# Civil Technology Grade 11 Eastern Cape November 2018 QP

> Grade 11 Civil Technology question paper from the Eastern Cape November 2018 (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/gr11-civil-tech-s18-qp-eng-ct-civil-services/38366be6-bd5f-4a87-b691-0d2b0e7c68c9
- Updated: 2026-09-27
- Subject: Civil Technology
- Grade: Grade 11
- Document type: Question paper
- Year: 2018
- Exam period: Eastern Cape November
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 11](https://www.hlayiso.com/library/grade-11) › [Civil Technology](https://www.hlayiso.com/library/grade-11/civil-technology) › [Civil Technology Grade 11 Eastern Cape November 2018 QP](https://www.hlayiso.com/library/gr11-civil-tech-s18-qp-eng-ct-civil-services/38366be6-bd5f-4a87-b691-0d2b0e7c68c9)

## About this document

Civil Technology · Grade 11 · Eastern Cape November · 2018. Question paper, 18 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Downloaded from hlayiso.com

                               NATIONAL
                          SENIOR CERTIFICATE

                                  GRADE 11

                           NOVEMBER 2018

         CIVIL TECHNOLOGY: CIVIL SERVICES

MARKS:    200

TIME:     3 hours

   This question paper consists of 18 pages, including 4 pages of answer sheets.

### Page 2

Downloaded from hlayiso.com
 2                         CIVIL TECHNOLOGY: CIVIL SERVICES                  (EC/NOVEMBER 2018)

  REQUIREMENTS:

  1.     ANSWER BOOK

  2.     Drawing instruments

  3.     A non-programmable pocket calculator

  INSTRUCTIONS AND INFORMATION

  1.     This question paper consists of SIX QUESTIONS: TWO questions are
         generic and FOUR questions are subject specific.

  2.     Answer ALL the questions.

  3.     Answer each question as a whole. Do NOT separate subsections of
         questions.

  4.     Start the answer to EACH question on a NEW page.

  5.     Do NOT write in the margins of the ANSWER BOOK.

  6.     You may use sketches to illustrate your answers.

  7.     Write ALL calculations and answers in the ANSWER BOOK or on the
         attached ANSWER SHEETS.

  8.     Use the mark allocation as a guide to the length of your answers.

  9.     Make drawings and sketches in pencil, fully-dimensioned and neatly
         finished off with descriptive titles and notes to conform to the SANS/SABS
         Code of Practice for Building Drawings.

  10.    For the purpose of this question paper, the size of a brick should be taken
         as 220 mm x 110 mm x 75 mm.

  11.    Use your own discretion where dimensions and/or details have been
         omitted.

  12.    Answer QUESTIONS 2.6, 3.1, 5.1 and 6.9 on the attached ANSWER
         SHEETS using drawing instruments where necessary.

  13.    Write your NAME on every ANSWER SHEET and hand them in with your
         ANSWER BOOK, whether you have answered the question or not.

  14.    Due to electronic transfer, drawings in the question paper are NOT to
         scale.

Copyright reserved                                                               Please turn over

### Page 3

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)           CIVIL TECHNOLOGY: CIVIL SERVICES                                   3

 QUESTION 1: SAFETY AND MATERIAL (GENERIC)

 1.1      Answer the following questions with regard to the safety equipment in
          FIGURE 1.1.

                                            FIGURE 1.1

          1.1.1      What is the safety equipment in FIGURE 1.1 called?                    (1)

          1.1.2      On which type of site is this type of safety equipment compulsory?    (1)

 1.2      Describe the safety measure which is applicable to each of the following
          factors:

          1.2.1      Loose clothing                                                        (1)

          1.2.2      Type of shoes in a workshop                                           (1)

          1.2.3      Carrying of sharp objects                                             (1)

          1.2.4      Dangerous moving parts of power tools                                 (1)

          1.2.5      Number of operators who operate a machine                             (1)

 1.3      Who is responsible for the safety of visitors on a construction site?            (1)

 1.4      Name any FOUR safety measures which are applicable to the storage of
          flammable liquids.                                             (4 x 1)           (4)

 1.5      Unreinforced concrete, reinforced concrete and precast concrete are used
          on construction sites.
          Identify the type of concrete which will be used for the following work:

          1.5.1      Suspended concrete floors                                             (1)

          1.5.2      Lintels above door openings                                           (1)

          1.5.3      Foundations for single-storey buildings                               (1)

Copyright reserved                                                                Please turn over

### Page 4

Downloaded from hlayiso.com
 4                            CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/NOVEMBER 2018)

 1.6      Name ONE use of screed.                                                         (1)

 1.7      Name TWO reasons why lime can be added to a mortar mix.              (2 x 1)    (2)

 1.8      Briefly motivate why pine wood is used for carpentry work on a
          construction site.                                                              (2)

 1.9      Indicate whether the following statements are TRUE or FALSE. Write only
          the word ‘true’ or ‘false’ next to the number in the ANSWER BOOK.

          1.9.1      Board products are cheaper than solid wood products.                 (1)

          1.9.2      Stock bricks are manufactured from cement.                           (1)

          1.9.3      Face bricks must be plastered.                                       (1)

          1.9.4      Cement blocks are cast with hollow cores to make them lighter.       (1)

 1.10     Briefly motivate why sinks are manufactured from stainless steel.               (2)

 1.11     Briefly describe what an alloy is.                                              (3)

 1.12     Name ONE use of thermosetting plastic.                               (1 x 1)    (1)
                                                                                         [30]

Copyright reserved                                                              Please turn over

### Page 5

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)         CIVIL TECHNOLOGY: CIVIL SERVICES                                5

 QUESTION 2: EQUIPMENT, TOOLS AND GRAPHICS (GENERIC)
 2.1    Answer the following questions with regard to the hand tool in FIGURE 2.1.

                                                     2.1.A

                                             FIGURE 2.1

        2.1.1    What is this tool called?                                               (1)
        2.1.2    Describe the purpose of part 2.1.A.                                     (2)
        2.1.3    Briefly motivate why part 2.1.A must be replaced regularly.             (2)
 2.2    Identify the tool in FIGURE 2.2 and name THREE measures that should be
        taken to care for it.                                                            (4)

                                         FIGURE 2.2

 2.3    Identify the tool in FIGURE 2.3 and name THREE measures that should be
        taken to care for it.                                                            (4)

                                         FIGURE 2.3

 2.4    Name TWO measures for caring for a concrete mixer.                     (2 x 1)   (2)

Copyright reserved                                                             Please turn over

### Page 6

Downloaded from hlayiso.com
 6                            CIVIL TECHNOLOGY: CIVIL SERVICES                (EC/NOVEMBER 2018)

 2.5    Answer the following questions with regard to the plan elevation in
        FIGURE 2.5.

                                     PROTEA STREET

                                                                            2.5.B
            2.5.A

                                                                             2.5.C

           PLOT 124                     PLOT 126                   PLOT 128

            PLOT 135                    PLOT 137

                                            FIGURE 2.5

        2.5.1        What is the plan elevation called?                                     (1)

        2.5.2        What is die plot number of the plot on the west side of plot 126?      (1)

        2.5.3        What are the lines at 2.5.A called?                                    (1)

        2.5.4        Identify the symbols at 2.5.B and 2.5.C.                               (2)

Copyright reserved                                                                Please turn over

### Page 7

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)           CIVIL TECHNOLOGY: CIVIL SERVICES                                  7

 2.6    FIGURE 2.6, on ANSWER SHEET A, shows an incomplete section view of
        a single brick wall. Complete the section view to scale 1 : 20 and show the
        following parts with symbols and labels:

        2.6.1        A strip foundation of 700 x 250 mm with the invert level of 400 mm      (3)

        2.6.2        A single brick wall with a height of 2 700 mm from the floor level
                     and 10 mm plaster work on the outside and inside                        (5)

        2.6.3        The hardcore filling of 250 mm                                          (1)

        2.6.4        The dampproof course                                                    (2)

        2.6.5        The blinding layer of 50 mm                                             (1)

        2.6.6        The concrete floor slab of 90 mm                                        (1)

        2.6.7        A door opening with a height of 2 100 mm                                (1)

        2.6.8        A concrete lintel with a thickness of 70 mm above the door
                     opening                                                                 (2)

        2.6.9        A wall plate of 114 x 38 mm                                             (2)

        2.6.10       Show any TWO labels.                                         (2 x 1)    (2)
                                                                                            [40]

Copyright reserved                                                                 Please turn over

### Page 8

Downloaded from hlayiso.com
 8                              CIVIL TECHNOLOGY: CIVIL SERVICES               (EC/NOVEMBER 2018)

 QUESTION 3: QUANTITIES, JOINING AND GRAPHICS (GENERIC)

 3.1    FIGURE 3.1 shows the foundation wall of a building. The width of the wall
        is 220 mm and the height 450 mm.

                                           9 000

              6 000

                                             FIGURE 3.1

        Use the quantity list on ANSWER SHEET B and calculate the following:

        3.1.1         Determine the centre line of the foundation wall.                      (6)

        3.1.2         Determine the quantity of bricks needed to build the foundation
                      wall. Make provision for 5% brick breakages.                           (9)

 3.2    Fully describe the purpose of the description column on the dimension
        paper for quantities.                                                                (3)

 3.3    Describe, in point form, the application process of contact glue.                    (3)

 3.4    Which joining glue/material consists of resin and a hardener?                        (1)

 3.5    Name TWO properties of mastic sealant.                                     (2 x 1)   (2)

 3.6    Make neat sketches to illustrate the following symbols on a floor plan:

        3.6.1         Gully                                                                  (2)

        3.6.2         Check valve                                                            (2)

        3.6.3         Dressed wood                                                            (2)
                                                                                             [30]

Copyright reserved                                                                 Please turn over

### Page 9

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)          CIVIL TECHNOLOGY: CIVIL SERVICES                               9

 QUESTION 4: SAFETY, MATERIAL, EQUIPMENT AND JOINING (SPECIFIC)

 4.1    Name TWO causes of water pollution.                                   (2 x 1)     (2)

 4.2    Briefly describe the safety risk of sewage.                                       (2)

 4.3    Briefly motivate why the working area where soldering work is done, must be
        well ventilated.                                                                  (2)

 4.4    Briefly describe the difference between the sizes of coarse aggregate and
        fine aggregate.                                                                   (2)

 4.5    Various metals are listed to possibly fit the following properties. Choose the
        correct answer and write it next to the question number in your ANSWER
        BOOK, e.g. 4.5.4 Copper.

        4.5.1    ... is suitable for producing sewerage pipes.                            (1)

                 A       Lead
                 B       Grey cast iron
                 C       Tin
                 D       Stainless steel

        4.5.2    ... is ideal for producing hot-water pipes.                              (1)

                 A       Wrought iron
                 B       Aluminium
                 C       Copper
                 D       Tin

        4.5.3    ... is suitable for external water taps.                                 (1)

                 A       Brass
                 B       Stainless steel
                 C       Bronze
                 D       Copper

 4.6    Name THREE properties of thermoplastic.                                (3 x 1)    (3)

 4.7    Which hand tool will be used for the following work?

        4.7.1    To cut sheet metal                                                       (1)

        4.7.2    To form rivet heads                                                      (1)

Copyright reserved                                                             Please turn over

### Page 10

Downloaded from hlayiso.com
 10                            CIVIL TECHNOLOGY: CIVIL SERVICES             (EC/NOVEMBER 2018)

 4.8    Identify the tools in FIGURES 4.8.1 and 4.8.2 and name ONE use of each.

                                                                                          (4)
        FIGURE 4.8.1                                  FIGURE 4.8.2

 4.9    Indicate whether the following statements are TRUE or FALSE. Write only
        the word ‘true’ or ‘false’ next to the number in the ANSWER BOOK.

        4.9.1        Copper pipe is heated with a torch to bend it.                        (1)

        4.9.2        Galvanised steel pipe is bent by means of a pipe bending spring.      (1)

        4.9.3        Polythene pipes are joined with PVC glue and joints.                  (1)

 4.10 Answer the following questions with regard to the joining component in
      FIGURE 4.10.

                         4.10.A            4.10.B

                                            FIGURE 4.10

        4.10.1       What is this type of pipe joint called?                               (1)

        4.10.2       Name the parts 4.10.A and 4.10.B.                                     (2)

        4.10.3       Which type of pipe is joined by this type of joint?                   (1)

 4.11 Make a neat sketch of a grooved-seamed joint for sheet metal.                        (2)

 4.12 What is the purpose of the flux when soldering work is done?                         (1)
                                                                                          [30]

Copyright reserved                                                              Please turn over

### Page 11

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)            CIVIL TECHNOLOGY: CIVIL SERVICES                             11

 QUESTION 5: GRAPHICS AND CONSTRUCTION IN CIVIL SERVICES
             (SPECIFIC)

 5.1    FIGURE 5.1 on ANSWER SHEET C shows a 45° cut-off cylindrical pipe.
        Use ANSWER SHEET C and develop and draw the development of the cut-
        off of the cylindrical pipe to scale 1 : 1.                                       (14)

 5.2    Answer the following questions with regard to the sink installation in
        FIGURE 5.2.

                                                                        5.2.E

          5.2.A                                                         5.2.F

          5.2.B

          5.2.C

          5.2.D

                                                   FIGURE 5.2

        5.2.1        What is the pipe at 5.2.A called?                                     (1)

        5.2.2        What is the access opening at part 5.2.A called?                      (1)

        5.2.3        At what angle is the pipe at 5.2.A bent?                              (1)

        5.2.4        What is the pipe at 5.2.B called?                                     (1)

        5.2.5        What is the section size of the pipe at 5.2.B?                        (1)

        5.2.6        At what angle is the pipe at 5.2.C bent?                              (1)

        5.2.7        Name parts 5.2.D tot 5.2.F.                                           (3)

 5.3    Make a neat section-view sketch to illustrate the construction of a straight
        capillary soldering joint for copper pipes.                                        (2)

Copyright reserved                                                               Please turn over

### Page 12

Downloaded from hlayiso.com
 12                            CIVIL TECHNOLOGY: CIVIL SERVICES                (EC/NOVEMBER 2018)

 5.4    Choose the term from COLUMN B that matches the description in COLUMN
        A. Write only the letter (A–C) next to the question number (5.4.1–5.4.3) in
        the ANSWER BOOK, for example 5.4.4 F.

                            COLUMN A                                COLUMN B
         5.4.1       Fresh concrete is covered with damp      A   Floating
                     hessian

         5.4.2       Formwork for fresh concrete              B   Concrete placing

         5.4.3       Tampers are used to fill all holes and   C   Compacting
                     corners with concrete

                                                              D   Curing

                                                              E   Plywood boards
                                                                                   (3 x 1)    (3)

 5.5    What is the minimum thickness of the following concrete parts?

        5.5.1    Domestic floor slabs                                                         (1)

        5.5.2    Manhole slab                                                                 (1)
                                                                                             [30]

Copyright reserved                                                                 Please turn over

### Page 13

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)              CIVIL TECHNOLOGY: CIVIL SERVICES                          13

 QUESTION 6: COLD AND HOT WATER SUPPLY, DRAINAGE AND SANITARY
             FITMENTS (SPECIFIC)

 6.1    Under which circumstances are stainless steel pipes used?                          (1)

 6.2    Name THREE disadvantages of stainless steel pipes.                     (3 x 1)     (3)

 6.3    Name THREE advantages of high-density polyethylene pipes.               (3 x 1)    (3)

 6.4    Answer the following questions with regard to the valve in FIGURE 6.4.

                         6.4.A

                      6.4.B                                         6.4.C

                                            FIGURE 6.4

        6.4.1    What is the type of valve in FIGURE 6.4 called?                           (1)

        6.4.2    What is part 6.4.A called?                                                (1)

        6.4.3    Which arrow point indicates the correct flow direction, arrow point
                 6.4.B or 6.4.C?                                                           (1)

        6.4.4    In which circumstances is this type of valve used?                        (1)

 6.5    Make neat sketches of the symbols for the following:

        6.5.1    Draining tap                                                              (2)

        6.5.2    Float valve                                                               (2)

        6.5.3    External pipe                                                             (2)

        6.5.4    Water meter                                                               (2)

 6.6    What is the purpose of the thermostat in a geyser?                                 (1)

 6.7    Which part of the geyser allows air to enter the pipe when needed?                 (1)

Copyright reserved                                                              Please turn over

### Page 14

Downloaded from hlayiso.com
 14                           CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/NOVEMBER 2018)

 6.8    Answer the following questions with regard to the hot-water reservoir
        system in FIGURE 6.8.

         6.8.A                                           6.8.F

                              6.8.B
                                                                        6.8.E
                              6.8.C       6.8.D

                                                  FIGURE 6.8

        6.8.1        Name the parts 6.8.A to 6.8 F.                                         (6)

        6.8.2        Name TWO functions of part 6.8.F.                           (2 x 1)    (2)

 6.9    FIGURE 6.9 on ANSWER SHEET D shows the side elevation of the
        incomplete schematic representation of the sanitary fittings which must be
        connected to a one-pipe system. Complete on ANSWER SHEET D the
        following sanitary pipework by means of neat line sketches:

        6.9.1        Discharge stack and vent pipe
                     Indicate the vent pipe by means of a neat label.                       (2)

        6.9.2        Traps for the sanitary fitments                                        (2)

        6.9.3        Waste-water discharge pipes                                            (2)

        6.9.4        Soil-water discharge pipe                                              (1)

 6.10 Briefly describe how the following factors can cause the water locks in traps
      to break:

        6.10.1       Wavering                                                               (2)

        6.10.2       Compression                                                            (2)
                                                                                           [40]

                                                                                TOTAL:     200

Copyright reserved                                                               Please turn over

### Page 15

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)         CIVIL TECHNOLOGY: CIVIL SERVICES                           15

                               CIVIL TECHNOLOGY
  ANSWER SHEET          A           GENERIC
                                                       NAME:

2.6      FIGURE 2.6 on ANSWER SHEET A shows an incomplete section view of a single
         brick wall. Complete the section view to scale 1 : 20.

                                                   2.6.1    Strip foundation      3
                                                   2.6.2    Single brick wall     5
                                                   2.6.3    Hard core filling     1
                                                   2.6.4    Damp proof course     2
                                                   2.6.5    Blinding layer        1
                                                   2.6.6    Concrete floor slab   1
                                                   2.6.7    Door opening          1
                                                   2.6.8    Concrete lintel       2
                                                   2.6.9    Wall plate            2
                                                   2.6.10   2 Labels              2
                                                            TOTAL                 20

                                           NGL

Copyright reserved                                                          Please turn over

### Page 16

Downloaded from hlayiso.com
 16                             CIVIL TECHNOLOGY: CIVIL SERVICES                               (EC/NOVEMBER 2018)

                                     CIVIL TECHNOLOGY
  ANSWER SHEET              B             GENERIC
                                                                        NAME:

QUESTION 3.1

       A             B         C                                            D
                                     3.1.1     CENTRE LINE:                                                    (6)

                                     .......... x ................ m = ................ m

                                     .......... x ................ m = ................ m

                                                                     = ................ m

                                     Minus: ........ x ............ m = ................. m

                                        TOTAL CENTRE LINE = ................. m

                                     3.1.2     QUANTITY OF BRICKS:                                             (9)

                                     AREA:
                                     Total wall area
      ......      ......
                 .......      ...... Thus: Total wall area = ...............

                                        TOTAL BRICKS
                  .......               100 bricks/ m2 for single brick wall
                 ........   ........... Thus: .................. bricks for total wall

                                     5% BREAKAGE

                                     TOTAL BRICKS:
                                     ................ + ............... = ................ total quantity bricks

Copyright reserved                                                                                  Please turn over

### Page 17

Downloaded from hlayiso.com
 (EC/NOVEMBER 2018)         CIVIL TECHNOLOGY: CIVIL SERVICES                     17

                               CIVIL TECHNOLOGY
  ANSWER SHEET          C        CIVIL SERVICES
                                                      NAME:

5.1    FIGURE 5.1 on ANSWER SHEET C shows a 45° cut-off cylindrical pipe.
       Use ANSWER SHEET C and develop and draw the development of the cut-
       off of the cylindrical pipe on scale 1 : 1.                            (14)

       SIDE VIEW

      TOP VIEW

Copyright reserved                                                    Please turn over

### Page 18

Downloaded from hlayiso.com
  18                       CIVIL TECHNOLOGY: CIVIL SERVICES              (EC/NOVEMBER 2018)

                                CIVIL TECHNOLOGY
    ANSWER SHEET          D       CIVIL SERVICES
                                                          NAME:

6.9 FIGURE 6.9 on ANSWER SHEET D shows the side elevation of the incomplete
    schematic representation of the sanitary fittings which must be connected to a one-
    pipe system. Complete on ANSWER SHEET D the following sanitary pipework by
    means of neat line sketches:

                                WB

         WC
                                      B

                                                   Discharge stack + vent pipe.
                                                   Label                           2
                                                   Traps                           2
                                                   Waste water discharge pipes.    2
                                                   Soil water discharge pipe.      1
                                                   TOTAL                           7

 Copyright reserved                                                          Please turn over

## Related documents

- [CIVIL TECH GRD 11 QP CONSTRUCTIONS ENG D](https://www.hlayiso.com/library/civil-tech-grd-11-qp-constructions-eng-d/1196db5c-18c1-4a77-92bd-46233279a6b3) — Civil Technology · QP · 2018 · Eng
- [Gr11-CIVIL TECH-S18-QP-AFRK ct HOUTBEWERKING](https://www.hlayiso.com/library/gr11-civil-tech-s18-qp-afrk-ct-houtbewerking/d9e55177-e7af-43fb-9a1d-73aa0e7668c9) — Civil Technology · QP · 2018
- [Gr11-CIVIL TECH-S18-QP-Eng ct CONSTRUCTION](https://www.hlayiso.com/library/gr11-civil-tech-s18-qp-eng-ct-construction/fa48c386-2b61-42c7-98b2-e79ce02a5650) — Civil Technology · QP · 2018 · Eng
- [CIVIL TECH GRD 11 QP CIVIL SERVICES ENG D](https://www.hlayiso.com/library/civil-tech-grd-11-qp-civil-services-eng-d/5370e1be-f6c7-4b23-aab8-6f4f1ff95e77) — Civil Technology · QP · 2018 · Eng
- [Gr11-CIVIL TECH-S18-QP-AFRK ct KONSTRUKSIE](https://www.hlayiso.com/library/gr11-civil-tech-s18-qp-afrk-ct-konstruksie/c00e83a2-63af-4492-b376-be97cc505263) — Civil Technology · QP · 2018
- [CIVIL TECH GRD 11 QP SIVIELE DIENSTE AFR D](https://www.hlayiso.com/library/civil-tech-grd-11-qp-siviele-dienste-afr-d/8b8297dc-ddf4-4225-a6a5-32c8200d7879) — Civil Technology · QP · 2018 · Afr

## More from Grade 11 Civil Technology

- [Gr 11 Cons ATP 2023-24](https://www.hlayiso.com/library/gr-11-cons-atp-2023-24/5adb6254-7b36-487a-a882-c42b36bf49b7) — ATP
- [Gr 11 Civil Ser ATP 2023-24](https://www.hlayiso.com/library/gr-11-civil-ser-atp-2023-24/91ce1dc1-91cc-4a38-926b-b3d45f5b5305) — ATP
- [CIV TECH GR11 MEMO NOV2022 Civil Services Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-civil-services-afrikaans/85a9ce14-da0c-4943-8570-643c7a62e6a8) — Memo · 2022 · Afr
- [CIV TECH GR11 MEMO NOV2022 Construction Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-construction-afrikaans/6d31745c-a94c-4612-8aef-4e9b624a57b0) — Memo · 2022 · Afr
- [CIV TECH GR11 MEMO NOV2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-woodworking-english/a7e06718-cada-4092-84e6-dffe9c65d79c) — Memo · 2022 · Eng
- [CIV TECH GR11 MEMO NOV2022 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr11-memo-nov2022-woodworking-afrikaans/16d10915-16d2-413b-a24e-24b5588c3601) — Memo · 2022 · Afr

## Collection

- [Grade 11 past papers](https://www.hlayiso.com/grade-11/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.