# Engineering Graphics and Design Grade 12 P1 2022 QP (Eng)

> Grade 12 Engineering Graphics and Design Paper 1 question paper from the Eastern Cape Mock Exam 2022 (English), 6 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/egd-qp-p1-eng-d/42020f87-f85c-4b4e-8d91-2fe5bf07f6c9
- Updated: 2026-09-27
- Subject: Engineering Graphics and Design
- Grade: Grade 12
- Document type: Question paper
- Year: 2022
- Exam period: Eastern Cape Mock Exam
- Paper: 1
- Curriculum: CAPS
- Pages: 6

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Engineering Graphics and Design](https://www.hlayiso.com/library/grade-12/engineering-graphic-and-design) › [Engineering Graphics and Design Grade 12 P1 2022 QP (Eng)](https://www.hlayiso.com/library/egd-qp-p1-eng-d/42020f87-f85c-4b4e-8d91-2fe5bf07f6c9)

## About this document

Engineering Graphic And Design · Grade 12 · Eastern Cape Mock Exam · 2022. Question paper, 6 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

*GRDSE1*

### Page 2

Engineering graphics and design / P41

Downloaded from hlayiso.com

EC / September 2022

QUESTION 1: ANALYTICAL (CIVIL)

TAND SURVEYOR'S CERTIFICATE
SYMBOL LEGEND DIMENSION LAYOUT OF THE STAFF OF THE SIDE LENGTHS AND. Given:
IRNER HEIGHTS OF : , , ,
1] Fee] | @mmorusren PARKING AREA co eee So The site plan of a new development with new dwellings, shopping centre, parking areas, a title block and a table of
31300 GUISES ON PES questions. The drawing has not been prepared to the indicated scale
2 | —O—©-|PALISADE FENCING oJ rj LENGTHS IN | CORNER HEIGHTS IN Instructi .
g| FS MILLIMETRES. METRES Instructions: . . . .
3] wr | perarenone || STAFE PARKING AREA z “B= 42200 3426 Complete the table below by neatly answering the questions which refer to the accompanying drawing and title block. [29]
3 ,
8 A BC = 93500 B= 345,1
4] PB _ | movcenous rece | |" A (OD = 42200 3458 QUESTIONS ANSWERS
3800 27500 7 Of =
ss e AD = 93500 341.9 1 | Who is the architect of the development on STAND 121? q
5 4 PALM TREE NOTE:
Contractors must verify all dimensions [> T Who is the owner of the development?
and levels on the site before 1
commencing work. Architects to be -
oo VOORTREKKER STREET notified immediately of any 3 | Whatis the reference code? 1
42206 discrepancies.
A 1 a 4 | What is the width of the pavement in meters?
\— * (7 | Moreen 1
BL 8000 CHENTS SIGNATURE 5 | The existing workshop is drawn with hidden lines. What does the 2
| STAFE PARKING AREA ANSWER 17 hidden lines mean to the contractor?
| | Ig In the space below, draw, in neat 6 |Name the feature at 1.
| I. freehand, the front and top view of the 1
Me 3h SANS 10143 graphical symbol for a
| BATH 7 |How many sliding gates need to be installed? 1
9090 | 8 | What type of fence must be used between the new proposed 1
PROPOSED SHOPPING CENTRE | dwellings?
L | 9 | In what colour should the new proposed dwellings be indicated on F;
y i | the site plan?
& | 10 | How many parking bays for disabled are there for the visitors? a
§
§ 5 STAND 121 7 | 11 | How many inspection chambers must be installed at the new 1
Se | proposed dwellings?
we lg 2 2022-01-24 Add allstreetnames | 12 | Name the type of material that must be used as a ground cover
a lg under the trees, around the parking area. ‘
exstnc House \je Jj | 5 Tndcatedsabied : Parking 3728.
' me] (és | 8 1 2022-01-19 | parking areas 43 | With reference to the north point, on which side of the shopping 2
++ = _ visitors. ir 2
ck PARKING AREA 7 Ed REVISION [DATE DESCRIPTION centre is the staff parking area?
eee _—_ al MLANDWA ARCHITECTS. 14 | Determine the total length (indicated with an X) of the shopping a
ge | be Cc 4 @ Z| 21 SEDIDI STREET centre, in meter.
f g
e cew proposen [fE | bo L L Z| ALEXANDRIA 15 | The existing house is already fenced with a palisade fence. Determine, in the space below
@ DWELLING. on | existing_l 8 | 082 2227888 (Answer 15) how many meters of palisade fence need to be purchased to fence the two new 3
al 12 G@_|WORKSHOP |B 2 | mlandwa.architect@hotmail.com dwellings. The Kerkhof street side already has betafence and do not need palisade.
g |6 z
g| la ° E| PRINTED BY DATE OF PRINT 16 | n the space provided below (ANSWER 16), determine the total area of the staff parking area, in B
| \ [New propose GE | |: é| LUDIDI PRINTERS 2022-02-14 square meters. See dimension layout of staff parking.
iS DWELLING Fie | | DRAWING TILE: SITE PLAN 17 |\n the space in the title panel (ANSWER 17), draw in neat freehand, the front and top view of the
3 | el | SANS 10143 graphical symbol for a BATH 4
lo] PLAYGROUND | PROVECT
5 PROPOSED NEW DEVELOPMENT
GRASS
bs wt )) an FOR MRS DLAYEDWA Show ALt caus show ALL ealeuations TOTAL] 29
Lee = = BL 5000. = STAND 121, Cnr. VOORTREKKER & ow ALE caloulations. S
© KROG STREET ALEXANDRIA
PROECTNOMBER PRAVING HORBER
—----_4 LOOP STREET «RA 02.2022 DELo11-2021
22400 DATE [DRAWN —[ORECRED—SONE
2021-11-21) RONNIE DLABA | 1:300 NAME
REFERENCE CODE DRAWNG RO
SITE- 1210-22 10F6 NAME. [2

Copyright reserved

Please tum over

### Page 3

Downloaded from hlayiso.com

Engineering graphics and design / P1 EC / September 2022

QUESTION 2: SOLID GEOMETRY

Given:

© The front view and top view of a square prism with a
cylindrical hole.

* Starting point X, the centre point of the cylindrical hole

Instructions:
Draw to scale 1 : 1, the following views:

2.1. The top view.

2.2. The front view with the cutting line (Draw the cutting
line through points a and b.

2.3. The sectional right view on cutting plane D-D

2.4 The true shape of the cutting area

* Show ALL centre lines and hidden detail
* Show ALL necessary construction lines.
[31]

60

ASSESSMENT CRITERIA

1 | TOP view 43

x 2 | FRONT VIEW 6

3 | SECTIONAL RIGHT View | 12

4 | TRUE SHAPE 8h

PENALTIES (-)

TOTAL| 31

NAME

NAME [3

Copyright reserved Please tum over

### Page 4

Engineering graphics and design / P1

Downloaded from hlayiso.com

NSC

EC / September 2022

QUESTION 3: PERSPECTIVE
Given:

* Two views of a small chapel and the information needed to

draw a two-point perspective drawing.

PP - Picture plane
HL - Horizon line
GL - Ground line
SP - Station point

Instructions:
Complete the perspective drawing

Align the drawing sheet with the ground line (GL)
Determine and label the vanishing points.

Show ALL necessary construction.

NO hidden detail is required

Window opening

<j

ASSESSMENT CRITERIA

CONSTRUCTION + VP's 5
WALLS + WINDOW 1
ROOF wd
TOWER 14
[42] ARCH +consTRUCTION | 44
PENALTIES (-)
Window opening
TOTAL | 42
PP
HL
T
L |
|
|
|
| L |
—_t4
|
r
| i
| i
J 4
GL |
& NAME
NAME. [4

Copyright reserved

Please tum over

### Page 5

Downloaded from hlayiso.com

Engineering graphics and design / P1 EC / September 2022

QUESTION 4: CIVIL DRAWING 100 mm RAINWATER DOWN-PIPE
; THAT STOPS 100 mm ABOVE THE RAINWATER
Given: GULLEY (300 x 300 x 150) _-—_ RIDGE COVER ITEMS DOOR AND WINDOW SCHEDULE
« The incomplete west elevation of a new house, showing 44400, ee aa
the walls, windows and door openings, the braai area, the 240 x.20 mm —_ GUTTER TorIT TOFIT zoo, ‘|
roof and labels. FASCIA BOAR zo 3 i + + + + 5
* The incomplete floor plan showing the walls, step, position | | S>i€ af g 8 I]
of the doors, windows, fixtures and the electrical layout. a 1 x 3
* A schematic diagram of the roof truss and roof notes. § suDING a | 8 Ey
© The incomplete foundation and external wall with 8 g DOOR A
dimensions. N &| | OPENING ol 100 g . —aNDOW
« Room designations as well as floor finishes. 8 a NDA)
2 300 g (ND4)
© A door and window schedule f= _ = GROUND LEVEL ol +4200
4 Fa 8
. 400
A table of sanitary fixtures 7s 11 300 WEST ELEVATION Feo H——— FinisHeD FLOOR LEVEL g
© A table of roof components He
* A table of electrical symbols A —a
e i items § ©) Ree eoSoroccco —=—-tt- FEATURES
A table of rainwater items R Nos wos A FEATURES as DOOR (01) °
© The incomplete floor plan and ground line of a new house, | Two | NC4 + NCB + ND4 WINDOWS sod
drawn to scale 1 : 50, and the incomplete foundation and | \ sH y ann SLIDING DOOR (02) WINDOW.
a break line for the for the detailed section, drawn to Re slucd FIXTURES. (Nca)
scale 1: 20, on page 6 | 4 awe}; We TOILET 150] WINDOW NoTES |
f een L W I WB WASH BASIN ‘OPENING SIDE
instructions: bt opt 4 2 gan OPENING SI 13
[Answer this question on page 6. | 1 op al | | S SINK THICKNESS OF ALL FRAMES: 50mm rs
4.1 Use the given incomplete floor plan, to draw, in first-angle | = __ | SH SHOWER 8 o
orthographic projection to scale 1 : 50, the following | | ELECTRICAL FITTINGS WINDOW SILL:
views of the new house: | I 1, ONE-WAY SWITCH - SINGLE-POLE Cate eb CEMENT Sit whee
4.1.1 THE COMPLETE FLOOR PLAN | | 2, ONE-WAY SWITCH - DOUBLE-POLE ui ows (nce)
Add the following features to the drawing: | \ 3, SWITCHED SOCKET OUTLET
. ir 4, FLUORESCENT LIGHT 1x 40 W
5 AEE Gots an Winco cated by th | | 5. CEILING LIGHT ROOM DESIGNATIONS ROOF COMPONENTS
sanitary fixtures as indicated by the 6, WALL-MOUNTED LIGHT AND FLOOR FINISHES 240 x 20 mm.
abbreviations ir | FASCIA BOARD
*  AlL electrical fittings as indicated by the numbers Z N] NOTE: 1. KITCHEN TILES 300] ROOF CAP AND
. " THE ARROWS ON THE FLOOR PLAN SHOW 2. BATHROOM: TILES
AL Pehing deal FLOOR PLAN THE LIGHT CONNECTION TO THE SWITCH. 3, BEDROOM: CARPET 1227S RIDGE COVER
SCALE 1: 50
4.1.2 THE COMPLETE WEST ELEVATION Soon AREA wee? LI }150x 100 curTeR
Show the following features on the drawing: 280,
© The outside walls, braai, slidingdoor,step and In ——
window detail ROOF NOTES: 4X 250 x 100 mm LINTEL __, 3 ol 4 ELECTRICAL SYMBOLS
* The roof detail, including the fascia boards, ridge : * ABOVE ALL ARCH, DOOR AND
cover, gutters, rainwater down-pipe and gulley 20° ROOF PITCH. WINDOW OPENINGS faunal for ro) fo}
* The finished floor level.
114 x 38 mm ROOF TRUSSES ON —
|4.2. Using the given foundation and break line on page 6, 114038 nm WALL PLATES w fe)
draw, to scale 1: 20 a DETAILED SECTION on cutting
plane A-A of the area in the ellipse shown on the 300 mm ROOF OVERHANG TO THE END OF THE ROOF TRUSS x axsow,
incomplete floor plan. ROOF COVER: 20 mm FIBRE CEMENT ROOF SHEETING 3 K
‘ ang: mm g
Show the following features on the drawing: ON 75x50 mm PURLINS @ 1000 mm cl g FLOOR PLAN L-—_
* The complete foundation, external wall, lintel and g
window detail 240 x 20 mm FASCIA BOARD WITH 150 X 100 mm GUTTERS ON ALL uJ SANITARY
The shower to the north of the cutting plane A-A | SIDES AND A @100 mm RAINWATER DOWN-PIPE
* The roof detail, including the fascia board and re 400
gutter. 410 mm CEILING BOARD ON 38 x 38 mm BRANDERING @ 400 mm dl. _ tt
* ALL hatching detail. ONLY the substructure 3 200) C7 3| | 400 ud
hatching may be drawn in neat freehand. 400 10 “| 3 3 © } 5)
3 ao
Label the following: = 3] croup LeveL Ei FLOORLEVEL
* The west elevation q ( Jar
© The room designations and floor finishes. 3 ZI g gro lg Fl
* Ground level, finished floor level and damp proof course ‘a00de | 400 ee oO ° no, =
(use the correct abbreviations and show it on ALL the SCHEMATIC DIAGRAM OF THE 30 ° +200
relevant views) ROOF TRUSS FOR ROOF DIMENSION GUIDE: SHOWER WASH BASIN TOILET ‘SINK
NOTE: INCOMPLETE FOUNDATION AND (GH) (WB) (wo) ‘)
ALL drawings must comply with the guidelines and EXTERNAL WALL DETAIL
graphical symbols as contained in the SANS 10143. [98]

Copyright reserved Please tum over

### Page 6

Engineering graphics and design / P1

Downloaded from hlayiso.com

EC / September 2022

FLOOR PLAN
SCALE 1:50

ROOF DETAIL: MARK ALLOCATION

PENALTIES

ROOF ANGLE

CEILING
: F | soaro ?

1 | correct scaLe

ROOF SHEET

1 G |wareare | 4

2 | NoN-ALIGNMENT OF VIEWS:

3 | Incorrect LETTERING

oor truss | 3 | rac soaro |
pune [45 | curren ; TOTAL PENALTIES (-)
SRANDERING | 4g
espana | 2
ASSESSMENT CRITERIA
TOTAL | 11
FLOOR PLAN
DOORS +
1 | winoows a
ELECTRICAL +
2 | ROOF LINES ud
3 | FIxTURES 7
4 | HATCHING 3
5 | LABELS 5
SUBTOTAL} 40
NORTH ELEVATION
ROOF + GUTTER +
4 |RwoP+cuLLEY | 49
FACIA BOARD +
RIDGE COVER
WALLS +PORCH | 94
2 |sarani+erL | 92
DOOR + ;
3 | winoow 1
4 | LaBeLs 1
SUBTOTAL | 28
DETAILED SECTION
1 | ROOF DETAIL 4
9 | FOUNDATIONS «|g 4
WaLLs + FLOoR | 82
Winoow +
3 | sHower 5
4 | HATCHING 6
5 | LABELS
SUBTOTAL] 30
TOTAL| 98
PENALTIES (-)
GRAND TOTAL
DETAILED SECTION A-A NAME
SCALE 1: 20
NAME [6

Copyright reserved

## Related documents

- [EGD MEMO P1 EA](https://www.hlayiso.com/library/egd-memo-p1-ea/4d9b5038-c328-4ca1-9dfa-3a811ac596b7) — Engineering Graphic and Design · Memo · 2022
- [Engineering Graphics Design P1 Nov 2022 Eng](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2022-eng/b97f6197-e0e2-4075-baab-4edfc388285f) — Engineering Graphic and Design · QP · 2022 · Eng
- [COVER PAGE](https://www.hlayiso.com/library/cover-page/140b2ccb-82fb-4f2b-a439-03fa13a23734) — Engineering Graphic and Design · QP · 2013
- [EGD p1 Memo protected watermark](https://www.hlayiso.com/library/egd-p1-memo-protected-watermark/4afe999d-829f-4029-81f4-f01ba594587f) — Engineering Graphic and Design · Memo · 2025
- [EGD P1 GR12 MEMO SEPT2023 Afr+Engl](https://www.hlayiso.com/library/egd-p1-gr12-memo-sept2023-afr-engl/f0ef5f18-cddf-486c-9131-1f3fc1806ba4) — Engineering Graphic and Design · Memo · 2023 · Afr
- [EGD P1 Gr 12 SEPT Memo EA](https://www.hlayiso.com/library/egd-p1-gr-12-sept-memo-ea/98991191-ca71-4de5-87f4-dab0ebb30bde) — Engineering Graphic and Design · Memo · 2018

## More from Grade 12 Engineering Graphics and Design

- [EGD P2 ENG MEMO DD watermark](https://www.hlayiso.com/library/egd-p2-eng-memo-dd-watermark/19628a3f-1387-4c5c-bbbd-fa7b7d8dfa52) — Memo · 2025 · Eng
- [Engineering Graphics and Design P2 June 2025 Possible Answers](https://www.hlayiso.com/library/engineering-graphics-and-design-p2-june-2025-possible-answers/33c95b30-d504-42bd-acc1-56b020ec92fb) — Memo · 2025
- [EGD P2 GR12 MEMO SEP2024 English](https://www.hlayiso.com/library/egd-p2-gr12-memo-sep2024-english/aa083dea-fbb2-497c-bf52-437fbe9dc226) — Memo · 2024 · Eng
- [Pages from Exam Paper September 2023 Final-5](https://www.hlayiso.com/library/pages-from-exam-paper-september-2023-final-5/ce3ac88f-c3a8-47ff-81b7-09ccce136455) — QP · 2023
- [EGD P2 QP SEPT2023 AFR](https://www.hlayiso.com/library/egd-p2-qp-sept2023-afr/bcd511cb-4c3a-4c53-afc7-47f820a47af7) — QP · 2023 · Afr
- [Engineering Graphics & Design P1 Nov 2023 Eng](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2023-eng/15d72a8f-e8dc-4d1e-82bc-86650e523125) — QP · 2023 · Eng

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
