# Civil Technology Grade 12 NSC June 2024 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC June Exam 2024 (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/grade-12-civil-technology-2024-nsc-june-exam-memorandum-english/1ef9ca43-2710-40c4-9e1f-f82b949ed2c0
- Updated: 2026-09-28
- Subject: Civil Technology
- Grade: Grade 12
- Language: English
- Document type: Memorandum
- Year: 2024
- Exam period: NSC June Exam
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC June 2024 Memo (English)](https://www.hlayiso.com/library/grade-12-civil-technology-2024-nsc-june-exam-memorandum-english/1ef9ca43-2710-40c4-9e1f-f82b949ed2c0)

## About this document

Civil Technology · Grade 12 · NSC June Exam · 2024 · English. Memorandum, 18 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

SENIOR CERTIFICATE EXAMINATIONS/
         NATIONAL SENIOR CERTIFICATE EXAMINATIONS

                     CIVIL TECHNOLOGY: CIVIL SERVICES

                                  MAY/JUNE 2024

                             MARKING GUIDELINES

                                                                      MARKS: 200

                     These marking guidelines consist of 18 pages.

Copyright reserved                                                   Please turn over

### Page 2

Civil Technology: Civil Services              2                             DBE/May/June 2024
                                   SC/NSC Marking Guidelines

INSTRUCTIONS FOR MARKERS

1.    Markers should:

      •    Familiarise themselves with the question and answer before evaluating the
           responses of candidates.
      •    Always interpret the responses of the candidates within the context of the
           question.
      •    Consider any relevant and acceptable answer during pre-marking but
           should strictly adhere to the answers after finalisation of the marking
           guideline.
      •    There are TWO approaches to answering questions; these are (1) to
           describe and (2) to explain.
              1. If a candidate is required to explain e.g., a process in 4 steps, only the
                  first 4 responses should be considered.
              2. However, if for example candidate is required to explain or describe a
                  process, we need to consider that that candidates may write a long
                  description, not necessarily well organised. In this case, the marker
                  needs to evaluate the complete statement to judge if the candidate
                  explained the required outcome satisfactorily and allocate marks on
                  merit.
      •    Mark what the candidate wrote and do not interpret or predict responses.
      •    Indicate the tick or cross right at the position where the mark needs to be
           awarded or where the candidate made the error.
      •    Accept the letter corresponding with the correct answer as well as the
           answer written in full in multiple-choice questions or similar questions.
      •    Accept incorrect spelling in answers unless the spelling changes the
           meaning of the answer.
      •    If a learner writes two or more answers separated by a slash (/) mark only
           the first response, unless the additional answer/s are different names for the
           same item e.g., Yale lock/Night latch. In this case, the answer for the
           response should be awarded and the slash (/) should NOT be considered as
           an additional answer.

2.    For calculations:

      •    A mark is only awarded if the correct unit is written next to the answer. If the
           question states that the answer must be in a specific unit, a mark will ONLY
           be awarded if the answer has the correct unit as indicated in the question.
      •    Marks will only be allocated for the correct values if the candidates add
           instead of multiply. NO marks will be awarded for the calculations and the
           answer.
      •    Where an incorrect answer is correctly carried over, the marker must
           recalculate the values, using the incorrect answer from the first calculation.
           If correctly used, the candidate should receive the full marks for subsequent
           calculations.
      •    Alternative methods of calculations must be considered, provided that the
           correct answer is obtained.
      •    For the calculation of quantities marks will be awarded for the correct use of
           the dimension paper.

Copyright reserved                                                              Please turn over

### Page 3

Civil Technology: Civil Services                 3                           DBE/May/June 2024
                                   SC/NSC Marking Guidelines

3.       When marking drawings:

               •   The member for which the mark should be awarded should be drawn
                   correctly in the correct position to receive a mark.
               •   A member incorrectly drawn but wrongfully repeated in another
                   position will be awarded the mark for the repeated incorrect member
                   provided that the marking guideline provide for TWO or more marks
                   for that member (positive marking).
               •   Marks can only be awarded for a label if the label is correctly
                   indicating the correct member. Do not consider labels for members of
                   which the labels were provided on the answer sheet.
               •   Scale drawings should always be marked using an appropriate mask.
               •   If the incorrect/wrong drawing was drawn, the candidate can be
                   awarded for only what was provided for on the marking guideline.
               •   If a line diagram or an orthographic view instead of a pictorial drawing
                   (isometric/oblique/perspective) is drawn, the first assessment criteria
                   for each member will be marked wrong, but marks will be awarded for
                   the subsequent members if TWO or more marks are awarded for the
                   same member.
               •   If candidates draw/give more information than what is required, mark
                   strictly according to the assessment criteria.

4.       Incorrect numbering of questions:

         •   If a candidate numbered an incorrectly, but the answer is in the correct
             position according to the sequence of the questions in the question paper,
             circle then the incorrect numbering and mark the response.
         •   If questions were answered randomly not following the same sequence as
             in the question paper and the learner numbered incorrectly, the response
             should NOT be marked.

5.       Duplication of responses and questions answered in the correct place:

     •       If a question is answered twice, mark the first response.
     •       If a question should be answered on an answer sheet and the candidate
             answered it on both the answer sheet and in the answer book, mark the
             response on the answer sheet and cancel the response in the answer book.
     •       If the question was answered in the answer book instead of on the answer
             sheet, mark the response in the answer book according to the assessment
             criteria on the marking guideline.

Copyright reserved                                                              Please turn over

### Page 4

Civil Technology: Civil Services                 4                            DBE/May/June 2024
                                   SC/NSC Marking Guidelines

QUESTION 1:          OHSA, MATERIALS,            TOOLS,        EQUIPMENT    AND     JOINING
                     (GENERIC)

1.1        1.1.1        D✓                                                                           (1)

           1.1.2        D✓                                                                           (1)

           1.1.3        B✓                                                                           (1)

           1.1.4        C✓                                                                           (1)

           1.1.5        B✓                                                                           (1)

           1.1.6        B✓                                                                           (1)

           1.1.7        A✓                                                                           (1)

           1.1.8        D✓                                                                           (1)

           1.1.9        C✓                                                                           (1)

           1.1.10       A✓                                                                           (1)

           1.1.11       B✓                                                                           (1)

           1.1.12       A✓                                                                           (1)

1.2.       1.2.1        Rawl plugs/Plastic plugs with screws/Coach screws/Lag bolts ✓                (1)

           1.2.2        Rawl plugs/Plastic plugs with screws/Coach screws/Lag bolts:
                        • Are strong fasteners ✓
                        • Resist pull out failure ✓
                        • Have excellent carrying capacity
                        • Easy to install
                        • Are cost effective
                        ANY TWO OF THE ABOVE                                                         (2)

           1.2.3        • Drill holes/Drill holes and remove the debris ✓
                        • Position the cabinet and insert the rawl plugs/plastic plugs into
                          the holes through the cabinet ✓ OR
                          Insert plastic plugs into the holes, position the cabinet and insert
                          the joining fixtures into the holes through the cabinet
                        • Tighten the screws/Insert the screws into the holes and tighten
                          the screws ✓                                                               (3)

1.3.       1.3.1        Multi detector ✓                                                             (1)

           1.3.2        Laser level/Spirit level ✓                                                   (1)
                                                                                                     [20]

Copyright reserved                                                                Please turn over

### Page 5

Civil Technology: Civil Services                 5                             DBE/May/June 2024
                                   SC/NSC Marking Guidelines

QUESTION 2:          GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

NO.                     QUESTIONS                                ANSWERS                      MARKS

        Name the type of building that is            Multi-storey building/
 1.                                                                                                  1
        illustrated by FIGURE A.                     Three-storey building ✓

        Deduce from the building plan the            North elevation/North ✓                         1
 2.
        elevation on which the sink is located.

                                                     Ridge capping/Ridge/Roof/
 3.     Identify number 1.                                                                           1
                                                     Roof covering/Hipped end ✓

        Why are balusters installed at
 4.                                                  To prevent people from falling off ✓            1
        number 2?

        What type of material was specified          Laminated safety glass/Safety
 5.                                                                                                  1
        for number 3?                                glass ✓

        Recommend ONE suitable material for
 6.
        number 4.                           Timber/Fibre cement ✓                                    1

        Who is the owner of the proposed
 7.                                                  Mr P Xhosa ✓                                    1
        dwelling?

        Identify the number that indicates the
 8.                                                  5✓                                              1
        downpipe.

        Name ONE other sanitary fixture,
 9.     besides a washbasin, that can be             Shower/Bath/Bidet/Urinal ✓                      1
        installed in the bathroom.

 10.    Identify number 7.                           Distribution board/DB ✓                         1

                                                     To access the garage with a
 11.    Describe the purpose of number 8.                                                            1
                                                     vehicle ✓

        How many fluorescent tubes are
 12.                                                 1✓                                              1
        indicated in the building?

 13.    Name the street in which the new
                                                     Protea Street ✓                                 1
        building will be erected.

Copyright reserved                                                                Please turn over

### Page 6

Civil Technology: Civil Services                 6                              DBE/May/June 2024
                                   SC/NSC Marking Guidelines

        What type of finish was specified for
 14.                                                 Stone cladding ✓                                 1
        the walls?

        Deduce from the building plan why it         Drawing of balustrades/Balustrades
 15.                                                                                                  1
        was revised.                                 were not drawn ✓

        What must be installed to gain access
 16.                                                 Stairs ✓                                         1
        to the first and second floor?

        Deduce from the building plan who
 17.                                                 Architect ✓ and Client ✓                         2
        must sign off the building plan.

        What are the prescribed dimensions
 18.                                                 40 mm x 40 mm x 1 200 mm ✓                       1
        for the balusters?

        How many hinged window openings
 19.    are indicated on window 2 in the             1✓                                               1
        window schedule?

                                                     •    To have electricity during load
                                                          shedding ✓
        Provide a reason for installing solar        •    To save on electricity cost
 20.                                                                                                  1
        panels on the roof.                          •    To be independent from
                                                          electricity providers
                                                     •    To ensure exposure to sun light

        The interior door frames are covered
 21.    with plywood. Draw the symbol for                                           ✓✓                2
        plywood.

        Draw the symbol for a wall mounted                                  ✓✓
 22.                                                                                                  2
        urinal.

        Describe the top end shape of the
 23.                                                 Square ✓                                         1
        baluster.

Copyright reserved                                                                 Please turn over

### Page 7

Civil Technology: Civil Services                 7                           DBE/May/June 2024
                                   SC/NSC Marking Guidelines

                                                    2,6 ✓ + 0,17 ✓ + 2,6 ✓ + 0,17 ✓ +
                                                    2,6 ✓ + 1,8 m ✓
                                                  = 9,94 ✓ m
        Calculate the total height of the                         OR
        building from the finished floor level up
 24.                                               2 600 + 170 + 2 600 + 170                       7
        to the top of the roof. Give your
        answer in m.                               + 2 600 + 1 800 mm
                                                  = 9 940 mm
                                                  = 9,94 m

        Calculate the area of the external wall      = (2,6 ✓ x 12 ✓) – (2,1 ✓ x 1,8 ✓)
25.     of the second floor from the top of the      = 31,2 ✓ – 3,78 m² ✓                          7
        floor up to roof height in the west          = 27,42 ✓ m²
        elevation in FIGURE A. Show ALL                              OR
        calculations Give your answer in m².
                                                     = (2 600 x 12 000) – (2 100 x 1 800)
                                                     = 31 200 000 – 3 780 000 mm²
                                                     = 27 420 000 mm2
                                                     = 27,42 m²

                                                                                 TOTAL:            40

Copyright reserved                                                              Please turn over

### Page 8

Civil Technology: Civil Services                 8                         DBE/May/June 2024
                                   SC/NSC Marking Guidelines

QUESTION 3: CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA
            AND QUANTITIES (SPECIFIC)

3.1        3.1.1        1:90 ✓                                                                   (1)

           3.1.2        150 mm ✓                                                                 (1)

           3.1.3        OHSA ✓                                                                   (1)

           3.1.4        Orange/Red ✓                                                             (1)

           3.1.5        Loose/Waterlogged ✓                                                      (1)

3.2        Soil compaction is the process of increasing the density ✓ of soil by pressing
           the soil particles closer together. ✓                                                 (2)

3.3        Precautionary measures to work in excavations:
           • The sides of the excavation must be properly supported ✓
           • If the sides are not properly supported, no person is allowed to work in the
              trench ✓
           • The supervisor must ensure that no load, material or heavy machinery is
              placed near the edge of any excavation
           • Deep trenches should have shoring
           • The supervisor (competent person) must have precautionary measures in
             place to prevent any person from being buried or trapped from falling
             materials in excavations
           ANY TWO OF THE ABOVE                                                                  (2)

3.4        3.4.1        Shower rose ✓                                                            (1)

           3.4.2        Chrome/Brass/Plastic/Steel ✓                                             (1)

           3.4.3        Copper/Galvanised mild steel/Pex-pipe: (Cross linked polythene           (1)
                        pipe)/Polythene ✓

           3.4.4        15 mm ✓                                                                  (1)

           3.4.5        Hot-water pipe ✓                                                         (1)

           3.4.6        Mixer tap ✓                                                              (1)

           3.4.7        Chrome/Brass ✓                                                           (1)

           3.4.8        90° Elbow ✓                                                              (1)

Copyright reserved                                                            Please turn over

### Page 9

Civil Technology: Civil Services                 9                       DBE/May/June 2024
                                   SC/NSC Marking Guidelines

3.5        Length of pipe = 5 000 mm
           Fall of drainpipe
                                    1✓ X 5 000 ✓
                                =         X
                                                      X

                                   60 ✓ 1     X

                                   = 83,3
                                                   ✓
                                   = 83 mm/0,083 m        X

                                                                                                (4)

3.6          • Spirit level ✓
             • Dumpy level ✓
             • Laser level
             • Incidence board/Gradient template
           ANY TWO OF THE ABOVE                                                                 (2)

3.7        Poling boards/Strut/Walling boards/Solid timber/Shutter board/Folding
           wedge ✓
           ANY ONE OF THE ABOVE                                                                 (1)

3.8       Locations for manholes:
          • Close to municipal connections ✓
          • Not more than 2 m from boundary
          • Every 20 m to 25 m on a straight drain line
          • At change of directions
          • At important junctions
          ANY ONE OF THE ABOVE                                                                  (1)

3.9

                                   1              2                2        1

                                                              2

                                                      TOP VIEW

                                                      FRONT VIEW

                              NO.        ASSESSMENT CRITERIA                MARK
                               1  Header bricks                               2
                               2  Stretcher bricks                            3                 (5)
                                                            TOTAL:            5                 [30]

Copyright reserved                                                           Please turn over

### Page 10

Civil Technology: Civil Services                     10                     DBE/May/June 2024
                                       SC/NSC Marking Guidelines

QUESTION 4: COLD AND HOT-WATER SUPPLY, TOOLS, EQUIPMENT AND
            MATERIALS (SPECIFIC)

4.1        4.1.1        Electronic tap/Electric tap/Sensor tap/Automatic tap ✓                      (1)
           4.1.2        To save water/To reduce water usage/Can be used without
                        touching the tap ✓                                                          (1)
           4.1.3        In public bathrooms/Bathrooms/Kitchens ✓                                    (1)
           4.1.4
                             ✓

                                            ✓
                                                 ✓
                                   ✓

                                                                                                    (4)
4.2        4.2.1        A - P-trap ✓
                        B - 90°Waste bend plain/90° bend plain ✓
                        C - Waste pipe/Waste water pipe ✓
                                                                                                    (3)
           4.2.2        110 mm ✓                                                                    (1)

           4.2.3        To carry the waste/soil water to the manhole/municipal
                        connection/septic tank/vacuum tank ✓                                        (1)
           4.2.4        The function of a 135° Waste junction:
                        • To connect sewer pipes at an angle of 135° ✓
                        • To connect three sewer pipes
                        • To join a branch pipe on the main sewer pipe
                        ANY ONE OF THE ABOVE
                                                                                                    (1)
4.3        4.3.1
                                       ✓

                             ✓                  ✓
                                                      OR

                                         NOTE (can be drawn in any position)                        (3)
           4.3.2        40 mm/50 mm ✓                                                               (1)

Copyright reserved                                                               Please turn over

### Page 11

Civil Technology: Civil Services                 11                       DBE/May/June 2024
                                   SC/NSC Marking Guidelines

           4.3.3        Plain T-waste junction:
                        • Under a double bowl sink ✓
                        • Under basins
                        • To connect a wash tub and single sink
                        • To connect three pipes with the same diameter
                        • At sanitary fitments where three pipes must be connected
                        ANY ONE OF THE ABOVE                                                    (1)

4.4        4.4.1        Full-way valve/Gate valve ✓                                             (1)

           4.4.2        Wheel/Hand wheel ✓                                                      (1)

           4.4.3        The tapering gate will:
                        • Move down ✓
                        • Close the valve ✓
                        • Stop the flow of water
                        • Reduce the water flow
                        ANY TWO OF THE ABOVE                                                    (2)

Copyright reserved                                                           Please turn over

### Page 12

Civil Technology: Civil Services                 12                         DBE/May/June 2024
                                   SC/NSC Marking Guidelines

4.5

                                                                          OUTLET 3
      HOT WATER TO
      HOUSE

                     2
                                              1

                                                                      1

                                                      1

                                                                            1

                                                          3   INLET

                 NO.      ASSESSMENT CRITERIA               MARK
                  1  Arrows showing direction of water flow   4
                  2  Hot-water to house                       1
                  3  Labels: Inlet and Outlet                 2
                                                  TOTAL:      7                                    (7)

4.6        4.6.1         Storage water heater (domestic type) ✓                                    (1)

           4.6.2         Expansion control vessel ✓                                                (1)

           4.6.3         Mixer (Thermostatically controlled) ✓                                     (1)

           4.6.4         Water meter ✓                                                             (1)

Copyright reserved                                                              Please turn over

### Page 13

Civil Technology: Civil Services                 13                       DBE/May/June 2024
                                   SC/NSC Marking Guidelines

4.7        Cleaning of drain cleaning rods:
           • Hose down the drain cleaning rods ✓
           • Wash the drain cleaning rods thoroughly ✓
           • Disinfect the drain cleaning rods
           • Allow the drain cleaning rods to dry
           ANY TWO OF THE ABOVE                                                                 (2)

4.8        If it contains any oil. ✓                                                            (1)

4.9        Zinc has a very weak atomic bond relative to other metals. ✓                         (1)

4.10       Consequences of dezincification:
           • Zinc in contact with oxygen and water dissolves and the material that
             remains is a weak spongy copper layer ✓
           • Can cause leaks if fittings weakens ✓
           • Can cause blockages when debris from dezincification falls into the pipe
           ANY TWO OF THE ABOVE                                                                 (2)

4.11       White ✓                                                                              (1)
                                                                                                [40]

Copyright reserved                                                           Please turn over

### Page 14

Civil Technology: Civil Services                 14                     DBE/May/June 2024
                                   SC/NSC Marking Guidelines

QUESTION 5: GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
            STORM WATER (SPECIFIC)

5.1        Installation of a PVC gutter:
           • Measure and mark out positions of gutter brackets at a slope ✓
           • Attach gutter brackets to fascia board ✓
           • Measure, mark out and cut gutters to the required length ✓
           • Create hole in gutter for outlet and clip on outlet ✓
           • Clip gutter to brackets and join with union clip ✓                                  (5)

5.2        1 metre ✓                                                                             (1)

5.3        50/50 solder/Solder with 50% tin and 50% lead mixture ✓                               (1)

5.4        Dampness/Water will accumulate under the building ✓                                   (1)

5.5
                                                               ✓

                                                       ✓
                                                   ✓

                                      ✓

                               PRE-FABRICATED SURFACE CHANNEL                                    (4)

Copyright reserved                                                            Please turn over

### Page 15

Civil Technology: Civil Services                           15                                DBE/May/June 2024
                                             SC/NSC Marking Guidelines

 5.6

                                                                               2
                         A
                                                                      2

                                                                           3

                                         7                             1

                                     5
                                                 4
                                 5
                                                     4
                                                               4
                           5

  6                       5                                                1

                           5

                             5

                             5

                                                         NO.       ASSESSMENT CRITERIA                MARK
                                                          1        Projection lines to determine apex   2
                                                          2        Division of circle into 12 equal     2
                                                                   parts
                                                          3        Projection lines from circle         1
                                         7
                                                          4        Construction lines and arcs from     3
                                                                   cone
                                                          5        Development of top of cone           7
                                                          6        Development of base of cone          1
                                                          7        3 mm seam on both sides              2
                                                                                               TOTAL:  18             [30]
                                                                                                                    [30]

Copyright reserved                                                                               Please turn over

### Page 16

Civil Technology: Civil Services                     16                    DBE/May/June 2024
                                       SC/NSC Marking Guidelines

QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)

6.1        6.1.1        C✓                                                                       (1)

           6.1.2        E/B ✓                                                                    (1)

           6.1.3        A✓                                                                       (1)

           6.1.4        F✓                                                                       (1)

           6.1.5        B✓                                                                       (1)

6.2        PVC pipes are lightweight. ✓
           Cast iron pipes are heavy. ✓                                                          (2)

6.3        6.3.1

                                   ✓                ✓

                                              ✓

                                                                                                 (4)
                                                     ✓
           6.3.2        100 mm/110 mm ✓                                                          (1)

6.4        6.4.1        Material used to manufacture a washbasin:
                        •  Ceramic ✓
                        •  Stainless steel/Pressed steel
                        •  Cast iron
                        •  Plastic
                        •  Terrazzo
                        •  Wood
                        •  Concrete
                         ANY ONE OF THE ABOVE                                                    (1)

           6.4.2        Waste outlet/Outlet/Waste water outlet ✓                                 (1)

           6.4.3        Device to seal the water:
                        •  Rubber plug/Push plug/Plug ✓                                          (1)

           6.4.4        To direct overflowing water from the washbasin/hand washbasin to
                        the waste outlet/waste pipe/It prevents the overflow of water from
                        the washbasin/hand washbasin. ✓                                          (1)

           6.4.5        The water in the trap prevents odours/sewer gasses from entering
                        the home. ✓                                                              (1)

Copyright reserved                                                            Please turn over

### Page 17

Civil Technology: Civil Services                       17                        DBE/May/June 2024
                                         SC/NSC Marking Guidelines

6.5        6.5.1        Allowance for sheet metal joints:
                        • The thickness of the material ✓
                        • Discretion of the worker
                        ANY ONE OF THE ABOVE                                                           (1)

           6.5.2        1 mm ✓                                                                         (1)

           6.5.3        Outside of the marked pattern/On the waste side of the pattern ✓               (1)

           6.5.4           Joining methods:
                           • Pop rivet joints ✓
                           • Soldered joints ✓                                                         (2)

6.6        Process to install a chemical anchor:
           • Mix the chemical resin with the hardening agent and insert into hole ✓
           • Insert bolt and allow mixture to cure ✓
           • Attach bracket and fix with nut ✓
           • Place the bracket in position and fix with nut
           ANY THREE OF THE ABOVE                                                                      (3)

6.7

                                                                     2

                                                                             5

                                                        3                4

                            1                                        4
                                                                     1
                                                                     1
                                                            2            4

                                   NO.           ASSESSMENT CRITERIA     MARK
                                    1      Outlet pipe                     1
                                    2      Housing walls                   2
                                    3      Hatching of walls               1
                                    4      Draw-off valve                  3
                                    5      Kerb                            1
                                                                  TOTAL:   8

Copyright reserved                                                                  Please turn over

### Page 18

Civil Technology: Civil Services               18                      DBE/May/June 2024
                                     SC/NSC Marking Guidelines

6.8        6.8.1        A-Vent pipe/Ventilation pipe/VP/Vent valve ✓
                        B-Inspection eye/IE ✓                                              (2)

           6.8.2                           ✓                                               (1)

           6.8.3        Settling chamber ✓
                        Discharge chamber ✓                                                (2)

           6.8.4        French drain ✓                                                     (1)

           6.8.5        Rodding eye/RE ✓                                                   (1)
                                                                                           [40]

                                                                             TOTAL:        200

Copyright reserved

## Related documents

- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — Civil Technology · QP · 2024 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Woodworking English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-woodworking-english/62d9cbb1-1077-4edb-86c4-7a21fd6749a9) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2022 Civil Services English](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2022-civil-services-english/896ddb1f-2144-4bfc-a35a-3a71507d7637) — Civil Technology · Memo · 2022 · Eng
- [CIV TECH GR12 MEMO SEPT2021 English Civil Services](https://www.hlayiso.com/library/civ-tech-gr12-memo-sept2021-english-civil-services/80eb9860-b118-41e2-98fd-5bea1b29a026) — Civil Technology · Memo · 2021 · Eng
- [CIVIL TECH GR12 MEMO GR12 SEPT2017 English](https://www.hlayiso.com/library/civil-tech-gr12-memo-gr12-sept2017-english/fcb77566-a1ac-4dff-af72-678e70ccfbc4) — Civil Technology · Memo · 2017 · Eng
- [Civil Technology May June 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-may-june-2019-civil-services-memo-afr/2a9b9e1b-37dc-48dc-9aa7-67dd5fa19a10) — Civil Technology · Memo · 2019 · Afr

## More from Grade 12 Civil Technology

- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — QP · 2025 · Afr
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT 2023 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept-2023-construction-english/4163a632-f091-41bf-8a36-993d566fb2cc) — QP · 2023 · Eng
- [Civil Technology Nov 2023 (Construction) Eng](https://www.hlayiso.com/library/civil-technology-nov-2023-construction-eng/e6743728-8140-42ae-838d-282654a975a5) — QP · 2023 · Eng
- [Civil Technology Nov 2023 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2023-civil-services-afr/b820ac91-947c-4aed-821f-256aa13aabe1) — QP · 2023 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
