# Engineering Graphics and Design Grade 12 P1 2017 QP (Eng)

> Grade 12 Engineering Graphics and Design Paper 1 question paper from the NSC November Exam 2017 (English), 6 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2017-eng/15fad31b-4311-4044-8ab2-829e2c408962
- Updated: 2026-09-27
- Subject: Engineering Graphics and Design
- Grade: Grade 12
- Document type: Question paper
- Year: 2017
- Exam period: NSC November Exam
- Paper: 1
- Curriculum: CAPS
- Pages: 6

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Engineering Graphics and Design](https://www.hlayiso.com/library/grade-12/engineering-graphic-and-design) › [Engineering Graphics and Design Grade 12 P1 2017 QP (Eng)](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2017-eng/15fad31b-4311-4044-8ab2-829e2c408962)

## About this document

Engineering Graphic And Design · Grade 12 · NSC November Exam · 2017. Question paper, 6 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

basic education

Department
« y) Basic Education
"4 REPUBLIC OF SOUTH AFRICA

NATIONAL

SENIOR CERTIFICATE

.

i ENGINEERING GRAPHICS AND DESIGN P14 \

i] iit

i NOVEMBER 2017 j
Y

MARKS: 200

TIME: 3 hours

This question paper consists of 6 pages.

INSTRUCTIONS AND INFORMATION

This question paper consists of FOUR questions.

Answer ALL the questions.

ALL drawings are in first-angle orthographic projection, unless otherwise stated.
ALL drawings must be completed using pencil and instruments, unless otherwise
stated.

ALL answers must be drawn accurately and neatly.

ALL the questions must be answered on the QUESTION PAPER, as instructed.
ALL the pages, irrespective of whether the question was attempted or not, must
be re-stapled in numerical sequence in the TOP LEFT-HAND CORNER ONLY.
8. Proper planning is essential in order to complete all the questions.

9. Print your examination number in the block provided on every page.

10. Any details or dimensions not given must be assumed in good proportion.

ROENS

NOn

FOR OFFICIAL USE ONLY
QUESTION |] MARKS OBTAINED | 3 | SIGN MODERATED 3] SIGN RE-MARKING 2 | SIGN
1
2
3
4
TOTAL
2/0/0 2/;0/0 2/0/0
FINAL CONVERTED MARK CHECKED BY
100

COMPLETE THE FOLLOWING:
CENTRE NUMBER

CENTRE NUMBER
EXAMINATION NUMBER

EXAMINATION NUMBER

Copyright reserved

Please tum over

### Page 2

Engineering Graphics and Design/P1

SYMBOL LEGEND:
CORNERHEIGHTS AND BOUNDARY | {DP mi iGH LANE POSTS
SPACED MAXIMUM 50 m cic
A 137,38 AB 143,56
2. EXISTING PALM TREES:
B 134,67 BC 223,91
c 7335 cp | 143,89 | 3: NEW DECIDUOUS TREES
D 136 DA 223,87

> PAVEMENT

2000 KVA ELECTRICAL
SUBSTATION No. 8789

WILDEBEEST DRIVE

3m MOTOR VEHICLE
ENTRANCE

iN

EXISTING 2 x 70 CUBIC LITRE
UNDERGROUND FUEL
STORAGE TANKS = STAND 7391
A
- - e000 BL -
“ee
vu COoREFUELLING PONT”
88 7
52 [} a
&s—t- 30000
aan C x 4 3
ae) EXISTING GUARD *
(alt HOUSE STAND a a
j 7392 |
A yy um J “he
9g
g
| Fe
ci g 4
w
a; 3 é
ba 3 &
é 3
g i
) 5 g
a, 8 5 4
5 a
3
NEW STAFF PARKING
' fF U_J
‘| yD PROPOSED NEW LOGISTICS bec
B CENTRE '
gs g wo
a ¢ BS
1 EEE 38
Gs
NewPusLicParKiInc \ 39!
ROPOSED NEW ie (25
GUARD HOUSE =e
\ oS

t

‘ALL NEW DRIVEWAYS AND.
PARKING AREAS LAID ON WELL-
COMPACTED HARDCORE WITH |

‘A.50 mm ASPHALT FINISH MUNICIPAL SEWER»

CONNECTION

/ GENERAL NOTES: STAND 7383 on

1,2m DEEP

SITE PLAN
SCALE 1 : 1500

a

&

3mHIGH SECURITY

50-YEAR FLOOD LINE

ORANGE RIVER

Downloaded from hlayiso.com

NOTE:
Contractors. must verify all dimensions and
levels on site before commencing work.
Architects to be notified immediately of any
discrepancies.

ARCHITECT'S SIGNATURE

DBE/November 2017

QUESTION 1: ANALYTICAL (CIVIL)

Given:

The site plan of an existing warehouse with a proposed new logistics centre and guard house, a title panel and a
table of questions. The drawing has not been prepared to the indicated scale

CLIENT'S SIGNATURE Instructions:
Complete the table below by neatly answering the questions which refer to the accompanying drawing and title panel
[30]
ANSWER 20
In the space below, draw, in neat QUESTIONS ANSWERS
freehand, the front view and top view >
of the SANS 10143 graphical symbol! |_1_| Who checked the drawing 1
for a WASHTUB. 2 | Whats the number of the stand? 1
3. | What is the number of the electrical substation? 1
4 | How far is the refuelling point from the fuel tanks in metres? 1
5 | How deep is the municipal sewerage connection? 4
6 | How many gullies are shown? 1
7 | What does the abbreviation IE stand for? 1
8 | How many palm trees are shown? 1
g. | What is the maximum permitted distance between the lamp posts 4
in metres?
40 | What is the combined capacity of the underground fuel tanks in y
cubic litres?
11 | Besides the trees, what other natural feature is indicated? 1
12 | What does the line at 1 indicate? 1
13 | What does the line at 2 indicate? 1
14 | Name the feature at 3. 1
2 _| 2017-01-09 Security lighting 4g | in what colour must a new sewerage line be indicated on a q
2
1 2017-01-07 | New staff parking Grainage plan’
Which elevation of the proposed new logistics centre faces the
REVISION | DATE DESCRIPTION 16 | new staff parking? A
; What is the distance between the boundary line and the building
3D STUDIO 17 | line on the north eastern side of the stand in metres? z
ARCHITECTS
1024 FOREST DRIV! 48 | In the space below (ANSWER 18), determine the perimeter of the stand in metres. 3
ISIPINGO 4g | In the space below (ANSWER 19), determine the total area of the proposed new logistics centre in 3
®@ 031 555 2792 square metres.
PRNTED BY DATE OF PRINT 99 | In the space in the title pane! (ANSWER 20), draw, in neat freehand, the front view and top view of the |
FAST PRINT 2017-01-28, SANS 10143 graphical symbol for a WASHTUB.
DRAWING THEE TOTAL | 30
SITE PLAN
PROJECT ANSWER 18 21000 ANSWER 19

PROPOSED NEW LOGISTICS CENTRE AND
GUARD HOUSE FOR RAGE INDUSTRIES
ON PLOT 7392, RIVER HORSE INDUSTRIAL
PARK, 28 WILDEBEEST DRIVE, ISIPINGO.

PROJECT NUNBER DRAWING NUMBER
SSA/FS/-2015 LF 5-10-8PKIN
DATE DRAWN _[GHEGKED | SCALE
2017-01-05] NM LUKE 1: 1500
REFERENCE CODE
ViVv1-2017

Copyright reserved

Show ALL calculations.

27000
-—_il

PROPOSED NEW LOGISTICS
CENTRE

67500

28500
34500

Show ALL calculations.

EXAMINATION NUMBER

EXAMINATION NUMBER [2

Please tum over

### Page 3

Engineering Graphics and Design/P1

>
%
o8

DBE/November 2017

Downloaded from hlayiso.com

Copyright reserved

QUESTION 2: SOLID GEOMETRY

Given:

* The front view and the top view of a right
regular hexagonal prism with a right regular
hexagonal pyramidal hole

* Cutting plane A-A

Instructions:
Draw, to scale 1 : 1, the following views of the
solid

2.1. The given front view

2.2 Asectional top view

2.3 Asectional left view

2.4 The true shape of the cut surface

© Show ALL hidden detail
* Show ALL construction [35]

64

ASSESSMENT CRITERIA
1 | FRONT VIEW 4
2 | SECTIONAL TOP VIEW NM
3 | SECTIONAL LEFT VIEW 10%
4 | TRUE SHAPE 6
5 | HATCHING 5
PENALTIES (-)
TOTAL} 35
EXAMINATION NUMBER:
EXAMINATION NUMBER [3

Please tum over

### Page 4

Downloaded from hlayiso.com

Engineering Graphics and Design/P1 DBE/Noverber 2017
2 y QUESTION 3; PERSPECTIVE
Ce
3 .
Given:
Three views of a serving area and the information
needed to draw a two-point perspective drawing
PP - Picture plane
HL - Horizon line
GL - Ground line
SP - Station point
Instructions:
Complete the perspective drawing.
¢ Align the drawing sheet with the ground line (GL).
© Determine and label the vanishing points.
Show ALL construction.
NO hidden detail is required. [40]
PP \
11
hat
rit
lt
toot
hit
hit
hat
| THU! _| HU
hit
to
hit
ii | 7
Fo pee
rit | r
hat | '
iat | i
hit I i
hat | '
hat I i
hit j i
hat | '
hai I I
hit I i
bid ! 1 GL
ASSESSMENT CRITERIA
1 | CONSTRUCTION 6
2 |WALLS AND WINDOW | 17%
3 | SERVING AREA "1
4 | SEMICIRCLE ah
sP PENALTIES () EXAMINATION NUMBER
TOTAL | 40 EXAMINATION NUMBER [4

Copyright reserved

Please tum over

### Page 5

Engineering Graphics and Design/P1

ROOF B ROOF A

Downloaded from hlayiso.com —

2700

2050

2375
2700

o i if

INCOMPLETE WEST ELEVATION

J6_ COUNTER Rp ——

\

14

ROOF NOTES:
30° ROOF PITCH

PURLINS @ 1000 mm cle
200 x 9mm BARGE BOARD ON GABLE ENDS

ONALL SIDES

STRIPS @ 400 mm cic

“| equa.| equar | equal |~

SCHEMATIC DIAGRAM OF A
ROOF TRUSS FOR ROOF B

114 x 38 mm ROOF TRUSS ON 114 x 38 mm WALL PLATES: PY
ry

500 mm ROOF OVERHANG TO END OF ROOF TRUSS

10 mm FIBRE CEMENT ROOF SHEETING ON 75 x 50 mm

250 x 9 mm FASCIA BOARD WITH 150 x 100 mm GUTTERS

9 mm CEILING BOARD ON 38 x 38 mm BRANDERING

100 mm THICK FLAT CONCRETE ROOF
200 x 9 mm FIBRE CEMENT BARGE BOARD.
250 x 9 mm FIBRE CEMENT FASCIA BOARD
150 x 100 mm GUTTER

70 mm RWDP

DOOR OPENING

BAY WINDOW OPENING

FINISHED FLOOR LEVEL
900 x 300 x 200 CONCRETE STEPS
GROUND LEVEL

FEATURES
D DOOR
W1TOW3 WINDOWS
FIXTURES

we TOILET

WB WASHBASIN
SH SHOWER

s SINK

ELECTRICAL FITTINGS
ONE-WAY SWITCH - SINGLE-POLE
ONE-WAY SWITCH - DOUBLE-POLE

. FLUORESCENT LIGHT 3 x 40 W
WALL-MOUNTED LIGHT

NoOpaena

ELECTRICAL
SYMBOLS

naw

fo)
fe)
fo)

DOOR AND WINDOW SCHEDULE

TOFIT

2050

DOOR FRAME AND DOOR (D)

DOOR NOTE:
TWO 75 x 100 mm LINTELS
ABOVE THE DOOR

1500
@
>
>
o
°

CEILING LIGHT =>
SWITCHED SOCKET OUTLET =. 3&
DISTRIBUTION BOARD 8| y
THE ARROW SHOWS THE LIGHT 1320
CONNECTION TO THE SWITCH. WINDOW (w3)
BAY WINDOW (W1)
e ala alg
WINDOW NOTES:
«A= OPENING SIDE
« B= HINGED SIDE
1500 © C= FIXED PANEL
. #150 x20 mm FIBRE CEMENT
WINDOW (wa) SILL UNDER ALL WINDOWS,
ROOM DESIGNATIONS
FLOOR FINISHES
TBATHROOM, TILE
° 2BEDROOM: — CARPET FIXTURES
8 3 LOUNGE: CARPET
8s 4 KITCHEN TILE 800
— 400
— CTE ool
rt 25 mm SCREED 3 el ov iva
s aaa OOR LEVEL |
ete FLOOR JBL
GROUND ROO ts eal
3 COMPONENTS a =e vss)
LEVEL 3 6 j= 8 o 8
‘ 2227 | ROOF cap Th i ae
Cade EL /| \ 8 aap pom
600 114 x 38 mm SINK (S) WASHBASIN (WB) TOILET (WC)
ES | watt PLATE 300,
INCOMPLETE FOUNDATION 50 x10 f {
‘AND EXTERNAL WALL x 100 mm
<TERNA CUTTER SHOWER (SH)

Copyright reserved

QUESTION 4: CIVIL DRAWING

Given:

* The incomplete west elevation of a new house, showing
the walls, the door and window openings, the roof and
notes

* The incomplete floor plan showing the walls, positions of
the doors, windows, fixtures and the electrical layout

* A schematic diagram of a roof truss and roof notes

* Room designations and floor finishes

* The incomplete foundation and external wall detail

* A table of roof components

* A table of electrical symbols

* A door and window schedule

* A table of fixtures

* The incomplete floor plan of the new house, drawn to
scale 1 : 50, and the incomplete foundation of the detailed
section, drawn to scale 1 : 20, on page 6

Instructions:

Answer this question on page 6.

4.1. Using the given incomplete floor plan, draw, in first-angle
orthographic projection and to scale 1 : 50, the following
views of the new house:

4.1.1 THE COMPLETE FLOOR PLAN

Add the following features to the drawing:

ALL doors and windows

© The fixtures as indicated by the abbreviations

* ALL electrical fittings as indicated by the numbers

* ALL hatching detail

4.1.2 THE COMPLETE WEST ELEVATION

Show the following features on the drawing:

© The outside walls, door and window detail

The roof detail, including the barge boards, fascia
boards, gutters and rainwater down-pipe

© The finished floor level

4.2. Using the incomplete foundation on page 6, draw, to
scale 1: 20,a DETAILED SECTION on cutting plane
A-A of the area in the ellipse shown on the incomplete
floor plan.

Show the following features on the drawing:

© The foundation and external wall detail

© The door detail

* The roof detail, including the fascia board and gutter

© The sink

* ALL hatching detail. ONLY the substructure hatching
may be drawn in neat freehand.

Label the following:

* The west elevation

* The room designations and floor finishes

* Ground level, finished floor level and damp-proof course
(use the correct abbreviations and show it on ALL the
relevant views)

NOTE:
ALL drawings must comply with the guidelines and
graphical symbols as contained in the SANS 10143. [95]

[5|

Please tum over

### Page 6

Engineering Graphics and Design/P1

Down

Le

Oe

DETAILED SECTION A-A
SCALE 1: 20

DBE/November 2017

loaded from hlayiso.com

ROOF LINE

N
\

\
COUNTER 7

I

|

|

|

|

|

|

|

|

|

|

|

FLOOR PLAN
SCALE 1 : 50

Copyright reserved

FOR OFFICIAL USE ONLY

INCORRECT SCALE

NON-ALIGNMENT OF VIEWS

VIEW(S) ROTATED

SECTION VIEWED INCORRECTLY

INCORRECT LETTERING

TOTAL

MARK ALLOCATION FOR ROOF SECTION

ale{clolelele|u]i|s
ASSESSMENT CRITERIA
FLOOR PLAN
Possisie | ostainen | sion | wooesareo

4 | fnbows 13%
2 | evectRicaL %
3 | rxtures 8%
4 | HATCHING 3
5 | tapers 4

sustotaL | 38%

WEST ELEVATION

1 | RooF +RwoP 12
2 | waus+ Fr. 6%
3 | finoow 8
4 | vases %

SUBTOTAL 28

DETAILED SECTION

1 | ROOF DETAR 1
3 | sink 3
4 | HATCHING 4%
5 | Laseis 1

SUBTOTAL 28%

TOTAL 95
PENALTIES (-)

GRAND TOTAL

EXAMINATION NUMBER

EXAMINATION NUMBER

## Related documents

- [Engineering Graphics & Design P1 Nov 2023 Eng](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2023-eng/15d72a8f-e8dc-4d1e-82bc-86650e523125) — Engineering Graphic and Design · QP · 2023 · Eng
- [Engineering Graphics Design P1 Nov 2022 Eng](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2022-eng/b97f6197-e0e2-4075-baab-4edfc388285f) — Engineering Graphic and Design · QP · 2022 · Eng
- [Engineering Graphics Design P1 Nov 2021 Afr](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2021-afr/124a16ca-48b9-45f0-b37b-77c9f5640fa2) — Engineering Graphic and Design · QP · 2021 · Afr
- [Engineering Graphics Design P1 Nov 2020 Eng](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2020-eng/16b88bb0-8d43-4eb0-af77-c7238c9bbd18) — Engineering Graphic and Design · QP · 2020 · Eng
- [Engineering Graphics Design P1 Nov 2019 Afr](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2019-afr/59fdb165-fcc0-466a-8ae3-e945ef513563) — Engineering Graphic and Design · QP · 2019 · Afr
- [Engineering Graphics Design P1 Nov 2018 Afr](https://www.hlayiso.com/library/engineering-graphics-design-p1-nov-2018-afr/a89853d7-e603-4540-91da-92cfe9a1a633) — Engineering Graphic and Design · QP · 2018 · Afr

## More from Grade 12 Engineering Graphics and Design

- [EGD p1 Memo protected watermark](https://www.hlayiso.com/library/egd-p1-memo-protected-watermark/4afe999d-829f-4029-81f4-f01ba594587f) — Memo · 2025
- [EGD P2 ENG MEMO DD watermark](https://www.hlayiso.com/library/egd-p2-eng-memo-dd-watermark/19628a3f-1387-4c5c-bbbd-fa7b7d8dfa52) — Memo · 2025 · Eng
- [Engineering Graphics and Design P2 June 2025 Possible Answers](https://www.hlayiso.com/library/engineering-graphics-and-design-p2-june-2025-possible-answers/33c95b30-d504-42bd-acc1-56b020ec92fb) — Memo · 2025
- [EGD P2 GR12 MEMO SEP2024 English](https://www.hlayiso.com/library/egd-p2-gr12-memo-sep2024-english/aa083dea-fbb2-497c-bf52-437fbe9dc226) — Memo · 2024 · Eng
- [EGD P1 GR12 MEMO SEPT2023 Afr+Engl](https://www.hlayiso.com/library/egd-p1-gr12-memo-sept2023-afr-engl/f0ef5f18-cddf-486c-9131-1f3fc1806ba4) — Memo · 2023 · Afr
- [Pages from Exam Paper September 2023 Final-5](https://www.hlayiso.com/library/pages-from-exam-paper-september-2023-final-5/ce3ac88f-c3a8-47ff-81b7-09ccce136455) — QP · 2023

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
