso.com/library/egd-gr-12-sept-2019-qp-a3-eng-d/7f715d97-b28a-4b5d-baf5-b5ba647ec0b1) — Engineering Graphic and Design · QP · 2019 · Eng
- [EGD Gr .12 SEPT 2019 Q2](https://www.hlayiso.com/library/egd-gr-12-sept-2019-q2/1275a265-61c9-47c8-867c-7765b6be0d47) — Engineering Graphic and Design · QP · 2019
- [EGD Gr .12 SEPT 2019 Q1](https://www.hlayiso.com/library/egd-gr-12-sept-2019-q1/52cc9003-064e-4b00-8470-b1f17343452c) — Engineering Graphic and Design · QP · 2019

## More from Grade 12 Engineering Graphics and Design

- [Engineering Graphics & Design P1 May-June 2025 Afr](https://www.hlayiso.com/library/engineering-graphics-design-p1-may-june-2025-afr/bdb1c7cf-1e83-49ee-b598-eeb5026e5c71) — QP · 2025 · Afr
- [Engineering Graphics & Design P2 May-June 2025 Afr](https://www.hlayiso.com/library/engineering-graphics-design-p2-may-june-2025-afr-1/55d6af85-d3ce-4134-b1cb-91d1b25d8820) — QP · 2025 · Afr
- [EGD P1 SEP AFR QP](https://www.hlayiso.com/library/egd-p1-sep-afr-qp/7d047bec-7cce-4511-a669-aa644aa52d01) — QP · 2024 · Afr
- [EGD P2 SEP AFR QP D](https://www.hlayiso.com/library/egd-p2-sep-afr-qp-d/801f2051-294e-4c42-84bb-3e2fcf153206) — QP · 2024 · Afr
- [Engineering Graphics & Design P1 Nov 2024 Afr](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2024-afr/9e12f86e-1027-404b-a851-90f9217639a4) — QP · 2024 · Afr
- [Gr 12 EDG P2 (English) June 2024 Question Paper](https://www.hlayiso.com/library/gr-12-edg-p2-english-june-2024-question-paper/5258bc0e-6828-4661-a7e7-9553fbae9844) — QP · 2024 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
