# Engineering Graphics and Design Grade 11 P1 2019 QP (Eng)

> Grade 11 Engineering Graphics and Design Paper 1 question paper from the Eastern Cape November 2019 (English), 6 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/egd-p1-gr-11-eng-qp-d/8a128a62-efcd-4ce3-bd0a-0156883050db
- Updated: 2026-09-27
- Subject: Engineering Graphics and Design
- Grade: Grade 11
- Document type: Question paper
- Year: 2019
- Exam period: Eastern Cape November
- Paper: 1
- Curriculum: CAPS
- Pages: 6

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 11](https://www.hlayiso.com/library/grade-11) › [Engineering Graphics and Design](https://www.hlayiso.com/library/grade-11/engineering-graphic-and-design) › [Engineering Graphics and Design Grade 11 P1 2019 QP (Eng)](https://www.hlayiso.com/library/egd-p1-gr-11-eng-qp-d/8a128a62-efcd-4ce3-bd0a-0156883050db)

## About this document

Engineering Graphic And Design · Grade 11 · Eastern Cape November · 2019. Question paper, 6 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com
                                                            INSTRUCTIONS AND INFORMATION

                       ISEBE LEMFUNDO LEMPUMA KOLONI
                     EASTERN CAPE EDUCATION DEPARTMENT
                       OOS-KAAP ONDERWYSDEPARTEMENT

                                                                              FOR OFFICIAL USE ONLY
                               NATIONAL                                                               MODERATED
                                                                                                        MARK
                          SENIOR CERTIFICATE
                                                                          1
                                                                          2
                                                                          3
                                                                          4
                                    GRADE 11                            TOTAL

                                                                                  2 0 0              2 0 0
                                                                         FINAL CONVERTED          CHECKED BY
                                 *IGRDSE1*                                     MARK

             ENGINEERING GRAPHICS AND DESIGN                                  100
                         PAPER 1
                                                                              COMPLETE THE FOLLOWING:
                               NOVEMBER 2019                                               NAME

                                                                                           NAME
MARKS: 200
                                                                                 EXAMINATION CENTRE
TIME: 3 hours

This question paper consists of 6 pages.
                                                                                 EXAMINATION CENTRE
Copyright reserved
                                                                                                                  Please turn over   1

### Page 2

Engineering graphics and design / P1
                                                           Downloaded from hlayiso.com                                NSC                                                                                                                EC / November 2019

  AP
      LE
                                  FIGURE 1:                                                   FIGURE 3:                      QUESTION 1A: ANALYTICAL (CIVIL)
 ST

                                                                                                                             Given:
                                                       1                                                                     Figure 1: Incomplete wall and foundation detail.
                                                                                                                             Figure 2: A view of a floorplan with measurements (not to scale).
                                                       2                                                                     Figure 3: The plan view of the SANS 10143 symbol for steps.
                                                       3                                                                     Figure 4: A symbol with a specific meaning.
                                                       4                                                                     Instructions:
                                                                                              FIGURE 4:                      Complete the table below by neatly answering the questions, which refer to the accompanying figures (1 to 4) and
                                                       5                                                                     civil content.                                                                                           [35]

                                                       6                                                                    1   What SI-unit was used for the dimensions in figure 2?                                                                1
                                                                                                                                                                                           ALL EXISTING MATERIALS                                    1

                               FIGURE 2:                                       ANSWER 5:                   ANSWER 6:                                                                       NEW WOOD                                                  1

                                  14500                                                                                         In which colours must the following features be shown      NEW DRAINAGE / SEWERAGE                                   1
                                                                                                                            2   on a civil drawing according to the SANS 10143?            NEW MASONRY                                               1

                                                                                                                                                                                           NEW GLASS                                                 1
                              FLOOR PLAN                                                                                                                                                   NEW CONCRETE                                              1
                                  NTS
                                                                                                                                                                                                                                                     1
            10000
                                                                                                                                                                                                           1
                                                                                                                                                                                                           2                                         1
                                2500
                                                                                                                                Name the parts from 1 to 6 of the incomplete wall and                      3                                         1
                                                                                                                            3
                                        2500
                                                                                                                                foundation detail shown in figure 1.                                                                                 1
                                                                                                                                                                                                           4
                                                                                                                                                                                                           5                                         1
                       5000
                                                                                                                                                                                                           6                                         1

                     ANSWER 9.1                        ANSWER 9.2                                    ANSWER 9.3             4   What does the abbreviation NTS, in figure 2, stand for?                                                              1

                                                                                                                                In the space provided (ANSWER 5) determine the total perimeter of the house, in figure 2, in meters.
                                                                                                                            5                                                                                                                        3
                                                                                                                                Show all calculations.

                                                                                                                                In the space provided (ANSWER 6) determine the total area of the house, in figure 2, in square meters.
                                                                                                                            6                                                                                                                        4
                                                                                                                                Show all calculations.

                                                                                                                            7   What does the arrow in figure 3 mean?                                                                                1

                                                                                                                            8   Name the symbol in figure 4.                                                                                         1

                                                                                                                                In the space provided (ANSWER 9.1 - 9.3), draw, in neat freehand, the front view and top view of the SANS 10143
                                                                                                                            9   graphical symbol for the following:                                                                                12
                                                                                                                                9.1 BATH; 9.2. SINGLE SINK; 9.3 TOILET
                                                                                                                            TOTAL:                                                                                                                 35
                      BATH                             SINGLE SINK                                   TOILET
                                                                                                                                                FIGURE 6:                                                        ANSWER 1B:
                         FIGURE 5:

                                                                                                                                                    PUSH
                                               M           QUESTION 1B: ELECTRONICS                                                                SWITCH
                                                                                                                                                    "PTM"
                                                           Given:                                                                                                                                                                                 MARKS
                                                           Figure 5: A table with symbols of electronic components.                   LED
                                                           Figure 6: A diagram with labels of a touch sensor.                                                                                                                                Q 1A        35
                                                                                                                                                                   9V
                                                                                                                                                                 BATTERY
                                                                                                                                                                                                                                              Q 1B       6
                                                           Instructions:                                                             RESISTOR
                                                           Draw the electronic diagram with the correct electronic                                                                                                                           TOT 41
                                                           symbols, in free hand, in the space provided
                                                                                                                                     NPN
                                                   +       under ANSWER 1B.
                                                                                                                [6]
                                                                                                                                  TRANSISTOR
                                                                                                                                                                                                                                   NAME

           ELECTRONIC COMPONENTS: SYMBOLS                                                                                                                                                                                          NAME                          2
Copyright reserved                                                                                                                                                                                                                            Please turn over

### Page 3

Engineering graphics and design / P1
                                                  Downloaded from hlayiso.com
                                                                  NSC                                                                           EC / November 2019

  AP
      LE
                                                                                                  QUESTION 2: TRANSITION PIECE
 ST
                                                                                                  Given:
                                                                                                  x   The top view and front view of a square to triangle transition
                                                                                                      piece, drawn in first-angle orthographic projection.
                                                                                                  x   An isometric help view of the transition piece.
                                                                                                  x   Axis XY and -X1Y1.and a starting point c and c1.
                                                                                                  x   Starting point ABC and the direction of development.

                                                                                                  Instructions:
                                              X
                                              1
                                                                                                  Draw, to scale 1 : 1, the following views of the transition piece.
                                                                                                  Start at C, C1.
                                                                                                  2.1 The given top view.
                                                                                                  2.2 The given front view.
                                                                                                  2.3 The left view.
                                                                                                  2.4 The development of the transition piece, starting and
                                                                                                       ending with seam AB. The direction of the arrow P indicates
                                                                                                       the direction of the development.

                                                                                                  Show ALL constructions.
                                                                                                                                                                     [36]
                                                                                                                                               30
                                                                                                                              a                          d

                                                                                                                                                             80

                                         c
                                                                                                                              b                          c
      X                                                   Y                                                               X                              Y
                                                                                                                                          p    c1d1
                                         c1                                                                              a1b1
                                                                                                                                    60°

                                                                                                                                                             60

                                                                                                                                          60
                                                                                      C       A
                                                                                                                                  ASSESSMENT CRITERIA
                                                                                                                         CONSTRUCTIONS +
                                                                                                                D    1   PLACING
                                                                                                                                                    4

                                                                                                                     2 TOP VIEW                     6

                                              Y
                                              1                                                                     3 FRONT VIEW                    5
                                                                                  P
                                                                                                                     4 LEFT VIEW                    4
                                                              A
                                                                                              B
                                                                                                     P              5 DEVELOPMENT                   17

                                                                                                                                     TOTAL          36
                                                                                                                C
                                                                        B
                                                                                                                                          NAME
                                                                            ISOMETRIC VIEW:
                                                                                                                                          NAME                              3
Copyright reserved                                                                                                                                       Please turn over

### Page 4

Engineering graphics and design / P1
                                                                  Downloaded from hlayiso.com
                                                                             NSC                                             EC / November 2019
      LE
  AP
 ST
                     QUESTION 3: PERSPECTIVE

                     Given:
                     Three views of a HOUSE WITH A PORCH and the
                     information needed to draw a two-point perspective
                     drawing.                                                                                 ASSESSMENT CRITERIA
                     PP − Picture plane
                     HL − Horizon line                                                           1 CONSTRUCTION + VPs        6
                     GL − Ground line
                     SP − Station point                                                          2 ROOFS                     7

                     Instructions:                                                               3 WALLS + BRAAI +           15
                                                                                                    CHIMNEY
                     Complete the perspective drawing.
                                                                                                 4 WINDOW + DOOR             8½
                     x Align the drawing sheet with the ground line (GL).
                     x Determine and label the vanishing points.                                 5 PORCH                     4½
                     x Show ALL necessary construction.
                     x NO hidden detail is required.
                                                                     [41]
                                                                                                                     TOTAL   41

                                                                              PORCH
                                                                                      PORCH
  PP                                                                                                                                         PP

      HL                                                                                                                                      HL

                                                                  PORCH                         PORCH                                         GL
      GL

                                                                                                                        NAME
                                                                               SP
                                                                                                                        NAME                         4
Copyright reserved                                                                                                                Please turn over

### Page 5

Engineering graphics and design / P1
                                                                                                Downloaded from hlayiso.com                                                       NSC                                                                                                                                              EC / November 2019
      LE
  AP
 ST                                                                                                                                                                                                                                                                                    QUESTION 4: CIVIL DRAWING

                                                                                                                                                SLIDING DOOR OPENING
                                                                                                                                                                                                                     DOOR AND WINDOW SCHEDULE                                          Given:
 WINDOW OPENING
                                                                                                                                                                                                                          SLIDINGDOOR AND -FRAME (SD)
                                                                                                                                                                                                                                                                                       x   The incomplete SOUTH ELEVATION of a proposed new
                                                                                                                                               GARAGE DOOR OPENING
                                                                                                                                                                                                                                                                                           dwelling, showing the walls, step as well as window-,
                                                   1500                                                                                                                                                                             TO FIT
                                                                                  2050                                2150
                                                                                                                                               GARAGE FINISHED FLOOR                                                                                                                       door- and roll up garage door openings.
                                                                                                                                               LEVEL
                      400                                                                                                                                                                                                                                                              x   The incomplete floor plan showing the walls, position of
                                                                                                                                               GROUND LINE                                                                                                                                 the doors, windows and sanitary fixtures.
                                                                                                                                                                                                                                                                                       x   The incomplete foundation and wall detail.
                                                      STEP                                                                                     RAMP            200                                                                                                                     x   Room designations and floor finishes.
 FINISHED FLOOR LEVEL                                                                                                                                                                                                                                                                  x   A door, window and garage door schedule.
                                                                                                                                                                                                    2050
                                                          INCOMPLETE SOUTH ELEVATION
                                                                                                                                                                                                                                                                                       x   A table of sanitary fixtures.
                                                                                                                                                                                                                                                                                       x   The floor plan of the new dwelling as well as a breakline
                                                                                                                                                                                                                                                                                           and the natural ground level in the south elevation, drawn
                                                                                                KITCHEN CABINET                                                                                                                                                                            to scale 1:50 and the starting point and breakline for the
                                                                                                HEIGHT: 800MM
                                                                                                                                                      FEATURES                                                                                                                             sectional view to scale 1:20 (on page 6).
                                                                                                                                                                                                                               SLIDINGDOOR NOTES
                                           W2                       W2                          W1                                                                                                                            FRAMES 50 mm
                                                                                                                                                      D1      DOOR
                                                                  WC                                S                                                                                                                     TO FIT                 1000                                  Instructions:
                                                                            B                                                                         SD      SLIDING DOOR
                                                                                                                                                      W1      WINDOW                                                                                                                   Answer this question on page 6.
                                                                                                A         D1      A                                   W2      WINDOW
                                                                  WB    3                                                                             GD      ROLL UP GARAGE DOOR                                                                                                      4.1 Using the given incomplete floor plan, draw in first-angle
                                                                                                4                                                                                                                                                                A        800
                                               2                                                                                                                                                                                                                                           orthographic projection and to scale 1 : 50, the following
                                                                            SH                                                                        FIXTURES                                                                                    350            B
                                                                                                                                                                                                                                                                                           views of the new dwelling:
                                                                                                                                                                                                            2050
                                   BIC                             D1
                                                                                                                                                      WC      TOILET                                                                                         WINDOW (W1)
                                                     D1                                                   D1                       W1
                                                                                                                                                      B       BATH                                                                                                                     4.1.1 THE COMPLETE FLOOR PLAN
                                                             D1                                                                                       WB      WASH BASIN                                                                                       1500                    Add the following features to the drawing:
                                         BIC                                                                                                          SH      SHOWER                                                                                    650                                 x ALL doors and windows.
                                                                                                                                                      S       SINK
                                                                                                                        6                             BIC     BUILT IN CUPBOARD
                                                                                                                                                                                                                                                                                            x ALL fixtures as indicated by the abbreviations.
                                                                                                                                                                                                                                      450                                                   x ALL hatching detail.
                                                                                                                                                      ROOM DESIGNATIONS                             DOOR AND -FRAME (D1)                                A
                                               1                                         5                                                                                                          100
                                                                                                                                                                                                                                                                                1500
                                                                                                                                                      FLOOR FINISHES                                          DOOR FRAME PROFILE                                      B                4.1.2 THE SOUTH ELEVATION
                                                                                                                                                      1. BEDROOM                    CARPET
                                                                                                                                                                                                             WINDOW NOTES
                                                                                                                                                                                                                                                         A                             Show the following features on the drawing:
                                                                                                                                                      2. BEDROOM                    CARPET     50            A = OPENING SIDE                                                               x The outside walls, step, window-, door- and roll up garage
                                               W2                                                                      GD
                                                                                                                                                      3. BATHROOM                   TILE                                              400               B
                                                                                                                                                                                                                                                                                               door detail below the given breakline.
                                                                                                                                                                                                             B = FIXED PANEL
                                                                                                                                                      4. KITCHEN                    TILE
                                                                                                                                                      5. LIVING ROOM                TILE
                                                                                                                                                                                                             FRAMES 50 mm                                                                   x The finished floor level.
                                                                                   SD                                                                                                                                                  WINDOW (W2)
                                                                                                                                                      6. GARAGE                     GRANO                    WINDOW SILL: 220 x 110 mm
                                                     STEP
                                                                                                                                                                                                             WINDOW SILL: BRICK ON EDGE UNDER ALL                                      4.2 Draw in the space provided on page 6 to scale 1 : 20, a
                                                                                                                                               RAMP
                                                                        INCOMPLETE FLOORPLAN                                                                                                                 WINDOWS                                                                       DETAILED SECTION according to cutting plane A-A of the
                                                                                  240                                                                                                                                                                   2550                               area in the ellipse shown on the floor plan.
                                                                                                                                                                                                                                                                                       Show the following features:
                     110                                                                                                                                                                                                                                                                   x The complete foundation, external wall and door detail.
                                                                                                    2 X 120 x 100 mm LINTEL                                                                                                                                                                x The lintels above the door.
                                                                                                    ABOVE DOOR- AND
                                                                                                    WINDOW OPENINGS                                                                                 R200                 ROLL UP GARAGE DOOR (GD)                                          x The partial window in the kitchen.
                                                                                                                                                                                                                                                                                           x A partial kitchen cabinet.
                                                                                                                                                                                                                                                                                           x ALL hatching detail. ALL substructure hatching may be
                                                                                                                                                                                             SANITARY FIXTURES                                                                                drawn neat in freehand.
                                                                                                                                               500
                                                                                         2400                                                                               400                                                                                                        Label the following:
                                                                                                                                                                                                                                400
                                                                                                                                                                                                                                                                                           x The south elevation and scale.
                                                                                                                                                                                                     2050
                                                                                                                                                      200
                                                                                                                                        850                                                                        850                                                                     x The room designations and floor finishes.
                                                                                                                                                                 750
   25 mm                                                                                                                                                                              100                                                                                                  x Using the correct abbreviations, label the following
                                                      25 mm                                                                                                    400                                                                          390
 SCREED                                                                                                                                         FLOOR LEVEL                                                                                                                                    features in the correct view: natural ground level, finished
                             100                      SCREED
                                                                                                                                                                                                                                                                                               floor level and damp proof course.
                                                                                         100
                       300                                                                                                                            400      600
                                                                                                                                                                     200
                                                                                                                                                                                      1100                         500                350
                                                            550                                         GROUND LEVEL                                                                                                                         800                                       NOTE:
                                                                                   250                                                                                                                                                                                                 ALL drawings must comply with the guidelines and graphical
      550                                                                                                                                                                                                                    1200
                                                            200                                                                                                                               800                                                               1400                   symbols contained in the SANS 10143.                [82]
                                                                            600                                                               WASH BASIN                   TOILET                                            SINK
               400                                                                                                                                                                           SHOWER
                                                                                                                                                 (WB)                       (WC)                                              (S)                             BATH (B)
                                                                                                                                                                                               (SH)

       INCOMPLETE NON LOAD                                                                                                                                                                                                                                                                                                   NAME
         BEARING WALL AND                                   INCOMPLETE LOAD BEARING
                                                                                                                              STARTING POINT FOR DETAILED SECTION
        FOUNDATION DETAILS                                 WALL AND FOUNDATION DETAILS
                                                                                                                                                                                                                                                                                                                             NAME                          5
Copyright reserved                                                                                                                                                                                                                                                                                                                      Please turn over

### Page 6

Engineering graphics and design / P1
                                         Downloaded from hlayiso.com
                                                    NSC                                                                      EC / November 2019

                                                                                                            PENALTIES
      LE
  AP
 ST

                                                                                          1   INCORRECT OVERALL SCALE

                                                                                          2   INCORRECT POSITIONING OF VIEWS

                                                                                          3   NON-ALIGNMENT OF VIEWS

                                                                                                  TOTAL PENALTIES (-)

                                                                                                            ASSESSMENT CRITERIA

                                                                                                                    FLOOR PLAN

 NGL                                                      NGL
                                                                                              1    DOORS +
                                                                                                   WINDOWS              20

                                                                                              2    FIXTURES             9

                                                                                              3    HATCHING             3

                                                                                              4    LABELS               6

                                                                                              SUB TOTAL                 38
                                                                                                               SOUTH ELEVATION

                                                                                              1    WALLS + STEP +
                                                                                                   FFL                  5

                                                                                              2    WINDOW + DOOR +
                                                                                                   GARAGE DOOR          10

                                                                                              3    LABELS               4

                                                                                              SUB TOTAL                 19

                                                                                                              DETAILED SECTION

                                                                                              1    FOUNDATION +
                                                                                                   WALL + FLOOR         9

                                                                                              2    DOOR + LINTEL +
                                                                                                   WINDOW +
                                                                                                   KITCHEN CABINET
                                                                                                                        8

                                                                                              3    HATCHING             5

                                                                                              4    LABELS               3

                                                                                              SUB TOTAL                 25
                                                                                                            TOTAL       82
                                                                                          PENALTIES (-)
                                                                                                              FINAL TOTAL

                                                                   STARTING POINT FOR
                                                                    DETAILED SECTION

                                                                DETAILED SECTION ON A-A
                     FLOORPLAN                                        SCALE 1 : 20
                       SCALE 1 : 50
                                                                                                                      NAME

                                                                                                                      NAME                        6
Copyright reserved

## Related documents

- [EGD P1 GR 11 AFR QP D](https://www.hlayiso.com/library/egd-p1-gr-11-afr-qp-d/e9ec42ab-8882-4396-ac35-db3b33ac1526) — Engineering Graphic and Design · QP · 2019 · Afr
- [EGD P1 EA GR 11 MEMO QP D](https://www.hlayiso.com/library/egd-p1-ea-gr-11-memo-qp-d/cb5dfb86-3b27-4753-a1a5-56fa46641398) — Engineering Graphic and Design · Memo · 2019
- [EGD P2 Gr11 Nov 2019 AFR D](https://www.hlayiso.com/library/egd-p2-gr11-nov-2019-afr-d/450ae1e9-e7cc-4593-ad59-e30291f56347) — Engineering Graphic and Design · QP · 2019 · Afr
- [EGD P2 Gr11 Nov 2019 ENG D](https://www.hlayiso.com/library/egd-p2-gr11-nov-2019-eng-d/1323a954-d206-4372-8afa-44cfa741ea9f) — Engineering Graphic and Design · QP · 2019 · Eng
- [EGD P1 GR11 NOV2020 QP ENG D](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-qp-eng-d/33ec3c9c-0d6f-46e0-8004-27e114ea193c) — Engineering Graphic and Design · QP · 2020 · Eng
- [EGD P1 GR11 NOV2020 QP AFR D](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-qp-afr-d/50789484-ecd0-4022-93cb-f02646e54f26) — Engineering Graphic and Design · QP · 2020 · Afr

## More from Grade 11 Engineering Graphics and Design

- [Gr 11 EngGraph Des ATP 2023-24](https://www.hlayiso.com/library/gr-11-enggraph-des-atp-2023-24/6fbec59e-8df9-49dc-9042-1e84389c22fa) — ATP
- [EGD P1 GR11 MEMO NOV2022 Afr+Engl](https://www.hlayiso.com/library/egd-p1-gr11-memo-nov2022-afr-engl/dc8a6861-4564-49b7-9da7-af10cd3460f8) — Memo · 2022 · Afr
- [EGD P2 GR11 MEMO NOV2022 Afrikaans](https://www.hlayiso.com/library/egd-p2-gr11-memo-nov2022-afrikaans/085022c0-c1e2-44e3-8f13-b13c4d9661fd) — Memo · 2022 · Afr
- [EGD P2 GR11 MEMO NOV2022 English](https://www.hlayiso.com/library/egd-p2-gr11-memo-nov2022-english/50c4e044-b732-4d91-bcb3-e98c1bc8bfc1) — Memo · 2022 · Eng
- [EGD P1 GR11 MEMO NOV2022 Afr+Engl](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2022-exemplar-november-exam-memorandum-paper-1-english/9926f9cd-76bc-4eff-a287-c1394b665aaf) — Memo · 2022 · Eng
- [EGD P2 GR11 MEMO NOV2022 Afrikaans](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2022-exemplar-november-exam-memorandum-paper-2-afrikaans/964722fb-b9df-42a0-a525-cbab4bbad105) — Memo · 2022 · Afr

## Collection

- [Grade 11 past papers](https://www.hlayiso.com/grade-11/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
