# Civil Technology Grade 12 NSC November 2025 Memo (English)

> Grade 12 Civil Technology memorandum from the NSC November Exam 2025 (English), 18 pages. Read online or download the free PDF.

- Page: https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/c2434c92-47fb-4b60-9c19-2984821a9356
- Updated: 2026-09-28
- Subject: Civil Technology
- Grade: Grade 12
- Document type: Memorandum
- Year: 2025
- Exam period: NSC November Exam
- Curriculum: CAPS
- Pages: 18

Breadcrumbs: [Home](https://www.hlayiso.com/) › [Library](https://www.hlayiso.com/library) › [Grade 12](https://www.hlayiso.com/library/grade-12) › [Civil Technology](https://www.hlayiso.com/library/grade-12/civil-technology) › [Civil Technology Grade 12 NSC November 2025 Memo (English)](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-memorandum/c2434c92-47fb-4b60-9c19-2984821a9356)

## About this document

Civil Technology · Grade 12 · NSC November Exam · 2025. Memorandum, 18 pages. Read online or download the PDF.

Read it free online on the page above; download the PDF from there.

## Document text

Text extracted from the PDF. Layout, diagrams and tables may not survive extraction.

### Page 1

NATIONAL
                             SENIOR CERTIFICATE

                                     GRADE 12

                      CIVIL TECHNOLOGY: CIVIL SERVICES

                                  NOVEMBER 2025

                              MARKING GUIDELINES

MARKS: 200

                     These marking guidelines consist of 18 pages.

Copyright reserved                                                   Please turn over

### Page 2

Civil Technology: Civil Services              2                         DBE/November 2025
                                   NSC – Marking Guidelines

INSTRUCTIONS FOR MARKERS

1.    Markers should:
      • Familiarise themselves with the question and answer before evaluating the
         responses of candidates.
      • Always interpret the responses of the candidates within the context of the
         question.
      • Consider any relevant and acceptable answer during pre-marking but
         should strictly adhere to the answers after finalisation of the marking
         guideline.
      • There are TWO approaches to answering describe and explain type of
         questions.
           1. If a candidate is required to explain e.g., a process in a prescribed
                number of steps (e.g. 3 steps), only the first required number of
                responses should be considered.
           2. However, if for example candidate is required to explain or describe a
                process, we need to consider that candidates may write a long
                description, not necessarily well organised. In this case the marker
                needs to evaluate the complete statement to judge if the candidate
                explained the required outcome satisfactorily and allocate marks on
                merit.
            Answering short questions.
            1. Bullet Form Answers: When a candidate provides their answers in
                 bulleted points, each bullet should be treated as a single answer.
                 Award 1 mark for each complete bulleted response.
            2. Paragraph Form Answers: When a candidate provides answers in
                 paragraph form, the response should be evaluated based on the
                 accuracy and completeness of each fact presented. Award marks for
                 each distinct fact or point made, ensuring that each fact is correctly
                 articulated.
      • Mark what the candidate wrote and do not interpret or predict responses.
      • Indicate the tick or cross right at the position where the mark needs to be
         awarded or where the candidate made the error.
      • Accept the letter corresponding with the correct answer as well as the
         answer written in full in multiple-choice questions or similar questions.
      • Accept incorrect spelling in answers unless the spelling changes the
         meaning of the answer.
      • If a learner writes two or more answers separated by a slash (/) mark only
         the first response, unless the additional answer/s are different names for the
         same item, e.g. Yale lock/Night latch. In this case, the answer for the
         response should be awarded and the slash (/) should NOT be considered as
         an additional answer.

Copyright reserved                                                          Please turn over

### Page 3

Civil Technology: Civil Services              3                          DBE/November 2025
                                   NSC – Marking Guidelines

2.    For calculations:
      • A mark is only awarded if the correct unit is written next to the answer. If the
          question states that the answer must be in a specific unit, a mark will be
          awarded even if the answer is indicated without the unit.
      • Marks will only be allocated for the correct values if the candidates add
          instead of multiply. NO marks will be awarded for the calculations and the
          answer.
      • Where an incorrect answer is correctly carried over, the marker must
          recalculate the values, using the incorrect answer from the first calculation.
          If correctly used, the candidate should receive the full marks for subsequent
          calculations.
      • Alternative methods of calculations must be considered, provided that the
          correct answer is obtained.
      •   For the calculation of quantities marks will be awarded for the correct use of
          the dimension paper.
3.    When marking drawings:
      • The member for which the mark should be awarded should be drawn
          correctly in the correct position to receive a mark.
      • A member incorrectly drawn but wrongfully repeated in another position will
          be awarded the mark for the repeated incorrect member provided that the
          marking guideline provides for TWO or more marks for that member
          (positive marking).
      • Marks can only be awarded for a label if the label is correctly indicating the
          correct member. Do not consider labels for members of which the labels
          were provided on the answer sheet.
      • Scale drawings should always be marked using an appropriate mask.
      • If the incorrect/wrong drawing was drawn, the candidate can be awarded for
          only what was provided for on the marking guideline.
      • If a line diagram or an orthographic view instead of a pictorial drawing
          (isometric/oblique/perspective) is drawn, the first assessment criteria for
          each member will be marked wrong, but marks will be awarded for the
          subsequent members if TWO or more marks are awarded for the same
          member.
      • If candidates draw/give more information than what is required, mark strictly
          according to the assessment criteria. However, if the additional information
          alters or contradicts the correct response, the answer should be marked as
          incorrect.
4.    Incorrect numbering of questions:
      • If a candidate numbered incorrectly, but the answer is in the correct position
          according to the sequence of the questions in the question paper, circle the
          incorrect numbering and mark the response.
      • If questions were answered randomly not following the same sequence as
          in the question paper and the learner numbered incorrectly, the response
          should NOT be marked.
5.    Duplication of responses and questions answered in the correct place:
      • If a question is answered twice, mark the first response.
      • If a question should be answered on an answer sheet and the candidate
          answered it on both the answer sheet and in the answer book, mark the
          response on the answer sheet and cancel the response in the answer book.

Copyright reserved                                                           Please turn over

### Page 4

Civil Technology: Civil Services                  4                         DBE/November 2025
                                       NSC – Marking Guidelines

      •    If the question was answered in the answer book instead of on the answer
           sheet, mark the response in the answer book according to the assessment
           criteria on the marking guideline.

QUESTION 1:          OHSA, MATERIALS,            TOOLS,      EQUIPMENT     AND     JOINING
                     (GENERIC)

1.1        1.1.1        38 mm ✓                                                                     (1)

           1.1.2        150 mm ✓                                                                    (1)

           1.1.3        320 kg per m² ✓                                                             (1)

           1.1.4        two ✓                                                                       (1)

           1.1.5        two ✓                                                                       (1)

           1.1.6        overhead ✓                                                                  (1)

           1.1.7        two thirds ✓                                                                (1)

           1.1.8        unauthorised persons ✓                                                      (1)

           1.1.9        760 x 560 mm ✓                                                              (1)

           1.1.10       health and safety ✓                                                         (1)

1.2        C✓                                                                                       (1)

1.3        Bolts are purchased according to:
           • Length of the shank ✓
           • Diameter ✓
           • Type of thread
           • Head size
           • Type of head
           • Strength
           • Material
           ANY TWO OF THE ABOVE                                                                     (2)

1.4        1.4.1        Process of powder coating:
                        Applying a plastic finish/coating in powder form, ✓ by using a spray
                        gun ✓                                                                       (2)

Copyright reserved                                                               Please turn over

### Page 5

Civil Technology: Civil Services                 5                           DBE/November 2025
                                      NSC – Marking Guidelines

           1.4.2        Advantages of applying powder coating to a metal:
                        •   Strengthen the metal ✓
                        •   Provides stability
                        •   Environmentally friendly
                        •   Thicker coat can be applied
                        •   More durable
                        •   Available in a variety of colours, textures and gloss levels
                        •   Withstand higher levels of heat
                        •   Thermoset powder coatings have a beautiful appearance
                        •   It is cheaper than other methods
                        •   Resists corrosion
                        ANY ONE OF THE ABOVE                                                        (1)

1.5        Do not use the following to clean a multi detector:
           • Cleaning agents ✓
           • Solvents/Chemicals
           • Moist cloth
           ANY ONE OF THE ABOVE                                                                     (1)

1.6        Two materials that can be detected:
           • Steel ✓
           • Copper ✓
           • Brass
           • Wiring/AC
           ANY TWO OF THE ABOVE                                                                     (2)

1.7        Plumb bob ✓                                                                              (1)
                                                                                                    [20]

Copyright reserved                                                               Please turn over

### Page 6

Civil Technology: Civil Services               6                             DBE/November 2025
                                    NSC – Marking Guidelines

QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)

NO.                     QUESTIONS                               ANSWERS                      MARKS
        What elevation is indicated by
 1.                                                West elevation/West/W ✓                          1
        FIGURE A?
        Deduce, from the notes column, what
 2.                                                Hipped roof ✓                                    1
        type of roof is indicated by number 1.
        What energy-generating components
 3.     are installed on the roof, as indicated    Solar Panels ✓                                   1
        by number 2?

 4.     Identify number 3.                         Fascia board ✓                                   1

 5.     Identify number 4.                         Window sill/Sill ✓                               1

        What material is recommended to be
 6.                                                Stainless steel ✓                                1
        used to manufacture number 5?

 7.     Identify number 6.                         NGL/Natural ground level ✓                       1

        Write down the abbreviation for
 8.                                                FFL ✓                                            1
        number 7.

        Identify the end shape used to
 9.                                                Round/Square/Rectangular ✓                       1
        manufacture number 8.

        How many built-in cupboards are
 10.                                               One/1 ✓                                          1
        there in the building?

                                                   Socket outlet/Switch socket
        What electrical installation has been      outlet/Lights/Electrical wiring/
 11.                                                                                                1
        omitted in the building?                   Switch/Distribution board/
                                                   Inverter ✓

        What type of material can be used to       Timber/Fibre cement/
 12.    manufacture the fascia board in            uPVC/Aluminium/Stainless                         1
        FIGURE A?                                  steel/Galvanised sheets ✓

        How should the opening direction of
 13.    the sliding door be indicated on the       By means of an arrow ✓                           1
        floor plan?
                                                   Ceramic/PVC/Timber/Steel/
                                                   Stainless steel/Porcelain/Clay/
        Name ONE material that can be used
 14.                                               Plastic/Fibre glass/Glass/Concrete/              1
        to manufacture number 9.
                                                   Stone/Marble/Terrazzo/
                                                   Cast iron/Pressed steel/Brass ✓

Copyright reserved                                                               Please turn over

### Page 7

Civil Technology: Civil Services                7                            DBE/November 2025
                                     NSC – Marking Guidelines

        Deduce, from the notes column, what
 15.                                          Lintels ✓                                            1
        must be installed above every window.

        How many external doors are visible
 16.                                                Two/2 ✓                                        1
        on the southern side of the building?

        How many water closets are installed
 17.                                                Four/4 ✓                                       1
        in the building?

 18.    Identify number 10.                         One-way switch double pole ✓                   1

        Deduce the thickness of the internal
 19.                                                110 mm/110 ✓                                   1
        walls from FIGURE B.
        State the reference code of the
 20.                                                QP 5 - 2025 ✓                                  1
        proposed building.
        How many 1 200 x 600 mm windows
 21.                                                Five/5 ✓                                       1
        are there in the building?

        Deduce, from the notes column, the
 22.    dimensions of the aluminium side            600 ✓ x 2 000 mm ✓                             2
        panel with windows.

                                                                 ✓
 23.    Draw the symbol for a grease trap.                           ✓                             3
                                                                ✓✓   ✓

        Draw the symbol for undisturbed                              ✓
 24.    earth.                                                                                     3
                                                                     ✓   ✓

        What sanitary fitting is installed in the
 25.                                                Sink unit – double/Double sink ✓               1
        scullery?
                                                 5✓x4✓
        Calculate the area of the scullery to be = 20 ✓ m²
        covered with floor tiles.
 26.    The sink unit must be installed on top   OR                                                3
        of the tiles.
        Give your answer in m².                  = 5 000 mm x 4 000 mm
                                                 = 20 m²
                                                 220 ✓ + 5 000 ✓ + 110 ✓ +
                                                 5 000 ✓ + 220 ✓
        Calculate the total length of the wall   = 10 550 ✓ mm
        on the northern side of the building.    = 10,55 ✓m
 27.                                                                                               7
        Show ALL calculations. The length
        must be indicated in metres.             OR

                                                    0,22 + 5 + 0,11 + 5 + 0,22= 10,55 m
                                                                                TOTAL:             40

Copyright reserved                                                              Please turn over

### Page 8

Civil Technology: Civil Services                 8                        DBE/November 2025
                                      NSC – Marking Guidelines

QUESTION 3: CONSTRUCTION ASSOCIATED WITH CIVIL SERVICES, OHSA
            AND QUANTITIES (SPECIFIC)

3.1        3.1.1        Faults in the manhole installation:
                        • The walls are not on the foundation ✓
                        • The benching is not at a slope ✓
                        • The channel is too shallow ✓
                        • The channel needs to be half-round
                        • No manhole cover/Cover lid omitted
                        • No manhole cover frame
                        ANY THREE OF THE ABOVE                                                   (3)

           3.1.2        Medical/First aid ✓                                                      (1)

           3.1.3        Breathing apparatus/Respirator/Gas mask ✓                                (1)

           3.1.4        A dust mask that covers the mouth and nose does not filter the air
                        to protect a person from harmful gasses ✓/It will not provide
                        sufficient protection where harmful gasses are present.
                        ANY ONE OF THE ABOVE                                                     (1)

           3.1.5        Stretcher bond/English bond ✓                                            (1)

           3.1.6        Concrete ring manhole/Plastic/Fibre glass ✓                              (1)

Copyright reserved                                                            Please turn over

### Page 9

Civil Technology: Civil Services                        9                        DBE/November 2025
                                             NSC – Marking Guidelines

3.2
               POLING BOARD          4                         POLING BOARD

                             3
              1

                  2                      2
                             3
                                                     OR

                      STRUT/BRACE             4                    STRUT/BRACE

                                                    OR

                          NO.            ASSESSMENT CRITERIA     MARK
                           1       Excavation/Trench               1
                           2       Poling boards                   2
                           3       Struts/Braces                   2
                           5       Any TWO labels                  2
                                                          TOTAL:   7                                   (7)

Copyright reserved                                                                  Please turn over

### Page 10

Civil Technology: Civil Services               10                         DBE/November 2025
                                     NSC – Marking Guidelines

3.3        3.3.1        Volume of a cubic water storage tank:
                        Volume = l x b x h
                        Volume = s3
                        = 2,65 ✓ m x 2,65 ✓ m x 2,65 ✓ m
                        = 18,61 ✓ m3

                           OR

                        2 650 x 2 650 x 2 650
                        = 18 609 625 000
                        = 18,61 m3                                                              (4)

           3.3.2        Volume of water in tank = 18,61 ✓ x 1 000 ✓
                                                = 18 610 ℓ ✓                                    (3)

3.4
                                                                      1
      A                                                    1

                                                3
                                                                      2

                                                                      2

                                                           3
                                                                                      2
                                                                      1

                              NO.         ASSESSMENT CRITERIA                MARK
                               1  Horizontal bricks                            3
                               2  Vertical bricks                              3
                               3  Projection lines                             2
                                                             TOTAL:            8                (8)
                                                                                                [30]

Copyright reserved                                                           Please turn over

### Page 11

Civil Technology: Civil Services                  11                         DBE/November 2025
                                        NSC – Marking Guidelines

QUESTION 4: COLD AND HOT-WATER SUPPLY, TOOLS, EQUIPMENT AND
            MATERIALS (SPECIFIC)

4.1        4.1.1     E✓

           4.1.2     B✓

           4.1.3     D✓

           4.1.4     C✓

           4.1.5     G✓

           4.1.6     I✓

           4.1.7     K✓

           4.1.8     H✓                                                                             (8)

4.2        4.2.1        A – Pressure-reducing valve/Pressure control valve ✓
                        B – Vacuum breaker ✓
                        C – TP safety valve/Outlet/Pipe ✓
                        D – Drain cock ✓                                                            (4)

           4.2.2        When hot water heats up it rise to the top of the cylinder. ✓               (1)

           4.2.3        300 mm ✓                                                                    (1)

           4.2.4        If a leakage occurs water may damage the ceiling and anything
                        below the ceiling. ✓                                                        (1)

           4.2.5        Ø 50 mm ✓                                                                   (1)

           4.2.6        A – Reduces and controls the incoming water pressure to the
                            geyser. ✓
                        D – Is used to drain the geyser when repairs need to be done or
                            when the geyser needs to be replaced. ✓                                 (2)

                                   ✓
           4.2.7                            ✓
                                   WH
                                                                                                    (2)

4.3          Uses of water-pressure testing pump:
             • To test the water pressure in pipes ✓                                                (1)

             Centrifugal pump:
             • To pump water from one place to another ✓
             • To increase the water pressure
             ANY ONE OF THE ABOVE                                                                   (1)

Copyright reserved                                                               Please turn over

### Page 12

Civil Technology: Civil Services                 12                         DBE/November 2025
                                       NSC – Marking Guidelines

4.4        4.4.1                   ✓          ✓
                                                                                                   (2)

           4.4.2                   ✓
                                             ✓
                                                                                                   (2)

           4.4.3
                               H        ✓
                               ✓
                               C                                                                   (2)

4.5        4.5.1        If water is not hot enough it may be:
                         • that the thermostat is set too low ✓
                         • that the thermostat and element is malfunctioning
                         • that there is an insufficient electricity supply
                         ANY ONE OF THE ABOVE                                                      (1)

           4.5.2        Preventing the shortage of hot water:
                        • Set thermostat to 65°✓/The required temperature
                        • Ensure that the thermostat and element is in good working
                            Condition ✓
                        • Provide additional insulation to geyser and pipes
                        • Ensure that the electricity supply to the geyser is switched
                          on for a sufficient period of time
                        ANY TWO OF THE ABOVE                                                       (2)

4.6        4.6.1        Waste bend plain 90° ✓                                                     (1)

           4.6.2        The function of the fitting is:
                        • To connect two pipes of the same diameter at an angle of 90°✓
                        • To connect wastewater pipes at an angle
                        • To change the direction of wastewater
                        ANY ONE OF THE ABOVE                                                       (1)

           4.6.3        The ends of the fitting are larger:
                        • To ensure that the pipe fits in the fitting ✓
                        • For joining purposes
                        ANY ONE OF THE ABOVE                                                       (1)

           4.6.4        Ø 40/50 mm ✓                                                               (1)

4.7        The electrolytic reaction can be prevented:
           • By using the same type of metal throughout the whole system ✓
           • By using a non-metal coupling when copper pipe and galvanized pipes are
             connected ✓                                                                           (2)

Copyright reserved                                                              Please turn over

### Page 13

Civil Technology: Civil Services                 13                            DBE/November 2025
                                       NSC – Marking Guidelines

           4.8.1        Water saving valves in terms of use:
                        A – This tap can be opened halfway to save water ✓
                            OR
                            A strainer in the outlet of this tap can mix air with the water to
                            reduce water usage                                                         (1)

                        B – This tap allows water to flow as long as the button is pressed ✓
                            OR
                            Water flows for a pre-set period when the button is pressed
                            and saves water                                                            (1)

           4.8.2        Electronic tap with sensor/Sensor tap/Electronic tap ✓                         (1)
                                                                                                       [40]

Copyright reserved                                                                  Please turn over

### Page 14

Civil Technology: Civil Services               14                      DBE/November 2025
                                     NSC – Marking Guidelines

QUESTION 5:          GRAPHICS AS MEANS OF COMMUNICATION, ROOF WORK AND
                     STORM WATER (SPECIFIC)

5.1        5.1.1        D✓                                                                   (1)

           5.1.2        A✓                                                                   (1)

           5.1.3        D✓                                                                   (1)

           5.1.4        D✓                                                                   (1)

           5.1.5        D✓                                                                   (1)

5.2        5.2.1        A – Gutter corner ✓
                        B – Union clip ✓                                                     (2)

           5.2.2        A – At a 90º corner where two gutters meet ✓
                        B – To join two gutters along its length ✓                           (2)

5.3       Consequences of poorly designed storm water systems:
          • Might lead to learners losing their lives ✓
          • Structural damage to the building ✓
          • Moisture penetrating the walls
          • Structural integrity can be compromised
          • Moisture on inside of wall
          ANY TWO OF THE ABOVE                                                               (2)

Copyright reserved                                                        Please turn over

### Page 15

Civil Technology: Civil Services                              15                                     DBE/November 2025
                                                       NSC – Marking Guidelines

5.4

                           1                                                                     6

                                                                   4

                                                           4

                   2                                   4

                                       3           4

                                               4

                                           4

                                                                                            5
                                       6                               5           5    5
                                                               5             5
                                   B

                       A

                               2
                                                                       3

                                                                             USE A MASK TO MARK THIS QUESTION

                                                                       NO.     ASSESSMENT CRITERIA              MARK
                                                                        1    Division of circle into 12 parts     1
                                                                        2    Projection lines from circle         2
                                                                        3    Projection lines from shoe           2
                                                                        4    Development of base of shoe          6
                                                                        5    Development of top of shoe           6
                                                                        6    3 mm seams                           2
                                                                                                      TOTAL:     19

                                                                                                                     (19)
                                                                                                                     [30]

Copyright reserved                                                                                       Please turn over

### Page 16

Civil Technology: Civil Services               16                       DBE/November 2025
                                        NSC – Marking Guidelines

QUESTION 6: SEWERAGE, SANITARY FITTINGS AND JOINING (SPECIFIC)

6.1        6.1.1        sludge ✓                                                                  (1)

           6.1.2        compost ✓                                                                 (1)

           6.1.3        Bio-reactor ✓                                                             (1)

           6.1.4        biomass ✓                                                                 (1)

           6.1.5        chlorine ✓                                                                (1)

6.2        6.2.1        90º elbow ✓                                                               (1)

           6.2.2        The rubber washer will prevent leaking/Seal the outlet ✓                  (1)

           6.2.3        PVC bend with inspection eye/PVC access bend ✓                            (1)

           6.2.4       • PVC weld ✓
                       • Solvent weld
                       • PVC glue/adhesive
                       ANY ONE OF THE ABOVE                                                       (1)

           6.2.5        Prevents odours/sewer gas ✓from entering the dwelling. ✓                  (2)

           6.2.6        Gully ✓                                                                   (1)

6.3        6.3.1        Manhole/Rodding eye ✓                                                     (1)

           6.3.2        One/1 ✓                                                                   (1)

6.4        Materials that can be used for drainpipes:
           • uPVC/Unplasticised Polyvinyl chloride ✓
           • PVC/Polyvinyl chloride ✓
           • Cast iron
           • Fibre cement
           • Clay or earthenware
           • Concrete
           ANY TWO OF THE ABOVE                                                                   (2)

Copyright reserved                                                             Please turn over

### Page 17

Civil Technology: Civil Services               17                         DBE/November 2025
                                     NSC – Marking Guidelines

6.5        Properties of solder:
           • Silver-coloured ✓
           • Heavy ✓
           • The higher the tin content, the higher the melting point
           • The higher the lead content, the lower the melting point
           • Can creep/Capillary action in liquid form
           • Elastic modulus
           • Elongation is possible
           • Ductile
           • High strain rate
           • Malleable
           ANY TWO OF THE ABOVE                                                                  (2)

6.6        If the head is too cold, the solder will not melt sufficiently to obtain proper
           adhesion. ✓
           If the head is too hot, the tin in the solder will burn, leaving it useless. ✓        (2)

6.7        6.7.1        Vacuum tank/Conservancy tank ✓                                           (1)

           6.7.2        A – Vent pipe/Vent valve ✓
                        B – Manhole cover/Lid ✓                                                  (2)

           6.7.3        Draw-off valve ✓                                                         (1)

Copyright reserved                                                            Please turn over

### Page 18

Civil Technology: Civil Services                  18                                  DBE/November 2025
                                           NSC – Marking Guidelines

6.8
                                                   MUNICIPAL CONNECTION

                                                                  MH

                                                                  IE

                                                   6     2

                                           G

                                                        1    IE
                                                                           2

                                                        1    IE

                                  VP                                       5   VP
                              5            2
        3            2                                       4

      RE             IE           7    7   IE
                     1                         1

                                                            RE         3

             NO.             ASSESSMENT CRITERIA                               MARK
              1          Inspection eyes (Any FOUR)                              4
              2          Branch pipes (Any FOUR)                                 4
              3          Rodding eyes                                            2
              4          Junction of the main sewer pipes                        1
              5          Vent pipe (Correctly placed)                            2
              6          Gully                                                   1
              7          Main sewer line                                         2
                                                    TOTAL:                      16                        [40]

                                                                                             TOTAL:       200

Copyright reserved

## Related documents

- [Civil Technology Nov 2025 (Woodworking) Afr](https://www.hlayiso.com/library/grade-12-civil-technology-2025-nsc-november-exam-question-paper/05a95faf-5891-4d88-9e5e-7d13c1d21648) — Civil Technology · QP · 2025 · Afr
- [Civil Technology Nov 2022 (Civil Services) MG Afr](https://www.hlayiso.com/library/civil-technology-nov-2022-civil-services-mg-afr/42b5315c-825c-40e3-b394-85e0253fc0fb) — Civil Technology · Memo · 2023 · Afr
- [Civil Technology Nov 2020 (Construction) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2020-construction-memo-eng/f06cef7f-235e-45f7-9f9b-f8e6a2b0c0ca) — Civil Technology · Memo · 2020 · Eng
- [Civil Technology Nov 2020 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2020-civil-services-memo-afr/8cffc125-69c0-44e9-b0eb-88ae7e930363) — Civil Technology · Memo · 2020 · Afr
- [Civil Technology Nov 2019 (Civil Services) Memo Afr](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-afr/13c03cd5-cfa4-42cf-9a7c-5d7b0e1069f0) — Civil Technology · Memo · 2019 · Afr
- [Civil Technology Nov 2019 (Civil Services) Memo Eng](https://www.hlayiso.com/library/civil-technology-nov-2019-civil-services-memo-eng/53bd979c-a0bb-411f-960b-1f8755cd4874) — Civil Technology · Memo · 2019 · Eng

## More from Grade 12 Civil Technology

- [Civil Technology (Woodwork) (English and Afrikaans) June 2025 Question Paper](https://www.hlayiso.com/library/civil-technology-woodwork-english-and-afrikaans-june-2025-question-paper/c8edd459-5237-48e0-8588-69d7ecd7f8e5) — QP · 2025 · Afr
- [Civil Technology May-June 2025 (Construction) Afr](https://www.hlayiso.com/library/civil-technology-may-june-2025-construction-afr/591d6ffd-20b1-4748-a1ba-b055be0a14c3) — QP · 2025 · Afr
- [CIV TECH GR12 QP SEPT2024 Woodworking Afrikaans](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-woodworking-afrikaans/1c6d5c64-83b5-456b-abcf-2abc23f1f1fe) — QP · 2024 · Afr
- [CIV TECH GR12 QP SEPT2024 Construction English](https://www.hlayiso.com/library/civ-tech-gr12-qp-sept2024-construction-english/12643629-87af-4230-a48a-002beb7f6cd7) — QP · 2024 · Eng
- [Civil Technology Nov 2024 (Woodworking) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-woodworking-afr/eefaae29-fe93-4b75-8223-87bf4f3fc14c) — QP · 2024 · Afr
- [Civil Technology Nov 2024 (Civil Services) Afr](https://www.hlayiso.com/library/civil-technology-nov-2024-civil-services-afr/307147a5-3280-4a11-a82e-cf3e33388eb0) — QP · 2024 · Afr

## Collection

- [Grade 12 past papers](https://www.hlayiso.com/grade-12/past-papers)

---

Hlayiso: free CAPS and IEB past papers, memos, notes and study guides for South African learners. When citing, link the page URL above, not a PDF or /api/ URL.
