# Engineering Graphics and Design Grade 12 P1 NSC June 2019 QP

> Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC June 2019 (English), 6 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/engineering-graphics-design-p1-may-june-2019-eng/8606db1f-5166-4b8f-af72-af81b18a37fc
- Updated: 2026-09-27
- Subject: Engineering Graphics and Design
- Grade: Grade 12
- Document type: Question paper
- Year: 2019
- Exam period: NSC June
- Paper: 1
- Curriculum: CAPS
- Pages: 6

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Engineering Graphics and Design](https://www.hlayiso.com/library/grade-12/engineering-graphic-and-design) › [Engineering Graphics and Design Grade 12 P1 NSC June 2019 QP](https://www.hlayiso.com/library/engineering-graphics-design-p1-may-june-2019-eng/8606db1f-5166-4b8f-af72-af81b18a37fc)

## About this document

Engineering Graphic And Design · Grade 12 · NSC June · 2019. Question paper, 6 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

INSTRUCTIONS AND INFORMATION

This question paper consists of FOUR questions.

Answer ALL the questions.

ALL drawings are in first-angle orthographic projection, unless otherwise stated.
ALL drawings must be prepared using pencil and instruments, unless otherwise

Department: stated.
Basic Education . ALL answers must be drawn accurately and neatly.
« yy . ALL the questions must be answered on the QUESTION PAPER, as instructed.

basic education

BOND

NO

REPUBLIC OF SOUTH AFRICA ALL the pages, irrespective of whether the question was attempted or not, must
be re-stapled in numerical sequence in the TOP LEFT-HAND CORNER ONLY.
8. Time management is essential in order to complete all the questions.
9. Print your examination number in the block provided on every page.
10. Any details or dimensions not given must be assumed in good proportion.

SENIOR CERTIFICATE EXAMINATIONS/
NATIONAL SENIOR CERTIFICATE EXAMINATIONS RORLOFFIGIALUSIE ONLY
QUESTION |} MARKS OBTAINED | 3 | SIGN MODERATED 3] SIGN RE-MARKING 2] sion
1
2
3
ENGINEERING GRAPHICS AND DESIGN P1 7i
2019 TOTAL
2/0/0 2/0/0 2/0/0
MARKS: 100
TIME: 3 hours FINAL CONVERTED MARK CHECKED BY
100
p77 ----------- 4 COMPLETE THE FOLLOWING:
| | CENTRE NUMBER
This question paper consists of 6 pages. | |
sarcode be CENTRE NUMBER
| | EXAMINATION NUMBER
| |
| | EXAMINATION NUMBER

Copyright reserved Please turn over

### Page 2

Engineering Graphics and Design/P1

Downloaded fram hlayiso.com

DBE/2019

LAND SURVEYOR'S CERTIFICATE OF
STAND 108, SURVEYED ON 2017-08-31
BOUNDARY | CorNER HEIGHTS
LENGTHS IN INMETRES
METRES
‘AB = 22,36 ‘A= 1603
BC = 30 B= 1602,
CD =20 C= 1598
DA=40 D = 1600
EVERGREEN
PUBLIC PARK

O %

STAND 106

NEW 2m HIGH

CONCRETE WALL 3 STAND 108

BUILT TO u =

ENGINEER'S e|

SPECIFICATIONS PROPOSED
{NEW HOUSE|

sp

GENERAL NOTES:
* NEW DRIVEWAY LAID ON WELL-COMPACTED
HARDCORE WITH A 80 mm ASPHALT FINISH
* SLOW RIVER IS A NON-PERENNIAL RIVER

(DOES NOT FLOW THE ENTIRE YEAR)

‘SYMBOL LEGEND:
+ 2,5 m HIGH LAMP POSTS

*PALM TREES,

* DECIDUOUS TREES

i
_=

* CONCRETE WALL

PUBLIC
PARKING

SLOW RIVER

‘SERVITUDE

PAVEMENT,
a p

(a)
CONNECTION 4@ «&)
1,2m DEEP
SITE PLAN
SCALE 1 : 500

NOTE:
Contractors. must verify all dimensions and
levels on site before commencing work.
Architects to be notified immediately of any
discrepancies.

ARCHITECT'S SIGNATURE

CLIENT'S SIGNATURE

QUESTION 1: ANALYTICAL (CIVIL)

Given:
The site plan of a proposed new house, a title panel and a table of questions. The drawing has not been prepared to
the indicated scale.

Instructions:
Complete the table below by neatly answering the questions, which refer to the accompanying drawing, title panel

and civil content. [30]
ANSWER 20
In the space below, complete, in neat
freehand and according to the SANS QUESTIONS ANSWERS
10143:
a) The plan view of the ramp, with a 1 | Who checked the drawing? 1
gradient of 1 : 10 and the lowest F >
point on the right 2 |Whatis the stand number of the proposed new house’ 1
b) The plan view of a sliding door | 3 | Whatis the project number? 1
between the given walls —
4 |How wide is Evergreen Drive in metres? 1
a) 5 | How deep is the municipal sewerage connection in metres? 1
6 | How many inspection eyes are on the drawing? 1
7 |How many deciduous trees are on STAND 108? 1
8 |How high are the lamp posts in millimetres? 1
D In what colour could proposed new work be indicated on a site
9 1
plan?
va Z 10 | What does the abbreviation /C stand for? 1
Other than trees, what other natural feature is shown on the site
4 > 1
plan’
412 |Name the feature at 1. 1
13 |Name the feature at 2. 1
14 | What does the number at 3 indicate? 1
2 2018/05/13 | MOVE LAMP POSTS | 45 |Name the feature at 4. 4
‘ADD NEW , ,
1 | 201810178 | gounoaay was | 4g | What is the shortest distance from wall ST on the proposed new ;
house to Evergreen Drive in metres?
REVISION DATE DESCRIPTION
47 | Which elevation of the proposed new house faces the entrance to A
BAYERN the property?
ARCHITECTS 48 |In the space below (ANSWER 18), determine the perimeter of the proposed new house in metres. 3
108 MUNICH DRIVE
NEW GERMANY 49 | In the space below (ANSWER 19), determine the total area of STAND 108 in square metres. 3
® 031 108 1080 In the space in the title panel (ANSWER 20), complete, in neat freehand and according to the
20 | SANS 10143: q
PRNTED BY DATE OF PRINT: a) The plan view of the ramp, with a gradient of 1 : 10 and the lowest point on the right
EXPRESS PRINT 2018-08-25 b) The plan view of the sliding door between the given walls
DRAWING THLE
SITE PLAN TOTAL | 30
PROECT ANSWER 18 9000 ‘ANSWER 19
Show ALL calculations. Rand ~ Show ALL calculations.
PROPOSED NEW HOUSE FOR
THOMAS ZONDO ON STAND 108, 2
EVERGREEN DRIVE, REEDSVILLE, 2080 s PROPOSED 8
$ [NEW HOUSE] ‘\
PRORCT NUMBER DRAWING NOWSER EY
YG/-2018 CE 1-01-DV. =e
DATE DRaan — [OntOXED, | SCALE
2018-01-13] DIANNE | VANESSA | 1: 500 sl EXAMINATION NONBER)
REFERENCE CODE: ny
X5-2018 EXAMINATION NUMBER [2|

Copyright reserved

Please tum over

### Page 3

Engineering Graphics and Design/P1

Downloaded fram hlayiso.com

DBE/2019

oe

Copyright reserved

QUESTION 2: INTERPENETRATION AND
DEVELOPMENT

Given:

* The incomplete front view and the top view of a
hollow right square prism with a right cylindrical
branch pipe. The axes of both pipes lie in a
common vertical plane.

* An auxiliary view of the branch pipe

Instructions:

Draw, to scale 1: 1, the following views of the

TWO pipes:

2.1. The given top view

2.2 The complete front view, clearly showing the
curve of interpenetration

2.3 The development of the cylindrical branch
pipe. Make AB the seam.

* Planning is essential.
* Show ALL hidden detail.
* Show ALL construction. 137]

256

Ba

4
|
A
30" | y
‘AB IS THE SEAM
ASSESSMENT CRITERIA
1 |TOP view 103
2, [FRONT View + CIRCLE 6s
DIVISION 2
3, [CURVE OF 9
INTERPENETRATION
4 |DEVELOPMENT 1
PENALTIES (-)
TOTAL| 37
EXAMINATION NUMBER
EXAMINATION NUMBER [3]

Please tu over

### Page 4

Engineering Graphics and Design/P1

Downloaded fram hlayiso.com

DBE/2019

PP.

QUESTION 3; PERSPECTIVE

Given:
Three views of a building and the information
needed to draw a two-point perspective drawing

PP — Picture plane

HL - Horizon line

GL - Ground line

SP - Station point

Instructions:
Complete the perspective drawing.

* Align the drawing sheet with the ground line (GL).
* Determine and label the vanishing points.

* Show ALL construction.

* NO interior detail is required.

* NO hidden detail is required. [38]

ASSESSMENT CRITERIA

CONSTRUCTION 6

1
2 |FLOOR AND WALLS 10
3 |DOOR AND WINDOWS 133

4 |ROOF 384

PENALTIES (-)

TOTAL | 38

GL

GL

sP

Copyright reserved

EXAMINATION NUMBER:

EXAMINATION NUMBER, [4

Please tum over

### Page 5

Engineering Graphics and Design/P1

Downloaded fram hlayiso.com

DBE/2019

4550

2970|

INCOMPLETE FLOOR PLAN @

ROOF NOTES:
30° ROOF PITCH

414 x 38 mm ROOF TRUSS ON 114 x 38 mm WALL PLATES,
240 mm ROOF OVERHANG TO END OF ROOF TRUSS

30 mm CORRUGATED ROOF SHEETING ON 75 x 50 mm
PURLINS @ 1000 mm cle

300 x 75 x 10 mm BARGE BOARD ON GABLE ENDS,
20 mm PAST THE GUTTER

300 x 20 mm FASCIA BOARD WITH 140 x 100 mm
GUTTERS ON ALL SIDES

9 mm CEILING BOARD ON 38 x 38 mm BRANDERING
STRIPS @ 400 mmclc

Ve

#

‘SCHEMATIC DIAGRAM OF A
ROOF TRUSS FOR ROOF 'A’

SCHEMATIC DIAGRAM OF A
ROOF TRUSS FOR ROOF ‘8°

x75x —— — =
Boek” 10mm BARGE I ——————1 ELECTRICAL DOOR AND WINDOW SCHEDULE
| | } SYMBOLS
I I Hh
Poa us ! peel laa
140x100 mmGUTTERONA | f “ ' — ra
30x20 mm FASCIABOARD = || L__y | !
I I 4
100 mm RWDP- ! ! i Ib A
DOOR OPENING rf 3 4 i g
4000 x 300 x 150 mm ' ! |! 3 g Is
CONCRETE STEPS, | | A OA Ee =
FINISHED FLOOR LEVEL x g
GROUND LEVEL c /8
400 «400 x 180 GULLY ROOM DESIGNATIONS k
a0W * “x
FLOOR FINISHES
FEATURES 1 BATHROOM: TILE or DOOR FRAME WINDOW (w1)
D Door 2 LIVING ROOM: CARPET AND DOOR (D)
wi Tows WINDOWS 3 KITCHEN TILE DOOR NOTE:
75 x 100 mm LINTELS
we TOILET ABOVE THE DOORS 4150
WB = WASHBASIN fe (s06 1
sH SHOWER
s SINK 004
ELECTRICAL FITTINGS 3
4. ONE-WAY SWITCH - SINGLE-POLE RAIN WATER e 8 S| lle alll c
2. ONE-WAY SWITCH - DOUBLE-POLE ITEMS z| -
3, FLUORESCENT LIGHT 2.x 40 W A
4, CEILING LIGHT
5. SWITCHED SOCKET OUTLET an 90,
6, DISTRIBUTION BOARD EN LAY WINDOW (w2) WINDOW (W3)
NoTE: soo WINDOW NOTES:
THE ARROW SHOWS THE LIGHT A= Mee
CONNECTION TO THE SWITCH. FIXED PANEL
© 150 x 20 mm FIBRE CEMENT
SILL UNDER ALL WINDOWS
Poy, 199 ° @ 100
x
sf 4 ROOF COMPONENTS
300
220, | ROOF CAP
{ = | 114x38 mm WALL PLATE
2 2
8 8 LI | 140 x 100 mm GUTTER
FIXTURES.
[* mm SCREED |
Es x 8 200
GROUND. & |. o| Sk — ro 500
LEVEL = Her 3 XT El as
Ey $ Z| \_]
i cre . aay
800) 400 ES FLoorLever J
INCOMPLETE WALL AND , 3 ap SR
. FOUNDATION DETAIL OF AN e 84 z \e) 8 8
| = EXTERNAL AND AN 8 50 ~ a0 a
— - . INTERNAL WALL # va # A X
coua._| cova)
# 900 +
SHOWER (SH) SINK (S) WASHBASIN (WB) TOILET (WC)

Copyright reserved

QUESTION 4: CIVIL DRAWING

Given:

© The incomplete west elevation of a new house showing the
walls, the door and window openings, the roof and notes

© The incomplete floor plan showing the walls, positions of the
doors, windows, fixtures and the electrical layout

* Roof notes and a schematic diagram of roof truss
truss 'B’

Room designations and floor finishes

© The incomplete wall and foundation detail of an external and
an internal wall

* A table of electrical symbols

* A table of rain water items

* A door and window schedule

* A table of roof components

* A table of fixtures

* The incomplete floor plan of the new house, drawn to scale
1: 50 and the incomplete foundation of a detailed section,
drawn to scale 1 : 20, on page 6

and roof

Instructions:

Answer this question on page 6.

4.1 Using the given incomplete floor plan, draw, in first-angle
orthographic projection and to scale 1 : 50, the following
views of the new house:

4.1.1 THE COMPLETE FLOOR PLAN

Add the following features to the drawing:

* ALL doors and windows

* The fixtures as indicated by the abbreviations

* ALL electrical fittings as indicated by the numbers

* ALL hatching detail

4.1.2 THE COMPLETE WEST ELEVATION

Show the following features on the drawing:

* The outside walls, gullies, steps and door detail

* The roof detail, including the barge boards, fascia board,
gutter and rainwater down-pipes

The finished floor level

4.2. Using the incomplete foundation on page 6, draw, to scale

1:20, a DETAILED SECTION on cutting plane A-A of the

area in the ellipse shown on the incomplete floor plan

Show the following features on the drawing:

¢ The wall and foundation detail of both walls

* The door detail

© The roof detail, including the fascia board, barge board
and gutter

* The shower, tollet and the window above the ellipse

* ALL hatching detail. ONLY the substructure hatching
may be drawn in neat freehand.

Label the following:

© The west elevation

© The room designations and floor finishes

© Ground level, finished floor level and damp-proof course (use
the correct abbreviations and show it on ALL the relevant
views)

NOTE:

ALL drawings must comply with the guidelines and graphical
symbols as contained in the SANS 10143. [95]

[5

Please tum over

### Page 6

Downloaded fram hlayiso.com

Engineering Graphics and Design/P1 DBE/2019
1, MARK
ee FOR OFFICIAL USE ONLY
BOORSECTION INCORRECT SCALE(S)
A(1) USED:
B(1) NON-ALIGNMENT OF
C2) VIEWS
De) VIEW(S) ROTATED
E (2) SECTION VIEWED
F(t) INCORRECTLY
._] ] INCORRECT
0) LETTERING
Ht)
i)
TOTAL TOTAL
ASSESSMENT CRITERIA
FLOOR PLAN
POSSIBLE | oBTaNED | SIGN | nooeRaTeD
1 | fomoows 10
2 | eccoriioa 6
3 | roures 8
4 | natcHne 3
J ‘| 5 |usves 3
|
t 1
| 1 | SUBTOTAL 30
| | Le WEST ELEVATION
A lteawbe fmm | 0
Li \ W I 2 | Waus+rrL ed
f / |
aan iA 4 3 [ay | 2
Z BIC
| , | 7 | 4 | sets 14
7
| | 4 | SUBTOTAL 20
| | < DTT TT DETAILED SECTION
| | \ | 1 ] roo vera 15
N
| | \ | 9. | FOUNDATION + 1
| | \ | WALL + DOOR 142
| | \. | 3 | wegsnower | 7
| | 4 | HarcHINe 7%
eRe
| ere) | ‘\- Tina | vases 1
| |
cy ele) | | SUBTOTAL 45
| i |
RWDP_ __ ee a] TOTAL 95
PENALTIES (-)
GRAND TOTAL
EXAMINATION NUMBER:
DETAILED SECTION A-A FLOOR PLAN
SCALE 1 : 20 SCALE 1: 50
EXAMINATION NUMBER [ 6

Copyright reserved

## Related documents

- [Engineering Graphics Design P1 May-June 2019 Memo Eng](https://www.hlayiso.com/library/engineering-graphics-design-p1-may-june-2019-memo-eng/e328ff03-45a0-4005-ac9e-b9da201b7878) — Engineering Graphic and Design · Memo · 2019 · Eng
- [Engineering Graphics Design P2 May-June 2019 Eng](https://www.hlayiso.com/library/engineering-graphics-design-p2-may-june-2019-eng/8482920a-cb25-4596-914c-baa7c014f6ea) — Engineering Graphic and Design · QP · 2019 · Eng
- [Engineering Graphics Design P1 Nov 2019 Afr](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2019-afr/59fdb165-fcc0-466a-8ae3-e945ef513563) — Engineering Graphic and Design · QP · 2019 · Afr
- [Technical Drawing BIL P1 (HG) QP](https://www.hlayiso.com/library/technical-drawing-bil-p1-hg-qp/7521886c-8984-460e-925d-4a1d91e3b39b) — Engineering Graphic and Design · QP · 2014
- [Technical Drawing BIL P1 (SG) QP](https://www.hlayiso.com/library/technical-drawing-bil-p1-sg-qp/16297358-303d-4632-9df0-3067fdd9f3cc) — Engineering Graphic and Design · QP · 2014
- [Tech Draw P1 (HG) (English and Afrikaans) Diagram Sheet](https://www.hlayiso.com/library/tech-draw-p1-hg-english-and-afrikaans-diagram-sheet/7f38f42b-0264-403c-bded-b80fbd0b6cfd) — Engineering Graphic and Design · QP · 2014 · Afr

## More from Grade 12 Engineering Graphics and Design

- [EGD p1 Memo protected watermark](https://www.hlayiso.com/library/egd-p1-memo-protected-watermark/4afe999d-829f-4029-81f4-f01ba594587f) — Memo · 2025
- [EGD P2 ENG MEMO DD watermark](https://www.hlayiso.com/library/egd-p2-eng-memo-dd-watermark/19628a3f-1387-4c5c-bbbd-fa7b7d8dfa52) — Memo · 2025 · Eng
- [Engineering Graphics and Design P2 June 2025 Possible Answers](https://www.hlayiso.com/library/engineering-graphics-and-design-p2-june-2025-possible-answers/33c95b30-d504-42bd-acc1-56b020ec92fb) — Memo · 2025
- [EGD P2 GR12 MEMO SEP2024 English](https://www.hlayiso.com/library/egd-p2-gr12-memo-sep2024-english/aa083dea-fbb2-497c-bf52-437fbe9dc226) — Memo · 2024 · Eng
- [EGD P1 GR12 MEMO SEPT2023 Afr+Engl](https://www.hlayiso.com/library/egd-p1-gr12-memo-sept2023-afr-engl/f0ef5f18-cddf-486c-9131-1f3fc1806ba4) — Memo · 2023 · Afr
- [Pages from Exam Paper September 2023 Final-5](https://www.hlayiso.com/library/pages-from-exam-paper-september-2023-final-5/ce3ac88f-c3a8-47ff-81b7-09ccce136455) — QP · 2023

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
