# Engineering Graphic And Design Grade 11 P1 2020 QP (Eng)

> Grade 11 Engineering Graphic And Design Paper 1 question paper from the National Exemplar November Exam 2020 (English), 6 pages. Read online or get the free PDF download, memo linked when available.

- Page: https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-question-paper-paper-1-english/49216894-9dbe-420a-827e-3bad1e447cf5
- Updated: 2026-09-28
- Subject: Engineering Graphic And Design
- Grade: Grade 11
- Language: English
- Document type: Question paper
- Year: 2020
- Exam period: National Exemplar November Exam
- Paper: 1
- Curriculum: CAPS
- Pages: 6

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 11](https://www.hlayiso.com/library/grade-11) › [Engineering Graphic And Design](https://www.hlayiso.com/library/grade-11/engineering-graphic-and-design) › [Engineering Graphic And Design Grade 11 P1 2020 QP (Eng)](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-question-paper-paper-1-english/49216894-9dbe-420a-827e-3bad1e447cf5)

## About this document

Engineering Graphic And Design · Grade 11 · National Exemplar November Exam · 2020 · English. Question paper, 6 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Matching paper and memo

- [EGD P1 GR11 NOV2020 QP MEMO ENG D](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-memorandum-paper-1-english/4661fe3b-2457-4840-b384-e15860bd5f65) — Memo · 2020 · Eng

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

ISEBE LEMFUNDO LEMPUMA KOLONI
EASTERN CAPE EDUCATION DEPARTMENT
OOS-KAAP ONDERWYSDEPARTEMENT

NATIONAL
SENIOR CERTIFICATE

*IGRDSET*

>

ENGINEERING GRAPHICS AND DESIGN P1

NOVEMBER 2020

MARKS: 200
TIME: 3 hours
This question paper consists of 6 pages.

Copyright reserved

INSTRUCTIONS AND INFORMATION

The paper consists of FOUR questions
Answer ALL the questions

All drawings must be drawn to scale 1 : 1, unless otherwise stated

The questions must be answered on the answer sheets provided

All the answers sheets must be re-stapled in numerical sequence and
handed in irrespective of whether the question was attempted or not.
Careful time management is essential in order to complete all the questions.
Print your name in the block provided on every ANSWER SHEET.

All answers must be drawn accurately and neatly.

Any details or dimensions not given must be estimated in good proportion
0. ALL drawings are in first angle orthographic projection, unless stated
otherwise

ORONS

2 Oana

FOR OFFICIAL USE ONLY

MODERATED
MARK

oa

TOTAL
2/0/0 2/0/0
FINAL CONVERTED CHECKED BY
MARK

100

COMPLETE THE FOLLOWING:
NAME

NAME
EXAMINATION CENTRE

EXAMINATION CENTRE

Please turn over 1

### Page 2

Engineering graphics and design / P1

NSC

EC / November 2020

INCOMPLETE FLOOR PLAN

900

a 5 500
(j,LZZZZZ
BEDROOM
CARPET
17,48 mi?

c
gs BATHROO!
S| PASSAGE TILES
2 TILES 7,03 m?

2,48 mt
A—*
LOUNGE / DINING ROOM
woop
17,59 m? II
Ll II
im KITCHEN
B 1 | TILES
4 in 5,95 m*
a“ i
2
§| 8 I
a
7] A] @
Ot)

NOTE:

QUESTION 1A: ANALYTICAL (CIVIL)

Given:
The incomplete floor plan of a house. A title panel and a table of questions. The drawing has not been prepared to
an indicated scale.

Instructions:
Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title

Contractors must verify all dimensions panel. [28]
and levels on site before commencing
work. Architects to be notified
immediately of any dsorepancies QUESTIONS ANSWERS
1 | What is the name of the architectural firm responsible for
ARCHITECTS SIGNATURE 1
drawing the house plans?
CUENTS SIGNATURE 2 | Whatis the project number for this drawing? 1
3 | 2020-08-27 |conmtere tHe wnoows 3 | Who was the person responsible for checking the 1
correctness of the drawing?
2 2020-03-27,
INSERT THE Door’ 4 | Whois the person responsible for drawing the floor plan? 1
1 | 2020-03-27 |THE FLOORPLAN
5 | When was the drawing printed?
REVISION DATE DESCRIPTION 1
6 | Who is the owner of the house?
BOTHA ARCHITECTS 1
11 Da Gamma street ——
2
JEFEREYSEAY 7 | What feature is indicated by the symbol at A’ 1
6330
TEL: 072 293 0392 8 | What feature does the line, indicated by arrow B show? a
FAX: 042 293 0392
EMAIL; kbotha@gmail,com - - -
SENT OME OF PART 9 | What does the abbreviation NTS in the tle panel stand 1
BLUEDEVILLE 2020-04-01 for!
10 | Has revision 3 been done correctly? Explain
DRAWNG THLE 1
FLOOR PLAN
ORG 14 | What is wrong with the hatching in the floor plan? 5
PROPOSED NEW HOUSE FOR
MRS. X. RUPPING, STAND 1442, 12 | What does the abbreviation BIC indicate?
THORNHILL, EASTERN CAPE. 2
Sa EE 18 | Which VIEW is indicated by arrow C? a
DP 2020 - 04 ofa
DATE [DRAWN |@REOKED | SCALE 14 | What is the width of the doors in mm if a scale of 1 : 100
2020 -03- 20} LINDO TYRON NTS: was used? a
ee 0E.2020 15 | In the space provided below, determine the perimeter of the entire house y
16 | In the space provided below, determine the total floor area that must be tiled, in square meters. | 4
TOTAL | 27
ANSWER 15 ANSWER 16
NAME
NAME [2

Copyright reserved

Please tum over

### Page 3

Engineering graphics and design / P1

NSC

EC / November 2020

QUESTION 2: INTERPENETRATION AND DEVELOPMENT

Given:

The top view and incomplete front view of a right regular
triangular prism that penetrates a right regular hexagonal
prism

The auxiliary view of the triangular prism:

The position of point X, the centre ofthe hexagon and starting
point for the top view.

A starting point AB for the development required.

Instructions:
Draw, to a scale 1 : 1 and in first angle orthographic projection, the
following views of the two solids:

24
2.2
2.3
24

The given top view using point X as a starting point.

The complete front view showing the curve of interpenetration.
The left view

The surface development of the triangular prism.

Use line AB as reference point.

Show ALL constructions.

[39]
B
3
ES)
4o__| 3
°
g
3
s
50 |
ASSESSMENT CRITERIA
4 | TOP view = G
CONSTRUCTION
2 FRONT VIEW + 9
INTERPENETRATION
3] LeFT view 8
4) DeveLOPMENT 16
TOTAL | 39
A
NAME
NAME [3

Copyright reserved

Please tum over

### Page 4

Engineering graphics and design / P1

NSC

EC / November 2020

QUESTION 3: PERSPECTIVE

Given:
Two views of a HOUSE and the information needed
to draw a two-point perspective drawing.

PP - Picture plane

HL - Horizon line

GL ~ Ground line

SP - Station point

Instructions:
Complete the perspective drawing

* Align the drawing sheet with the ground line (GL).
© Determine and label the vanishing points.

* Show ALL necessary construction.

* NO hidden detail is required

44]
CEMENT PORCH AROUND
THE HOUSE
PP
HL
ASSESSMENT CRITERIA

41 | CONSTRUCTION + VPs 5

2 | ROOF 15

3 | WALLS: 7

4 | DOOR + WINDOWS 10
.
I
| 5 | PORCH 7
|
|
L. TOTAL | 44

c I H GL
a ua NAME
CEMENT PORCH AROUND SP
THE HOUSE
NAME [4

Copyright reserved

Please tum over

### Page 5

Engineering graphics and design / P1

NSC

EC / November 2020

QUESTION 4: CIVIL DRAWING

Given:

* The incomplete SOUTH ELEVATION of a proposed new
dwelling, showing the walls, step, windows, the door openings
and notes.

* The incomplete floor plan showing the walls, position of the
doors, windows and sanitary fixtures.

© The incomplete foundation and wall detail.

* Room designations and floor finishes.

* A door and window schedule.

* A table of sanitary fixtures.

* The floor plan of the new dwelling, drawn to scale 1 : 50 and the
starting point P for the sectional view to scale 1 : 20 (on page 6).

Instructions:
Answer this question on page 6.

4.1. Using the given incomplete floor plan draw in first-angle
orthographic projection and to scale 1 : 50, the following views
of the new dwelling

4.1.1 THE COMPLETE FLOOR PLAN
Add the following features to the drawing:
* ALL doors and windows.
* ALL sanitary fixtures as indicated by the abbreviations.
* ALL hatching detail.

4.1.2 THE SOUTH ELEVATION
Show the following features on the drawing:
* The outside walls, step, doors and window detail as well as the
window sill under the widows.
Draw a break line 2 700 mm above the finished floor level
* The finished floor level.

4.2 Inthe space provided on page 6, using the incomplete
foundation and break line, draw, to scale 1 : 20, a DETAILED
SECTION on cutting plane A-A of the area in the ellipse shown
on the incomplete floor plan.

Show the following features:

The complete foundation, external wall and window detail

The lintels above the window.

The window sill under the window.

The bath in position.

Indicate with dimensioning the length of the bath.

ALL hatching detail.

ALL substructure hatching may be drawn neat in freehand.

Label the following:

* The south elevation and scale

* The room designations and floor finishes.

* Using the correct abbreviations, label the following features in
the correct view: natural ground level, finished floor level and
damp proof course.

NOTE:
* ALL drawings must comply with the guidelines and graphical
symbols contained in the SANS 10143. [89]

3.000

INCOMPLETE SOUTH ELEVATION

Am wa wi b
Two We 3
5 2
SH 3
D
1 4
—
. w3
sD 5 oO
STEP

INCOMPLETE FLOOR PLAN

n
2X 125 x 80 mm
LINTELS ABOVE ALL
Zz DOOR AND WINDOW
OPENINGS
S
8
2
9
s
a
8} 100)
GROUND LEVEL
3
3
L__f al
600
INCOMPLETE WALL AND

FOUNDATION DETAIL

DOOR AND WINDOW SCHEDULE
v TOFIT y yTOFIT |
t { t {

DOOR OPENING

WINDOW OPENING

SLIDING DOOR OPENING

FINISHED FLOOR LEVEL

STEP

GROUND LEVEL g g
oo n N

SLIDING DOOR DOOR FRAME AND
(sp) DOOR (0)
ROOM DESIGNATIONS
FLOOR FINISHES 1500 2000
1. BEDROOM CARPET 450, 450 450
2. BATHROOM TILE v v 1 u v
3. KITCHEN TLE
4, LOUNGE woop
5. PORCH CEMENT
ol IB all oc B al c lA B
8
FEATURES =|
D_-DOOR
SD SLIDING DOOR e
wt WINDOW g c c c c c
w2 WINDOW
WS WINDOW WINDOW (wa) WINDOW (wa)
FIXTURES
WC TOILET
WB WASH BASIN 4000
SH SHOWER ot WINDOW NOTES.
B BATH
S SINK 5 PENING SIDE
ol INGED SIDE
3 IXED PANE
THICKNESS OF ALL FRAMES: 50 mm
c
WINDOW SILL: 180 x 20 mm FIBRE
WINDOW (w1) CEMENT SILL UNDER ALL WINDOWS
SANITARY FIXTURES

2050
850
Bly

vt —T
SS (oat

750
10.

850

FLOOR LEVEL

750 1H

x

S|
750

SHOWER WASH BASIN
(SH) (WB)

500

Ba)

SS 1700
ToWeT BATH SINK
(we) ®) ©)

Copyright reserved

Please tum over

### Page 6

Engineering graphics and design / P1

NSC

EC / November 2020

a =
Cc
a
—_ im
FLOOR PLAN DETAILED SECTION ON A:A
SCALE 1: 50 SCALE 1: 20

|

PENALTIES

4 | INCORRECT OVERALL
SCALE

2 | INCORRECT POSITIONING
OF VIEWS.

3 | NON-ALIGNMENT OF VIEWS.

TOTAL PENALTIES (-)

ASSESSMENT CRITERIA

FLOOR PLAN
1 livoows | 17
2 | rxtures 9
3 | vasets 5
4 HATCHING 5

SUB TOTAL 36

SOUTH ELEVATION

4 | waLs + steps

+FFL+BREAK | 7
LINE

DOOR +

WINDOWS 14
LABELS 2

SUB TOTAL 23

DETAILED SECTION

4| Founations+ |g 4
WALLS + SLAB 2
WINDOW + SILL
2|\ LINTEL wo
3 | Hatcuine 64
4 | eats 23
5 | vimension 1
6 | seis 14
SUB TOTAL 30
TOTAL | 89
PENALTIES (-)
GRAND TOTAL
NAME
NAME [6

Copyright reserved

## Related documents

- [EGD P1 GR11 NOV2020 MEMO EA D A3](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-memorandum-paper-1/06588178-53df-4637-b644-1431070cfa22) — Engineering Graphic and Design · Memo · 2020
- [EGD P1 GR11 NOV2020 MEMO EA D](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-memorandum-paper-1/272e70c4-3a12-4125-8360-4d20754e049e) — Engineering Graphic and Design · Memo · 2020
- [GR11 IGO V2 NOV 2020 VRAESTEL](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-question-paper/82bb8e8a-84be-4237-b4cd-17ff7f76b176) — Engineering Graphic and Design · QP · 2020
- [GR11 IGO V2 NOV 2020 NASIEN RIGLYN](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-question-paper/a5c6ca64-93a6-4940-bbec-0dfbae6f3631) — Engineering Graphic and Design · QP · 2020
- [GR11 EGD P2 NOV 2020 QUESTIONPAPER](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-question-paper-paper-2/598ae231-66ec-402a-abfe-9749f0ba2356) — Engineering Graphic and Design · QP · 2020
- [EGD P1 GR11 NOV2020 QP ENG D](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-qp-eng-d/33ec3c9c-0d6f-46e0-8004-27e114ea193c) — Engineering Graphic and Design · QP · 2020 · Eng

## More from Grade 11 Engineering Graphic And Design

- [Gr 11 EngGraph Des ATP 2023-24](https://www.hlayiso.com/library/gr-11-enggraph-des-atp-2023-24/6fbec59e-8df9-49dc-9042-1e84389c22fa) — ATP
- [EGD P1 GR11 MEMO NOV2022 Afr+Engl](https://www.hlayiso.com/library/egd-p1-gr11-memo-nov2022-afr-engl/dc8a6861-4564-49b7-9da7-af10cd3460f8) — Memo · 2022 · Afr
- [EGD P2 GR11 MEMO NOV2022 English](https://www.hlayiso.com/library/egd-p2-gr11-memo-nov2022-english/50c4e044-b732-4d91-bcb3-e98c1bc8bfc1) — Memo · 2022 · Eng
- [EGD P1 GR11 MEMO NOV2022 Afr+Engl](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2022-exemplar-november-exam-memorandum-paper-1-english/9926f9cd-76bc-4eff-a287-c1394b665aaf) — Memo · 2022 · Eng
- [EGD P2 GR11 MEMO NOV2022 English](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2022-exemplar-november-exam-memorandum-paper-2-english/d5edd880-5fdb-4dcf-b0c1-c3eab2663873) — Memo · 2022 · Eng
- [EGD P1 GR11 NOV2020 QP MEMO AFR D](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-qp-memo-afr-d/4e58e8f6-6dcd-474e-84f8-988130cfd1d5) — Memo · 2020 · Afr

## Collection

- [Grade 11 past papers](https://www.hlayiso.com/grade-11/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.