# Civil Technology Grade 11 Eastern Cape November 2018 Memo

> Grade 11 Civil Technology memorandum from the Eastern Cape November 2018 (English), 15 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-eng-ct-civil-services/949512e7-12a5-4c5f-82d0-1196bc4a5b45
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 11
- Document type: Memorandum
- Year: 2018
- Exam period: Eastern Cape November
- Curriculum: CAPS
- Pages: 15

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 11](https://www.hlayiso.com/library/grade-11) › [Civil Technology](https://www.hlayiso.com/library/grade-11/civil-technology) › [Civil Technology Grade 11 Eastern Cape November 2018 Memo](https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-eng-ct-civil-services/949512e7-12a5-4c5f-82d0-1196bc4a5b45)

## About this document

Civil Technology · Grade 11 · Eastern Cape November · 2018. Memorandum, 15 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                               NATIONAL
                          SENIOR CERTIFICATE

                                  GRADE 11

                            NOVEMBER 2018

         CIVIL TECHNOLOGY: CIVIL SERVICES
                 MARKING GUIDELINE

MARKS:    200

  This marking guideline consists of 15 pages, including 4 pages of answer sheets.

### Page 2

Downloaded from hlayiso.com
 2                             CIVIL TECHNOLOGY: CIVIL SERVICES             (EC/NOVEMBER 2018)

 QUESTION 1: SAFETY AND MATERIAL (GENERIC)

 1.1      1.1.1      Hard hat / Safety hat                                               (1)
          1.1.2      All building sites / construction sites                             (1)

 1.2      1.2.1      Loose clothing – Button up / Remove                                 (1)
          1.2.2      Type of shoes in a workshop – Non-slip / Metal point                (1)
          1.2.3      When sharp object are carried – Point downwards                     (1)
          1.2.4      Dangerous moving parts of power tools – Covered by guards           (1)
          1.2.5      Number of operators who operates a machine – Only one               (1)

 1.3      Contractor                                                                     (1)

 1.4      Any FOUR safety measures which are applicable to the storage of
          flammable liquids.
               Room must be well ventilated
               Door must have a threshold
               No material that may cause a spark
               Liquids that may interact chemically not to be stored in close
                proximity
               Containers sealed properly                                   (4 x 1)     (4)

 1.5      1.5.1      Suspended concrete floors – Reinforced concrete                     (1)
          1.5.2      Lintels above door openings – Precast concrete                      (1)
          1.5.3      Foundations for single-storey buildings – Unreinforced concrete     (1)

 1.6      Any ONE use of screed.
              A finish for floors and walls
              Facing material
              Surfacing of suspended floors
              Insulated roof screed                                                     (1)

 1.7      Any TWO reasons why lime can be added to a mortar mix
              Increases plasticity
              Makes mortar more workable                                      (2 x 1)   (2)

 1.8      (1) Cheap (2) easy workable                                                    (2)

 1.9      1.9.1      True                                                                (1)

          1.9.2      False                                                               (1)

          19.3       False                                                               (1)

          1.9.4      True                                                                (1)

Copyright reserved                                                              Please turn over

### Page 3

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)        CIVIL TECHNOLOGY: CIVIL SERVICES                               3

 1.10     (1) High hygienic properties and (2) easy to clean                          (2)

 1.11     (1) Two or more metals (2) are combined to (3) form a new metal / with
          better properties / other properties                                        (3)

 1.12     Any ONE use of thermosetting plastic.
              Sewerage pipes
              Gutters
              Cold and hot water pipes                                   (1 x 1)     (1)
                                                                                      [30]

Copyright reserved                                                           Please turn over

### Page 4

Downloaded from hlayiso.com
 4                            CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/NOVEMBER 2018)

 QUESTION 2: EQUIPMENT, TOOLS AND GRAPHICS (GENERIC)

 2.1      2.1.1      Comb hammer                                                          (1)

          2.1.2      Steel comb, finish bricks, blocks/roughen smooth surfaces            (2)

          2.1.3      (1) Hammering on hard bricks (2) decays the comb / make comb
                     blunt                                                                (2)

 2.2      (1) Mitre try square
          Any THREE uses of it.(3)
               Testing squareness
               Marking out perpendicular lines
               Can be used as a ruler
               Marking square lines
               Test if surfaces are straight
               Drawing 45° lines                                                         (4)

 2.3      (1) Radial arm saw
          Any THREE caring measures for it.(3)
               Maintain – lubricate and adjust according to instructions
               Clean after use
               Repair damaged electrical cords
               Handle with care not to damage accuracy
               Use only for intended purpose
               Do not force the saw
               Avoid blunt blades
               Keep ventilation holes open
               Service regularly                                                         (4)

 2.4      Any TWO caring measures for a concrete mixer.
              Clean inside after use
              Do not leave water in the drum
              Oil inside of drum when storing for a long time               (2 x 1)      (2)

Copyright reserved                                                               Please turn over

### Page 5

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)          CIVIL TECHNOLOGY: CIVIL SERVICES                                5

 2.5    2.5.1    Site plan                                                               (1)

        2.5.2    124                                                                     (1)

        2.5.3    Building boundary                                                       (1)

        2.5.4    2.5.B – Manhole
                 2.5.C – Rodding eye                                                     (2)

 2.6    FIGURE 2.6 on ANSWER SHEET A shows an incomplete section view of
        a single brick wall. Complete the section view on scale 1 : 20 and show the
        following parts with symbols and labels:

        2.6.1    A strip foundation of 700 x 250 mm with the invert level of
                 400 mm                                                                  (3)

        2.6.2    A single brick wall with a height of 2 700 mm from the floor level
                 and 10 mm plaster work on the outside and inside                        (5)

        2.6.3    The hard core filling of 250 mm                                         (1)

        2.6.4    The damp proof course                                                   (2)

        2.6.5    The blinding layer of 50 mm                                             (1)

        2.6.6    The concrete floor slab of 90 mm                                        (1)

        2.6.7    A door opening with a height of 2 100 mm                                (1)

        2.6.8    A concrete lintel with a thickness of 70 mm above the door
                 opening                                                                 (2)

        2.6.9    A wall plate of 114 x 38 mm                                             (2)

        2.10     Show any TWO labels.                                          (2 x 1)    (2)
                                                                                         [40]

Copyright reserved                                                              Please turn over

### Page 6

Downloaded from hlayiso.com
 6                          CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/NOVEMBER 2018)

 QUESTION 3: QUANTITIES, JOINING AND GRAPHICS (GENERIC)

 3.1    FIGURE 3.1 shows the foundation wall of a building. The width of the wall
        is 220 mm and the height 450 mm.
        Use the quantity list on ANSWER SHEET B and calculate the following:

        3.1.1    Determine the centre line of the foundation wall.                     (6)

        3.1.2    Determine the quantity of bricks needed to build the foundation
                 wall and make provision of 5% brick breakage damage.                  (9)

 3.2    (1) Thorough description of the (2) item that was measured and (3) any
        preliminary calculations or sketches                                           (3)

 3.3    (1) Apply adhesive to both surfaces (2) allow to dry and (3) when almost
         dry, clamp parts together                                                     (3)

 3.4    Epoxy                                                                          (1)

 3.5    Any TWO properties of mastic sealant.                               (2 x 1)
            Works well on metals
            Prevents dust penetration in joints
            Flexible, yet keeps surfaces together
            Adhesion for 5 years
            Smooth exterior
            Can be used outdoors
            Water tight
            Withstand low and high temperatures
            Not weakened by exposure to sun                                (2 x 1)    (2)

3.6    3.6.1    Gully

                                                                                         (2)

       3.6.2    Check valve

                                                                                         (2)

       3.6.3    Dressed wood
                                                                                         (2)
                                                                                        [30]

Copyright reserved                                                            Please turn over

### Page 7

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)             CIVIL TECHNOLOGY: CIVIL SERVICES                          7

 QUESTION 4: SAFETY, MATERIAL, EQUIPMENT AND JOINING (SPECIFIC)

 4.1    Any TWO causes of water pollution / similar answers.
            Leaking sewer systems
            Factory waste
            Dumping of sewer near rivers
            Sewage seeping into ground water                                (2 x 1)    (2)

 4.2    Similar answer:
        (1) Sewage contains harmful micro-organisms / bacteria / viruses / parasites
        (2) which are harmful / unhealthy for people                                    (2)

 4.3    Similar answer:
        (1) To prevent (2) breathing in poisonous fumes                                 (2)

 4.4    Coarse aggregate – Stone / Rock
        fine aggregate – Sand                                                           (2)

 4.5    4.5.1        ... is suitable for use as sewerage pipes.
                     B      Grey cast iron                                              (1)

                     ... is ideal for use as hot-water pipes.
        4.5.2        C       Copper                                                     (1)

        4.5.3        ... is suitable for external water taps.
                     A      Brass or
                     D      Copper                                                      (1)

 4.6    Any THREE properties of thermoplastic.
            Can be reshaped
            Easy to handle
            Lightweight
            Does not break easily
            Available in variety of colours or transparent
            Maintenance is low
            Easy to cut, file, drill
            Joints are firm
            Resistant to shrinking and expansion
            Poor conductor of heat
            Low heat resistance                                              (3 x 1)   (3)

 4.7    4.7.1        Cut sheet metal – Tin snips                                        (1)

        4.7.2        To form rivet heads – Ball-peen hammer                             (1)

Copyright reserved                                                           Please turn over

### Page 8

Downloaded from hlayiso.com
 8                           CIVIL TECHNOLOGY: CIVIL SERVICES         (EC/NOVEMBER 2018)

 4.8    Identify the tools in FIGURES 4.8.1 and 4.8.2 and name ONE use of each.

        4.8.1        Universal pliers
                         Gripping
                         Cutting
                         Bending
                         Pulling wires

        4.8.2        Water pump pliers
                         Clamping of plumbing pipes                                 (2)

 4.9    4.9.1        True                                                            (1)

        4.9.2        False                                                           (1)

        4.9.3        True                                                            (1)

 4.10 4.10.1         Compression joint                                               (1)

        4.10.2       4.10.A – Compression nut
                     4.10.B – Ferrule                                                (2)

        4.10.3       Copper pipe                                                     (1)

 4.11 Grooved seamed joint for sheet metal

                                                                                     (2)

 4.12 Any ONE similar answer.
          Prevents oxidation
          Promotes flow of solder
          Assists in cleaning of solder material                                     (1)
                                                                                     [30]

Copyright reserved                                                        Please turn over

### Page 9

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)           CIVIL TECHNOLOGY: CIVIL SERVICES                           9

   QUESTION 5: GRAPHICS AND CONSTRUCTION IN CIVIL SERVICES (SPECIFIC)

 5.1    FIGURE 5.1 on ANSWER SHEET C shows a 45° cut-off cylindrical pipe.
        Use ANSWER SHEET C and develop and draw the development of the cut-
        off of the cylindrical pipe to scale 1 : 1.                                    (14)

 5.2    5.2.1        Waste water bend                                                  (1)

        5.2.2        Inspection eye                                                    (1)

        5.2.3        87,5°.                                                            (1)

        5.2.4        Waste water pipe                                                  (1)

        5.2.5        40/50 mm                                                          (1)

        5.2.6        135°                                                              (1)

        5.2.7        D – Gully E – Pillar tap F – P-trap                               (3)

 5.3    Illustrate a straight capillary soldering joint for copper pipes.

                                                                                       (2)

 5.4    5.4.1        D – Curing

        5.4.2        E – Plywood boards

        5.4.3        C – Compacting                                         (3 x 1)    (3)

 5.5    5.5.1        100 mm                                                            (1)

        5.5.2        150 mm                                                             (1)
                                                                                       [30]

Copyright reserved                                                          Please turn over

### Page 10

Downloaded from hlayiso.com
 10                           CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/NOVEMBER 2018)

 QUESTION 6: COLD AND HOT WATER SUPPLY, DRAINAGE AND
             SANITARY FITMENTS (SPECIFIC)

 6.1    A Steam system / Industrial installations                                          (1)

 6.2    Any THREE disadvantages of stainless steel pipes.
            Difficult to bend
            Very expensive
            Maintenance is expensive
            Special welding may be required                                   (3 x 1)     (3)

 6.3    Any THREE advantages of high-density polyethylene pipes.
        - Extended service life
            Resistant to strong acids
            Light
            Resistant to rough handling
            Easy to join
            High rigidity and tensile strength
            High flow capacity
            No cracking or deformation
            Elastic                                                           (3 x 1)     (3)

 6.4    6.4.1        Non-return valve                                                      (1)

        6.4.2        Locking valve                                                         (1)

        6.4.3        6.4.B                                                                 (1)

        6.4.4        To prevent backflow in pipe system that pumps water to a higher-
                     lying area                                                            (1)

 6.5    6.5.1        Draining tap
                                                                                           (2)

        6.5.2        Float valve

                                                                                           (2)

        6.5.3        External pipe.
                                                                                           (2)

        6.5.4        Water meter                          Or
                                               M
                                                                                           (2)

 6.6    Controls water temperature                                                         (1)

 6.7    Vacuum breaker                                                                     (1)

Copyright reserved                                                              Please turn over

### Page 11

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)           CIVIL TECHNOLOGY: CIVIL SERVICES                                11

 6.8    6.8.1        6.8.A – Outlet
                     6.8.B – Insulation
                     6.8.C – Flow tubes
                     6.8.D – Header
                     6.8.E – Inlet
                     6.8 F – Glazing                                                          (6)

        6.8.2        Any TWO functions of part 6.8.F.
                         Keep dirt out
                         Keep heat in                                         (2 x 1)        (2)

 6.9    FIGURE 6.9 on ANSWER SHEET D shows the side elevation of the
        incomplete schematic representation of the sanitary fittings which must be
        connected to a one-pipe system. Complete on ANSWER SHEET D the
        following sanitary pipework by means of neat line sketches.

        6.9.1        Discharge stack and vent pipe
                     Indicate the vent pipe by means of a neat label.                         (2)

        6.9.2        Traps for the sanitary fitments                                          (2)

        6.9.3        Waste water discharge pipes                                              (2)

        6.9.4        Soil water discharge pipe                                                (1)

 6.10 6.10.1         Wavering – (1) Wind passing over the top over the stack (2)
                     causes wavering out of the seal                                          (2)

        6.10.2       Compression – (1) When main pipe flow causes (2) a build-up of
                     pressure at lower levels                                                 (2)
                                                                                             [40]

                                                                              TOTAL:         200

Copyright reserved                                                                 Please turn over

### Page 12

Downloaded from hlayiso.com
 12                         CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/NOVEMBER 2018)

                               CIVIL TECHNOLOGY
  ANSWER SHEET          A           GENERIC
                                                       NAME:

2.6      FIGURE 2.6 on ANSWER SHEET A shows an incomplete section view of a
         single brick wall. Complete the section view to scale 1 : 20.

                                                    2.6.1    Strip foundation        3
                                                    2.6.2    Single brick wall       5
                                                    2.6.3    Hard core filling       1
                                                    2.6.4    Damp proof course       2
                                                    2.6.5    Blinding layer          1
                                                    2.6.6    Concrete floor slab     1
                                                    2.6.7    Door opening            1
                                                    2.6.8    Concrete lintel         2
                                                    2.6.9    Wall plate              2
                                                    2.6.10   2 Labels                2
                                                             TOTAL                  20

                                         2xLabels

                                                               NGL

Copyright reserved                                                            Please turn over

### Page 13

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)          CIVIL TECHNOLOGY: CIVIL SERVICES                         13

                                CIVIL TECHNOLOGY
  ANSWER SHEET           B           GENERIC
                                                           NAME:

QUESTION 3.1

      A              B     C                                  D
                                3.1.1      CENTRE LINE:                            (6)

                                2 x 9 m = 18 m

                                2 x 6 m = 12 m

                                             = 30 m

                                Minus: 4 x 0.22 m = 0.88 m

                                        TOTAL CENTRE LINE = 29.12 m

                                3.1.2      QUANTITY OF BRICKS:                       (9)

                                AREA:
                                Total wall area
      1          29.12
                  0.45 13.104. Thus: Total wall area = 13.104 m²
                         ....
                                 TOTAL BRICKS
                13.104           100 bricks/ m2 for single brick wall
                  100 1 310.4 Thus: 1 311 bricks for total wall
                       310......
                         .... 5% BREAKAGE

                                5/
                                     100 x 1 311

                                = 66 bricks

                                TOTAL BRICKS :
                                1 311 + 66 = 1 377 total quantity bricks

Copyright reserved                                                         Please turn over

### Page 14

Downloaded from hlayiso.com
 14                              CIVIL TECHNOLOGY: CIVIL SERVICES               (EC/NOVEMBER 2018)

                                    CIVIL TECHNOLOGY
  ANSWER SHEET               C        CIVIL SERVICES
                                                               NAME:

5.1    FIGURE 5.1 on ANSWER SHEET C shows a 45° cut-off cylindrical pipe.
       Use ANSWER SHEET C and develop and draw the development of the cut-
       off of the cylindrical pipe on scale 1:1.                           (14)

                                       0   1   2   3   4   5    6   7   8   9     1      1    1
        SIDE VIEW                                                                 0      1    2

            9
       10            8
 11                      7
12
 0                       6

  1                      5
       2             4
            3

      TOP VIEW

Copyright reserved                                                                    Please turn over

### Page 15

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)       CIVIL TECHNOLOGY: CIVIL SERVICES                              15

                                CIVIL TECHNOLOGY
   ANSWER SHEET          D        CIVIL SERVICES
                                                         NAME:

6.9    FIGURE 6.9 on ANSWER SHEET D shows the side elevation of the incomplete
       schematic representation of the sanitary fittings which must be connected to a one-
       pipe system. Complete on ANSWER SHEET D the following sanitary pipework by
       means of neat line sketches:

      VENT PIPE
                                                   Discharge stack + vent pipe.
                                                   Label                           2
                                                   Traps                           2
                                                   Waste water discharge pipes.    2
                                                   Soil water discharge pipe.      1
                                                   TOTAL                           7
                               WB

        WC
                                     B

Copyright reserved                                                           Please turn over

## Related documents

- [CIVIL TECH GRD 11 MEMO WOODWORKING ENG D](https://www.hlayiso.com/library/civil-tech-grd-11-memo-woodworking-eng-d/0c949e26-dd00-453a-b9ba-02dfb10bc39b) — Civil Technology · Memo · 2018 · Eng
- [Gr11-CIVIL-TECH S18-MEMO-Eng CT CONSTRUCTION](https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-eng-ct-construction/3e8968f2-6360-4925-8808-baa7bf13f42f) — Civil Technology · Memo · 2018 · Eng
- [CIVIL TECH GRD 11 MEMO KONSTRUKSIE AFR D](https://www.hlayiso.com/library/civil-tech-grd-11-memo-konstruksie-afr-d/a833678f-ed1c-40c5-b07a-26ba77e4dc1d) — Civil Technology · Memo · 2018 · Afr
- [Gr11-CIVIL-TECH S18-MEMO-AFRK CT SIVIELE DIENSTE](https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-afrk-ct-siviele-dienste/77da9da4-54ce-404b-ac53-32294ed35961) — Civil Technology · Memo · 2018
- [Gr11-CIVIL-TECH S18-MEMO-AFRK CT HOUTBEWERKING](https://www.hlayiso.com/library/gr11-civil-tech-s18-memo-afrk-ct-houtbewerking/e2a52fe8-59d0-4050-a612-bf25f67c4663) — Civil Technology · Memo · 2018
- [CIVIL TECH GRD 11 QP CONSTRUCTIONS ENG D](https://www.hlayiso.com/library/civil-tech-grd-11-qp-constructions-eng-d/1196db5c-18c1-4a77-92bd-46233279a6b3) — Civil Technology · QP · 2018 · Eng

## More from Grade 11 Civil Technology

- [Gr 11 Cons ATP 2023-24](https://www.hlayiso.com/library/gr-11-cons-atp-2023-24/5adb6254-7b36-487a-a882-c42b36bf49b7) — ATP
- [Gr 11 Civil Ser ATP 2023-24](https://www.hlayiso.com/library/gr-11-civil-ser-atp-2023-24/91ce1dc1-91cc-4a38-926b-b3d45f5b5305) — ATP
- [CIV TECH GR11 QP NOV2022 Civil Services Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-civil-services-afrikaans/195d9d88-060d-4288-a6c8-5c59a0e1f4e5) — QP · 2022 · Afr
- [CIV TECH GR11 QP NOV2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-civil-services-english/ed0b5808-e643-408f-bef2-165736e1c4b6) — QP · 2022 · Eng
- [CIV TECH GR11 QP NOV2022 Construction English](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-construction-english/ef9cc9f6-54a4-49fb-a7b1-407a487eeec8) — QP · 2022 · Eng
- [CIV TECH GR11 QP NOV2022 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-qp-nov2022-construction-afrikaans/f47aab44-2dd9-4504-b76e-8fab9b0cb88a) — QP · 2022 · Afr

## Collection

- [Grade 11 past papers](https://www.hlayiso.com/grade-11/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
