# Civil Technology Grade 12 NSC November 2025 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2025 (English), 19 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392
- Updated: 2026-09-28
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2025
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 19

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2025 Memo (English)](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/0e265899-dc44-4809-aabf-8f374f1af392)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2025. Memorandum, 19 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

NATIONAL
                             SENIOR CERTIFICATE

                                     GRADE 12

                     CIVIL TECHNOLOGY: CONSTRUCTION

                                  NOVEMBER 2025

                              MARKING GUIDELINES

MARKS: 200

                     These marking guidelines consist of 19 pages.

Copyright reserved                                                   Please turn over

### Page 2

Civil Technology: Construction               2                           DBE/November 2025
                                   NSC – Marking guidelines

INSTRUCTIONS FOR MARKERS

1.    Markers should:
      • Familiarise themselves with the question and answer before evaluating the
          responses of candidates.
      • Always interpret the responses of the candidates within the context of the
          question.
      • Consider any relevant and acceptable answer during pre-marking but
          should strictly adhere to the answers after finalisation of the marking
          guideline.
      • There are TWO approaches to answering describe and explain type of
          questions.
             1. If a candidate is required to explain e.g., a process in a prescribed
                 number of steps (e.g. 3 steps), only the first required number of
                 responses should be considered.
             2. However, if for example candidate is required to explain or describe a
                 process, we need to consider that candidates may write a long
                 description, not necessarily well organised. In this case the marker
                 needs to evaluate the complete statement to judge if the candidate
                 explained the required outcome satisfactorily and allocate marks on
                 merit.
       • Answering short questions.
              1. Bullet Form Answers: When a candidate provides their answers in
                  bulleted points, each bullet should be treated as a single answer.
                  Award 1 mark for each complete bulleted response.
              2. Paragraph Form Answers: When a candidate provides answers in
                  paragraph form, the response should be evaluated based on the
                  accuracy and completeness of each fact presented. Award marks for
                  each distinct fact or point made, ensuring that each fact is correctly
                  articulated.
      • Mark what the candidate wrote and do not interpret or predict responses.
      • Indicate the tick or cross right at the position where the mark needs to be
          awarded or where the candidate made the error.
      • Accept the letter corresponding with the correct answer as well as the
          answer written in full in multiple-choice questions or similar questions.
      • Accept incorrect spelling in answers unless the spelling changes the
          meaning of the answer.
      • If a learner writes two or more answers separated by a slash (/) mark only
          the first response, unless the additional answer/s are different names for the
          same item, e.g. Yale lock/Night latch. In this case, the answer for the
          response should be awarded and the slash (/) should NOT be considered as
          an additional answer.
2.    For calculations:
      • A mark is only awarded if the correct unit is written next to the answer. If the
          question states that the answer must be in a specific unit, a mark will be
          awarded if the answer is indicated without the unit.
      • Marks will only be allocated for the correct values if the candidates add
          instead of multiply. NO marks will be awarded for the calculations and the
          answer.

Copyright reserved

### Page 3

Civil Technology: Construction                3                           DBE/November 2025
                                    NSC – Marking guidelines

      •    Where an incorrect answer is correctly carried over, the marker must
           recalculate the values, using the incorrect answer from the first calculation.
           If correctly used, the candidate should receive the full marks for subsequent
           calculations.
      •    Alternative methods of calculations must be considered, provided that the
           correct answer is obtained.
      •    For the calculation of quantities marks will be awarded for the correct use of
           the dimension paper.
3.    When marking drawings:
      • The member for which the mark should be awarded should be drawn
          correctly in the correct position to receive a mark.
      • A member incorrectly drawn but wrongfully repeated in another position will
          be awarded the mark for the repeated incorrect member provided that the
          marking guideline provides for TWO or more marks for that member
          (positive marking).
      • Marks can only be awarded for a label if the label is correctly indicating the
          correct member. Do not consider labels for members of which the labels
          were provided on the answer sheet.
      • Scale drawings should always be marked using an appropriate mask.
      • If the incorrect/wrong drawing was drawn, the candidate can be awarded for
          only what was provided for on the marking guideline.
      • If a line diagram or an orthographic view instead of a pictorial drawing
          (isometric/oblique/perspective) is drawn, the first assessment criteria for
          each member will be marked wrong, but marks will be awarded for the
          subsequent members if TWO or more marks are awarded for the same
          member.
      • If candidates draw/give more information than what is required, mark strictly
          according to the assessment criteria. However, if the additional information
          alters or contradicts the correct response, the answer should be marked
          incorrect.
4.    Incorrect numbering of questions:
      • If a candidate numbered incorrectly, but the answer is in the correct position
          according to the sequence of the questions in the question paper, circle the
          incorrect numbering and mark the response.
      • If questions were answered randomly not following the same sequence as
          in the question paper and the learner numbered incorrectly, the response
          should NOT be marked.
5.    Duplication of responses and questions answered in the correct place:
      • If a question is answered twice, mark the first response.
      • If a question should be answered on an answer sheet and the candidate
          answered it on both the answer sheet and in the answer book, mark the
          response on the answer sheet and cancel the response in the answer book.
      •   If the question was answered in the answer book instead of on the answer
          sheet, mark the response in the answer book according to the assessment
          criteria on the marking guideline.

Copyright reserved                                                            Please turn over

### Page 4

Civil Technology: Construction                  4                          DBE/November 2025
                                      NSC – Marking guidelines

QUESTION 1:          OHSA, MATERIALS,          TOOLS,      EQUIPMENT      AND     JOINING
                     (GENERIC)

1.1       1.1.1        38 mm ✓                                                                     (1)

          1.1.2        150 mm ✓                                                                    (1)

          1.1.3        320 kg per m² ✓                                                             (1)

          1.1.4        two ✓                                                                       (1)

          1.1.5        two ✓                                                                       (1)

          1.1.6        overhead ✓                                                                  (1)

          1.1.7        two thirds ✓                                                                (1)

          1.1.8        unauthorised persons ✓                                                      (1)

          1.1.9        760 x 560 mm ✓                                                              (1)

          1.1.10       health and safety ✓                                                         (1)

1.2       C✓                                                                                       (1)

1.3       Bolts are purchased according to:
          • Length of the shank ✓
          • Diameter ✓
          • Type of thread
          • Head size
          • Type of head
          • Strength
          • Material
          ANY TWO OF THE ABOVE                                                                     (2)

1.4       1.4.1        Process of powder coating:
                       Applying a plastic finish/coating in powder form, ✓ by using a spray
                       gun. ✓                                                                      (2)

Copyright reserved                                                              Please turn over

### Page 5

Civil Technology: Construction                  5                           DBE/November 2025
                                      NSC – Marking guidelines

          1.4.2        Advantages of applying powder coating to a metal:
                       •   Strengthen the metal ✓
                       •   Provides stability
                       •   Environmentally friendly
                       •   Thicker coat can be applied
                       •   More durable
                       •   Available in a variety of colours, textures and gloss levels
                       •   Withstand higher levels of heat
                       •   Thermoset powder coatings have a beautiful appearance
                       •   It is cheaper than other methods
                       •   Resists corrosion
                       ANY ONE OF THE ABOVE                                                         (1)

1.5       Do not use the following to clean a multi detector:
          • Cleaning agents ✓
          • Solvents/Chemicals
          • Moist cloth
          ANY ONE OF THE ABOVE                                                                      (1)

1.6       Two materials that can be detected:
          • Steel ✓
          • Copper ✓
          • Brass
          • Wiring/AC
          ANY TWO OF THE ABOVE                                                                      (2)

1.7       Plumb bob ✓                                                                               (1)
                                                                                                    [20]

Copyright reserved                                                               Please turn over

### Page 6

Civil Technology: Construction                6                             DBE/November 2025
                                    NSC – Marking guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

NO.                    QUESTIONS                               ANSWERS                      MARKS
        What elevation is indicated by
 1.                                               West elevation/West/W ✓                          1
        FIGURE A?
        Deduce, from the notes column, what
 2.                                               Hipped roof ✓                                    1
        type of roof is indicated by number 1.
        What energy-generating components
 3.     are installed on the roof, as indicated   Solar Panels ✓                                   1
        by number 2?

 4.     Identify number 3.                        Fascia board ✓                                   1

 5.     Identify number 4.                        Window sill/Sill ✓                               1

        What material is recommended to be
 6.                                               Stainless steel ✓                                1
        used to manufacture number 5?

 7.     Identify number 6.                        NGL/Natural ground level ✓                       1

        Write down the abbreviation for
 8.                                               FFL ✓                                            1
        number 7.

        Identify the end shape used to
 9.                                               Round/Square/Rectangular ✓                       1
        manufacture number 8.

        How many built-in cupboards are
 10.                                              One/1 ✓                                          1
        there in the building?

                                                  Socket outlet/Switch socket
        What electrical installation has been     outlet/Lights/Electrical wiring/
 11.                                                                                               1
        omitted in the building?                  Switch/Distribution board/
                                                  Inverter ✓

        What type of material can be used to      Timber/Fibre cement/
 12.    manufacture the fascia board in           uPVC/Aluminium/Stainless                         1
        FIGURE A?                                 steel/Galvanised sheets ✓

        How should the opening direction of
 13.    the sliding door be indicated on the      By means of an arrow ✓                           1
        floor plan?
                                                  Ceramic/PVC/Timber/Steel/
                                                  Stainless steel/Porcelain/Clay/
        Name ONE material that can be used
 14.                                              Plastic/Fibre glass/Glass/Concrete/              1
        to manufacture number 9.
                                                  Stone/Marble/Terrazzo/
                                                  Cast iron/Pressed steel/Brass ✓

Copyright reserved                                                              Please turn over

### Page 7

Civil Technology: Construction                  7                             DBE/November 2025
                                      NSC – Marking guidelines

        Deduce, from the notes column, what
 15.                                          Lintels ✓                                              1
        must be installed above every window.

        How many external doors are visible
 16.                                                Two/2 ✓                                          1
        on the southern side of the building?

        How many water closets are installed
 17.                                                Four/4 ✓                                         1
        in the building?

 18.    Identify number 10.                         One-way switch double pole ✓                     1

        Deduce the thickness of the internal
 19.                                                110 mm/110 ✓                                     1
        walls from FIGURE B.
        State the reference code of the
 20.                                                QP 5 - 2025 ✓                                    1
        proposed building.
        How many 1 200 x 600 mm windows
 21.                                                Five/5 ✓                                         1
        are there in the building?

        Deduce, from the notes column, the
 22.    dimensions of the aluminium side            600 ✓ x 2 000 mm ✓                               2
        panel with windows.

                                                                  ✓
 23.    Draw the symbol for a grease trap.                            ✓                              3
                                                                 ✓✓   ✓

        Draw the symbol for undisturbed                               ✓
 24.    earth.                                                                                       3
                                                                      ✓   ✓

        What sanitary fitting is installed in the
 25.                                                Sink unit – double/Double sink ✓                 1
        scullery?
                                                 5✓x4✓
        Calculate the area of the scullery to be = 20 ✓ m²
        covered with floor tiles.
 26.    The sink unit must be installed on top   OR                                                  3
        of the tiles.
        Give your answer in m².                  = 5 000 mm x 4 000 mm
                                                 = 20 m²
                                                 220 ✓ + 5 000 ✓ + 110 ✓ +
                                                 5 000 ✓ + 220 ✓
        Calculate the total length of the wall   = 10 550 ✓ mm
        on the northern side of the building.    = 10,55 ✓m
 27.                                                                                                 7
        Show ALL calculations. The length
        must be indicated in metres.             OR

                                                    0,22 + 5 + 0,11 + 5 + 0,22= 10,55 m
                                                                                TOTAL:            40

Copyright reserved                                                                Please turn over

### Page 8

Civil Technology: Construction                         8                  DBE/November 2025
                                             NSC – Marking guidelines

QUESTION 3:          ROOFS, STAIRCASES AND JOINING (SPECIFIC)

3.1       3.1.1           760 mm ✓                                                               (1)

          3.1.2           1 400 mm ✓                                                             (1)

3.2
                                      2
                                                                   3
                     1
                         76                      1   76

                                 50                           76
                                  1                            1

                              NO.         ASSESSMENT CRITERIA                 MARK
                               1          Dimensions (TWO on each drawing)      4
                               2          Drawing rectangular shape             1
                               3          Drawing square shape                  1
                                                                       TOTAL:   6                (6)

3.3       3.3.1           42 ✓                                                                   (1)

          3.3.2           14 ✓                                                                   (1)

          3.3.3           Three/Four ✓                                                           (1)

          3.3.4           150 ✓                                                                  (1)

3.4        • Rawl bolt ✓
           • Sleeve anchor
           • Bolt
           • Bolt and chemical anchor
           • Coach screw and plug
           ANY ONE OF THE ABOVE                                                                  (1)

Copyright reserved                                                            Please turn over

### Page 9

Civil Technology: Construction                       9                      DBE/November 2025
                                           NSC – Marking guidelines

3.5       3.5.1        A – Ridge plate/Ridge capping ✓
                       B – Purlin ✓
                       C – Roof covering ✓
                       D – Rafter/Roof truss ✓                                                      (4)

          3.5.2        Consequences of not installing a ridge plate:
                       • Water damage/leaks can occur when the roof is not covered. ✓
                       • Wind can easily lift the roof covering without the ridge plate.
                       • Insects, vermin and other objects can enter the roof space.
                       ANY ONE OF THE ABOVE                                                         (1)

                                                                             4
3.6
                                           RIDGE BEAM
                                                                       3                   3

                                               RAFTER                        4

                                                        3   RAFTER PITCH           2

              TIE BEAM
          WALL PLATE
                                               1
                         3
                                 5
           OVERHANG
                  WALL

                                     HATCHING 6
                                                               7   7
                                     APPLICATION OF SCALE:

                                     USE A MASK TO MARK THIS QUESTION

                     NO.     ASSESSMENT CRITERIA                           MARK
                      1      Wall plate                                      1
                      2      Tie beam                                        1
                      3      Rafters + Pitch of rafter                       4
                      4      Ridge beam (correctly drawn and placed)         2
                      5      Overhang                                        1
                      6      Hatching (any ONE part)                         1
                             Application of scale:
                             All correct               =2
                       7                                                    2
                             ONE incorrect             =1
                             TWO or more incorrect     =0
                                                             TOTAL:         12                      (12)
                                                                                                    [30]

Copyright reserved                                                               Please turn over

### Page 10

Civil Technology: Construction                   10                      DBE/November 2025
                                       NSC – Marking guidelines

QUESTION 4:          EXCAVATIONS, FORMWORK,                  TOOLS,   EQUIPMENT     AND
                     MATERIALS (SPECIFIC)

4.1       4.1.1        Lead ✓                                                                   (1)

          4.1.2        Ductile cast iron ✓                                                      (1)

          4.1.3        Medium carbon steel ✓                                                    (1)

          4.1.4        Brass ✓                                                                  (1)

          4.1.5        Galvanised sheet metal ✓                                                 (1)

4.2       4.2.1        C✓                                                                       (1)

          4.2.2        F✓                                                                       (1)

          4.2.3        A✓                                                                       (1)

          4.2.4        I✓                                                                       (1)

          4.2.5        E✓                                                                       (1)

          4.2.6        B✓                                                                       (1)
4.3       • Depth ✓
          • Width/Length/Breadth/Dimensions/Size ✓
          • Services (plumbing and electrical)
          ANY TWO OF THE ABOVE                                                                  (2)

4.4       By machine/excavator/T.L.B/mechanically ✓                                             (1)

4.5       Shuttering for firm soil ✓                                                            (1)

4.6       Cutting ✓ and filling ✓                                                               (2)

4.7       4.7.1        Machines that can be used:
                       •  Plate compacter ✓
                       •  Tamping rammer
                       ANY ONE OF THE ABOVE                                                     (1)
          4.7.2        Care after using the machines:
                       • Clean after use ✓
                       • Service the plate compactor ✓
                       • Remove loose dirt and soil
                       ANY TWO OF THE ABOVE                                                     (2)

          4.7.3        •    Ear muffs/Ear plugs ✓
                       •    Loss of hearing ✓                                                   (2)

Copyright reserved                                                           Please turn over

### Page 11

Civil Technology: Construction                   11                         DBE/November 2025
                                       NSC – Marking guidelines

4.8       4.8.1        The test is performed:
                        • To test the density of concrete before it is placed by
                           determining the amount of water it contains.✓
                        • To determine the workability. ✓
                        • To determine the consistency of the batches that are mixed.
                        • To determine the slump of the mixture.
                       ANY TWO OF THE ABOVE                                                        (2)

          4.8.2        Outcomes of the slump test:

                          ✓                ✓

                              TRUE SLUMP ✓

                      ✓
                                      ✓

                              SHEAR SLUMP ✓

                          COLLAPSED SLUMP
                       ANY TWO OF THE ABOVE                                                        (6)
4.9

                                      ✓

                                 WEDGE ✓

                                                                   WEDGE
                                                   OR

                              ✓
                                           ✓

                          FOLDING WEDGES

                                                                  FOLDING WEDGES                   (4)

Copyright reserved                                                              Please turn over

### Page 12

Civil Technology: Construction                  12                          DBE/November 2025
                                      NSC – Marking guidelines

4.10
                                                                                  TIE

                                                                                  CONCRETE
                                                                                  CLEAT

                                                                                  SHUTTER BOARD

                                                                                  FIXING PLATE
                                  1

                                                                       BEARER/HEAD TREE

                                                                 2
                                      2
                                                                       BRACE/STRUTS

                                                                       PROP/STRUT

                                                   3

                                          4
                                                                       FOLDING WEDGES
                                  5                                    SOLE PLATE

                           NO.   ASSESSMENT CRITERIA                 MARK
                            1    Bearer/Head tree                      1
                            2    Braces/Struts                         2
                            3    Prop/Strut                            1
                            4    Folding wedges                        1
                            5    Soleplate                             1
                                                  TOTAL:               6                           (6)
                                                                                                   [40]

Copyright reserved                                                              Please turn over

### Page 13

Civil Technology: Construction                    13                          DBE/November 2025
                                        NSC – Marking guidelines

QUESTION 5:          PLASTER AND SCREED, BRICKWORK AND GRAPHICS AS
                     MEANS OF COMMUNICATION (SPECIFIC)

5.1       5.1.1          Plastering ✓                                                                (1)

          5.1.2          Hand hawk ✓
                         Plastering trowel ✓                                                         (2)

          5.1.3          Builders lime/Lime ✓                                                        (1)

5.2       5.2.1          Types of screeds:
                         • Dry screeds ✓
                         • Monolithic screeds ✓
                         • Bonded screeds
                         ANY TWO OF THE ABOVE                                                        (2)

          5.2.2          Testing the absorptiveness of concrete to receive screed:
                         • Pour a cup of water onto the surface the day before laying the
                             screed. ✓
                         • If the water is absorbed within five minutes, the surface suction
                             is good. ✓
                         • The surface should be kept moist/wet for four hours.✓                     (3)

5.3                                                                2

               1
                                                                       2

                     1                                             2

               BRICK FOR ROUGH ARCH                BRICK FOR GAUGED ARCH

                           NO.      ASSESSMENT CRITERIA                MARK
                             1      Brick for rough arch                 2
                             2      Brick for gauged arch                3
                                                       TOTAL:            5                           (5)

Copyright reserved                                                                Please turn over

### Page 14

Civil Technology: Construction                   14                      DBE/November 2025
                                       NSC – Marking guidelines

5.4

                                   3

                                          3

                                              OR
                     4
                                              HATCHING                              HATCHING

                                   3

                                   2
             1            1

          NOTE: PLASTER CAN BE INDICATED ON ANY ONE SIDE OF THE WALL
          DEPENDING ON THE SIDE OF THE HINGE

                         NO.     ASSESSMENT CRITERIA              MARK
                           1     Symbol for plaster                 2
                           2     Hinge                              1
                           3     Steel door frame                   3
                           4     Hatching of wall                   1
                                                    TOTAL:          7
                                                                                                (7)

Copyright reserved                                                           Please turn over

### Page 15

Civil Technology: Construction                   15                      DBE/November 2025
                                       NSC – Marking guidelines

5.5

                                                        2

                                                                            CORRUGATED IRON
                                                                            ROOF SHEETING

                                                                            RAFTER

                                                                           HANGER
                             1
                         1

                                                                           FOOT PURLIN

             3                                    4

FASCIA                           5
BOARD
                                                                           BEARER
              8
                                 6                                         QUARTER ROUND
                                                  7
                                                                           WALL
            CEILING BOARD

                     NO.     ASSESSMENT CRITERIA                        MARK
                      1      Foot purlin (1 = Purlin + 1 = Placement)     2
                      2      Roof covering                                1
                      3      Fascia board                                 1
                      4      Hanger (no hidden detail)                    1
                      5      Bearer                                       1
                      6      Ceiling board                                1
                      7      Quarter round                                1
                      8      Hatching (any ONE part)                      1
                                                TOTAL:                    9                     (9)
                                                                                                [30]

Copyright reserved                                                           Please turn over

### Page 16

Civil Technology: Construction             16               DBE/November 2025
                                 NSC – Marking guidelines

QUESTION 6:          REINFORCEMENT IN CONCRETE, FOUNDATIONS, CONCRETE
                     FLOORS AND QUANTITIES (SPECIFIC)

6.1       6.1.1        B✓                                                          (1)

          6.1.2        C✓                                                          (1)

          6.1.3        B✓                                                          (1)

          6.1.4        D✓                                                          (1)

          6.1.5        C✓                                                          (1)

6.2       Types of pile foundations:
          • Steel tube caisson piles ✓
          • Precast concrete piles ✓
          • Driven in-situ piles
          • Short-bored (auger) piles
          ANY TWO OF THE ABOVE                                                     (2)

6.3       Cantilever beam ✓                                                        (1)

Copyright reserved                                              Please turn over

### Page 17

Civil Technology: Construction                          17                            DBE/November 2025
                                              NSC – Marking guidelines

6.4
                                                                         5
                                          1

                                                                                 STIRRUP

                                      3                                          MINIMUM CONCRETE
                                                                                 COVER

                                                                                 MAIN BAR

                                  4 MAIN BARS CORRECTLY PLACED

                                                                                   MAIN BAR
                                              2

                                                                             5

                                                                                    MINIMUM CONCRETE
                                                                                    COVER

                                  4
                                                                                     STIRRUP

                                  6 MAIN BARS CORRECTLY PLACED

                                 NO.           ASSESSMENT CRITERIA                  MARK
                                  1            Main bars – square (four)              1
                                  2            Main bars - round (six)                1
                                  3            Stirrup – square                       1
                                  4            Stirrup – round                        1
                                  5            Minimum concrete cover                 2
                                                                  TOTAL:              6                        (6)

6.5       A – Reinforcing mesh/Wire/Steel mesh/Welded wire mesh ✓
          B – Hollow-core concrete block ✓
          C – Conduit pipe ✓
          D – Reinforcing in rib/Reinforcing ✓
          E – Precast concrete rib/Rib ✓                                                                       (5)

Copyright reserved                                                                          Please turn over

### Page 18

Civil Technology: Construction                   18                           DBE/November 2025
                                       NSC – Marking guidelines

6.6
                                 ANCHOR BAR                                                SHEAR BAR

                                                       2              4
                                                                                       2
                                          5
                                                                  3       3
                                                                                              CONCRETE
                                                                                      1       BEAM
                                                       1

                           STIRRUP

                                         MAIN BAR

                                                                                              WALL

          NO.     ASSESSMENT CRITERIA                MARK
           1      Main bar                             2
           2      Anchor bar                           2
           3      Shear bar                            2
           4      Stirrups (close spacing)             1
           5      Stirrups (further spacing)           1
                                       TOTAL:          8                                               (8)

Copyright reserved                                                                Please turn over

### Page 19

Civil Technology: Construction                     19                        DBE/November 2025
                                         NSC – Marking guidelines

6.7         A         B              C                               D
6.7.1                                         Length of wall plate needed:
          2/ ✓ 12,06 ✓                        12 500 mm – 2/220 ✓ = 12 060 mm
                                 24,12 m ✓    24,12 m wall plate needed                          (4)

            A         B              C                              D
6.7.2                                         Number of trusses needed:
                                                        Internal dimension
                                              Distance between centres + 1 roof truss
                                              =    12,06 ✓
                                                  1,2 + 1 ✓
                                              10,05 + 1
                                              11 + 1 ✓
                                              12 roof trusses needed ✓                           (4)

6.7.3       A         B              C                              D
                                              Number of purlins needed:
                                              Number             Length of rafter
                                                         =
                                              purlins       Distance between purlins
                                                   4,92 ✓
                                              =
                                                   1,13 ✓
                                              = 4,35 = 5
                                              = 5 x 2 ✓ = 10 purlins ✓                           (4)
                                                                   OR
                                              Number of purlins needed:
                                              Number              Length of rafter
                                                         =                           +1
                                              purlins       Distance between purlins
                                                   4,92
                                              =          +1
                                                   1,13
                                              = 4,35 + 1
                                              = 5+1
                                              = 6 x 2 = 12 purlins

                                              Correct use of dimension paper ✓                   (1)
                                                                                                 [40]

                                                                                   TOTAL:        200

Copyright reserved

## Related documents

- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — Civil Technology · QP · 2025 · Afr
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Civil Technology · Memo · 2023 · Afr
- [Civil Technology Nov 2020 (Construction) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-construction-memo-eng/f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca) — Civil Technology · Memo · 2020 · Eng
- [Civil Technology Nov 2020 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-memo-afr/8cffc125-69c0-44e9-b0eb-88ae7e930363) — Civil Technology · Memo · 2020 · Afr
- [Civil Technology Nov 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-afr/13c03cd5-cfa4-42cf-9a7c-5d7b0e1069f0) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology Nov 2019 (Civil Services) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-eng/53bd979c-a0bb-411f-960b-1f8755cd4874) — Civil Technology · Memo · 2019 · Eng

## More from Grade 12 Civil Technology

- [CVLT Woodworking Eng watermark](https://www.hlayiso.com/library/cvlt-woodworking-eng-watermark/8e178c6e-fa7b-40f4-8a2c-936e0bee3b38) — QP · 2025 · Eng
- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.