# Engineering Graphic And Design Grade 11 P1 2022 QP (Eng)

> Grade 11 Engineering Graphic And Design Paper 1 question paper from the Exemplar November Exam 2022 (English), 6 pages. Read online or get the free PDF download, memo linked when available.

- Page: https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2022-exemplar-november-exam-question-paper-paper-1-english/23ceba4b-2e24-44ca-8ea3-08cd5e2be138
- Updated: 2026-09-28
- Subject: Engineering Graphic And Design
- Grade: Grade 11
- Language: English
- Document type: Question paper
- Year: 2022
- Exam period: Exemplar November Exam
- Paper: 1
- Curriculum: CAPS
- Pages: 6

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 11](https://www.hlayiso.com/library/grade-11) › [Engineering Graphic And Design](https://www.hlayiso.com/library/grade-11/engineering-graphic-and-design) › [Engineering Graphic And Design Grade 11 P1 2022 QP (Eng)](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2022-exemplar-november-exam-question-paper-paper-1-english/23ceba4b-2e24-44ca-8ea3-08cd5e2be138)

## About this document

Engineering Graphic And Design · Grade 11 · Exemplar November Exam · 2022 · English. Question paper, 6 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Matching paper and memo

- [EGD P1 GR11 MEMO NOV2022 Afr+Engl](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2022-exemplar-november-exam-memorandum-paper-1-english/9926f9cd-76bc-4eff-a287-c1394b665aaf) — Memo · 2022 · Eng

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

Province of the

Shee EASTERN CAPE

ad S @, EDUCATION

NATIONAL
SENIOR CERTIFICATE

ENGINEERING GRAPHICS AND DESIGN P 1

NOVEMBER 2022

MARKS: 200
TIME: 3 hours
This question paper consists of 6 pages.

Copyright reserved

INSTRUCTIONS AND INFORMATION

QRONS

soene

The paper consists of FOUR questions.
Answer ALL the questions

All drawings must be drawn to scale 1 : 1, unless otherwise stated

The questions must be answered on the answer sheets provided

All the answers sheets must be re-stapled in numerical sequence and
handed in irrespective of whether the question was attempted or not

Careful time management is essential in order to complete all the questions.
Print your name in the block provided on every ANSWER SHEET.

All answers must be drawn accurately and neatly.

Any details or dimensions not given must be estimated in good proportion
ALL drawings are in first angle orthographic projection, unless stated
otherwise

FOR OFFICIAL USE ONLY

MODERATED
MARK

WwW) NM) =>

4
TOTAL
2/|0/0 2/0|0
FINAL CONVERTED CHECKED BY
MARK

100

COMPLETE THE FOLLOWING:
NAME

NAME
EXAMINATION CENTRE

EXAMINATION CENTRE
Please turn over 1

### Page 2

Engineering graphichs and design / P1

NCS

EC / November 2022

NOTE:

Contractors must verify all dimensions
and levels on the site before
commencing work. Architects to be
notified immediately of any

ELEVATION 2
1500 8000
3870
ft ttt

—

3 B

5 BEDROOM 1 KITCHEN

CARPET
-
g BATHROOM fe g|
S| TILE ES
x
LOUNGE

BEDROOM 2

woop

4240

VIEW 1

NORTH EAST ELEVATION

QUESTION 1A: ANALYTICAL (CIVIL)

Given:
A incomplete floor plan and two elevations of a new dwelling. A title panel and a table of questions. The drawing has
not been prepared according to the indicated scale.

Instructions:
Complete the table below by neatly answering the questions, which refer to the accompanying drawing and title

discrepancies. panel. [33]
ARCHITECTS SIGNATURE
seers QUESTIONS ANSWERS
1 | Whois the client? 1
2 | What is the reference code of the drawing? 1
ANSWER 16 3 | How many signatures are reqiured on the drawing? 1
4 | On what date was the house plan printed? 1
5 | Line A indicates the FFL. What line type should be used for 1
this?
6 | What does the abbreviation BIC stand for? 1
7 | What item is indicated by B? 1
8 | How many exterior doors open to the outside of the house? 2
9 | What does the line indicated by arrow G, illustrate? 2
In what colour would new masonary be presented on a
3 2021-02-28 | ADD HATCHING 10 drawing? '
2 2021-02-28 | ret acuaoom | 44 | In what colour would new glass be presented on a drawing? 1
1 2021-02-26 |SHOW THE SCALE 42 | What SI unit are used for the dimensions on the given A
REVISION | DATE | DESCRIPTION drawing?
13 | What would view 1 be called? 1
GLENDA ARCHITECTS
16 Wainwright Street 14 | What would elevation 2 be called? 2
QUEENSTOWN
5319 Have all the proposed revision been made on the drawing?
TEL; 083 050 9882 15 | Motivate your answer. 2
FAX: 045 050 9882
EWALL:qve@gmaiicon | |. | In the space provided in the title panel, draw, in neat freehand, the front view and top view of the A
PRNTEDEY DATE OF PRINT SABS 10143 graphical symbol (convention) for a BATH.
DINDELA PRINTERS. 2021-04-12,
DRAWING THLE 17 | In the space provided below, (answer 17) determine the perimeter of the house, in meter. 4
FLOOR PLAN WITH ELEVATIONS,
In the space provided below, (answer 18) determine the total tile area of the bathroom floor in
PROIEGT 18) square meter 5
PROPOSED NEW DWELLING FOR :
MR. P. CEKISO ON STAND 13, ANSWER 17 ANSWER 18
UITENHAGE, EASTERN CAPE. TOTAL | 33

PROJECT NUMBER: ‘DRAWING NUMBER:
EGD 2021-01 P2021
DATE: DRAWN: [CHEGKED: SCALE:
2021-01-17] HLASO | DLABA | 1; 100
REFERENCE CODE! PAGE NUMBER:
DOE-2021EC 10F 4

NAME

NAME

[2

Copyright reserved

Please tum over

### Page 3

Engineering graphichs and design / P1

EC / November 2022

QUESTION 2: INTERPENETRATION AND DEVELOPMENT

Given:
* A top view and incomplete front view of a pentagonal pipe
penetrating a square pipe.
* Starting point X, the centre of the main pipe (vertical pipe)
in the top view. B
An auxiliary view of the pentagonal pipe.
Seam AB, the starting point for the development

Instructions:
Draw to scale 1:1, the following views of the interpenetrating

pipes:
2.1 The given top view
2.2 The complete front view clearly showing the curve of aL 35
interpenetration. - -
2.3 The left view.
2.4 The development of the branch pipe (pentagonal pipe) with
AB as the seam.
Show ALL hidden detail and folding lines. FE
Show ALL necessary construction lines.
[40]
30 q
|_30 | q
ASSESSMENT CRITERIA
4 TOP VIEW + 8
CONSTRUCTION
2 | FRONT VIEW 9
3 | Lert view 9
5 | DEVELOPMENT 14
PENALTIES (-)
xb TOTAAL | 40
NAME
NAME [3

Copyright reserved

Please tum over

### Page 4

Engineering graphichs and design / P41

NCS

EC / November 2022

QUESTION 3: PERSPECTIVE

GL

Given: ASSESSMENT CRITERIA
Three views of a HOUSE and the information needed to draw a
two-point perspective drawing. CONSTRUCTION AND VPs | 7
PP - Picture plane
HL - Horizon line ROOF 4
GL - Ground line
SP - Station point WALLS 18
Instructions: wiNDows 7
Complete the perspective drawing
PENALTIES (-)
* Align the drawing sheet with the ground line (GL).
© Determine and label the vanishing points.
* Show ALL necessary construction TOTAL] 36
* NO hidden detail is required
* W= Window [36]
PP
HL
t
|
LJ w3 L.
| w2 DOOR
| wt
wal | L.
|
L4
|
| FFL
1

et

NAME

[4

Copyright reserved

Please tum over

### Page 5

Engineering graphichs and design / P1

NCS

EC / November 2022

QUESTION 4: CIVIL DRAWING

Given:

© The incomplete EAST ELEVATION of a proposed new one
bedroom dwelling, showing the walls, step, windows, door
openings and notes.

© The incomplete floor plan showing the walls, position of the
doors, windows and sanitary fixtures

© The incomplete foundation and wall detail

* Room designations and floor finishes

* A door and window schedule.

* A table of sanitary fixtures.

© The floor plan of the new dwelling, drawn to scale 1 : 50 and the
starting point P for the sectional view to scale 1 : 20 (on page 6).

3000

Instructions:
‘Answer this question on page 6.

4.1. Using the given incomplete floor plan draw in first-angle
orthographic projection and to scale 1 : 50, the following views
of the new dwelling:

4.1.1 THE COMPLETE FLOOR PLAN
Add the following features to the drawing:
ALL doors and windows.
* ALL sanitary fixtures as indicated by the abbreviations.
* ALL hatching detail.

4.1.2 THE EAST ELEVATION
Show the following features on the drawing:
© The outside walls, step, doors and window detail,
window sills, and the garage ramp.
* Draw a break line 3000 mm above the ground level.
© The finished floor level.

4.2 In the space provided on page 6, using the incomplete
foundation and break line, draw, to scale 1: 20, a DETAILED
SECTION on cutting plane A-A of the area in the ellipse shown
on the incomplete floor plan.

Show the following features:
* The complete foundation, external wall and window detail.

The lintels above the window.

The window sill under the window.

Show a part of the garage door opening

ALL hatching detail

ALL substructure hatching may be drawn neat in freehand

Label the following:

* The east elevation and scale.

* Detailed section A : A and scale.

* The room designations and floor finishes.

* Using the correct abbreviations, label the following features in
the correct view: natural ground level, finished floor level and
damp proof course.

NOTE:
* ALL drawings must comply with the guidelines and graphical
symbols contained in the SANS 10143. [91]

2100

250

GARAGE DOOR OPENING

[ DOOR OPENING DOOR AND WINDOW SCHEDULE
| WINDOW OPENINGS
y 2600 TOFIT
i i # 4 # a
g x
ba FINISHED FLOOR LEVEL
|. _ GROUND LEVEL
af ° ol
INCOMPLETE EAST ELEVATION 400) S 2
a al
-— W3 el
‘ GARAGE DOOR
w3 DOOR FRAME AND
(GD) DOOR (D)
ROOM DESIGNATIONS AND FLOOR FINISHES
1. BEDROOM CARPET
2.BATHROOM — TILE x 2.000 x
3. KITCHEN] TILE 450 450 450
4, LOUNGE woop 1 x
5. GARAGE CEMENT
FEATURES
D DOOR al °
wi wWkbow & || ¢ & |B A) cA B
w2 WINDOW 7 ~
W3 WINDOW
STEP FIXTURES t Re
WC TOILET
INCOMPLETE FLOOR PLAN We Wash BASIN WINDOW (W2) ‘WINDOW (W1)
240, ee y—1000_y WINDOW NOTES
B PENING SIDE
n INGED SIDE
2 A C= FIXED PANE
2X 120 x 80 mm LINTELS 8 THICKNESS OF ALL FRAMES: 50 mm.
ABOVE ALL DOOR AND c WINDOW SILL: 180 x 20 mm FIBRE
I s00 nt NBOuE 4 CEMENT SILL UNDER ALL WINDOWS
THE FINISHED FLOOR 100 WINDOW (WS)
LEVEL
1 4
Ss | SANITARY FIXTURES
q GROUND LEVEL.
S r=)
8 Fe 500
“ gs At 500
“Sp 8) a
‘4-800 400) S| 2009) ol \ |_| Fa pry
INCOMPLETE FOUNDATION AND iN} 2 3 7] °
100 EXTERNAL WALL DETAIL OF THE al FLOOR LEVEL
HOUSE
(sa ; RE J Oe : > it
ale
— GROUND LEVEL 8 ae 200) O zg [ea
3
“ zg ‘900 of
Ll ‘SHOWER WASH BASIN TOILET SINK
(SH) (we) (we) ()
INCOMPLETE FOUNDATION AND NAME
EXTERNAL WALL DETAIL OF THE
j|ARAGE
SARAGE NAME [5

Copyright reserved

Please tum over

### Page 6

Engineering graphichs and design / P1

NCS

EC / November 2022

|__]

PENALTIES

4 | INCORRECT OVERALL
SCALE

2 | INCORRECT POSITIONING
OF VIEWS:

3 | NON-ALIGNMENT OF VIEWS:

TOTAL PENALTIES (-)

FLOOR PLAN

SCALE 10

ASSESSMENT CRITERIA
FLOOR PLAN
DOORS AND 4
1 | winoows 403
2 | FIXTURES 84
3 | LABELS 5
4 | HATCHING 5
SUB-TOTAL 39
EAST ELEVATION
WALLS, STEPS,
1 | FFLAND BREAK 64
LINE
DOOR AND 1
2 | winoows Wa
3 | LABELS 2
SUB-TOTAL 23
DETAILED SECTION
FOUNDATIONS,
1 | WALLS AND 8
FLOOR
WINDOW, SILL,
2 | LINTEL AND 13
GARAGE DOOR
3. | HATCHING 53
4 | LABeLs 23
SUB-TOTAL 29
TOTAL 1
PENALTIES (-)
GRAND TOTAL
NAME
NAME [6

Copyright reserved

## Related documents

- [EGD P2 GR11 MEMO NOV2022 English](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2022-exemplar-november-exam-memorandum-paper-2-english/d5edd880-5fdb-4dcf-b0c1-c3eab2663873) — Engineering Graphic and Design · Memo · 2022 · Eng
- [EGD P1 GR11 NOV2020 QP ENG D](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-question-paper-paper-1-english/49216894-9dbe-420a-827e-3bad1e447cf5) — Engineering Graphic and Design · QP · 2020 · Eng
- [EGD P2 GR11 MEMO NOV2022 English](https://www.hlayiso.com/library/egd-p2-gr11-memo-nov2022-english/50c4e044-b732-4d91-bcb3-e98c1bc8bfc1) — Engineering Graphic and Design · Memo · 2022 · Eng
- [EGD P1 GR11 NOV2020 QP MEMO ENG D](https://www.hlayiso.com/library/grade-11-engineering-graphic-and-design-2020-national-exemplar-november-exam-memorandum-paper-1-english/4661fe3b-2457-4840-b384-e15860bd5f65) — Engineering Graphic and Design · Memo · 2020 · Eng
- [EGD P1 GR11 MEMO NOV2022 Afr+Engl](https://www.hlayiso.com/library/egd-p1-gr11-memo-nov2022-afr-engl/dc8a6861-4564-49b7-9da7-af10cd3460f8) — Engineering Graphic and Design · Memo · 2022 · Afr
- [EGD P1 GR11 NOV2020 QP AFR D](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-qp-afr-d/50789484-ecd0-4022-93cb-f02646e54f26) — Engineering Graphic and Design · QP · 2020 · Afr

## More from Grade 11 Engineering Graphic And Design

- [Gr 11 EngGraph Des ATP 2023-24](https://www.hlayiso.com/library/gr-11-enggraph-des-atp-2023-24/6fbec59e-8df9-49dc-9042-1e84389c22fa) — ATP
- [EGD P1 GR11 NOV2020 QP MEMO AFR D](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-qp-memo-afr-d/4e58e8f6-6dcd-474e-84f8-988130cfd1d5) — Memo · 2020 · Afr
- [EGD P1 GR11 NOV2020 MEMO EA D](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-memo-ea-d/0fcafeba-14c7-4aef-bc9a-b0b1c5cbbeb2) — Memo · 2020
- [EGD P1 GR11 NOV2020 MEMO EA D 2 A4 on A3](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-memo-ea-d-2-a4-on-a3/65f950c9-b03f-428b-b507-f6c9a20a4f85) — Memo · 2020
- [EGD P1 GR11 NOV2020 MEMO EA D A3](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-memo-ea-d-a3/8caa0a5f-cb37-4455-8824-28dec6dcbb9e) — Memo · 2020
- [EGD P1 GR11 NOV2020 QP MEMO ENG D](https://www.hlayiso.com/library/egd-p1-gr11-nov2020-qp-memo-eng-d/af275228-8eea-4314-8b2f-c1cb80bcfb8b) — Memo · 2020 · Eng

## Collection

- [Grade 11 past papers](https://www.hlayiso.com/grade-11/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.